HomeMy WebLinkAbout(P2) Port Arthur-Council-11-7-2023Port Arthur Parks & Recreation Master Plan
Burditt Consultants
11-7-2023
Port Arthur Parks & Recreation Master Plan
Planning Process
•Parks & Facility Inventory
•Needs Assessment
•Stakeholder Engagement
•Analysis
•Recommendations
•Plan Development
Port Arthur Parks & Recreation Master Plan
Studies Conducted:
•Park Feature Inventory and Rating
•Inventory of Non-City Recreation Providers
•10-Minute Walk Analysis
•Standards Analysis
•Recreation Behavior of Port Arthur Residents
•Pedestrian and Bicycle Activity Patterns
•Community Events and Programs
•Recreation Trends
Inventory and Analysis
10-Minute Walk Analysis
56% of Residents Live Within a 10-Minute Walk to a
Park
- Trust for Public Land
Port Arthur Parks & Recreation Master Plan
Recreation Behavior Analysis
Port Arthur Parks & Recreation Master Plan
Community Engagement
•Online Survey
•January to April 2023
•91 Responses
•Public Meetings
•Parks Planning Workshop 3-30-2023 Bowers Civic Center
•Master Plan Open House 9-19-2023 Rose Hill Park
•Master Plan Open House 10-18-2023 Eagles Park
•Stakeholder Interviews
•Pleasure Island Director
•Port Arthur ISD Superintendent
•Port Arthur Oil and Gas Industry Representatives
•Chamber of Commerce
Port Arthur Parks & Recreation Master Plan
Overview of Key Recommendations
General Park Improvements:
•Replacement of Poor Condition Amenities
•Pathways within Parks
•Renovate Ball Fields
•Convert Some Tennis Courts to Other Uses
Whole Park Renovations
•S/Sgt Lucian Adams Park
•Rose Hill Park
•Jared N. Logan Music Park
•Cecil Reynolds Park
Port Arthur Parks & Recreation Master Plan
Proposed Implementation Schedule
Timeframe for Implementation
Park Name Classification Acres
Average
Feature
Rating Feature Rating Description
Recommended Improvements 0 to 2 Years 3 to 5 Years 6 to 10 Years
Babe Zaharias Park Mini 1.62 1.67 Poor
Replace Swingset, Repurpose Tennis Court for Fitness
Equipment
X
Barbara Jacket Park Community 12.94 2.32 Mediocre Parking Lot Repair X
Boardwalk Park Special Use 5.70 2.49 Mediocre
Renovate Boardwalk, Landscape, and Lighting After
Levee Construction is Complete X
Bryan Park Neighborhood 2.07 2.46 Mediocre
Add Connecting Pathways to Activity Areas. Replace
Perimeter Sidewalk. Replace Play Structure. Add Fall
Surface Fill to Playgrounds
X
Cecil Reynolds Park Community Park 7.50 1.87 Poor
Complete Park Renovation - Convert to Passive Park
with Playgrounds, Picnic Areas, and Community Garden.
Remove Ball Fields and Tennis Courts
X
County Park Community 8.72 2.17 Mediocre Renovate Ball Fields and Related Amenities X
Domasck Park Mini 0.16 No Amenities No Amenities Not Suitable for Development
Downtown Pavilion Special Use 0.96 2.67 Good-Excellent
Eagles Park Neighborhood 8.28 2.33 Mediocre
New Play Structure, Address Drainage at Playground,
Add Splash Pad, Convert Tennis Court to Pickleball
X X
El Vista Park Neighborhood 4.53 2.25 Mediocre Repair Basketball Court X
Griffing Park Community 1.72 2.38 Mediocre Renovate Parking Lot and Add Walking Paths X
Herman Park Neighborhood 3.34 2.04 Mediocre
Replace Poor Condition Site Furnishings (0 to 2 Years).
Replace Play Structure in 3 to 5 Years. Add Connecting
Pathways to Activity Areas. Replace Perimeter Sidewalk.
X X
Jared N. Logen Music Park Special Use 10.33 1.00 Poor Complete Park Renovation - Feasibility Study Needed X
Lakefront Park Regional 31.07 2.46 Mediocre Managed by Pleasure Island Department
Lakeshore Park Community 4.28 No Amenities No Amenities Maintain as Open Space
Port Arthur Parks & Recreation Master Plan
Proposed Implementation Schedule
Timeframe for Implementation
Park Name Classification Acres
Average
Feature
Rating Feature Rating Description
Recommended Improvements 0 to 2 Years 3 to 5 Years 6 to 10 Years
Lakeside Park Neighborhood 4.51 2.13 Mediocre
Renovate Basketball Court, Replace Play Structure,
Add Walking Path X
Lakeview Park Neighborhood 2.17 2.94 Good-Excellent Add Shade Structures X
Lamar Park Neighborhood 2.25 2.00 Mediocre
Lincoln Park Neighborhood 0.96 2.12 Mediocre Replace Play Structure and Swingset X
Lions Park (Sabine Pass)Neighborhood 2.41 3.00 Good-Excellent
London Bridge Park Neighborhood 1.93 1.62 Poor
Replace Playground Equipment and Site Furnishings.
Add Walking Paths X
Montrose Park Neighborhood 3.82 2.83 Good-Excellent Replace Play Structure and Add Walking Paths X
Peoples Park Mini/Special Use 0.40 2.67 Good-Excellent
Pioneer Park Community 16.21 2.26 Mediocre Renovate Ball Fields and Replace Play Structures X
Roosevelt Park Neighborhood 2.07 1.80 Poor
Replace Play Structures, Slide and Fall Surface,
Convert Baseball Field into Dog Park. X
Rose Hill Park Community 15.39 2.12 Mediocre Master Plan in Progress X
S/Sgt. Lucian Adams Park Regional 47.68 1.80 Poor Master Plan in Progress X
St. Mary's Park Neighborhood 0.48 3.00 Good-Excellent
Texaco Mini Park Mini 2.72 2.23 Mediocre
Replace Play Structures and Site Furnishings. Add
Shade and Repair Sidewalk X
Washington Park Community 5.57 2.19 Mediocre Renovate Basketball Court X
Port Arthur Parks & Recreation Master Plan
Creating a More Walkable,
Bikeable Community
•Old Railroad Right of Way
•Old Golf Course Paths
•Utility Right of Way
•Thomas Blvd. Trail
Port Arthur Parks & Recreation Master Plan
Port Arthur Parks & Recreation Master Plan
Renovation of Jared N. Logan Music Park
Port Arthur Parks & Recreation Master Plan
Renovation of Rose Hill Park
Port Arthur Parks & Recreation Master Plan
Questions?