PR 23467: CHANGE ORDER NO. 1 FOR SANITARY SEWER REHABILITATION SABINE PASS PEARL STREET PROJECT
EttergN City of City ort rthur Texas INTEROFFICE MEMORANDUM WATER UTILITY DEPARTMENT-ADMINIST RATION Date: November 27, 2023 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR No. 23467 — Change Order No. 1 for Sanitary Sewer Rehabilitation Sabine Pass Pearl Street Project Introduction: The intent of this Agenda Item is to seek the Council's approval of Change Order No. 1 for the Sanitary Sewer Rehabilitation Sabine Pass Pearl Street Project Background: On July of 2023, the Council passed Resolution No. 23-285 awarding the Sanitary Sewer Rehabilitation Sabine Pass Pearl Street Project contract to Global Drilling,Inc. of Winnie,Texas. The construction management of the project is performed by GTCE and city staff. After the project was awarded, the concrete structure of Lift Station No.7 started to crack and break. The proposed new 12"sewer pipe connects to this lift station. To prevent this lift station's future failure, city staff suggested Change No.1 (Exhibit "A"), which includes installation of new 12" HDPE Pipe by direction drilling from Manhole No. 4 to Manhole No. 5; modification of Manhole No. 5 for emergency backup of lift station; and decrease the 711 LF of 12" HDPE sanitary sewer pipe by pipe bursting. Change Order No. 1 is also extending the contract time by 60 days to a new total contract term on 180 days. Budget Considerations: Change Order No. 1 will increase the contract amount by $88,182.00 to a new total contract amount of$441,094.00. Funding is available in Account No. 405-40-000-8516-00-00-000, Project No. WS0006-CON. Recommendation: Recommend that the City Council approve Proposed Resolution No. 23467 authorizing the execution of Change Order No. 1 with Global Drilling, Inc. of Winnie, Texas as described/outlined above. PR No. 23467 11/27/2023 JL Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT WITH GLOBAL DRILLING,INC.OF WINNIE, TEXAS FOR THE SANITARY SEWER SYSTEM REHABILITATION SABINE PASS PEARL STREET PROJECT, INCREASING THE CONTRACT AMOUNT BY $88,182.00 TO THE NEW TOTAL CONTRACT AMOUNT OF $441,094.00; AND A TIME EXTENSION OF 60 DAYS TO A NEW TOTAL CONTRACT TERM OF 180 DAYS; FUNDING AVAILABLE IN ACCOUNT NO. 405-40-000-8516-00-00-000, PROJECT NO. WS0006-CON. WHEREAS, pursuant to Resolution 23-285, City Council award the contract to Global Drilling, Inc. of Winnie, Texas for the Sanitary Sewer Rehabilitation Sabine Pass Pearl Street Project with a total projected budgetary amount of$352,912.00; and, WHEREAS, after the project was awarded, the concrete structure of Lift Station No.7 started to crack and break,which is unsafe and causes the potential failure of the lift station; and, WHEREAS,to prevent this lift station's future failure, city staff suggested Change Order No. 1 (Exhibit"A")which includes installation of new 12" HDPE Pipe by direction drilling from Manhole No. 4 to Manhole No. 5; modification of Manhole No. 5 for emergency backup of lift station; and decrease the 711 LF of 12" HDPE sanitary sewer pipe by pipe bursting; and, WHEREAS, Change Order No. 1 will also extend the contract time by 60 days to a new total contract time of 180 days; and, NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, THAT,the City Manager of the City of Port Arthur is hereby authorized to execute Change Order No. 1 (Exhibit "A") with Global Drilling, Inc. of Winnie, Texas for the Sanitary Sewer PR No. 23467 11/27/2023 JL Page 2 of 3 System Rehabilitation, Sabine Pass, Pearl Street Project increase the current contract amount by $88,182.00 to a new total contract amount of$441,094.00 and extending the contract time by 60 days to a new term of 180 days; and, THAT, said funding for this contract is being provided through Water Utilities Capital Improvement Fund 405-40-000-8516-00-00-000, Project No. WS0006-CON; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ,ADOPTED AND APPROVED THIS day of , 2023 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor ; Councilmembers • NOES: Thurman Bill Bartie Mayor ATTEST: APPROVED AS TO FORM: Sherri Bellard Valecia Tizeno City Secretary City Attorney PR No. 23467 11/27/2023 JL Page 3 of 3 APPROVED FOR ADMINISTRATION: APPROVED FOR FUNDING: Yrri (6) 6064,4Ctifi Ronald Burton Lynda Boswell City Manager Finance Director I (AAL- Calvin Matthews, P.E. Clifton Williams, CPPB Water Utilities Director Purchasing Manager ATTACHMENT A (CHANGE ORDER NO. 1 Sanitary Sewer System Rehabilitation SABINE PASS, PEARL ST CHANGE ORDER NO. 1 DATE: 11/21/2023 CONTRACT NO.: 23-285 CONTRACT DATE: 9/21/2023 CONTRACTOR: Global Drilling Inc. The following changes are hereby made to the CONTRACT DOCUMENTS. 1. Increase the Contract Amount by$ 88,182.00 for the following changes. a. Installation of new 12" HDPE Pipe by Directional Drilling from Manhole No. 4 to Manhole No. 5, 711 LF. b. Modification of Manhole No.5 for emergency backup of lift station. c. Decrease the 711 LF of 12" HDPE Sanitary Sewer Pipe by Pipe Bursting. 2. Extend the Contract Time by 60 calendar days to account for the changed scope of work and material procurement. CHANGE TO CONTRACT PRICE: ORIGINAL CONTRACT PRICE: $ 352,912.00 CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $352,912.00 The Contract Price due to this CHANGE ORDER will be: Increased by: $88,182.00 The new CONTRACT PRICE, including this CHANGE ORDER, will be: $ 441,094.00 CHANGE TO CONTRACT TIME: ORIGINAL CON I KAC I I IME: 120 calendar days. CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER(S): 120 calendar days. The Contract Time due to this CHANGE ORDER will be: Increased by: 60 calendar days The new CONTRACT TIME, including this CHANGE ORDER, will be: 180 calendar days 11Page Sanitary Sewer System Rehabilitation SABINE PASS, PEARL ST CHANGE ORDER NO. 1 No other Terms and Conditions of the Contract are changed as a result of this Change Order Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs incurred by Contractor in his performance of the work covered by the Change Order RECOMMENDED BY ENGINEER: ACCEPTED BY: Wit— — , ____ _ ,,._______, _ .__. ,----T------ _, Li__ City of P Arthur (C NTRACTOR, OFFICER, OR OWNER) Utility ineering Manager RECOMMENDED BY ENGINEER: `—`_ ,, Golden Triangle Consulting Engineers CITY of Port Arthur 2IPage GLOBAL DRILLING, INC. GLOBAL 44994 Interstate 10 Winnie,Texas 77665,USA DRILLING, INC. T'+1 800 956 8720;F:(407)715 6150 Email:info©globaldrillingequipment corn,Websile:www,olooaldnlhngequioment corn Date- Attn: CITY OF PORT ARTHUR November 22,2023 Contract No.: 23-285 Project Name: SANITARY SEWER REHABILITATION PEARL STREET SABINE PASS PROJECT Location• Pearl St.,Sabine Pass Item Desc Unit Price Total Price No. rlptio Unit Qty (USD) (USD) CHANGE ORDER No. 1 1 -Installation of new 12"HDPE Pipe by Directional Drilling from LF 711 202.50 143,977 50 Manhole No.4 to Manhole No.5.It includes dewatering/wellpoint 2 -Modification of Manhole No.5,from 4"to 6",located outside the Lift EA 1 11,750 00 11,750.00 Station 3 -Requesting for Time Extension 4 Less:Quantities from Original Contract -Rehabilitate 12"Dia. Sanitary Sewer Pipe by Pipe Bursting using LF 711 95.00 (67,545 001 12"SDR-17 HDPE TOTAL: $ 88,182.50 I Amount in Words(US Dollars):Eighty Eight Thousand One Hundred Eighty-Two 8 50/100 Only For: GLOBAL DRILLING,INC. Mr.MOHAMMAD BAKER