Loading...
HomeMy WebLinkAbout(P1) AWC CPA-1030 12-19-23 Council Meeting PresentationMASTER DRAINAGE PLAN UPDATE DECEMBER 19, 2023 1 Master Drainage Plan 2 Drainage Criteria Manual Establishes a standard for analysis, design, and construction Provides sustainable community growth Intended to support the Master Drainage Plan and Drainage Regulations Manual delivered to the City in January of 2023 Recommend adopting final version into city ordinance 3 System Inventory Database Contains a complete inventory of all drainage assets within the City of Port Arthur Contains sizing, details, and specifications Electronic, living database maintainable by City staff Can be shared and accessed between departments to better coordinate growth and maintenance Database delivered to the City in November of 2023 4 Overall View 5 System Inventory Statistics Structures (inlets, manholes, grates, etc.) – 11,306 Code 1 (Clean) - 3,966 Code 2 (Needs to be cleaned) – 5,308 Code 3 (Needs to be repaired) – 1,307 Code 4 (Needs to be replaced) – 397 Code 5 (Inaccessible for inspection) – 328 Pipes – 193 miles Undersized (under 18” in diameter) – 37 miles 6 W 19th Street 7 W 19th Street 8 Repair Structures 9 Replace Structures 10 Undersized Pipes 11 Engineering Analysis Report A sophisticated model of the City of Port Arthur drainage system Built for modeling, simulation, and analysis of actual system Recommendations for system improvements based on simulated rainfall events Results delivered to the City in December of 2023 12 Drainage Basins - Pump Stations 13 25-Year Inundation 14 Surcharged System 15 Improvement Recommendations List of recommended system improvements is contained within the Engineering Report This list is still growing based on ongoing modeling and analysis of the system 16 Next Steps Meeting scheduled with City staff January 8, 2024 to discuss: Recommended improvement timelines Optimize cost evaluations per improvement area Any additional data requested for the finalized report Joint Meeting with Drainage District 7 Formally submit all pieces of the Master Drainage Plan based on City feedback 17