HomeMy WebLinkAboutPR 23539: AUTHORIZING AN INCREASE TO THE WOODWORTH STREETSCAPE IMPROVEMENT PROJECT ALLOCATION ��rt rflru�
www.PortArthurTx.gov
DEPARTMENT OF DEVELOPMENT SERVICES
INTEROFFICE MEMORANDUM
Date: December 27, 2023
To: The Honorable Mayor and City Council
Through: Ronald "Ron" Burton, City Manager
From: Pamela D. Langford, Assistant City Manager— Operations/Director of
Development Services
RE: P.R. NO. 23539 —A resolution authorizing an increase to the Woodworth
Streetscape Improvement Project allocation.
Introduction:
This Agenda Item intends to request authorization for the City Manager to amend
Resolution No. 23-149, allocating an additional $7,000,000.00 from Total Unallocated
Funds from FY 2023 Street Allocations for improvements to the Woodworth Boulevard
Streetscape Project from S.H. 87 (Gulfway Drive) to Lakeshore Drive. The new
budgeted amount for the project will be $14,200,000.00.
Background:
Woodworth Boulevard has been nominated for improvements and beautification for its
unique location and entryway into downtown Port Arthur. Pursuant to Resolution 21-
542, approved by the City Council on December 20, 2021, $3,000,000.00 was allocated
for the design, engineering, and construction of improvements to Woodworth Boulevard
from Lakeshore Drive to Gulfway Drive (Highway 87).
Pursuant to Resolution 22-284, approved by the City Council on June 21 , 2022, the City
Manager was authorized to enter into an agreement with Arceneaux, Wilson & Cole,
LLC (AWC) of Port Arthur, Texas, to provide professional engineering services
associated with the reconstruction of Woodworth Boulevard from Lakeshore Drive to
Gulfway Drive (Highway 87) for $383,410.00. AWC provided drawings and renderings
of the Woodworth Boulevard Project, and it was determined that the original
$3,000,000.00 allocated under Resolution 21- 542 would not be sufficient to complete
the project successfully.
"Remember, we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur.Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
Staff identified $14,945,286.00 available from Total Unallocated Funds from years 1- 5
Street Allocations, of which $4,200,000.00 was assigned to the project. Resolution No.
23-149 was submitted requesting that the City Manager amend Resolution 21-542 to
reflect the additional $4,200,000.00 to the Woodworth Boulevard Project for the total
budgeted amount of$7,200,000.00.
Arceneaux, Wilson, and Cole submitted engineering and design plans that were bided
out through the competitive bidding process.
On November 8, 2023, the City received two (2) sealed bids for the Woodworth
Boulevard Streetscape Improvement Project, with the lowest and most recommended
bid being $13,426,347.92.
The current funding allocation is still not sufficient to cover the total cost of the project,
creating a deficit of $6,700,000.00. Additional funding is being requested for
$300,000.00 for construction management services. P.R. No. 23539 is being submitted
requesting that the City Manager amend Resolution 23-149 to reflect the addition of
$7,000,000.00 to the Woodworth Boulevard Project for the total budgeted amount of
$14,200,000.00. Funding is available in the FY2023 Capital Improvement Street
Allocation Budget.
Budget Impact:
Funds are available in Total Unallocated Funds from FY2023 Street Allocations,
Account No. 307-21-053-8517-00-10-000. Final approval of the funding allocation will
require a budget amendment to re-appropriate the $7,000,000.00 allocation from the
general street budget to the Woodworth Boulevard Infrastructure Improvement Project
budget.
Recommendation:
It is recommended that the City Council approve P.R. No. 23415, authorizing the City
Manager to amend Resolution No. 23-149, allocating an additional $7,000,000.00 from
Total Unallocated Funds from FY 2023 Street Allocations for improvements to the
Woodworth Boulevard Streetscape Project from S.H. 87 (Gulfway Drive) to Lakeshore
Drive. The new budgeted amount for the project will be $14,200,000.00.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O. Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
P.R. NO. 23539
12/27/2023 PDL
Page 1 of 5
RESOLUTION NO.
A RESOLUTION AMENDING RESOLUTION 23-149 INCREASING
THE PROJECT ALLOCATION BY $7,000,000.00 FOR
ENGINEERING, DESIGN, AND CONSTRUCTION OF
INFRASTRUCTURE IMPROVEMENTS ALONG WOODWORTH
BOULEVARD BETWEEN SH 87 (GULFWAY DRIVE) AND
LAKESHORE DRIVE, ESTABLISHING A REVISED BUDGET
AMOUNT OF $14,200,000.00. FUNDING FOR THE PROJECT IS
AVAILABLE IN THE FY 2022 AND FY 2023 CAPITAL
IMPROVEMENT BUDGETS, ACCOUNT NUMBER 307-21-053-
8517-00-10-000.
WHEREAS, the City Council believes that the improvement of infrastructure along
Woodworth Boulevard between SH 87 (Gulfway Drive" and Lakeshore Drive will increase
the opportunity for investment and expand economic development in the City of Port
Arthur; and,
WHEREAS, pursuant to Resolution No. 21-542, the City Council authorized the
allocation of$3,000,000.00 for the engineering, design, and construction of improvements
to Woodworth Boulevard from Lakeshore Drive to SH 87 (Gulfway Drive); and,
WHEREAS, pursuant to Resolution No. 22-284, the City Council authorized the
City Manager to enter into an agreement with Arceneaux, Wilson, & Cole, LLC (AWC) of
Port Arthur, Texas, to provide professional engineering, planning, and design services for
the improvement project in the amount of $383,410.00; and,
WHEREAS, pursuant to Resolution No. 23-149, the City Council authorized an
increase in the project allocation by $4,200,000.00, establishing a revised budget amount
of $7,200,000.00 with funding being available in the FY 2022 Capital Improvement
Budget; and,
WHEREAS, Arceneaux, Wilson, and Cole have provided the city with engineering
and design plans for the project and have bided the construction phase through the
competitive bidding process; and,
P.R. NO. 23539
12/27/2023 PDL
Page 2 of 5
WHEREAS, on November 8, 2023, the City received two (2) sealed bids for the
Woodworth Boulevard Streetscape Improvement Project, with the lowest and
recommended bid being $13,426,347.92, as delineated in Exhibit "A"; and,
WHEREAS, it has been determined that an additional $7,000,000.00 is needed to
complete the construction phase of the Woodworth Boulevard Streetscape Improvement
Project from S.H. 87 (Gulfway Drive) to Lakeshore Drive, with the additional funding being
available in the FY 2023 Capital Improvement Budget; and,
WHEREAS, it is recommended that the City Council authorize the amendment to
Resolution 23-149 allocating an additional $7,000,000.00 to the project total, increasing
the total allocated amount to $14,200,000.00 for the Woodworth Boulevard Streetscape
Improvement project from S.H. 87 (Gulfway Drive) to Lakeshore Drive, including
construction management services; now therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
That the facts and opinions in the preamble are true and correct.
That the City Council of the City of Port Arthur hereby authorizes the amendment
to Resolution No. 23-149, increasing the project allocation by $7,000,000.00, establishing
a revised budget of $14,200,000.00 for the Woodworth Boulevard Streetscape
Improvement Project from S.H. 87 (Gulfway Drive) to Lakeshore Drive. Funding for the
project is available in FY 2022 and FY 2023 unallocated Street Capital Improvement
Budgets.
THAT final approval of the funding allocation will require a budget amendment to
re-appropriate the $7,000,000.00 allocation from the general street budget to the
Woodworth Boulevard Infrastructure Improvement Project budget.
P.R.NO.23539
12/27/2023 PDL
Page 3 of 5
That a copy of the caption of this Resolution be spread upon the Minutes of the
City Council.
READ, ADOPTED, AND APPROVED this day of January, A.D. 2024 at a
Special Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
Ayes:
Mayor:
Councilmembers:
Noes:
Thurman Bill Bartle, Mayor
ATTEST:
Sherri Bellard, TRMC, City Secretary
APPROVED AS TO FORM:
Valecia "Val" Tizeno, Esq., City Attorney
APPROVED FOR ADMINISTRATION:
Ronald "Ron" Burton, CPM, City Manager
/ ar lift.- "
John ' . atella, P.E., City Engineer
P.R. NO. 23539
12/27/2023 PDL
Page 4 of 5
APPROVED AS FOR AVAILABILITY OF FUNDS:
$6417J-e_2./,.e,-(,(
Lynda Boswell, Finance Director
P.R.NO.23539
12/27/2023 PDL
Page 5 of 5
EXHIBIT ic 33
• awc ARCENEAUX WILSON&COLE
engineering I surveying I planning
November 13, 2023
Mr.John Canatella, PE
City of Port Arthur
444 Fourth Street
Port Arthur,Texas 77640
RE: RECOMMENDATION OF AWARD
Woodworth Blvd. Streetscape Improvements
AWC Job No.: CPA-1100
Dear Mr.Canatella,
On November 8, 2023, the City of Port Arthur received two(2) sealed bids for
Woodworth Blvd. Streetscape Improvements project in Port Arthur, Texas.
The bids were opened and read aloud during the public bid opening. Each
sealed bid had a Total Amount Bid for four separate bid schedules for the
project, along with alternates. We have attached a copy of the bid summary for
your review. It is our recommendation that the City of Port Arthur awards the
project based on Bid Schedule"A" along with Alternate Items to construct a new
concrete roadway based on the bid submitted by BDS Constructors, LLC dba
MK Constructors of Vidor,Texas, in the amount of$13,426,347.92. A copy of the
Bid Tabulation is enclosed for your information.
On behalf of the City of Port Arthur,Arceneaux Wilson & Cole LLC (AWC) has
evaluated the bid documentation for each submitted bid. All Bid Packages were
submitted with the required contents and acknowledged receipt of Addenda
No. 1, 2 & 3. No substitutions were submitted.
Based on our past experience,we recommend that the City of Port Arthur award
the contract for Woodworth Blvd. Streetscape Improvements to BDS
409.724.7888
3120 Central Mall Dnve
Port Arthur,TX 77642 Ewing Sur/eying
ameng.conn F-16194 10194049
AWL
•(•
1
Constructors, LLC dba MK Constructors on the basis of the lowest responsive
Total Amount Bid Schedule "A" along with Alternates in the amount of
$13,426,347.92.
If you have any questions or require additional information, please don't hesitate
to contact me by email at Joe.Wilson@awceng.com or by phone at 409-724-
7888.
Sincerely,
ARCENEAUX WILSON & COLE LLC
Joe M. W n, Jr., PE
Presiders
eirlik
BID TABULATION SUMMARY
COMICWOODWORTH BLVD.STREETSCAPE IMPROVEMENTS
ARCENEAUX W (Jnn CITY OF PORT ARTHUR
BIDS OPENED: November 8, 2023 at 3:15 P.M.
MK CONSTRUCTORS,LLC. ALLCO,LLC.
VIDOR,TX BEAUMONT,TX
BID SCHEDULE"A"SUMMARY(Gulfway Dr to Lakeshore Dr)
TOTAL AMOUNT BID(BASE BID ITEMS) $ 12,006,571.19 $ 14,398,338.00
CALENDAR DAYS(BASE BID ITEMS) 523 750
TOTAL AMOUNT BID(BASE BID+ALT. ITEMS) $ 13,426,347.92 $ 18,791,258.84
CALENDAR DAYS(BASE BID+ALT.ITEMS) 591 870
BID SCHEDULE"B"SUMMARY(11th St to Lakeshore Dr)
TOTAL AMOUNT BID(BASE BID ITEMS) $ 9,201,011.66 $ 10,862,814.25
CALENDAR DAYS(BASE BID ITEMS) 381 600
TOTAL AMOUNT BID(BASE BID+ALT. ITEMS) $ 10,030,170.70 $ 13,645,168.89
CALENDAR DAYS(BASE BID+ALT. ITEMS) 473 720
BID SCHEDULE"C"SUMMARY(7th St to Lakeshore Dr)
TOTAL AMOUNT BID(BASE BID ITEMS) $ 5,397,655.17 $ 6,891,048.25
CALENDAR DAYS(BASE BID ITEMS) 252 480
TOTAL AMOUNT BID(BASE BID+ALT. ITEMS) $ 5,514,987.04 $ 7,843,024.31
CALENDAR DAYS(BASE BID+ALT.ITEMS) 258 600
BID SCHEDULE"D"SUMMARY(Procter St to Lakeshore Dr)
TOTAL AMOUNT BID(BASE BID ITEMS) $ 2,568,656.81 $ 3,753,988.75
CALENDAR DAYS(BASE BID ITEMS) 128 365
TOTAL AMOUNT BID(BASE BID+ALT. ITEMS) $ 2,355,022.99 $ 3,763,524.93
CALENDAR DAYS(BASE BID+ALT.ITEMS) 128 420
Math Error
ARCENEAUX WILSON & COLE LLC oF �
TEXAS REGISTERED ENGINEERING FIRM � • •� • rF h�
* 16194 * .•• •
�\ ••**l,
eiv• . 0
JOE M.WILSON,JR.
l0� 92067 ����
JOE WILSON, JR. PE 11Fs••t, CENSt '0•.�_
11/13/2023