Loading...
HomeMy WebLinkAboutPR 23553: THE SOLCO GROUP, LLC SERVICES FOR SAN ANTONIO AVENUE'S RECONSTRUCTION AND DRAINAGE REPAIRS City of Port Arthur Transit Department Memorandum To: Ron Burton,City Manager From: Ivan Mitchell,Transit Director Date: January 15,2024 Re: P.R 23553—The Solco Group,LLC Services for San Antonio Avenue's Reconstruction and Drainage Repairs Nature of Request:Authorize the City Manager to negotiate a contract with the Solco Group,LLC (TSG)to provide engineering and design services for reconstruction and drainage repairs on San Antonio Avenue. Background: Resolution No.22-086 and 22-087 pre-qualified firms to provide the City of Port Arthur with engineering and design services. PAT was awarded Federal Transit Administration funds in the amount of$904,750.00($723,800 federal/$180,950 local)under the Section 5324 Emergency Relief Program in December 2018. PAT selected TSG to provide engineering and design services for reconstruction and drainage repairs on San Antonio Avenue. Recommendation: It is recommended that the City Council approve proposed P.R. 23553 to negotiate a contract with TSG for engineering and design services for reconstruction and drainage repairs on San Antonio Avenue. Budgetary/Fiscal Effect: Funding to pay for the design and engineering services is available in Transit Capital Account 401-70-530-8512-00-60-000 PROJECT#DR1P06. P.R. No. 23553 1/15/2024 IM RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO NEGOTIATE A CONTRACT WITH THE SOLCO GROUP, LLC OF BEAUMONT, TEXAS TO PROVIDE ENGINEERING AND DESIGN SERVICES FOR PORT ARTHUR TRANSIT'S (PAT) RECONSTRUCTION AND DRAINAGE REPAIRS ON SAN ANTONIO AVENUE; FUNDING IS AVAILABLE IN ACCOUNT NO. 401-70-530-8512- 00-60-000, PROJECT #DR1P06 WHEREAS, pursuant to Resolution No. 22-086 and 22-087, the City of Port Arthur pre- qualified engineering firms to provide engineering and design services; and, WHEREAS, PAT recommends the City Council authorize the City Manager to negotiate a contract with the Solco Group, LLC to provide engineering and design services for reconstruction and drainage repairs on San Antonio Avenue. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts,and opinions in the preamble are true and correct. THAT,the City Manager is hereby authorized to negotiate a contract with the Solco Group, LLC of Beaumont, Texas to provide engineering and design services for reconstruction and drainage repairs on San Antonio Avenue. THAT, a copy of the caption of this Resolution be spread upon the minutes of the City Council. READ,ADOPTED AND APPROVED this day of January 2024 at a Regular meeting of the City of Port Arthur, Texas by the following vote: AYES: Mayor: Councilmembers: , NOES: . Thurman Bill Bartie, Mayor ATTEST: Sherri Bellard, City Secretary P.R. No. 23553 1/15/2024 IM APP OVED AS TO FORM: C1� - hi pdo al Tizen ity Attorney APPROVED FOR ADMINISTRATION: Ronald Burton City Manager Lark' Clifton Williams, CPPB Ivan Mitchell Purchasing Manger Transit Director