Loading...
HomeMy WebLinkAboutPR 23589: CHANGE ORDER NO. 1 FOR LANDFILL WATERLINE EXTENSION PROJECT nrt rtnur�� INTEROFFICE MEMORANDUM WATER UTILITIES DEPARTMENT- Date: February 1, 2024 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR No. 23589—Change Order No. 1 for Landfill Waterline Extension Project Introduction: This Agenda Item is to seek the City Council's approval for Change Order No. 1 for the Landfill Waterline Extension Project with BDS Construction, LLC dba MK Constructors of Vidor, Texas. Background: Resolution No. 23-386 awarded the project to BDS Construction, LLC dba MK Constructors of Vidor,Texas for$1,382,509.00,and Arceneaux Wilson&Cole Engineering Firm of Port Arthur, Texas is the project engineer and construction manager. Due to the project award amount being below the original project budgeted cost, the City has requested the Contractor to extend the proposed water line into the landfill property. The water line extension entails the addition of 370 ft of 8"PVC pipe,two mechanical joint 45-degree bend fittings, one fire hydrant assembly, one auto flush valve, and one service tap with RPZ backflow preventer to serve the landfill office building. Budget Impact: The Project was awarded for$1,382,509.00. Change Order No. 1 is an increase of $74,870.00 for a new total contract amount of $1,457,379.00. Funding is available in Account No. 405-40-000-8516-00-00-000, Project No. WS-0008 CON. Recommendation: It is recommended that the City Council approve PR 23589 to proceed with Change Order No. 1, as discussed/outlined above. "Remember,we are here to serve the Citizens of Port Arthur" PR No. 23589 2/1//24 JL Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT WITH BDS CONSTRUCTION, LLC DBA MK CONSTRUCTION OF VIDOR, TEXAS, FOR THE LANDFILL WATERLINE EXTENSION PROJECT, INCREASING THE CONTRACT AMOUNT BY $74,870.00 TO THE NEW TOTAL CONTRACT AMOUNT OF $1,457,379.00 FUNDS ARE AVAILABLE IN ACCOUNT NO. 405-40-000-8516-00-00-000, PROJECT NO. WS- 0008 CON. WHEREAS, pursuant to Resolution 23-386, the Landfill Waterline Extension Project was awarded to BDS Construction, LLC dba MK Constructors of Vidor, Texas with a total projected budgetary amount of$1,382,509.00; and, WHEREAS, pursuant to Resolution 21-078, Arceneaux Wilson & Cole Engineering Firm of Port Arthur, Texas was hired as Construction Engineer to oversee the project; and, WHEREAS, due to the project award amount being below the original project budgeted cost, the City has requested the Contractor to extend the proposed water line into the landfill property; and, WHEREAS, Arceneaux Wilson& Cole Engineering Firm proposed Change Order No. 1 for the additional project scope, including the installation of 370 ft of 8" PVC water line, two mechanical joint 45-degree bend fittings, one fire hydrant assembly, one auto flush valve, and one service tap with RPZ backflow preventer to serve the landfill office building (EXHIBIT "A") increasing contract amount by $74,870.00 to the new total contract amount of $1,457,379.00. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, PR No. 23589 2/1//24 JL Page 2 of 3 THAT, the City Council hereby approves Change Order No. 1 (EXHIBIT "A") to increase the amount by $74,870.00 to the new total contract amount of$1,457,379.00; and, THAT, the funding is available in Account No. 405-40-000-8516-00-00-000, Project No. WS-0008; and, THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. READ, ADOPTED, AND APPROVED, this day of , 2024, AD, at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following Vote: AYES: Mayor: Councilmembers: NOES: Thurman Bill Bartie Mayor ATTEST: Sherri Bellard City Secretary APPROVED AS TO FORM: e- ditiicg Valecia Tize City Attorney PR No. 23589 2/1//24 JL Page 3 of 3 APPROVED F INISTRATION: Ronald Burton City Manage Calvin Matthews, P.E. Water Utilities Director APPROVED AS TO FUND AVAILABILITY: Lyn oswell Finance Director U/Of1/4, LA4/4":-. Clifton Williams, CPPB Purchasing Manager EXHIBIT "A" (CHANGE ORDER NO. 1) AIM *VC.) +MN ARCENEAUX WILSON&COLE engineering 1 surveying 1 planning January 31, 2024 Mr. Calvin Matthews, P.E. City of Port Arthur Director of Water Utilities 444 4th Street Port Arthur, Texas 77640 RE. Proposal For Change Order No. 01 for LANDFILL WATER LINE EXTENSION AWC Job No. CPA-1010 Mr. Matthews: Attached is Change Order No. 1 for the Landfill Water Line Extension project. This change order is for increasing the contract amount by $74,870.00. Due to the project award amount being below the original project budgeted cost, the City has requested the Contractor to extend the proposed water line into the landfill property. This work will allow the City to serve potable water to the landfill office personnel as they currently do not have access to a potable water source on site. The extension into the landfill property entails the additions of 370 linear feet of 8" PVC CertaLok DR 18 water line, two (2) 8" mechanical joint 45-degree bend fittings, one (1) fire hydrant assembly, one (1) auto flush valve, and one (1) 1" service tap with RPZ backflow preventer. The City and Engineer have reviewed the proposed work to be performed and agree it is within the budget and scope as requested. This change order will not impact the original contract time. This change order will increase the original contract amount by$74,870.00. We recommend that the City of Port Arthur authorize this change order to the contract as submitted. We have attached Change Order No. 1 which modifies the contract to reflect this I 409.724.7888 3120 Central Mall Drive Port Arthur,TX 77642 Engineering Surveying awceng.com F-161'=14 "0194049 A41%. awn _. change for your consideration and action. Should you have any questions or require additional information, please contact our office. ARCENEAUX WILSON&COLELLC TEXAS REGISTERED ENGINEERING FIRM F-16194 Keith Zotzky, . ., CFM Vice President of Engineering Services Attached. Change Order#01 ♦D� •�� TMAI ARCENEAUX WILSON&COLE n.yn•c.ln�1+urvcyin�I Pbnr nc) CHANGE ORDER NO. 1 DATE: January 31, 2024 JOB NO.: CPA-1010 AGREEMENT DATE: October 16, 2023 NAME OF PROJECT: Landfill Water Line Extension OWNER: CITY of PORT ARTHUR CONTRACTOR: MK CONSTRUCTORS The following changes are hereby made to the CONTRACT DOCUMENTS: 1. Add 370 LF 8" PVC CertaLok DR 18 Installation in Trench at$143/LF. ($52,910.00) 2. Add 2 EA 8" MJ 45 Degree Bend at$580/EA. ($1,160.00) 3. Add 1 EA Fire Hydrant Assembly at$9,300/EA. ($9,300.00) 4. Add 1 Auto Flush Valve at$6,500/LS. ($6,500.00) 5. Add 1 1" Service Tap w/RPZ Backflow Preventer at $5,000/LS. ($5,000.00) TOTAL $74,870.00 CHANGE TO CONTRACT PRICE: ORIGINAL CONTRACT PRICE: $1,382,509.00 CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $1,382,509.00 The CONTRACT PRICE due to this CHANGE ORDER will be [increased] by: $74,870.00 The new CONTRACT PRICE, including this CHANGE ORDER,will be $1,457,379.00 I 1 of 2 ♦�_ CHANGE ORDER NO. 1 .41emaimic January 31, 2024 " Job No. CPA-1010 ARCENEAUX WILSON&COLE englnecrir.g I surveying I oI rw,, CHANGE TO CONTRACT TIME: ORIGINAL CONTRACT TIME: 180 Calendar Days CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: 0 Calendar Days CURRENT DATE OF COMPLETION: May 26, 2024 CONTRACT TIME due to this CHANGE ORDER will be increased by The New DATE OF COMPLETION: May 26, 2024 No other Terms and Conditions of the Contract are changed as a result of this Change Order. Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs incurred by Contractor in his performance of the work covered by the Change Order. RECOMMENDED Y ENGINEER: ACCEPTED BY: ARCENEAUXV N & COLE LLC (CONTRACTOR, OFFICER OR OWNER) MK CONSTRUCTORS ACCEPTED BY: CITY of PORT ARTHUR I 2 of 2