WATER UTILITY DEPARTMENT-ADMINISTRATION
Date: February 19, 2024
To: The Honorable Mayor and City Council
Through: Ronald Burton, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: PR No. 23642—Notice of future Main Wastewater Plant (WWTP) Improvement
Project Change Order No. 4
Introduction:
This agenda item intends to notify the Council of the intent to proceed with a possible Change
Order No. 4 with ALLCO, LLC for the Main Wastewater Treatment Plant (WWTP)
Improvement Project that will increase the contract amount by approximately $5,650,000.00 to
the new total projected budgetary contract amount of$73,100,464.43.
Background:
Resolution No. 22-147 awarded the Main Wastewater Plant(WWTP) Improvement Project to
ALLCO, LLC of Beaumont, Texas for the total amount of$73,643,227.00. The construction
phase is managed by Freese&Nichols, Inc.
On August 2, 2022, Resolution No. 22-329, approved Change Order No. 1 for value
engineering performed by Freese &Nichols, Inc., ALLCO, LLC, Golden Triangle Consulting
Engineers, and the City of Port Arthur staff in the deduction amount of$6,234,049.00.
On December 20, 2022, Resolution No. 22-586, approved Change Order No. 2 including,
Primary Clarifiers subgrade stabilization,Drying Beds demo,Demo and Remove CSS,Helical
Piles, and Brentwood PVC TF Media price increase and reduction for the removal of VE
Lighting Package, use of bank sand for pipe bedding, and remove Admin Building
improvements in the deduction amount of$73,564.57 and 75-day time extension with a final
project end date of December 17, 2026.
r
On December 19,2023,Resolution No.23-556,approved Change Order No. 3 for an increased
amount of$114,851.00 to replace 4 Trickling Filter Effluent Butterfly Valves with Slide Gates
and add an expansion joint to Aeration Basin Buttress Wall.
Water Utilities is providing notice to City Council of a possible potential Change Order No. 4
that will increase the current contract amount by approximately $5,650,000.00 to replace the
failed 30"force main from Main Outfall Lift Station(MOLS)to the Main WWTP Headworks
with a new 42" ductile iron pipe.
Budget Considerations:
The original contract price is $73,643,227.00
Change Order No. 1 decreased the contract amount by $6,234,049.00
Change Order No. 2 decreased the contract amount by $73,564.57
Change Order No. 3 increased the contract amount by $114,851.00
Proposed Change Order No. 4 for approximately $5,650,000 will increase the new total contract
amount to new projected total amount of$73,100,464.43.
The funding is contingent upon the approval of a budget amendment via Proposed Ordinance
7229 for Account No. 405-40-000-8516-00-00-000, Project No. WS0023
Recommendation:
Recommend City Council approve PR No. 23642 to authorize the City Manager to proceed with
a proposed Change Order No. 4 as specified in the attached Emergency Memo dated February
14, 2024 with ALLCO, LLC of Beaumont, Texas, as described/outlined above.
P.R. No. 23642
2/19/2024 JL
Page 1 of 3
RESOLUTION NO.
A RESOLUTION REQUESTING AUTHORIZATION FOR THE CITY
MANAGER TO PROCEED WITH A POTENTIAL FUTURE CHANGE
ORDER NO. 4 TO THE MAIN WASTEWATER TREATMENT PLANT
IMPROVEMENT PROJECT WITH ALLCO, LLC OF BEAUMONT,
TEXAS, THAT WILL INCREASE THE CONTRACT BY
APPROXIMATELY $5,650,000.00 TO A NEW TOTAL PROJECTED
BUDGETARY CONTRACT AMOUNT OF $73,100,464.43; FUNDING IN
ACCOUNT NO. 405-40-000-8516-00-00-000, PROJECT NO. WS0023 IS
CONTINGENT UPON THE APPROVAL OF A BUDGET AMENDMENT
VIA ADOPTION OF PROPOSED ORDINANCE 7229
WHEREAS, the City Council approved Resolution No. 22-147, awarding the Main
Wastewater Treatment Plant Rehabilitation project to ALLCO, LLC of Beaumont, Texas; and,
WHEREAS,on August 2,2022,Resolution No. 22-329, approved Change Order No. 1 to
reduce the contract amount by $6,234,049.00 for Value Engineering performed by Freese &
Nichols, Inc., ALLCO, LLC, Golden Triangle Consulting Engineers and the City of Port Arthur
staff for a new contract amount of$67,409,178.00; and,
WHEREAS,on December 20,2022,Resolution No. 22-586, approved Change Order No.
2 for a decreased amount of $73,564.57 including, Primary Clarifiers subgrade stabilization,
Drying Beds demo, Demo and Remove CSS, Helical Piles, and Brentwood PVC TF Media price
increase and reduction for the removal of VE Lighting Package, use of bank sand for pipe bedding,
and remove Admin Building improvements and add 75-day time extension with a final project end
date of December 17, 2026; and,
WHEREAS,on December 19,2023,Resolution No. 23-556, approved Change Order No.
3 for an increased amount of$114,851.00 to replace 4 Trickling Filter Effluent Butterfly Valves
with Slide Gates and add an expansion joint to Aeration Basin Buttress Wall; and,
WHEREAS, Water Utilities Department is providing notice of potential future Change
Order No. 4 for an approximate contract price increase of$5,650,000.00 to replace the failed 30"
P.R. No. 23642
2/19/2024 JL
Page 2 of 3
force main from Main Outfall Lift Station (MOLS) to the Main WWTP Headworks with a new
42" ductile iron pipe.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR:
THAT,the facts and opinions in the preamble are true and correct; and,
THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to
proceed with the future Change Order No.4 as delineated in the Emergency Memo dated February
14, 2024 (Attachment "A"), for an approximate cost of $5,650,000.00 with ALLCO, LLC of
Beaumont,Texas for the Main WWTP Improvements project,to a new approximate total projected
budgetary amount of$73,100,464.43; and,
THAT, funding for this project will be contingent upon a budget amendment via adoption
of Proposed Ordinance 7229 for Account No. 405-40-000-8516-00-00-000, Project No. WS0023;
and,
THAT, Change Order No. 4, it its entirety, will be submitted to City Council for final
approval; and
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City
Council.
READ, ADOPTED AND APPROVED THIS day of , 2024 at a
Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor ;
Councilmembers ;
NOES:
Thurman Bill Bartie
Mayor
PR No. 23642
2/19/2024 JL
Page 3 of 3
ATTEST: APPROVED AS TO FORM:
Sherri Bellard Valecia Tizeno
City Secretary City Attorney
APPROVED FOR ADMINISTRATION: APPROVED FOR FUNDING:
Yp > : JC4
Ronald Burton, CPM Ly a Boswell 8c46*ff mrnmerrf
City Manager Finance Director
47f/
Calvin Matthews, P.E. Clifto Williams, ( PPB
Water Utilities Director Purchasing Manager
ATTACHMENT A
(EMERGENCY MEMO DATED FEBRUARY 14,2024)
ern.,,,
a
_
art rthur`��
Ti,rus
INTEROFFICE MEMORANDUM
Date: February 14,2024
To: Ronald Burton, City Manager
4/1/
From: Calvin Matthews, P.E., Water Utilities Director
RE: Emergency Contract for Design and Construction of Replacement Force Main at Main
Outfall Lift Station
The Main Outfall Lift Station (MOLS) is connected to the Main WWTP through an existing
30" and a 36" force main. The current upgrades to the Main WWTP and MOLS required the
MOLS to be bypassed using the 30"force main to allow the 36"line to be removed from service
during upgrades. The 30" line failed when the bypass pumps were energized and upon
inspection was found to have deteriorated beyond use. The failure of the 30" line leaves the
MOLS dependent upon the single 36" force main which does not have enough capacity to
handle the permitted peak flow of the Main WWTP and the line is 50 years old and beyond its
expected useful life. If the 36" line were to fail the full flow of sewage to the Main WWTP
would have to be discharged into the DD7 canal to prevent overflows throughout the City
especially in the area around Duff Drive between Lakeside Drive and Lewis Drive. This
situation would continue until a replacement line could be procured and installed which could
take 4 to 6 months.
Due to the health and safety risk associated with a failure of the main in addition to potential
fines, we request approval to issue a change order to ALLCO, LLC under the Main WWTP
Improvements contract for the engineering and construction of a 42" parallel force main with
associated connections.
The expenditure for the engineering and pipe replacement is expected to be approximately
$5,650,000.00.
I Ronald Burton,hereby approve the emergency change order to ALLCO, LLC.
Ron B on
C. anager