INTEROFFICE MEMORANDUM
Date: February 22, 2024
To: The Honorable Mayor and City Council
Through: Ron Burton. City Manager
From: Chandra Alpough, Director of Parks and Recreation
RE: P.R. 23614—Change Order No. 1 to the Contract with Preferred Facilities
Group—USA, LLC for the Construction of Wayfinding Signs for the
Wayfinding and Monument Signage Program
Introduction:
The intent of this Agenda Item is to request the City Council's approval of P.R. No. 23614
authorizing the City Manager to execute Change Order No. 1 decreasing the cost by removing
the railroad signage from the scope of work($120,559.61), extending the contract by 80 days,
installing landscape edging around the City Hall sign($747.00), installing concrete turndowns
on the signs on Hwy 365 and Gulfway Drive($10,569.00),and decreasing the cost by installing
stone look panels instead of concrete columns ($2,447.00) decreasing the contract amount by
$111,690.61 for a new projected budgetary impact of$1,125,439.79 and extending the contract
time by 80 days.
Background:
Pursuant to Resolution 23-095, the City of Port Arthur entered into a contract with Preferred
Facilities Group—USA,LLC of Port Arthur, Texas for the construction of wayfinding signs for
the wayfinding and monument signage program for the City of Port Arthur. Preferred Facilities
Group—USA, LLC of Port Arthur submitted Change Order No. 1 that addressed the following:
• To remove the railroad signage from the scope of work and complete said signage at a
later date. (decreasing the contract amount by $120,559.61)
• An extension of 80 additional days to allow several species of plants to be installed
during the end of the winter/early spring season to eliminate the possibility of the plants
freezing. (add 80 days to the contract time)
• To install black metal edging around the City Hall sign mulch beds to prevent washout
onto the adjacent sidewalk. (increasing the contract amount by $747.00).
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
• Installation of two concrete turndowns at the Hwy 365 and Gulfway location in order to
help support the slab and offer a stronger foundation for the signs. (increasing the
contract by$10,569.00)
• Installation of stone look panels in lieu of concrete columns that were originally shown
in the project documents. (decreasing the contract amount by$2,447.00).
Change Order No. 1 will decrease the contract amount by $111,690.61 for a new projected
budgetary impact of$1,125,439.79 and extending the contract time by 80 days.
Budget Impact:
Funding in the amount of$1,125,439.79 ($975,310.13 is available for this purpose in HO1014
and$150,129.66 is available in PR0009-OTH)
Recommendation:
It is recommended that the City Council approve P.R.No.23614 authorizing the City Manager
to execute Change Order No. 1 decreasing the cost by removing the railroad signage from the
scope of work ($120,559.61), extending the contract by 80 days, installing landscape edging
around the City Hall sign ($747.00), installing concrete turndowns on the signs on Hwy 365
and Gulfway Drive ($10,569.00), and decreasing the cost by installing stone look panels
instead of concrete columns ($2,447.00) decreasing the contract amount by $111,690.61 for a
new projected budgetary impact of$1,125,439.79 and extending the contract time by 80 days.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
m.•.T,+r oc .....,. .-.r... sari , _
P. R. #23614
02/20/2024 ca
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO
EXECUTE CHANGE ORDER NO. 1, DECREASING THE COST
BY REMOVING THE RAILROAD SIGNAGE ($120,559.61),
EXTENDING THE CONTRACT BY 80 DAYS, INSTALLING
LANDSCAPE EDGING AT CITY HALL ($747.00), INSTALLING
CONCRETE TURNDOWNS ($10,569.00), DECREASING THE
COST FOR CONCRETE COLUMNS ($2,447.00) TO THE
CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND
PREFERRED FACILITIES GROUP — USA, LLC OF PORT
ARTHUR, TEXAS FOR THE CONSTRUCTION OF WAYFINDING
SIGNS FOR THE WAYFINDING AND MONUMENT SIGNAGE
PROGRAM FOR THE CITY OF PORT ARTHUR DECREASING
THE CONTRACT AMOUNT BY $111,690.61 AND EXTENDING
THE CONTRACT TIME BY 80 DAYS FOR A NEW PROJECTED
BUDGETARY IMPACT OF $1,125,439.79 ($975,310.13
AVAILABLE IN HO1014 AND $150,129.66 AVAILABLE IN
PR0009-OTH)
WHEREAS, pursuant to Resolution 23-095, the City of Port Arthur entered into a
contract with Preferred Facilities Group — USA, LLC of Port Arthur, Texas for the construction
of wayfinding signs for the wayfinding and monument signage program for the City of Port
Arthur with a projected budgetary impact of$1,237,130.40; and,
WHEREAS, the railroad signage has been removed from the scope of work and
will be performed at a later date; and,
WHEREAS, a time extension of 80 additional days has been requested to allow
several species of plants to be installed during the end of the winter/early spring season; and,
WHEREAS, a black metal edging needs to be installed around the City Hall sign
mulch beds to prevent washout onto the adjacent sidewalks; and,
WHEREAS, there was a need to install two (2) concrete turndowns at the
monument signs on Hwy 365 and Gulfway to help support the slab and offer a stronger
foundation for the signs; and,
WHEREAS, new stone look panels were installed in lieu of the concrete columns
P. R. #23614
02/20/2024 ca
originally shown in the project documents; and,
WHEREAS, Preferred Facilities Group — USA, LLC of Port Arthur, Texas
submitted Change Order No. 1 decreasing the cost by removing the railroad signage from the
scope of work ($120,559.61), extending the contract by 80 days, installing landscape edging
around the City Hall sign ($747.00), installing concrete turndowns on the signs on Hwy 365 and
Gulfway Drive ($10,569.00), decreasing the cost by installing stone look panels instead of
concrete columns ($2,447.00) attached hereto as Exhibit "A" decreasing the contract amount by
$111,690.61 for a new projected budgetary impact of$1,125,439.79 and extending the contract
time by 80 days; now, therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT
ARTHUR, TEXAS:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That the City Manager of the City of Port Arthur is hereby
authorized and directed to execute, on behalf of the City of Port Arthur, Change Order No. 1
decreasing the cost by removing the railroad signage from the scope of work ($120,559.61),
extending the contract by 80 days, installing landscape edging around the City Hall sign
($747.00), installing concrete turndowns on the signs on Hwy 365 and Gulfway Drive
($10,569.00), decreasing the cost by installing stone look panels instead of concrete columns
($2,447.00) attached hereto as Exhibit "A" decreasing the contract amount by $111,690.61 for a
new projected budgetary impact of$1,125,439.79 and extending the contract time by 80 days.
Section 3. That a copy of the caption of this Resolution be spread upon the
Minutes of the City Council.
READ, ADOPTED AND APPROVED THIS day of , A.D., 2024, at a
Regular Meeting of the City Council of the City of Port Arthur, by the following vote:
P. R. #23614
02/20/2024 ca
AYES:(Mayor)
Councilmembers:
NOES:
Thurman Bill Bartie
Mayor
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM:
James Black
Interim City Attorney
APPROVED AS TO ADMINISTRATION:
Ron Burton, CPM
City Manager
Chandra Alpough, CPM
Director of Parks and Recreation
P. R. #23614
02/20/2024 ca
APPROVED AS TO AVAILABILITY OF FUNDS:
OK -014 oi tri L. () Vele
Lynda Boswell
Director of Finance
Clifton Williams, CPPB
Purchasing Manager
Exhibit "A"
CHANGE ORDER NO. 1
ORIGINAL AGREEMENT DATE: May 10, 2023
PROJECT DESCRIPTION: Construction of Wayfinding Monument Signs for the City of Port Arthur
CHANGE IN SCOPE: Railroad Signage Deduct
Landscaping Time Extension
Landscaping Edging at City Hall
Concrete Turndowns
Concrete Column Credit
CHANGE TO CONTRACT AMOUNT:
Railroad Signage Decrease $120,559.61
Landscaping Time Extension 80 days
Landscaping Edging at City Hall $747.00
Concrete Turndowns $10,569.00
Concrete Column Decrease $2,447.00
Total Change Order Decrease $111,690.61
Additional Days 80 days
ORIGINAL CONTRACT PRICE: $1,237,130.40
CURRENT CONTRACT PRICE(adjusted by previous CHANGE ORDER):$1,237,130.40
The Contract Amount due to this CHANGE ORDER will decrease by: $111,690.61
The new CONTRACT AMOUNT including the CHANGE ORDER will be: $1,125,439.79
ORIGINAL CONTRACT DAYS: 240
NEW CONTRACT DAYS: 320
SIGNED AND AGREED TO on the day of , 2024.
PREFERRED FACILITESGROUP-USA, LLC
Print Name:
Title:
SIGNED AND AGREED TO on the_day of , 2024.
CITY OF PORT ARTHUR
BY:
RON BURTON
CITY MANAGER
°01e71 PREFERRED
FACILITIES GROUP - USA
February 19, 2024
Mailing Address:
PO Box20658 Chandra Alpough
Beaumont, TX 77720-0658 City of Port Arthur
444 4th St.
O (409)842-8293 Port Arthur, TX 77640
el (409)842-2274
pfg@pfg-usa.com Project: "City of Port Arthur—Monument Signage"
pfg-usa.com
Subject: "Change Order No.1"
Job Order Contracting Dear Ms. Alpough:
Co-Op Purchasing Agreements This will serve as our Change Order— 01. Included in Change Order No. 1 are Change
Proposals 1-5 which are listed below. Summary of Change Proposal Items will be shown
on individual Change Proposals.
Indefinite Delivery,Indefinite
Quantity-IDIQ Change Order-01 Recap:
• CP-01 Railroad Signage Deduct ($120,559.61)
Multiple Award Construction • CP-02 Landscaping Time Extension Add (80) Days to Contract
Contracts MACC • CP-03 Landscaping Edging at City Hall $747.00
• CP-04 Concrete Turndowns $10,569.00
Task Order Contracts • CP-05 Concrete Column Credit ($2,447.00)
TOC
Construction Management— Total Change Order-01
9 ($111,690.61)
Agent or At-Risk
Total Time Extension 80 Days
Design Build
Government
This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00
pm. Please contact us at 409-842-8293 at your convenience to discuss this estimate.
Commercial
Respectfully submitted,
Education Preferred Facilities Group- USA
Industrial
Matt Ueding
Infrastructure Project Manager
Communications
Corporate/Retail
Assembly
Southeast Texas Deep East Texas Central Texas Texas Gulf Coast
roP PREFERRED
.01" FACILITIES GROUP - USA
February 19, 2024
Mailing Address:
PO Box 20658 Chandra Alpough
Beaumont, TX 77720-0658 City of Port Arthur
444 4th St.
O (409)842-8293 Port Arthur, TX 77640
(409)842-2274
® pfg@pfg-usa.com Project: "City of Port Arthur—Monument Signage"
pfg-usa.com
Subject: "Change Proposal—01 Railroad Overpass Signage Deduct"
Job Order Contracting Dear Ms. Alpough:
Co Op Purchasing Agreements This will serve as our Change Proposal - 01 for the removal of the Railroad Signage
Scope of Work from the Monument Signage Project. This portion of the project has been
discussed by the team to be performed later and as a separate project. A deduct will be
Indefinite Delivery,Indefinite given back to the City of Port Arthur for the work not performed.
Quantity-IDIQ
Change Proposal -01 Railroad Overpass Signs Recap:
Multiple Award Construction • Site Prep & Mobilization
($5,537.23)
Contracts-MACC
• Traffic Control ($31,992.91)
• Power Wash, Prime, Paint ($47,681.75)
Task Order Contracts • Relocate Existing KCS Sign ($7,382.98)
TOC • PA RR Sign @ Woodworth ($13,982.37)
• PA RR Sign @ 16th St. ($13,982.37)
Construction Management-
Agent or At-Risk
Total Deduct ($120,559.61)
Design Build
Government
This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00
Commercial pm. Please contact us at 409-842-8293 at your convenience to discuss this estimate.
Respectfully submitted,
Education Preferred Facilities Group - USA
Industrial -v
Matt Ueding
Infrastructure
Project Manager
Communications
Corporate/Retail
Assembly
Southeast Texas Deep East Texas Central Texas Texas Gulf Coast
os.".001%***" PREFERRED
0001011% FACILITIES GROUP - USA
February 19, 2024
Mailing Address:
PO Box20658 Chandra Alpough
Beaumont, TX 77720-0658 City of Port Arthur
444 4th St.
O (409)842-8293 Port Arthur, TX 77640
41 (409)842-2274
A pfg@pfg-usa.com Project: "City of Port Arthur—Monument Signage"
sa
pfg-usa.com
Subject: "Change Proposal—02 Landscaping Time Extension"
Job Order Contracting Dear Ms. Alpough:
Co-Op Purchasing Agreements This will serve as our Change Proposal — 02 for our Time Extension Request for the
Project. The Project Team has determined it best to wait to plant some of the
temperamental species of plants in the month of March to eliminate and freezing
Indefinite Delivery,Indefinite possibilities. PFG is requesting (80) additional days to complete the landscaping of the
Quantity-IDIQ monument signs. The new Completion date would be March 25, 2024.
Change Proposal -02 Landscaping Time Extension:
Multiple Award Construction
Contracts-MACC • Add (80) Days to Contract to allow several species of plants to be installed
during the end of Winter/Early Spring Season.
Task Order Contracts
TOC • Planting these temperamental plants in late February and March will ensure
these plants will not be subjected to a late freeze
Construction Management—
Agent orAt-Risk • 90 Day Landscaping Warranty will now start once all plants have been
installed. Date TBD by confirmation of PFG-USA and the City of PA.
Design Build
Government
Total Time Requested (80) Days
Commercial
Education
This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00
pm. Please contact us at 409-842-8293 at your convenience to discuss this estimate.
Industrial
Respectfully submitted,
Preferred Facilities Group- USA
Infrastructure
Communications `
Matt Ueding
Corporate/Retail Project Manager
Assembly
Southeast Texas Deep East Texas Central Texas Texas Gulf Coast
0.00p PREFERRED
0,0% FACILITIES GROUP - USA
February 19, 2024
Mailing Address:
PO Box 20658 Chandra Alpough
Beaumont, TX 77720-0658 City of Port Arthur
444 4th St.
O (409)842-8293 Port Arthur, TX 77640
el (409)842-2274
A pfg@pfg-usa.com Project: "City of Port Arthur—Monument Signage"
pfg-usa.com
Subject: "Change Proposal—03 City Hall Landscaping Metal Edging"
Job Order Contracting Dear Ms. Alpough:
Co Op Purchasing Agreements This will serve as our Change Proposal—03 for the addition of landscape metal edging at
the City Hall Secondary Sign. Costs include labor, material, equipment, & insurance.
Indefinite Delivery,Indefinite Change Proposal -03 Recap:
Quantity-IDIQ
• Furnish and install approx. 75 LF of 14 GA black metal edging at the City Hall
Secondary Sign around the mulch beds to prevent mulch bed washout onto the
Multiple Award Construction adjacent sidewalks.
Contracts-MACC
Task Order Contracts
TOC Total Price $747.00
Construction Management—
Agent or At-Risk
This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00
Design Build pm. Please contact us at 409-842-8293 at your convenience to discuss this estimate.
Respectfully submitted,
Government Preferred Facilities Group- USA
Commercial
Education Matt Ueding
Project Manager
Industrial
Infrastructure
Communications
Corporate/Retail
Assembly
11114111111
Southeast Texas Deep East Texas Central Texas Texas Gulf Coast 01^
'0•P PREFERRED
00 FACILITIES GROUP - USA
February 19, 2024
Mailing Address:
PO Box20658 Chandra Alpough
Beaumont, TX 77720-0658 City of Port Arthur
444 4th St.
O (409)842-8293 Port Arthur, TX 77640
II (409)842-2274
A pfg@pfg-usa.com Project: "City of Port Arthur—Monument Signage"
:o. pfg-usa.com
Subject: "Change Proposal—04 Concrete Turndown"
Job Order Contracting Dear Ms. Alpough:
Co Op Purchasing Agreements This will serve as our Change Proposal—04 for the addition of concrete turndowns at the
Primary Sign locations per RFI-04. Cost includes labor, materials, equipment, &
insurance.
Indefinite Delivery,Indefinite
Quantity-IDIQ Change Proposal -04 Recap:
• Furnish and install (2) concrete turn downs per RFI-04,
Multiple Award Construction Approx. 11' Wide x 4' Height' x 2' Depth, 3000 psi Concrete
Contracts MACC • Furnish and install #5 Rebar @ 12" O.0 each way per RFI-04
• Continuous cleanup and final clean upon completion
Task Order Contracts
TOC
Total Price $10,569.00
Construction Management—
Agent or At-Risk
Design Build This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00
pm. Please contact us at 409-842-8293 at your convenience to discuss this estimate.
Government Respectfully submitted,
Preferred Facilities Group- USA
Commercial
Education
Matt Ueding
Project Manager
Industrial
Infrastructure
Communications
Corporate/Retail
Assembly
Southeast Texas Deep East Texas Central Texas Texas Gulf Coast
roP PREFERRED
0," FACILITIES GROUP - USA
February 19, 2024
Mailing Address:
Po Box 2a65s Chandra Alpough
Beaumont,TX 77720-0658 City of Port Arthur
444 4th St.
O (409)842-8293 Port Arthur, TX 77640
el (409)842-2274
A pfg@pfg-usa.com Project: "City of Port Arthur—Monument Signage"
,A.
pfg-usa.com
Subject: "Change Proposal—05 Concrete Column Deduct"
Job Order Contracting Dear Ms. Alpough:
Co Op Purchasing Agreements This will serve as our Change Proposal—05 for installation of stone look panels in lieu of
the concrete column originally shown in the project documents. Cost includes labor,
materials, equipment, and insurance. A proposal summary is shown below for the credit
Indefinite Delivery,Indefinite back to the City of Port Arthur.
Quantity-IDIQ
Change Proposal -01 Recap:
Multiple Award Construction SIGNAGE ADDITIONS
Contracts-MACC • Furnish and Install New Stone Look Metal Panels
(color and look approved by CoPA) $36,000.00
Task Order Contracts
TOC CREDIT BACK TO CoPA FOR CONCRETE COLUMN
• 8" Sch 40 - Pipe Materials ($12,847.00)
• Concrete Column Materials and Labor ($23,100.00)
Construction Management— • Crane Rental (1-Day) ($2,500.00)
Agent or At-Risk
Design Build
Total Price ($2,447.00)
Government
Commercial
This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00
Education pm. Please contact us at 409-842-8293 at your convenience to discuss this estimate.
Respectfully submitted,
Industrial Preferred Facilities Group- USA
Infrastructure
Communications Matt Ueding
Project Manager
Corporate/Retail
Assembly
Southeast Texas Deep East Texas Central Texas Texas Gulf Coast