Loading...
HomeMy WebLinkAboutPR 23657: CHANGE ORDER NO. 1 , DRC CONSTRUCTION COMPLETION OF THE NEW CONSTRUCTION HOME INTEROFFICE MEMORANDUM HOUSING ASSISTANCE PROGRAMS To: Ronald Burton, CPM, City Manager From: Beverly Freeman, Manager of Housing and Neighborhood Revitalization Date: March 6, 2024 Re: P.R.No. 23657 Nature of Request: The Housing Division recommends that the City Council adopt Proposed Resolution No. 23657 authorizing the City Manager to execute Change Order No. 1 to the Contract with DRC Construction, LLC, extending the contract time by 45 days, to a new total of 120 days to complete the new construction project at 1942 6th Street, Port Arthur, Texas. This Change Order will have no financial impact to the construction costs. Staff Analysis/Considerations: The City Council, by Resolution No. 23-474, authorized the City Manager to execute a contract between the City and DRC Construction, LLC for the site preparation and new construction of three (3) homes in the total amount of$618,125.00 which includes a contingency for $15,000.00. ($603,125.00+$15,000.00 =$618,125.00). Due to extensive vandalism to the house at 1942 6th Street, which was determined to be arson, the new construction project will be delayed. DRC Construction, LLC submitted a request for an extension of 45 days to clean the house and complete the new construction project. Budget Consideration: No impact. RECOMMENDATION: The Housing Division recommends that the City Council adopt Proposed Resolution No. 23657 authorizing the City Manager to execute Change Order No. 1 to the Contract with DRC Construction, LLC, exatending the contract time by 45 dyas to a new total of 120 days to complete the new construction project located at 1942 6th Street, Port Arthur, Texas with no additional financial impact on the construction costs. P. R. No. 23657 03/06/24 BAF RESOLUTION NUMBER A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT WITH DRC CONSTRUCTION LLC OF BEAUMONT, TEXAS, EXTENDING THE CONTRACT TIME BY 45 DAYS TO A NEW TOTAL CONTRACT TERM OF 120 DAYS FOR THE COMPLETION OF THE NEW CONSTRUCTION HOME LOCATED AT 1942 6TH STREET, PORT ARTHUR, TEXAS. THIS CHANGE ORDER WILL HAVE NO ADDITIONAL FINANCIAL IMPACT ON THE CONSTRUCTION COSTS. WHEREAS, the U.S. Department of Housing and Urban Development annually awards Community Development Block Grant (CDBG) Program and HOME Investment Partnership (HOME) Program funds to the City of Port Arthur for the primary benefit of low and moderate-income persons/families in accordance with 24 Code of Federal Regulations Part 92 and Part 570.; and, WHEREAS, the City Council, by its adoption of Resolution Number 23-206 (authorizing submission of the 2023 Action Plan), has obligated itself to provide new construction of houses to assist low and moderate-income persons/families; and, WHEREAS, the City Council, by its adoption of Resolution Number 23-474, authorized the City Manager to execute a contract with DRC Construction, LLC of Beaumont, Texas, for the site preparation and new construction of three (3) homes in the amount of Six Hundred Eighteen Thousand One Hundred Twenty-Five Dollars and No/100, ($618,125.00) (which includes a$15,000 Contingency); and, WHEREAS,the new construction project at 1942 6th Street is delayed due to extensive vandalism to the house, determined to be arson as identified in the attached Exhibit"A"; and, WHEREAS, DRC Construction, LLC, submitted a request for a time extension of 45 days, with no additional cost,to allow for the cleaning of the house as identified in the attached Exhibit "B"; and, WHEREAS, Change Order No. 1, attached hereto as Exhibit "C", is being submitted to extend the contract time by 45 days from the original 75 days, to a new total completion time of 120 days with no additional financial impact. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: Section 1. THAT the facts and opinions in the preamble are true and correct. Section 2. THAT the City Council hereby authorizes the City Manager to execute Change Order No. 1 to the contract with DRC Construction, LLC of Beaumont, Texas, extending the contract time by 45 days to a new total of 120 days to complete the construction of the home at 1942 6th Street, in substantially the same form as attached hereto as Exhibit "C", with no additional financial impact on the construction costs. Section 3. THAT a copy of the caption of this Resolution be spread upon the minutes of the City Council. READ, ADOPTED, AND APPROVED this day of March, A.D., 2024, at the Regular Meeting of the City Council of the City of Port Arthur, Texas by the following Vote: AYES: MAYOR: COUNCILMEMBERS: NOES: THURMAN, 'BILL" BARTIE, MAYOR ATTEST: SHERRI BELLARD, CITY SECRETARY APPROVED AS TO FORM: AMES BL , INTERIM C ATTORNEY APPROVED FOR ADMINISTRATION: RONALD BURTON, CPM CITY MANAGER 1:2) 0 q- tay. BEVERLY F' 'EMAN, MANAGER OF HOUSING &NEIGHBORHOOD REVITALIZATION EXHIBIT "A" Port Arthur Fire Department Report 3/5/24,9:48 AM Port Arthur Fire Department:2024-0002769 Location: Incident Type: PORT 1942 6 111-Building fire ARTHUR Port Arthur TX 77640 "°"" FDID: NH715 • 4, s t Lat/Long: Incident#: 2024-0002769 8 N 29°52'50.1" Exposure ID: 78568647 W 93°55'46.96" Exposure#: 0 4106,1t. Insidect Date:02/28/2024 Location Type: 1-Street address Dispatch Run#: 20240002769 Port Arthur Fire Department Station: 1 Shifts Or Platoon: C Shift Report Completed by: Not Completed Report Reviewed by: Not Reviewed Report Printed by: Washburn, Paul ID:30845 Date: 3/5/2024 Time: 09:47 Structure Type: Enclosed building Property Use: 419-1 or 2 family dwelling Automatic Extinguishment System Present: � Detectors Present: ❑ Cause of Ignition: Cause under investigation Aid Given or Received: None Primary action taken: 10-Fire control or extinguishment,other Losses Pre-Incident Values Property: $0.00 Property: $0.00 Civilian Injuries: 0 Fire Service Injuries: 0 Contents: $0.00 Contents: $0.00 Civilian Fatalities: 0 Fire Service Fatalities: 0 Total: $0.00 Total: $0.00 Total Casualties: 0 Total Fire Service Casualties: 0 Total #of apparatus on call: 7 Total #of personnel on call: 17 Narrative from dispatch: house bro. <>02:03:27 00005217:ac adv;02:04:45 00005217:Entergy adv and service man will be enrte;02:05:17 00005145:calling texas gas; 02:05:39 00005145:el smoke coming from the attic;02:07:35 00005145:11 to el fire on the left side of the house when you come in; 02:08:32 00005145:u3 secure fire 1;02:08:54 00005145:fire is knocked down; 02:09:03 00005145:per wolf;02:09:46 00005145:11 get a fan going as quick as we can;02:10:49 00005145:11 primary search complete;02:13:32 00005145:el get a investigator enroute;02:14:12 00005145:calling washburn--US;02:19:45 00005145:was mitchell U9 enroute; 02:32:28 00005217:Removed Unit-TONE; 02:32:28 00005217:Removed Officer- TONE;02:32:28 00005217:Set Primary Officer-El;04:27:15 00005145:Incident Closed;04:51:07 00005145:u9 just advised to close the callout; 04:51:10 00005145:Incident Re-Opened https://secure.emergencyreporting.com/nfirs/print.asp?printtype=2&printtype=3&printtype=4&printtype=5&eid=78568647&printtype=&printOption=&us... 1/5 3/5/24,9:48 AM Port Arthur Fire Department:2024-0002769 NARRATIVE(2) Narrative Title:Captain Wolfe Narrative Author:Wolfe, Benjamin Narrative Date: 02/28/2024 03:47:09 Narrative Apparatus ID: E-1 Narrative: El responded to a possible house fire at 1942 6th street. El arrived on scene to find smoke coming from the eaves of the house.The house had a lot of debris and building materials in the front yard due to it still being under construction. Ela perform a 360 degree size up and found that the back door was unlocked, but unopened. El crew pulled an 1.75 inch pre- connect line and forced the front door.Once inside, El crew made our way to the B side of the structure were we found fire in the kitchen area.The fire was small and was extinguished quickly. E2 used a 2.75 inch line to supply its tank water to El. Ll placed an electric fan at the front door and ventilated the windows in the kitchen to help clear the smoke out of the building. Ll also performed a primary search of the building. After the fire was out,an investigator was called out.While all crews were awaiting the investigator,everyone perform overhaul and completed a secondary search. Due to the building being under construction,there was very little contents in the home so overhaul was quick.All crews assisted with cleaning up tools and loading all hose back onto El.All units returned to service leaving U3 on scene awaiting the investigator. NARRATIVE(3) Narrative Title: n/a Narrative Author: McCorvy, Patrick Narrative Date: 02/29/2024 06:13:46 Narrative Apparatus ID: E-2 Narrative: Unit 3 responded to a report of a house fire.After determining that there was a working fire,I had dispatch secure Firel on the radio.Shortly after arriving,a PD officer informed me of a possible suspect if the cause if the fire was determined to be arson.I called for an Arson Investigator and passed the information on to him via telephone once he was en route. Crews had the fire under control fairly quickly.The home was under construction and had been dried-in,but there was no furniture or contents aside from a few appliances,limiting the fire load and heat potential.Once the fire was extinguished and hoses rolled,engines began returning to service and Firel was reopened.I waited on scene for the Investigator and turned it over to him. NARRATIVE(4) Narrative Title: n/a Narrative Author: Phelps,Cody Narrative Date: 02/29/2024 06:40:24 Narrative Apparatus ID: n/a Narrative: E2 responded to 1942 6 for a possible house fire. E2 arrived to find a new construction home with black smoke coming from the front door. El had a line stretched and E2 captain and firefighter went in to assist in extinguishment and search. The fire was out within seconds of going inside.Crews looked for extension by pulling ceiling and a secondary search was performed.After picking up tools E2 was released by command and returned to service. https://secure.emerg encyre po rti ng.com/nfi rs/print.asp?printtype=2&pri nttype=3&pri nttype=4&pri nttype=5&eid=78568647&pri nttype=&pri ntOption=&us... 2/5 3/5/24,9:48 AM Port Arthur Fire Department:2024-0002769 NARRATIVE(5) Narrative Title: n/a Narrative Author:Tompkins, Daniel Narrative Date: 02/29/2024 11:49:09 Narrative Apparatus ID: L-1 Narrative: Ll dispatched to a house fire at 1942 6th street. Ll arrived on scene with El and found a one-story private dwelling with moderate smoke showing.This home was under construction and near completion,there were no utilities ran to the home at this time. Li completed a 360 and found an open window on the Bravo side of the structure with a small amount of fire inside. El crew was able to find the fire quickly and extinguish it with a preconnected handline. Ll crew completed a primary search with nothing found.Once completed Li finished ventilating the structure.Crews on scene worked together to overhaul the structure and complete extinguishment.Crews on scene returned all equipment to service. Ll back in service. https://secure.e me rgencyreporti ng.com/nfirs/print.asp?pri nttype=2&pri nttype=3&pri nttype=4&pri nttype=5&eid=78568647&pri nttype=&pri ntOption=&us... 3/5 3/5/24,9:48 AM Port Arthur Fire Department:2024-0002769 APPARATUS Fire Controlled Date/Time: 2/28/2024 2:10:00 AM Unit E-1 Unit E-5 Type: Engine Type: Engine Use: Suppression Use: Suppression Response Mode: Lights and Sirens Response Mode: () #of People 3 #of People 3 Alarm 02/28/2024 02:00:52 Alarm 02/28/2024 02:00:52 Dispatched 02/28/2024 02:01:08 Dispatched 02/28/2024 02:01:08 Enroute 02/28/2024 02:03:28 Enroute 02/28/2024 02:03:33 Arrived 02/28/2024 02:04:53 Arrived 02/28/2024 02:08:17 Cancelled /--/-- Cancelled -- /--/-- -- :--:-- Cleared Scene 02/28/2024 04:27:14 Cleared Scene 02/28/2024 04:27:14 In Quarters 02/28/2024 04:27:14 In Quarters 02/28/2024 04:27:14 In Service 02/28/2024 04:27:14 In Service 02/28/2024 04:27:14 Unit L-1 Unit E-6 Type: Truck or aerial Type: Engine Use: Suppression Use: Suppression Response Mode: () Response Mode: 0 #of People 3 #of People 3 Alarm 02/28/2024 02:00:52 Alarm 02/28/2024 02:00:52 Dispatched 02/28/2024 02:01:08 Dispatched 02/28/2024 02:01:08 Enroute 02/28/2024 02:03:30 Enroute 02/28/2024 02:04:10 Arrived 02/28/2024 02:05:50 Arrived 02/28/2024 02:09:48 Cancelled /--/-- Cancelled -- /--/-- -- :-- :-- Cleared Scene 02/28/2024 04:27:14 Cleared Scene 02/28/2024 04:27:14 In Quarters 02/28/2024 04:27:14 In Quarters 02/28/2024 04:27:14 In Service 02/28/2024 04:27:14 In Service 02/28/2024 04:27:14 Unit U-3 Unit E-2 Type: Chief officer car Type: Engine Use: Suppression Use: Suppression Response Mode: 0 Response Mode: 0 #of People 1 #of People 3 Alarm 02/28/2024 02:00:52 Alarm 02/28/2024 02:00:52 Dispatched 02/28/2024 02:01:08 Dispatched 02/28/2024 02:01:08 Enroute 02/28/2024 02:05:24 Enroute 02/28/2024 02:03:15 Arrived 02/28/2024 02:08:00 Arrived 02/28/2024 02:07:15 Cancelled / / 02/28/2024 04:27:14 Cancelled / / Cleared Scene Cleared Scene 02/28/2024 04:27:14 In Quarters 02/28/2024 04:27:14 In Quarters 02/28/2024 04:27:14 In Service 02/28/2024 04:27:14 In Service 02/28/2024 04:27:14 Unit U-9 Type: Other apparatus/resource Use: Other Response Mode: 0 #of People 1 Alarm 02/28/2024 02:00:52 Dispatched 02/28/2024 02:01:08 Enroute 02/28/2024 02:40:00 Arrived 02/28/2024 03:07:39 Cancelled -- /--/-- -- : -- : -- Cleared Scene 02/28/2024 04:27:15 In Quarters 02/28/2024 04:27:15 4 In Service 02/28/2024 04:27 15 Number Of People not on apparatus: 0 https://secu re.emerge ncyreporting.co m/nfi rs/print.asp?pri nttype=2&p rinttype=3&pri nttype=4&pri nttype=5&e id=78568647&pri nttype=&printOption=&us... 4/5 3/5/24,9:48 AM Port Arthur Fire Department:2024-0002769 FIRE Acres Burned None or Less Than One Acres Burn From Wildland False Form Area Of Fire Origin Cooking area,kitchen Heat Source Undetermined Item First Ignited Appliance housing or Fire Is Confined To Object Of casing Origin Type Of Material Undetermined Cause Of Ignition Cause under investigation Factor Contributing To Undetermined Ignition Human Factors None Contributing STRUCTURE FIRE Structure Type Enclosed building Building Status Under construction #Of Stories At Above Grade 1 #Of Stories Below Grade 0 Square Feet Length 50 Width 40 Floor Of Origin 1 Fire Spread Confined to floor of origin Minor Damage 1 Significant Damage 0 Heavy Damage 0 Extreme Damage 0 ARSON Agency Name Agency Address Agency Phone 1942 6th ST CUSTOM FIELDS FORM Did you use a fire hydrant? No Did you use the Auto Pulse No https://secure.e mergencyreporting.com/nfi rs/print.asp?pri nttype=2&pri nttype=3&pri nttype=4&pri nttype=5&eid=78568647&pri nttype=&pri ntOpti on=&us... 5/5 EXHIBIT " B " DRC Construction, LLC Request for Extension Letter `‘'' DRC Construction LLC \I7; 6710 Eastex Freeway Beaumont TX 77708 �' 409-554-8135 To whom it may concern: DRC Construction LLC would like to request an extension of forty-five (45) days on our build time at job location 1942 6th Street Port Arthur,TX 77640 due to extensive vandalism on the home that occurred sometime between Tuesday, February 27, 2024 evening—Wednesday, February 28, 2024 morning.There will be no financial impact to the request for a Change Order to extend the contract term from 75 days to complete the house, adding 45 days for a total of 120 days. Dawn Cockerill DRC Construction LLC EXHIBIT " C " Change Order No. 1 CHANGE ORDER NO. 1 ORIGINAL AGREEMENT DATE: December 29, 2023 PROJECT DESCRIPTION: Site Preparation and New Construction of Three(3) Homes CHANGE IN SCOPE: Extend the Contract term from 75 days adding 45 days for a total of 120 days to complete the construction CHANGE TO CONTRACT AMOUNT: No Change ORIGINAL CONTRACT PRICE: $68,125.00 which includes a contingency amount of$15,000.00 CURRENT CONTRACT PRICE (adjusted by previous CHANGE ORDER):$618,125.00 The Contract Amount due to this CHANGE ORDER will increase by: EL new CONTRACT AMOUNT including the CHANGE ORDER will be: $618,125.00 ORIGINAL CONTRACT DAYS: 75 NEW CONTRACT DAYS: 120 SIGNED AND AGREED TO on the_day of , 2024. DRC CONSTRUCTION,LLC Print Name: Title: SIGNED AND AGREED TO on the day of , 2024. CITY OF PORT ARTHUR BY: RON BURTON, CPM CITY MANAGER