HomeMy WebLinkAboutPR 23659: CHANGE ORDER NO. 2, WAYFINDING SIGNS FOR THE WAYFINDING AND MONUMENT SIGNAGE PROGRAM www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: March 12, 2024 To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: Chandra Alpough, Director of Parks and Recreation RE: P.R. 23659—Change Order No. 2 to the Contract with Preferred Facilities Group—USA, LLC for the Construction of Wayfinding Signs for the Wayfinding and Monument Signage Program Introduction: The intent of this Agenda Item is to request the City Council's approval of P.R. No. 23659 authorizing the City Manager to execute Change Order No. 2 to remove the existing City Hall sign, enlarge the font size and add the address to the sign increasing the contract amount by $9,730.00 and to extend the contract time by 21 days for a new projected budgetary impact of $1,135,169.79. Background: Pursuant to Resolution No.23-095,the City of Port Arthur entered into a contract with Preferred Facilities Group—USA,LLC of Port Arthur, Texas for the construction of wayfinding signs for the wayfinding and monument signage program for the City of Port Arthur. Pursuant to Resolution No.24-100, Change Order No. 1 was approved, decreasing the cost by removing the railroad signage from the scope of work ($120,559.61), extending the contract by 80 days, installing landscape edging around the City Hall sign ($747.00), installing concrete turndowns on the signs on Hwy 365 and Gulfway Drive ($10,569.00), decreasing the cost by installing stone look panels instead of concrete columns($2,447.00)which decreased the contract amount by $111,690.61 for a new projected budgetary impact of $1,125,439.79 and extending the contract time by 80 days. Preferred Facilities Group—USA,LLC of Port Arthur submitted Change Order No. 2 to remove the existing City Hall sign, enlarge the font size, and add the address to the sign. The Change Order will also add 21 days to the exiting contract. Change Order No.2 will increase the contract amount by $9,730.00 for a new projected budgetary impact of$1,135,169.79 and extend the contract time by 21 days. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 Budget Impact: Funding in the amount of$1,135,169.79 ($985,040.13 is available for this purpose in H01020 and$150,129.66 is available in PR0009-OTH) Recommendation: It is recommended that the City Council approve P.R.No. 23659 authorizing the City Manager to execute Change Order No. 2 to remove the existing City Hall sign, enlarge the font size and add the address to the sign increasing the contract amount by $9,730.00 and to extend the contract time by 21 days for a new projected budgetary impact of$1,135,169.79. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 P. R. #23659 03/08/2024 ca RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 2, TO THE CONTRACT WITH PREFERRED FACILITIES GROUP — USA, LLC OF PORT ARTHUR, TEXAS FOR THE CONSTRUCTION OF WAYFINDING SIGNS FOR THE WAYFINDING AND MONUMENT SIGNAGE PROGRAM FOR THE CITY OF PORT ARTHUR, TO REMOVE THE EXISTING CITY HALL SIGNAGE, ENLARGE THE FONT SIZE AND ADD THE ADDRESS, THEREBY INCREASING THE CONTRACT AMOUNT BY $9,730.00 TO A NEW TOTAL PROJECTED BUDGETARY CONTRACT AMOUNT OF $1,135,169.79; AND EXTEND THE CONTRACT TIME BY 21 ADDITIONAL DAYS. ($985,040.13 AVAILABLE IN HO1020 AND $150,129.66 AVAILABLE IN PR0009-OTH) WHEREAS, pursuant to Resolution 23-095, the City of Port Arthur entered into a contract with Preferred Facilities Group —USA, LLC of Port Arthur, Texas for the construction of wayfinding signs for the wayfinding and monument signage program for the City of Port Arthur with a projected budgetary impact of$1,237,130.40; and, WHEREAS, pursuant to Resolution No. 24-100, Change Order No. 1 was approved, decreasing the cost by removing the railroad signage from the scope of work ($120,559.61), extending the contract by 80 days, installing landscape edging around the City Hall sign ($747.00), installing concrete turndowns on the signs on Hwy 365 and Gulfway Drive ($10,569.00), decreasing the cost by installing stone look panels instead of concrete columns ($2,447.00) decreasing the contract amount by $111,690.61 for a new projected budgetary impact of$1,125,439.79 and extending the contract time by 80 days; and, WHEREAS, the font size of the City Hall sign needs to be increased and the addressed needs to be added in order for visitors to be able to locate City Hall; and, WHEREAS, Preferred Facilities Group — USA, LLC of Port Arthur, Texas submitted Change Order No. 2 to remove the existing City Hall sign, enlarge the font size and P. R. # 23659 03/08/2024 ca add the address to the sign increasing the contract amount by $9,730.00 and to extend the contract time by 21 additional days; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: Section 1. That the facts and opinions in the preamble are true and correct. Section 2. That the City Manager of the City of Port Arthur is hereby authorized and directed to execute, on behalf of the City of Port Arthur, Change Order No. 2 to remove the existing City Hall sign, enlarge the font size, and add the address increasing the contract amount by $9,730.00 and to extend the contract time by 21 additional days attached hereto as Exhibit"A" for a new projected budgetary impact of$1,135,169.79. Section 3. That a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of , A.D., 2024, at a Regular Meeting of the City Council of the City of Port Arthur, by the following vote: AYES:(Mayor) Councilmembers: NOES: Thurman Bill Bartie Mayor ATTEST: Sherri Bellard City Secretary P. R. #23659 03/08/2024 ca APPROVED AS TO FORM: el/CtAl O James M lack ��� , Interim City Attorney APPROVED AS TO ADMINISTRATION: Ron Burton, CPM City Manager }laA ?d/z , Chandra Alpough, CPM Director of Parks and Recreation APPROVED AS TO AVAILABILITY OF FUNDS: cam) Lynda Boswell Director of Finance Clifton Williams, CP B Purchasing Manager Exhibit cc » A CHANGE ORDER NO. 2 ORIGINAL AGREEMENT DATE: May 10, 2023 PROJECT DESCRIPTION: Construction of Wayfinding Monument Signs for the City of Port Arthur CHANGE IN SCOPE: Remove existing City Hall sign to increase font size and add address CHANGE TO CONTRACT AMOUNT: Remove existing City Hall sign to increase font size and add address $9,730.00 Additional Days 21 days ORIGINAL CONTRACT PRICE: $1,237,130.40 CURRENT CONTRACT PRICE(adjusted by previous CHANGE ORDER):$1,125,439.79 The Contract Amount due to this CHANGE ORDER will increase by: $9,730.00 The new CONTRACT AMOUNT including the CHANGE ORDER will be: $1,135,169.79 ORIGINAL CONTRACT DAYS: 240 CURRENT CONTRACT DAYS: 320 NEW CONTRACT DAYS: 341 SIGNED AND AGREED TO on the_day of , 2024. PREFERRED FACILITESGROUP-USA,LLC Print Name: Title: SIGNED AND AGREED TO on the_day of , 2024. CITY OF PORT ARTHUR BY: RON BURTON CITY MANAGER °,0P PREFERRED 001011.111111 FACILITIES GROUP — USA March 4, 2024 Mailing Address: PO Box 20658 Chandra Alpough Beaumont,TX 77720-0658 City of Port Arthur 444 4th St. O (409)842-8293 Port Arthur, TX 77640 Co (409)842-2274 • pfg@pfg-usa.com Project: "City of Port Arthur—Monument Signage" es pfg-usa.com Subject: "Change Order No. 2" Job Order Contracting Dear Ms.Alpough: Co-Op Purchasing Agreements This will serve as our Change Order No.2 to remove the existing City Hall sign to increase font size and add address. The City of Port Arthur to confirm new signage shop drawings prior to any work being done on existing sign. Cost includes labor, materials, equipment, Indefinite Delivery,Indefinite and insurance. Quantity-IDIQ Change Order-02 Recap: Multiple Award Construction Contracts-MACC • Provide shop drawings for City of PA approval for larger letters, orientation of address addition Task Order Contracts • After approval of revised shop drawings, Remove existing City Hall sign cabinet TOC and bring back to RS Industrial Arts shop in Houston for refabrication • Install new sign faces painted to match faux concrete color Construction Management— • Reinstall sign cabinet with (2) sets of larger 3/8"thick CNC waterjet letterforms to Agent or At-Risk read: "CITY HALL" "444 4th Street" • All elements are painted using the Matthews Paint System Design Build • Site clean up after new sign with larger letters has been reinstalled Government Total Change Order-02 $9,730.00 Commercial Total Time Extension 21 Days Education This pricing is based on recommended work hours of Monday thru Friday 7:00 am to 5:00 pm. Please contact us at 409-842-8293 at your convenience to discuss this estimate. Industrial Respectfully submitted, Infrastructure Preferred Facilities Group- USA Communications Matt Ueding Corporate/Retail Project Manager Assembly Southeast Texas Deep East Texas Central Texas Texas Gulf Coast