HomeMy WebLinkAboutPR 23725: WATER PURIFICATION PLANT CENTRIFUGE BUILDING ROOF REPLACEMENT Cfrr of
or-t rtltur �
7ctus
INTEROFFICE MEMORANDUM
Date: April 25, 2024
To: The Honorable Mayor and City Council
Through: Ronald Burton, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: P.R.No. 23725 —Water Purification Plant Centrifuge Building Roof
Replacement
Introduction:
The intent of this Agenda Item is to seek the City Council's approval to replace the roof of the
centrifuge building at the Water Purification Plant with Mike Barnett Construction, Inc.
Background:
The centrifuge building roof has reached the end of its useful life. Mike Barnett Construction,
Inc. of Port Neches, Texas provided a quote through the Southeast Texas Purchasing
Cooperation administrated by Region 5 Education Service Center (Region 5 ESC) for
$46,650.00 to replace the centrifuge building roof with new 24 ga, galvalume PBR Roof Panel.
Budget Impact:
Funding is available in Account No. 410-40-210-5312-00-00-000, Building Maintenance.
Recommendation:
It is recommended that the City Council approve PR No. 23725, authorizing the replacement of
the centrifuge building roof at the Water Purification Plant as described/outlined above.
"Remember,we are here to serve the Citizens of Port Arthur"
PR No. 23725
04/25/24 cs
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO ENTER INTO AN AGREEMENT WITH MIKE
BARNETT CONSTRUCTION, INC. OF PORT NECHES,
TEXAS FOR THE WATER PURIFICATION PLANT
CENTRIFUGE BUILDING ROOF REPLACEMENT
UNDER THE SOUTHEAST TEXAS COOPERATIVE
CONTRACT NO. 20240202, ADMINISTERED BY THE
REGION 5 EDUCATION SERVICE CENTER (REGION 5
ESC), WITH A PROJECTED BUDGETARY IMPACT
AMOUNT OF $46,650.00. FUNDING IS AVAILABLE IN
ACCOUNT NO. 410-40-210-5312-00-00-000, BUILDING
MAINTENANCE.
WHEREAS,the centrifuge building roof has reached the end of its useful life; and
WHEREAS, Mike Barnett Construction, Inc. of Port Neches, Texas provided a quote
attached hereto as Exhibit "A", from Southeast Texas Purchasing Cooperation administered by
Region 5 Education Service Center(Region 5 ESC),to replace the centrifuge building roof for the
projected amount of$46,650.00; and
WHEREAS, pursuant to Chapter 271, Subchapter D, of the Texas Local Government
Code, a city, by resolution of its governing body, may participate in cooperative purchasing
programs established by the State Facilities Commission for the purchase of goods at prices
established through purchase contracts of the Commission; and
WHEREAS,per Resolution No. 20-019,the City entered into an Interlocal Agreement for
cooperative purchasing with Southeast Texas Purchasing Cooperation administered by Education
Service Center (Region 5 ESC); and
WHEREAS,Mike Barnett Construction, Inc. is a registered vendor on the Region 5 ESC,
Southeast Texas Cooperative Purchasing Organization.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR:
PR No. 23725
04/25/24 cs
Page 2 of 3
THAT, facts and opinions in the preamble are true and correct: and,
THAT,the City Manager is hereby authorized to execute an agreement with Mike Barnett
Construction, Inc. of Port Neches, Texas for the replacement of the centrifuge building roof, in
substantially the same form, attached as Exhibit"A".
THAT, a copy of the caption of this resolution be spread upon the minutes of the City
Council.
READ,ADOPTED,AND APPROVED THIS day of ,2024, at
a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor
Councilmembers:
NOES:
Thurman Bill Bartie
Mayor
ATTEST: APPROVED AS TO FORM:
Sherri Bellard J. - M. Black
City Secretary I - m City Attorney
PR No. 23725
04/25/24 cs
Page 3 of 3
APPROVED: FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY
OF FUNDS:
Ronald Burton, CPM yn (Lyn) Boswell, MA, IC A-CM
City ger Finance Director
ff4{ 6,641/2`-'1 1 All
Calvin Matthews, P.E. Clifton Williams, CPPB
Water Utilities Director Purchasing Manager
EXHIBIT "A"
cooperati‘e pwYin
CENTRIFUGE BUILDING ROOF REPLACEMENT
FOR WATER UTILITIES WATER PURIFICATION PLANT
THIS AGREEMENT, made this day of , 2024, by and
between the City of Port Arthur, a municipal corporation organized under the laws of the
State of Texas, hereinafter called "OWNER" or "CITY" and Mike Barnett Construction
of Port Neches, Texas hereinafter called "CONTRACTOR".
WITNESSETH: That for and in consideration of the payment terms, conditions and
agreements set forth herein, OWNER and CONTRACTOR agree as follows:
1. This contract shall be for 3 months from the date stated on the Notice to Proceed. The
City can terminate this contract at its convenience which includes, but is not limited
to, funding not being available in any budget cycle with thirty (30) days written
notice.
2. The Contractor will perform work as stated in the Contract Documents.
3. During the term of this Contract, the Contractor will furnish at his own expense all of
the materials, supplies, tools, equipment, labor, windstorm certification and other
services necessary in connection therewith, excepting those supplies specifically not
required of Contractor in the Specifications.
4. The CONTRACTOR agrees to perform all the work described in the specifications
and contract documents and to comply with the terms therein for the following cost:
Replace roof on the centrifuge building of the Water Purification Plant
Not To Exceed: $46,650
5. The term"Contract Documents"means and includes the following:
a. Agreement
b. Scope of Work
c. Bid/Quote
d. Notice of Award
e. Notice to Proceed
6. This Agreement shall be binding upon all parties hereto and their respective heirs,
executors, administrators, successors and assigns.
7. IN WITNESS WHEREOF,the parties hereto have executed, or caused to be executed
by their duly authorized officials, this Agreement in(2 copies)each of which shall be
deemed an original on the date first above written.
Signed and agreed to on the day of , 2024.
OWNER:
CITY OF PORT ARTHUR
BY:
Ronald Burton, CPM
City Manager
CONTRACTOR:
MIKE BARNETT CONSTRUCTION,INC.
BY:
Print Name:
Title:
:4
1t.r'
Region 5
Education Service
Center
350 Pine Street
Beaumont, TX 77701 CONGRATULATIONS!
409-951_1766 Your organization is an awarded vendor with
shugt:esqlesc5 net Southeast Toxas Purchasing Cooperative.
We look forward to partnering with you in
Award Letter f providing exemplary purchasing support to
April 2024- March 2025 our school districts.
April 1 . 2024
'1..•.a t,rV,;f;;rl;ltiryn ret entl' submitted an RFT to the SE IX Purchasing Cooperative ander the
category of Maintenance& Operation Equipment Supplies,Rental Sales wuir+r Service
020240202. We are pleased to inform you hare been a»atrdcti for the dates of April 2024.doer
March 31,2025. We recommence that you timid a c:Naf giprice list to each of the SETX Cnd)p
school district purchasing,s:;p tine:It. This may Se done by your mho ce of methodology(l'SPS.
e cttrortic.athv•UPS.etc ).Please make sure your communication clearly marked
Region 5 ESC- "Maintenance A Operation Equipment Supplies,Rental Sakit anrtur
Service"Carukrg'Price List for Contract Year of.sprit 1.2024,to March 31,2025
Alter April I.292a,those interested in a RID RECAP can go to the Ss>utttcaist resas Cooperative
PurchatsineOrganirat:tm+yehpageatholy...t'c _ahhariliost.i,In! "it7!s 2..t'1ickcviVendor
!Database. then click Ian.12runtenance& Operation Equipment Supplies, Rental Sales and/or
Service. An excel spreadsheet sill load on your screen yynit the list of awarded vendors in this
PLEASE NO1E: It is your responsibility to notify the 5E J'X Purchasing C'Iwop of any.man..h
changes of hid contact. address. email. etc. if the change occurs during the bid contract year
Members and contacts change frequently throughout the year. Ube attached database is correct as
of the date of this ayyard letter army
Again,congratulations and thank you for your Interest in ES(.'S SE.1 X Purchasing Cooperative.
Shicereis.
! 1
Stacey Ilughe'
1'ur€hasing t o rdiiiaa:'
t "GI(.ON 5
E.rlNrattiom �ra'YKf ta-nirr
�l >>
�A4
• • T•
CONSTRUCTION
4111f24
City of Port Arthur Water Treatment Plant
1101 1.O, Mills Blvd
Port Arthur,TX T7640
RE Centerfuge Building Roof Replacement
We propose to furnish ail labor, materials and insurance,to perform the scope of work below,
for a sum of $46►680.00•This price Includes 10%discount on materials and a 30% additional
discount tar coop membership.
Scope of Work:
t) Remove existing Lightning Protection System
2) Remove existing PBR Panel Roof Panels.
3) Install new 24 ga, galvalume PBR Panel Roof Panels using 1'tri-bead tacky tape
and Long Lite screws.
4) Reinstall and certify lightning protection system.
5) Remove all construction debris from jotasite.
• Existing insulation to remain
• Existing gutters and downspouts to remain
• hto Permit Fees included
Thank Po for ahe cPportunittr to laid on ands project N we can be of any further assisll9nce pease teat
fee to can me at any time
it you would like for us to perform the above scope of work, please sign below and return to us
as soon as possible. At that time. you will be added to the WWI<to perform list.
Payment is due upon completion.
Lance Barnett Accepted
General Manager
SETX Regional Coop Contract Info: Maintenance and Operations Equipment and Supplies,Rental Sates and/or
Services 20240202
\-)-`49 RecosD APR I 1 3924
t1Ia 3rkn.tt Conativatien,Nc.,I79t Part tiati.s All...Part Potato.TX Treat Pelon.6seWD'sari Faz t4 TR7.2'e0S