Loading...
HomeMy WebLinkAboutPR 23725: WATER PURIFICATION PLANT CENTRIFUGE BUILDING ROOF REPLACEMENT Cfrr of or-t rtltur � 7ctus INTEROFFICE MEMORANDUM Date: April 25, 2024 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: P.R.No. 23725 —Water Purification Plant Centrifuge Building Roof Replacement Introduction: The intent of this Agenda Item is to seek the City Council's approval to replace the roof of the centrifuge building at the Water Purification Plant with Mike Barnett Construction, Inc. Background: The centrifuge building roof has reached the end of its useful life. Mike Barnett Construction, Inc. of Port Neches, Texas provided a quote through the Southeast Texas Purchasing Cooperation administrated by Region 5 Education Service Center (Region 5 ESC) for $46,650.00 to replace the centrifuge building roof with new 24 ga, galvalume PBR Roof Panel. Budget Impact: Funding is available in Account No. 410-40-210-5312-00-00-000, Building Maintenance. Recommendation: It is recommended that the City Council approve PR No. 23725, authorizing the replacement of the centrifuge building roof at the Water Purification Plant as described/outlined above. "Remember,we are here to serve the Citizens of Port Arthur" PR No. 23725 04/25/24 cs Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT WITH MIKE BARNETT CONSTRUCTION, INC. OF PORT NECHES, TEXAS FOR THE WATER PURIFICATION PLANT CENTRIFUGE BUILDING ROOF REPLACEMENT UNDER THE SOUTHEAST TEXAS COOPERATIVE CONTRACT NO. 20240202, ADMINISTERED BY THE REGION 5 EDUCATION SERVICE CENTER (REGION 5 ESC), WITH A PROJECTED BUDGETARY IMPACT AMOUNT OF $46,650.00. FUNDING IS AVAILABLE IN ACCOUNT NO. 410-40-210-5312-00-00-000, BUILDING MAINTENANCE. WHEREAS,the centrifuge building roof has reached the end of its useful life; and WHEREAS, Mike Barnett Construction, Inc. of Port Neches, Texas provided a quote attached hereto as Exhibit "A", from Southeast Texas Purchasing Cooperation administered by Region 5 Education Service Center(Region 5 ESC),to replace the centrifuge building roof for the projected amount of$46,650.00; and WHEREAS, pursuant to Chapter 271, Subchapter D, of the Texas Local Government Code, a city, by resolution of its governing body, may participate in cooperative purchasing programs established by the State Facilities Commission for the purchase of goods at prices established through purchase contracts of the Commission; and WHEREAS,per Resolution No. 20-019,the City entered into an Interlocal Agreement for cooperative purchasing with Southeast Texas Purchasing Cooperation administered by Education Service Center (Region 5 ESC); and WHEREAS,Mike Barnett Construction, Inc. is a registered vendor on the Region 5 ESC, Southeast Texas Cooperative Purchasing Organization. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: PR No. 23725 04/25/24 cs Page 2 of 3 THAT, facts and opinions in the preamble are true and correct: and, THAT,the City Manager is hereby authorized to execute an agreement with Mike Barnett Construction, Inc. of Port Neches, Texas for the replacement of the centrifuge building roof, in substantially the same form, attached as Exhibit"A". THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. READ,ADOPTED,AND APPROVED THIS day of ,2024, at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Thurman Bill Bartie Mayor ATTEST: APPROVED AS TO FORM: Sherri Bellard J. - M. Black City Secretary I - m City Attorney PR No. 23725 04/25/24 cs Page 3 of 3 APPROVED: FOR ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: Ronald Burton, CPM yn (Lyn) Boswell, MA, IC A-CM City ger Finance Director ff4{ 6,641/2`-'1 1 All Calvin Matthews, P.E. Clifton Williams, CPPB Water Utilities Director Purchasing Manager EXHIBIT "A" cooperati‘e pwYin CENTRIFUGE BUILDING ROOF REPLACEMENT FOR WATER UTILITIES WATER PURIFICATION PLANT THIS AGREEMENT, made this day of , 2024, by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called "OWNER" or "CITY" and Mike Barnett Construction of Port Neches, Texas hereinafter called "CONTRACTOR". WITNESSETH: That for and in consideration of the payment terms, conditions and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. This contract shall be for 3 months from the date stated on the Notice to Proceed. The City can terminate this contract at its convenience which includes, but is not limited to, funding not being available in any budget cycle with thirty (30) days written notice. 2. The Contractor will perform work as stated in the Contract Documents. 3. During the term of this Contract, the Contractor will furnish at his own expense all of the materials, supplies, tools, equipment, labor, windstorm certification and other services necessary in connection therewith, excepting those supplies specifically not required of Contractor in the Specifications. 4. The CONTRACTOR agrees to perform all the work described in the specifications and contract documents and to comply with the terms therein for the following cost: Replace roof on the centrifuge building of the Water Purification Plant Not To Exceed: $46,650 5. The term"Contract Documents"means and includes the following: a. Agreement b. Scope of Work c. Bid/Quote d. Notice of Award e. Notice to Proceed 6. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors and assigns. 7. IN WITNESS WHEREOF,the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in(2 copies)each of which shall be deemed an original on the date first above written. Signed and agreed to on the day of , 2024. OWNER: CITY OF PORT ARTHUR BY: Ronald Burton, CPM City Manager CONTRACTOR: MIKE BARNETT CONSTRUCTION,INC. BY: Print Name: Title: :4 1t.r' Region 5 Education Service Center 350 Pine Street Beaumont, TX 77701 CONGRATULATIONS! 409-951_1766 Your organization is an awarded vendor with shugt:esqlesc5 net Southeast Toxas Purchasing Cooperative. We look forward to partnering with you in Award Letter f providing exemplary purchasing support to April 2024- March 2025 our school districts. April 1 . 2024 '1..•.a t,rV,;f;;rl;ltiryn ret entl' submitted an RFT to the SE IX Purchasing Cooperative ander the category of Maintenance& Operation Equipment Supplies,Rental Sales wuir+r Service 020240202. We are pleased to inform you hare been a»atrdcti for the dates of April 2024.doer March 31,2025. We recommence that you timid a c:Naf giprice list to each of the SETX Cnd)p school district purchasing,s:;p tine:It. This may Se done by your mho ce of methodology(l'SPS. e cttrortic.athv•UPS.etc ).Please make sure your communication clearly marked Region 5 ESC- "Maintenance A Operation Equipment Supplies,Rental Sakit anrtur Service"Carukrg'Price List for Contract Year of.sprit 1.2024,to March 31,2025 Alter April I.292a,those interested in a RID RECAP can go to the Ss>utttcaist resas Cooperative PurchatsineOrganirat:tm+yehpageatholy...t'c _ahhariliost.i,In! "it7!s 2..t'1ickcviVendor !Database. then click Ian.12runtenance& Operation Equipment Supplies, Rental Sales and/or Service. An excel spreadsheet sill load on your screen yynit the list of awarded vendors in this PLEASE NO1E: It is your responsibility to notify the 5E J'X Purchasing C'Iwop of any.man..h changes of hid contact. address. email. etc. if the change occurs during the bid contract year Members and contacts change frequently throughout the year. Ube attached database is correct as of the date of this ayyard letter army Again,congratulations and thank you for your Interest in ES(.'S SE.1 X Purchasing Cooperative. Shicereis. ! 1 Stacey Ilughe' 1'ur€hasing t o rdiiiaa:' t "GI(.ON 5 E.rlNrattiom �ra'YKf ta-nirr �l >> �A4 • • T• CONSTRUCTION 4111f24 City of Port Arthur Water Treatment Plant 1101 1.O, Mills Blvd Port Arthur,TX T7640 RE Centerfuge Building Roof Replacement We propose to furnish ail labor, materials and insurance,to perform the scope of work below, for a sum of $46►680.00•This price Includes 10%discount on materials and a 30% additional discount tar coop membership. Scope of Work: t) Remove existing Lightning Protection System 2) Remove existing PBR Panel Roof Panels. 3) Install new 24 ga, galvalume PBR Panel Roof Panels using 1'tri-bead tacky tape and Long Lite screws. 4) Reinstall and certify lightning protection system. 5) Remove all construction debris from jotasite. • Existing insulation to remain • Existing gutters and downspouts to remain • hto Permit Fees included Thank Po for ahe cPportunittr to laid on ands project N we can be of any further assisll9nce pease teat fee to can me at any time it you would like for us to perform the above scope of work, please sign below and return to us as soon as possible. At that time. you will be added to the WWI<to perform list. Payment is due upon completion. Lance Barnett Accepted General Manager SETX Regional Coop Contract Info: Maintenance and Operations Equipment and Supplies,Rental Sates and/or Services 20240202 \-)-`49 RecosD APR I 1 3924 t1Ia 3rkn.tt Conativatien,Nc.,I79t Part tiati.s All...Part Potato.TX Treat Pelon.6seWD'sari Faz t4 TR7.2'e0S