HomeMy WebLinkAbout(CM 2) Sewer Improvement - AG 2024 RV2 (2)City of Port Arthur Introduction
City of Port Arthur has a population of approximately 51,000 served by three(3)
wastewater treatment facilities: Main Plant (Permitted Avg. flow 9.2 MGD), Port
Acres Plant ( Permitted Avg. flow 3.8 MGD), and Sabine Pass Plant (Permitted
Avg. Flow 0.3 MGD)
There are 57 lift stations and over 230 miles of sewer piping
Violations of Major Concern to The Texas Attorney General
Major overflows of untreated sewage from wastewater treatment facilities
Failure of WWTP’s treatment equipment, even after repairs are made
Reporting of one or more Permit limit effluent violations per month (all 3 WWTPs)
Sanitary sewer overflows from manholes and lift stations
Sewer line breakage and collapses due to old sewer lines
Overflows of sewage into residents’ yards and homes
City Administrative Actions to Address Wastewater Infrastructure Issues
Contracted with Consulting Engineering Firms to provide planning and design for
Wastewater Improvements
Employed Utility Director with a Professional Engineer (PE) License
Employed Utility Engineer Manager with a Professional Engineer (PE) License
Created an extra Utility Engineer position to oversee utility construction and
improvements projects
Employed Utility Compliance Manager to ensure compliance with TCEQ and EPA rules and
regulations.
Implemented a Fats, Oil and Grease (FOG)Ordinance and permitting process to reduce
grease accumulation in the sewer collection system
Employed two inspectors to oversee compliance with the FOG and educational programs.
Monitored the wastewater collection system operations
Change the Culture
Wastewater Treatment and Collection System Operation Changes
Wastewater Treatment Operations
The Wastewater Treatment Plants currently are operated by Four(4) TCEQ “A” License operators.
Established Wastewater Treatment Laboratory w/Full Time Laboratory Analyst.
Developed Standard Operating Procedures (SOPs) for Operation of the treatment facilities.
Developed SOPs for reporting treatment system overflows.
Reorganized Wastewater treatment plant record keeping and filing system.
Collection System
Created a Citywide Pipe Bursting crew with the Superintendent and five full-time employees
and purchased over 1 million dollars in equipment.
Purchased Sewer Line Camera Truck for Identifying problem sewer lines and blockages.
Restructured SOPs for reporting collection system discharges.
City-wide Collection SystemSewerPipe Replacement 2012 -2024
Lift Station Rehabilitation 2019 -2024
1.46th St. Lift Station Rehabilitation. Construction Price –$784,981. Completed in 2021.Installation of bypass header and a section of force main piping arrangement.
2.Lift Station Remediation & Mitigation. Construction Price –$1,385,788. Completed in 2023New electrical power distribution equipment, and control panels for 12 Lift Stations, including 3rd Ave, 9th Ave, 46th St, 58th St, Operation Center, El Vista, Lakeside, Montrose, West Port Arthur Rd, Roosevelt Ave, Aero Drive, and Taft Ave Lift Station.
3.Pioneer Park Lift Station. Construction Price –$774,065. Completed in 2023.Rehabilitation of wet pit/dry pit into a new submersible pump lift station is complete with all new pumps, valves, piping, electrical, conversion of dry well into wet well, concrete coatings, site work, pump removal crane, and ancillary facilities.
4.North Plant Lift Station. Construction Price –$578,195. Completed in 2023.Rehabilitated the pumps, valves, and piping.
5.Business Park Lift Station Upgrade. Construction Price -$399,624.Completed in 2024.
Increased lift station capacity.
Lift Station Rehabilitation 2019 -2024
SABINE PASS COLLECTION SYSTEM
The City of Port Arthur is currently under a Sanitary Sewer Overflow Initiative Agreement with the TCEQ to replace and clean 2,000 linear feet a year of sewer lines in Sabine Pass. The agreement also requires the City to replace 5 manholes per year. Prior to the revised agreement, the City replaced approximately 3,000 LF between, 2019 and 2020. The agreement was revised in 2021 and will end on December 31, 2026.
The City has spent nearly 1.1 million dollars on the collection system in Sabine Pass.
From 2021 to 2024, the City replaced and cleaned over 12,000 linear feet of sewer lines and replaced 23 manholes in Sabine Pass and is ahead on its agreed-upon schedule(4,000 LF and 3 manholes ahead).
Sabine PassSewer Pipe Replacement 2019 -2024
SABINE PASS COLLECTION SYSTEM
Main Wastewater Treatment Plant Improvements Projects (April 2022)
1.Main Wastewater Treatment Plant Improvements. ALLCO, LLC. Construction Price –$73,643,227. Scheduled completion 2026
New Main Outfall Lift Station, Headworks, Primary Clarifiers, Trickling Filters, Multipurpose Lift Station, Final Clarifiers, RAS/WAS Meter Station, Filters, Chlorine Contact Basins, Non-Potable Water System, Dewatering System, Electrical/Instrumentation & Elec. Buildings, Mechanical Screens, Washer-Compactors.
2.42” Force Main Construction. ALLCO, LLC. Project Price –5,600,000. Scheduled completion March 2025.
Approximately 4,081 linear feet of 42” force main from the Main Outfall Lift Station to the Main Wastewater Treatment Plant and abandonment of the existing 30” force main.
Main Wastewater Treatment Plant Improvements Projects
Main Wastewater Treatment Plant
Main Outfall Lift Station
42” Force Main
Main Wastewater Treatment Plant Improvements Projects (April 2022)
Port Acres Wastewater Treatment Plant Improvement Projects
1.Installation of Aerobic Aeration Basin Improvement Project. Project Price -$2,600,000. Completed –2011
2.Centrifuge Improvements Project. Project Price –$534,000.Completed –2015. A New Centrifuge was installed with new piping.
3.2015 Port Acres WWTP Rehabilitation. Project Price –$2,521,727.Completed –2017.Aeration Modifications and Digester Modifications
4.Influent Lift Station Rehabilitation. Project Price –$597,352.00.Completed –2023.
5.New Sludge return pumps –Project Price -$400,000. Completed 2019.
6.Clarifier Rehabilitation. Project Price -$296,255. Completed –2023.
Cleaned the lift station well, replaced inlet valves, and rebuilt the influent pumps.
7. Port Acres WWTP Improvements. Project Price –$1,288,300.Scheduled completion –December 2024.Construct the new bypass header, piping, and valves.
PORT ACRES WWTP IMPROVEMENTS
PORT ACRES WWTP IMPROVEMENTS
Sabine Pass Wastewater Treatment Plant Improvement Projects
1.Clarifier Rehabilitation Project. Project Price –$237,500.00.Completed –2022.
New clarifier equipment and the sludge pumps.
2.Sabine Pass WWTP Improvement Project –Phase I. Project Price -$300,000 . Completed –2023.
Cleaned the sludge and grits, replaced blowers, rebuilt the aeration system, replaced the grinder and supernatant return pump, chlorine scales, and new splash guard around the aeration basin. Upgraded the de-chlorine system, and installed the new office with restroom on-site.
3.Sabine Pass WWTP Improvement Project –Phase II. Project Price estimate –$350,000.Scheduled completion –July 2025.
Drying beds, sidewalk, and safety handrail.
Sabine Pass Wastewater Treatment Plant Improvement Projects
Adopted 2024 Capital Improvement Budget5-year Program
Project Name 2024 Adopted Budget 2025 2026 2027 2028 Project Total Cost
Lift Stations Rehab $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $9,000,000
Sabine Pass Coll Sys $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
El Vista Force Manin $2,200,000 $1,100,000 $3,300,000
Sabine Pass Wastewater Treatment Plant $394,000 $394,000
46th Street Force Main $1,500,000 $1,500,000
Collection Systems Rehab $1,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $9,000,000
Install Parallel 36" Trunk Trans Line $19,000,000 $19,000,000
Elevated Storage Tank Rehab $1,000,000 $1,500,000 $1,000,000 $1,000,000 $4,500,000
Water Line Improvement/Replacements TWDB $5,000,000 $5,000,000 $2,000,000 $3,000,000 $15,000,000
Main WWTP Improvement CO $1,700,000 $1,700,000
Lead and Copper Phase I $500,000 $1,700,000 $2,200,000
Water Purification Plant Electrical Impr $1,000,000 $1,000,000
Atlanta Water Line Replacement $1,500,000 $2,000,000 $3,500,000
Fire Hydrant Replacement $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
TOTAL $8,094,000 $18,400,000 $12,600,000 $27,000,000 $9,000,000 $75,094,000
Funding Source 2024 Adopted Budget 2025 2026 2027 2028 Project Total Funding
General Revenue -Cash $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $10,000,000
Bonds $5,594,000 $15,900,000 $10,100,000 $24,500,000 $6,500,000 $62,594,000
CDBG
FEMA/HMPG Grant
Other Grant $500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
PAEDC
Other Funding Source1
Total $8,094,000 $18,400,000 $12,600,000 $27,000,000 $9,000,000 $75,094,000
Lift Station Projects Under Design/Study
Lift Station CIP Project
Project Description Capacity (gpm)Scope Project Status Estimated Cost
1 Lewis Drive Lift Station 2000 New station site, New well structure, submersible pumps,
sewer pipe relocation, SCADA, generator Under Capacity Study $
1,785,000.00
2 3rd Ave Lift Station 2000 New station site, New well structure, submersible pumps,
sewer pipe relocation, SCADA, generator Under Design $ 1,670,000.00
3 Sabine Pass Lift Station#7 750 New station site, New well structure, submersible pumps,
sewer pipe relocation, SCADA, generator Under Design $ 1,217,000.00
9 Lakeshore & Houston Ave Lift
Station 2710 New station site, New well structure, submersible pumps,
sewer pipe relocation, SCADA, generator Relocation Study $
1,150,000.00
10 Grannis Avenue Lift Station 400 New well structure, electrical, immersible pumps, SCADA,
generator Relocation Study $
1,141,000.00
11 HY365 Lift Station 3000 Upgrade the Capacity, New well structure, electrical,
immersible pumps, SCADA, generator Under Design $
835,000.00
Total Estimated Project Cost $ 7,798,000.00
Lift Station Projects 2024 EPA Community Change Grants (Applied)
Lift Station CIP Project
Project Description Capacity (gpm)Scope Project Status Estimated Cost
1 Lewis Drive Lift Station 2000 New station site, New well structure, submersible pumps, sewer pipe
relocation, SCADA, generator Under Capacity Study $ 1,785,000.00
2 3rd Ave Lift Station 2000 New station site, New well structure, submersible pumps, sewer pipe
relocation, SCADA, generator Under Design $ 1,670,000.00
3 Sabine Pass Lift Station#7 750 New station site, New well structure, submersible pumps, sewer pipe relocation, SCADA, generator Under Design $ 1,217,000.00
4 62nd Street Lift Station 650 New well structure, submersible pumps, sewer pipe relocation, SCADA,
generator $ 1,150,000.00
5 Peek Avenue Lift Station 400 New well structure, submersible pumps, sewer pipe relocation, SCADA,
generator $ 1,150,000.00
6 Lake Charles Dr. Lift Station 6550 Well coating, immersible pumps, electrical, piping, SCADA, generator $ 2,185,000.00
7 19th & Stilwell Lift Station 3000 Well coating, immersible pumps, electrical, SCADA, generator $ 1,898,000.00
8 Railroad &Thomas Lift Station 1300 New well structure, electrical, immersible pumps, SCADA, generator $ 1,380,000.00
9 Lakeshore & Houston Ave Lift Station 2710 New station site, New well structure, submersible pumps, sewer pipe relocation, SCADA, generator Relocation Study $ 1,150,000.00
10 Grannis Avenue Lift Station 400 New well structure, electrical, immersible pumps, SCADA, generator Relocation Study $ 1,141,000.00
11 Vista Village Lift Station 400 New well structure, electrical, immersible pumps, SCADA, generator $ 978,000.00
12 46th Street Lift Station 4200 Well coating, new vertical centrifugal pumps, and associated discharge
header piping $ 856,000.00
13 39th Ave Lift Station 300 New well structure, electrical, immersible pumps, SCADA, generator $ 633,000.00
14 Smith Young Lift Station 350 New well structure, electrical, immersible pumps, SCADA, generator $ 863,000.00
15 Operation Lift Station 350 New well structure, electrical, immersible pumps, SCADA, generator $ 633,000.00
Total Estimated Project Cost $ 18,056,000.00
Sewer Pipe Replacement Projects Under Design/Study
Project Description
Length
(LF)
Existing
Size (inch)
Proposed
Size (inch)
Phase Estimated Cost
46TH Street Force Main Replacement Project 11,088 24 24 Under design $6,407,382
El Vista Force Main Replacement Project phase II 1,462 16 16 Design complete $1,885,855
36th street to 34th street around 3rd Ave LS 4,500 12&15 16 Under design $822,460
Hwy 365 Force Main 9,660 8 16 Under design $2,165,000
Park Central Area (Stonegate)12,254 8 &10 8&10 Smoke Testing/TV $1,470,480
Citywide sewer rehab contract 2 (Vicksburg Ave)822,460 10&12&15 10&12&16 Under design $1,098,120
Total Estimated Project Cost $18,695,737
Sewer Pipe Replacement Projects2024 EPA Community Change Grants (Applied)
Project Description
Length
(LF)
Existing Size
(inch)
Proposed Size
(inch)Phase Estimated Cost
46TH Street Force Main Replacement Project 11,088 24 24 Under design $6,407,382
El Vista Force Main Replacement Project phase II 1,462 16 16 Design complete $1,885,855
36th street to 34th street around 3rd Ave LS 4,500 12&15 16 Under design $822,460
South of Highway 73 & 9th Ave 40,387 8 &10 8&10 $4,846,440
Hwy 365 Force Main 9,660 8 16 Under design $2,165,000
Park Central Area (Stonegate)12,254 8 &10 8&10 Smoke Testing/TV $1,470,480
Citywide sewer rehab contract 2 (Vicksburg Ave)822,460 10&12&15 10&12&16 Under design $1,098,120
Total Estimated Project Cost $18,695,737
Sewer Pipe Replacement Projects2024 EPA Community Change Grants (Applied)