HomeMy WebLinkAboutPR 23782: SANITARY SEWER SYSTEM REHABILITATION CONTRACT 1 CLOSEOUT (-41 „, rl�t tl INTEROFFICE MEMORANDUM Date: May 23, 2024 To: The Honorable Mayor and City Council Through: Ronald Burton, C.P.M., City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR 23782—Sanitary Sewer System Rehabilitation Contract 1 Closeout Introduction: The intent of this Agenda Item is to seek the City Council's approval for Final Change Order No. 4 with an increased amount of$703.95 for final reconciliation of quantities, to close out Sanitary Sewer System Rehabilitation Contract 1, and to authorize the City Manager to release the retainage invoice of$88,438.20. Background: The Sanitary Sewer System Rehabilitation Contract 1 project was designed by Golden Triangle Consulting Engineers and managed by City Staff. On May 9, 2023, the Council passed Resolution No. 23-219,which awarded King Solutions, LLC with the construction phase of the Sanitary Sewer System Rehabilitation Contract No. 1, in the original contract amount of $1,419,884.00. Per Resolution No. 23-352, Change Order No. 1, which increased the contract by $54,140.00, added 640 L.F. of sanitary sewer line on 22nd Street and 1020 L.F. on line 4, as well as deleting the 8" sanitary sewer replacement on line 3 and the 12"sewer replacement on 22nd Street between manholes 4 and 5. Per Resolution No. 24-039, Change Order No. 2, which increased the contract by $90,800.00, consolidated the contract quantity and additional nearby sewer line installation which collapsed after the design and award of the contract. It includes replacing 2,950 L.F. of 8" sewer line, 2 manholes, 1 clean-out, connecting 60 short side service lines, removing 1,960 L.F. of 10" sanitary sewer lines that had been done by city forces, and extending the construction time by 80 days. Per Resolution No. 24-078, Change Order No. 3, which increased the contract by $203,200.00, installed 3,300 L.F. of 8"sewer line,and 8 manholes between Thomas Blvd and 10th Street. The "Remember,we are here to serve the Citizens of Port Arthur" C ih rrt nrf t"1Jllfl" change order also requested a 30-day extension to complete all the remaining work due to delays in material's weather days, and additional scope of work. The Final Change Order No. 4 is for final reconciliation of quantities and will increase the contract by $703.95,to close out Sanitary Sewer System Rehabilitation Contract 1. Budget Impact: The original contract total amount is $1,419,884.00. Change Order No. 1 increased the total project cost by $54,140.00. Change Order No. 2 increased the total project cost by $90,800.00. Change Order No. 3 increased the total project cost by $203,200.00. Change Order No. 4 will increase the total project cost by 703.95, to the final total contract amount of$1,768,727.95. Funds are available in Account No. 405-40-000-8516-00-00-000, Project No. WS-0006-CON. Recommendation: It is recommended that City Council adopt Proposed Resolution No. 23782,which approves the final change order to close out the project, authorizing the City Manager to accept the project and authorize the release of the retainage of$88,438.20. "Remember, we are here to serve the Citizens of Port Arthur" PR No. 23782 5/23/24 cm Page 1 of 4 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE FINAL CHANGE ORDER NO. 4 FOR FINAL RECONCILIATION OF QUANTITIES, INCREASING THE CONTRACT AMOUNT BY $703.95 TO A NEW CONTRACT AMOUNT OF $1,768,727.95, ACCEPTING THE ENGINEER'S CERTIFICATE OF COMPLETION, CONTRACTOR'S AFFIDAVIT OF GUARANTEE AND AFFIDAVIT OF FINAL PAYMENT AND RELEASE, AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE CERTIFICATE OF ACCEPTANCE FOR THE SANITARY SEWER SYSTEM REHABILITATION CONTRACT NO. 1 BY KING SOLUTIONS, LLC OF HOUSTON, TEXAS AND AUTHORIZING THE RELEASE OF RETAINAGE IN THE AMOUNT OF $88,438.20 FROM ACCOUNT NO. 405- 40-000-8516-00-00-000,PROJECT NO.WS-0006-CON. WHEREAS, pursuant to Resolution No. 23-219, the City Council awarded a contract to King Solutions, LLC of Houston, Texas for the construction phase of the Sanitary Sewer System Rehabilitation Contract No. 1 for the total contract amount of$1,419,884.00; and, WHEREAS, pursuant to Resolution No. 23-352, Change Order No. 1 was approved by adding 640 L.F. of pipe bursting on 22nd Street and 1020 L.F. on line 4, as well as deleting the 8" sewer replacement on line 3 and the 12" sewer replacement on 22nd Street between manholes 4 and 5, increasing the contract amount by $54,140.00, and bringing the new contract amount to $1,474,024.00; and, WHEREAS, pursuant to Resolution No. 24-039, Change Order No. 2 was approved to replace 2,950 L.F. of 8" sanitary sewer lines, 2 manholes, 1 clean-out, connect 60 short side service lines, remove 1,960 L.F. of 10" sanitary sewer lines that the city forces had installed. increasing the contract by $90,800.00, to a new contract total of$1,564,824.00; and, PR No. 23782 5/23/24 cm Page 2 of 4 WHEREAS, pursuant to Resolution No. 24-078, Change Order No. 3 was approved install 3,300 L.F. of 8" sewer line, and 8 manholes between Thomas Blvd and 10th Street, increasing the contract by $203,200.00, to a new contract total of$1,768,024.00, and adding a 30-day extension to complete all the remaining work due to delays in material's weather days; and, WHEREAS, the proposed Final Change Order No. 4 (Exhibit "A") for final reconciliation of quantities will increase the contract amount by $703.95 to a new contract total of$1.768.727.95; and, WHEREAS, the City has received the Engineer's Certificate of Construction and Completion, dated May 15, 2024, from Golden Triangle Consulting Engineers of Beaumont, Texas, stating that to the best of their knowledge, Sanitary Sewer System Rehabilitation Contract No. 1 has been completed in general accordance with City standards, a copy is attached hereto and made a part hereof as (Exhibit `B"), together with a Contractor's Affidavit of Guarantee (Exhibit"C"), executed by King Solutions, LLC; and, WHEREAS, the retainage for this project is due, as the work is completed and billed, and the project engineer, Golden Triangle Consulting Engineers, approves release of retainage to King Solutions, LLC, in the amount of$88,438.20 (see Exhibit"E"). NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, THAT, the City Manager is hereby authorized to execute Final Change Order No. 4 (Exhibit "A"), and accept the closing documents that includes the Engineer's Certificate of Completion (Exhibit `B"), the Contractor's Affidavit of Guarantee and Contractor's Affidavit of PR No. 23782 5/23/24 cm Page 3 of 4 Final Payment and Release (Exhibit "C"), execute the Certificate of Acceptance (Exhibit "D") for the completion of the Sanitary Sewer System Rehabilitation Contract No. 1, and authorize the Release of Retainage to King Solutions, LLC, in the amount of 88,438.20 (Exhibit"E"); and, THAT, a copy of the caption of this Resolution be spread upon the minutes of the City Council. READ, ADOPTED,AND APPROVED THIS day of , 2024 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor: Councilmembers: NOES: Thurman"Bill"Bartie Mayor ATTEST: Sherri Bellard City Secretary PR No. 23782 5/23/24 cm Page 4 of 4 APPROVED AS TO FORM: Jam M. Black Interim City Attorney APPROVED F L ' ADMINISTRATION: APPROVED AS TO AVAILABILITY OF FUNDS: Ronald Burton, C • Lyndd(Lyn)Boswell, MA, ICMA-CM City Manager Director of Finance &14/ I / ; , 1, Calvin Matthews, P.E. Clifton Yilliams, CP' : Water Utilities Director Purchasing Manager EXHIBIT A (Change Order No. 4) CITY OF PORT ARTHUR Sanitary Sewer System Rehabilitation Contract #1 FINAL CHANGE ORDER DATE: 5/23/2024 CONTRACT NO.: 23-219 CONTRACT DATE: 9/8/2023 CONTRACTOR: KING SOLUTION The following changes are hereby made to the CONTRACT DOCUMENTS. Final Reconciliation of quantities increasing the contract amount by $703.95 (minus the retainage to an amount of$668.75) to the new contract amount to $1,768,727.95. CHANGE TO CONTRACT PRICE: ORIGINAL CONTRACT PRICE: $1,419,884.00 CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $1,768,024.00 The Contract Price due to this CHANGE ORDER will be: Increased by: $703.95 The new CONTRACT PRICE, including this CHANGE ORDER, will be: $1,768,727.95 CHANGE TO CONTRACT TIME ORIGINAL CONTRACT TIME: 150 DAYS CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER(S): 230 DAYS The Contract Time due to this CHANGE ORDER will be Extended by: 0 days The new CONTRACT TIME, including this CHANGE ORDER, will be: 230 days Page 1 of 2 F- CITY OF PORT ARTHUR Sanitary Sewer System Rehabilitation Contract #1 FINAL CHANGE ORDER No other Terms and Conditions of the Contract are changed as a result of this Change Order. Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs incurred by Contractor in his performance of the work covered by the Change Order RECOMMENDED BY ENGINEER: ACCEPTED BY: VIA724 —City of Port Arthur (CONTRACTOR, OFFICER, OR OWNER) Utility Engineering Manager King Solutions I RECOMMENDED BY ENGINEER: . (--c sI ----: Golden Triangle Consulting Engineers CITY of Port Arthur Page 2 of 2 ►� S L-UTIONS KING SOLUTION SERVICES, LLC MONTHLY ESTIMATE APPLICATION NO. FINAL DATE: 5/15/2024 CLIENT: CITY OF PORT ARTHUR ADDRESS: 444 4TH STREET PORT ARTHUR, TEXAS 77640 PROJECT: SANITARY SEWER SYSTEM REHABILITATION CONTRACT 1 PROJECT NO. 23-219 CONTRACTOR: King Solution Services, LLC ADDRESS: 13221 Chrisman Rd Houston, Texas 77039 ESTIMATE NO: FINAL FROM: 05-03-24 TO 05-03-24 ANALYSIS OF CONTRACT AMOUNT Original Contract Amount $1,419,884.00 Plus Additions By Change Order: $348,843.95 Deducts By Change Order: $0.00 Adjusted Contract Amount: $1,768,727.95 Work Performed to Date: $1,768,726.95 Less 5% Retainage: ($88,436.35) Net Amount Earned to Date: $1,680,290.60 Less Previous Payments: $1,679,621.85 ****AMOUNT DUE THIS ESTIMATE**** $668.75 RECOMMEND APPROVAL Payment Due Contractor: AGREED: CITY OF PORT ART R . KING SOLUTION SERVICES,LLC By: By: .4 /(% ENGINE R CONTRACTOR Date: Ho4.7 >t,4 I -zo Date: 5/24/2024 APPROVED: CITY OF PORT ARTHUR By: OWNER Date: I Page 1 I CLIENT:CITY OF PORT ARTHUR PROJECT:SANITARY SEWER SYSTEM REHABILITATION CONTRACT#1 ESTIMATE NO.9/FINAL A B C D E F G H I J K L M Unit Original Unit Total Qty Total Qty Unit Unit Amount Amount Contract Percent ttem Of Unit Price This Previous Quantities Quantities Due Due Amount Complete No. Description of Work Measure Qty Estimate Estimate To Date Remaining This Period To Date (F+G) (D-H) (F"E) (H*E) (D*E) (K/L) BASE BID 1 Mobilization costs,including payment bond, performance bond,insurance,moving equipment to project,and project sign,all in strict LS 1 $25,000.00 0 1.00 1 0 $0.00 $25,000.00 $25,000.00 130% accordance with the plans and specifications; NOT TO EXCEED 4%of total project cost 2 Rehabilitate 8"Diameter Sanitary Sewer Pipe by Pipe Bursting Using 8"SDR-17 HDPE Pipe,complete in place,all depths,including liner pipe, connection to manholes,bypass pumping, cleaning,well points,surface restoration. LF 5884 $40.00 12,863 12,863 -6,979 $0.00 $514,520.00 $235,360.00 219% testing and necessary appurtenances,all in strict accordance with plans and specifications 3 Rehabilitate 10"Diameter Sanitary Sewer Pipe by Pipe Bursting Using 10"SDR-17 HDPE Pipe,complete in place,all depths,including liner pipe, connection to manholes,bypass pumping, LF 4,580 $46.00 2,888 2,888 1,692 $0.00 $132,848.00 $210,680.00 53s, cleaning,well points,surface restoration,testing and necessary appurtenances,all in strict accordance with plans and specifications 4 Rehabilitate 12"Diameter Sanitary Sewer Pipe by Pipe Bursting Using 12"SDR-17 HDPE Pipe,complete in place,all depths,including liner pipe. connection to manholes,bypass pumping, LF I,474 $60.00 1,425 1,425 49 $0.00 $85,500.00 $88,440.00 97% cleaning,well points,surface restoration,testing and necessary appurtenances,all in strict accordance with plans and specifications 5 Rehabilitate 27'Diameter Sanitary Sewer Pipe by Pipe Bursting Using 30"SDR-17 HDPE Pipe,complete in place,all depths,including liner pipe, connection to manholes,bypass pumping. LF 915 $305.00 344 344 571 $0.00 $104,920.00 $279,075.00 38% cleaning,well points,surface restoration,testing and necessary appurtenances,all in strict accordance with plans and specifications 6 Furnish and Install 4"Sanitary Sewer Service Line (Short Side),to include tap on proposed sanitary sewer pipe,concrete cleanout box,cleanout, connection to existing sanitary sewer service line, complete in place including tapping saddle, EA 341 $720.00 457 457 -116 $0.00 $329,040.00 $245,520.00 134% embedment,excavation,backfill,surface restoration and testing all in strict accordance with the plans and specifications 7 Furnish and Install 4"Sanitary Sewer Service Line (Long Side)to include tap on proposed sanitary sewer pipe,concrete cleanout box,cleanout, connection to existing sanitary sewer service line, EA 15 $1,050.00 0 15 $0.00 $0.00 $15,750.00 0% complete in place including tapping saddle, embedment,excavation,backfill,surface restoration and testing all in strict accordance with the plans and specifications 8 Post-Installation TV Inspection including all labor, materials and equipment,all in strict accordance with the plans and specifications for LF 12,853 $3.00 234.650 10,365.00 10,599.650 2,253 $703.95 $31,798.95 $38,559.00 82% 9 Remove the Exiting Sanitary Manholes and Replace with reinforced Concrete Sanitary Sewer Manhole as Per Plans,complete in place. including excavation.cement stabilized sand backfill,compaction,surface restoration, EA 30 $8,900.00 49 49 -19 $0.00 $436,100.00 $267,000.00 163% SuperCover^^manhole ring and cover(or approved equal),water-tight connection of existing and proposed sanitary sewer lines,and testing,all in strict accordance with the plans and 10 Furnish and Install end of Line Cleanout,complete in place,including excavation,cement stabilized sand backfill,compaction,surface restoration, water-fight connection of proposed sanitary sewer EA 4 $1,500.00 5 5 -1 $0.00 $7,500.00 $6,000.00 125% lines,all in strict accordance with the plans and specifications 1 I Provide a Trench Safety Plan and a Trench Safety System,all in strict accordance with the plans and EA 1 $8,500.00 1 1 0 $0.00 $8,500.00 $8,500.00 100% specifications 12 30 IPS DRt7 HDPE PIPE LF 600 $155.00 600 600 0 $0.00 $93,000.00 $93,000.00 100% TOTAL BASE BID ITEMS 5703.95 S1,768,726.95 S1,512,884.00 117% TOTAL ESTIMATE $703.95 $1,768,726.95 S1,512,884.00 117% Page 2 EXHIBIT B (Engineer's Certificate of Completion) CERTIFICATE OF SUBSTANTIAL COMPLETION Purchase Order No.: "2 .3- ,�, Project Name: Sa�I+aVt1 Sewer S•IS-tery pp N _ i f b li}ctfiCr+ Corti-rat* 1 Contractor: Vi ncA Soltrii cev v:Ce S, L t Description of Work: The work performed under this contract has been reviewed and found to be substantially complete.The date of substantial completion is hereby established as KNOW ALL MEN BY THESE PRESENTS: I.) The stage of construction where,in the opinion of the City of Port Arthur,all items of the work necessary to enable the assets to be utilized without restrictions for the purpose for which the asset was constructed have been completed;and 2.) All pay items are complete and all necessary testing as required by the Laws and Regulations and/or Contract Documents have all been completed. Punch List All list of items to be completed or corrected,prepared by the CONTRACTOR and verified and amended by the ENGINEER,is attached hereto.The failure to include any items on such list does not alter the responsibility of the CONTRACTOR to complete all work in accordance with the contract documents.The CONTRACTOR shall complete or correct the work on the list of items attached hereto within in 60 days from the above date of substantial completion.The responsibilities shall be as set out in the Contract Documents or on the attached hereto.If not specified in and an attachment or in the Contract Do ents the CONTRACTOR is responsible for maintenance,utilities and insurance. �c.lr1 S oki-han C,+ttt .S, (.fit c J 1s I20v ON-TRACTOR NAME SIGNA DATE RECOMMENDED FOR ACCEPTANCE ENGINEER NAME SIGNA DA The City of Port Arthur accepts the work as Substantially Complete. City of Port Arthur,Department of Public Works. PROJECT MANAGER SIGNATURE DATE CITY ENGINEER SIGNATURE DATE PUBLIC WORKS DIRECTOR SIGNATURE DATE EXHIBIT C King Solutions, LLC (Contractor's Affidavit of Guarantee And Contractor's Affidavit of Final Payment and Release) CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: _ 1► S - i0O Servi C e.S) LLC To: C rti( of port f e+hu'r FOR: Scot- rq Sewty Sy5-fe�� 12erw6,11}m-V,ors CO•.t►ucit 1 REFERENCE CONTRACT NO. -2;3-352 ENTERED INTO THE DAY OF , , BETWEEN THE_CITY OF PORT ARTHUR AND k i Solvti Ors icervi ct-S , [LC (CONTRACTOR) OF 1kcpS-I-+De` 1 -1-exu5 (CITY/STATE) FOR: Sprig SevJex- SYS-tilesRehab.I•}et+iO % CCviCit # - 1 (PROJECT) KNOW ALL MEN BY THESE PRESENTS: 1. 14.i AC) Solt)ti o,. Services does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular, and free improper workmanship, and against injury from proper and usual wear, and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials, due to such require replacement or re-execution. 2. This guarantee shall cover a period of one(1)year from the date of acceptance of all work under this Contract, as evidenced by the Engineer's Certificate of Completion. IN WITNESS THEREOF, the undersigned has signed and sealed this instrument this the i;,41' day of h�-'� ,20+9.10'LI COMPANY SEAL Kim) Slott Or Serv;Ges LLLG (COMP NAME) Q-i4t4yy (OW R.SIGNATUR ITLE) Moth) Cal l (PRINT) SUBSCRIBED AND SWORN to before me this / 5-eh day of n ( J 2 My commission expires 0 d"11 'UUa'1 (DATE) thet (NOTARY PtfBLIC) N1 l , L 64,"/''% IgrE% OF `off. ;. •!a 12!!%;LO //,�� Exp. o2-\\ /11/1Htllll�l�\�� CONTRACTOR'S AFFIDAVIT OF ALL BILLS PAID Project: Location: Port Arthur, Texas Owner: City of Port Arthur County of Jefferson State of Texas The undersigned hereby certifies that, except as listed below, all previous progress payments received on account of the Work, have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. Exceptions: NONE Signature: Print: « Date: S- /IS-/w2-9 Sworn to and subscribed to me, a Notary Public,this /5r` day of ril , 20 ,40/tf,t, (Thagt oaA sot /'''% (Notary ublic) �'.o�PRYpG•.� ' My Commission Expires: Og aoa7 _ 9 i\ •. �OFt61•. +,o .,I78t0.. //4, OZ-17.201, �`411rrnrnm"\`\ EXHIBIT D (City of Port Arthur Certificate of Acceptance) City of Port Arthur, Texas Department of Utility Operations CERTIFICATE OF ACCEPTANCE FOR SANITARY SEWER SYSTEM REHABILITATION CONTRACT NO. 1 FOR THE CITY OF PORT ARTHUR To: King Solutions, LLC of Houston, Texas This document is to certify that the City of Port Arthur, Texas accepts the completion of the Sanitary Sewer System Rehabilitation Contract No. 1 on the basis of, the Engineer's Certificate of Completion, the Contractor's Affidavit of Final Payment and Release, and Contractor's Affidavit of Guarantee from King Solutions, LLC of Houston, Texas Ronald Burton, CPM City Manager ATTEST: Sherri Bellard City Secretary EXHIBIT E (Release of Retainage Invoice) � � S IONS KING SOLUTION SERVICES, LLC MONTHLY ESTIMATE APPLICATION NO. FINAL DATE: 5/15/2024 CLIENT: CITY OF PORT ARTHUR ADDRESS: 444 4TH STREET PORT ARTHUR, TEXAS 77640 PROJECT: SANITARY SEWER SYSTEM REHABILITATION CONTRACT 1 PROJECT NO. 23-219 CONTRACTOR: King Solution Services, LLC ADDRESS: 13221 Chrisman Rd Houston, Texas 77039 ESTIMATE NO: FINAL FROM: 05-03-24 TO 05-03-24 ANALYSIS OF CONTRACT AMOUNT Original Contract Amount $1,419,884.00 Plus Additions By Change Order: $348,843.95 Deducts By Change Order: $0.00 Adjusted Contract Amount: $1,768,727.95 Work Performed to Date: $1,768,726.95 Less 5% Retainage: $0.00 Net Amount Earned to Date: $1,768,726.95 Less Previous Payments: $1,680,290.60 ****AMOUNT DUE THIS ESTIMATE**** $88,436.35 RECOMMEND APPROVAL Payment Due Contractor: AGREED. CITY OF PORT ART KING SOLUTION SERVICES,LLC By: By: ,Ae /tA,?1-c ENGINEE CONTRACTOR Date: )4 Date: 5/24/2024 APPROVED: CITY OF PORT ARTHUR By: OWNER Date: Page 1 CLIENT:CITY OF PORT ARTHUR PROJECT:SANITARY SEWER SYSTEM REHABILITATION CONTRACT#1 ESTIMATE NO.9/FINAL A B C D E F G H I J K L M Unit Original Unit Total Qty Total Qty Unit Unit Amount Amount Contract Percent Item Of Unit Price This Previous Quantities Quantities Due Due Amount Complete No. Description of Work Measure Qty Estimate Estimate To Date Remaining This Period To Date (F+G) (D-H) (F•E) (H•E) (D•E) (K/L) BASE BID 1 Mobilization costs,including payment bond, performance bond,insurance,moving equipment to project.and project sign,all in strict LS I $25,000.00 0 1.00 1 0 $0.00 $25,000.00 $25,000.00 100% accordance with the plans and specifications: NOT TO EXCEED 4%of total project cost 2 Rehabilitate 8"Diameter Sanitary Sewer Pipe by Pipe Bursting Using 8'SDR-17 HDPE Pipe,complete in place,all depths,including liner pipe. connection to manholes,bypass pumping, cleaning,wet points,surface restoration, LF 5884 $40.00 12,863 12,863 -6,979 $0.00 $514.520.00 $235,360.00 219': testing and necessary appurtenances,all in strict accordance with plans and specifications 3 Rehabilitate 10"Diameter Sanitary Sewer Pipe by Pipe Bursting Using 10"SDR-17 HDPE Pipe,complete in place,all depths,including liner pipe. connection to manholes,bypass pumping, LF 4,580 $46.00 2,888 2,888 1,692 $0.00 $132,848.00 $210,680.00 63% cleaning,well points,surface restoration,testing and necessary appurtenances,all in strict accordance with plans and specifications 4 Rehabilitate 12'Diameter Sanitary Sewer Pipe by Pipe Bursting Using 12"SDR-17 HDPE Pipe,complete in place,all depths,including liner pipe, connection to manholes,bypass pumping, LF 1,474 $60.00 1,425 1,425 49 $0.00 $85,500.00 $88,440.00 97% cleaning,well points,surface restoration,testing and necessary appurtenances,all in strict accordance with plans and specifications 5 Rehabilitate 27'Diameter Sanitary Sewer Pipe by Pipe Bursting Using 30"SDR-17 HDPE Pipe,complete in place,all depths,including liner pipe. connection to manholes,bypass pumping, LF 915 $305.00 344 344 571 $0.00 $104,920.00 $279,075.00 38% cleaning,well points,surface restoration,testing and necessary appurtenances,all in strict accordance with plans and specifications 6 Furnish and Install 4"Sanitary Sewer Service Line (Short Side),to include tap on proposed sanitary sewer pipe,concrete cleanout box,cleanout, connection to existing sanitary sewer service line, complete in place including tapping saddle, EA 341 $720.00 457 457 -116 $0.00 $329,040.00 $245,520.00 134% embedment,excavation,backfill,surface restoration and testing all in strict accordance with the plans and specifications 7 Furnish and Install 4"Sanitary Sewer Service Line (Long Side)to include tap on proposed sanitary sewer pipe,concrete cleanout box,cleanout, connection to existing sanitary sewer service line, EA 15 $1,050.00 0 15 $0.00 $0.00 $15,750.00 0% complete in place including tapping saddle, embedment,excavation,backfill.surface restoration and testing all in strict accordance with the plans and specifications 8 Post-Installation TV Inspection including all labor, materials and equipment all in strict accordance with the plans and specifications for LF 12,853 $3.00 10,599.65 10,599.650 2,253 $0.00 $31,798.95 $38,559.00 82% 9 Remove the Exiting Sanitary Manholes and Replace with reinforced Concrete Sanitary Sewer Manhole as Per Plans,complete in place, including excavation,cement stabilized sand backfill,compaction.surface restoration, EA 30 $8,900.00 49 49 -19 $0.00 $436,100.00 $267,000 00 163% SuperCoverT.manhole ring and cover(or approved equal).water-tight connection of existing and proposed sanitary sewer lines,and testing,all in strict accordance with the plans and 10 Furnish and Install end of Line Cleanout,complete in place,including excavation,cement stabilized sand backfill,compaction,surface restoration, water-tight connection of proposed sanitary sewer EA 4 $1,500.00 5 5 -1 $0.00 $7,500.00 $6,000.00 125% lines,all in strict accordance with the plans and specifications 11 Provide a Trench Safety Plan and a Trench Safety Sysfem,all in strict accordance with the plans and EA 1 $8,500.00 1 1 0 $0.00 $8,500.00 $8,500.00 100% specifications 12 30IPS DR17 HDPE PIPE LF 600 $155.00 600 600 0 $0.00 $93,000.00 $93,000.00 100% TOTAL BASE BID ITEMS $0.00 $1,768,726.95 $1,512,884.00 117% TOTAL ESTIMATE $0.00 $1,768,726.95 $1,512,884.00 117% Page 2