Loading...
HomeMy WebLinkAboutPR 23823: AUTHORIZING THE CALLING OF A PUBLIC HEARING, PERMIT TO PORT ARTHUR PIPLELINE, LLC C/O SEMPRA ENERGY, 42 INCH NATURAL GAS PIPLELINE, WITHIN THE CITY LIMITS OF PORT ARTHUR P.R.No.23823 June 24,2024 rlb RESOLUTION NO. A RESOLUTION AUTHORIZING THE CALLING OF A PUBLIC HEARING TO CONSIDER WHETHER OR NOT TO ISSUE A MAJOR PIPELINE PERMIT TO PORT ARTHUR PIPELINE, LLC C/O SEMPRA ENERGY OF HOUSTON, TEXAS FOR THE INSTALLATION OF A FORTY-TWO INCH (42") NATURAL GAS PIPELINE WITHIN THE CITY LIMITS OF PORT ARTHUR,TEXAS. WHEREAS,Port Arthur Pipeline,LLC c/o Sempra Energy of Houston,Texas has submitted an application for a major pipeline permit to install a forty-two inch (42") natural gas pipeline to transport natural gas from facilities in Beauregard Parish,Louisiana to the Sempra Port Arthur LNG site (JCAD Property ID #127156) on South Highway 87 (S. Gulfway Drive) as shown on Exhibit "A"within the city limits of Port Arthur, Texas; and, WHEREAS, Port Arthur Pipeline, LLC has submitted all required documents and information for their major pipeline permit to be considered for approval; now therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, a Public Hearing before the City Council on the major pipeline permit requested by Port Arthur Pipeline, LLC will be held on Tuesday, July 16, 2024 at 10:00 A.M. in the 5th Floor Council Chambers, City Hall, Port Arthur, Texas; and THAT, the City Secretary shall cause notice of the Public Hearing to be published in the official newspaper of the City of Port Arthur not less than ten(10)days prior to the date of the public hearing; and THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. P.R. No.23498 Page 2 READ,ADOPTED AND APPROVED this the day of . A.D. 2024 at a meeting of the City Council of the City of Port Arthur,Texas by the following vote: AYES: Mayor: Councilmembers: NOES: Thurman Bill Bartie Mayor Attest: Sherri Bellard City Secretary A OVED AS TO FO nfe s M. Black I : 'm City Attorney APPROVED-SR ADMINISTRATION: alf1.0 Ronald Burto M City Man._-r John C. atella, P.E. City Engineer EXHIBIT "A" Port Arthur Pipeline, PORT ARTHUR PIPELINE Engineering & Construction PIPELINE DESCRIPTION The intent of this pipeline is for Port Arthur Pipeline, LLC (PAPL) to provide firm delivery of natural gas to Port Arthur LNG, LLC (PALNG). The PAPL Louisiana Connector (PAPLC) will originate near Ragley, LA with interconnects located at the Beauregard Parish Compressor Station. PAPLC will then travel —72 miles across Beauregard, Calcasieu, and Cameron Parishes in Louisiana before crossing both Orange and Jefferson Counties in Texas before terminating on-site at PALNG. —PAPLC(72 miles) ■ Proposed Compressor Station LNG Facility A Salt Cavern Gas Storage A Proposed Salt Cavern Gas Storage o Gas Hub Gillis(]., Lam" Compressor Station / Lake Charles PAPLC I 72 miles I Beaumont Vidor Spindletop Golden Triangle / LA Storage A • Port Arthur / Port Arthur LNG Gulf of Mexico 20 miles