HomeMy WebLinkAboutPR 23823: AUTHORIZING THE CALLING OF A PUBLIC HEARING, PERMIT TO PORT ARTHUR PIPLELINE, LLC C/O SEMPRA ENERGY, 42 INCH NATURAL GAS PIPLELINE, WITHIN THE CITY LIMITS OF PORT ARTHUR P.R.No.23823
June 24,2024
rlb
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CALLING OF A
PUBLIC HEARING TO CONSIDER WHETHER OR NOT
TO ISSUE A MAJOR PIPELINE PERMIT TO PORT
ARTHUR PIPELINE, LLC C/O SEMPRA ENERGY OF
HOUSTON, TEXAS FOR THE INSTALLATION OF A
FORTY-TWO INCH (42") NATURAL GAS PIPELINE
WITHIN THE CITY LIMITS OF PORT ARTHUR,TEXAS.
WHEREAS,Port Arthur Pipeline,LLC c/o Sempra Energy of Houston,Texas has submitted
an application for a major pipeline permit to install a forty-two inch (42") natural gas pipeline to
transport natural gas from facilities in Beauregard Parish,Louisiana to the Sempra Port Arthur LNG
site (JCAD Property ID #127156) on South Highway 87 (S. Gulfway Drive) as shown on Exhibit
"A"within the city limits of Port Arthur, Texas; and,
WHEREAS, Port Arthur Pipeline, LLC has submitted all required documents and
information for their major pipeline permit to be considered for approval; now therefore,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT, a Public Hearing before the City Council on the major pipeline permit requested by
Port Arthur Pipeline, LLC will be held on Tuesday, July 16, 2024 at 10:00 A.M. in the 5th Floor
Council Chambers, City Hall, Port Arthur, Texas; and
THAT, the City Secretary shall cause notice of the Public Hearing to be published in the
official newspaper of the City of Port Arthur not less than ten(10)days prior to the date of the public
hearing; and
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City
Council.
P.R. No.23498
Page 2
READ,ADOPTED AND APPROVED this the day of . A.D. 2024
at a meeting of the City Council of the City of Port Arthur,Texas by the following
vote: AYES:
Mayor:
Councilmembers:
NOES:
Thurman Bill Bartie
Mayor
Attest:
Sherri Bellard
City Secretary
A OVED AS TO FO
nfe
s M. Black
I : 'm City Attorney
APPROVED-SR ADMINISTRATION:
alf1.0
Ronald Burto M
City Man._-r
John C. atella, P.E.
City Engineer
EXHIBIT "A"
Port Arthur
Pipeline,
PORT ARTHUR PIPELINE
Engineering & Construction
PIPELINE DESCRIPTION
The intent of this pipeline is for Port Arthur Pipeline, LLC (PAPL) to provide firm delivery of
natural gas to Port Arthur LNG, LLC (PALNG). The PAPL Louisiana Connector (PAPLC) will
originate near Ragley, LA with interconnects located at the Beauregard Parish Compressor
Station. PAPLC will then travel —72 miles across Beauregard, Calcasieu, and Cameron
Parishes in Louisiana before crossing both Orange and Jefferson Counties in Texas before
terminating on-site at PALNG.
—PAPLC(72 miles)
■ Proposed Compressor Station
LNG Facility
A Salt Cavern Gas Storage
A Proposed Salt Cavern Gas Storage
o Gas Hub
Gillis(].,
Lam" Compressor
Station
/
Lake
Charles
PAPLC I
72 miles I
Beaumont Vidor
Spindletop
Golden Triangle / LA Storage A
•
Port Arthur
/
Port Arthur LNG
Gulf of Mexico
20
miles