Loading...
HomeMy WebLinkAboutPR 23813: RATIFY THE EMERGENCY INSTALLATION OF DIRECTIONALLY DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABINE PASS City of urt rthu Teras INTEROFFICE MEMORANDUM Date: June 17, 2024 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR 23813 —Ratify the Emergency Installation of Directionally Drilled 16" Casing and 12" Gravity Serwer in Sabine Pass Introduction: The intent of this Agenda Item is for the City Council to ratify the emergency repair of the sanitary sewer that crosses Hwy 87 at Pearl Street in Sabine Pass that was found to be 6" steel pipe. Background: The line was to be pipe burst under the existing Sabine Pass Pipe Bursting Contract. The City's sewer maps show the pipe crossing Hwy 87 as 12". However, during construction it was found to be a 6" pipe, but steel pipe cannot be replaced by pipe bursting and the system requires the upsizing the 6" pipe to a 12" inch pipe! This 6" line is connected to 12" sewers both upstream and downstream. The 6" pipe is restricting the sewer flow, resulting in serious issues at the school, motel, and residential areas. The only method available to solve this problem is by directional drilling a 16" HDPE casing under the highway for the insertion of the 12" HDPE sewer line and all related appurtenances. Global Drilling Inc. completed the project for the total amount of$184,320.00. Budget Impact: The total budgetary impact is $184,320.00 and funding is available in Account No. 405-40-000- 8516-00-00-000, Project No. WS0016-CON. Recommendation: It is recommended that the City Council approve Proposed Resolution No.23813, ratifying the emergency installation as described/outlined above. "Remember,we are here to serve the Citizens of Port Arthur" PR No. 23813 6/17/2024 cv Page 1 of 3 RESOLUTION NO. A RESOLUTION RATIFYING THE CITY MANAGER'S DECISION TO AUTHORIZE THE EMERGENCY INSTALLATION OF 16" CASING AND 12" GRAVITY SEWER IN SABINE PASS, FOR THE TOTAL NOT TO EXCEED AMOUNT OF $184,320.00; THE FUNDING FOR THIS PROJECT IN WATER UTILITIES ACCOUNT NO. 405-40-000-8516-00-00-000,PROJECT NO.WS0016-CON,IS CONTINGENT UPON THE APPROVAL OF A BUDGET AMENDMENT VIA ADOPTION OF PROPOSED ORDINANCE NO. 7256 WHEREAS,the City's sewer map records show that the sanitary sewer that crosses State Hwy 87 at Pearl Street in Sabine Pass as a 12" line; however, during construction it was found to be a 6" steel pipe; and WHEREAS, this 6" steel pipe cannot be replaced by pipe bursting and requires upsizing to a 12" inch pipe due to sewer flow restriction, which is a main problem for sewer backup, resulting in serious issues at the school, motel, and residential areas; and, WHEREAS,the only method available is to direction drill a 16"casing under the highway and replace the 6" sewer line with the insertion of 12" HDPE pipe; and, WHEREAS,the emergency installation memo(Exhibit"A")issued by the City Manager on February 19, 2024, to Global Drilling Inc. provided for an estimated expenditure amount of $120,000.00; and, WHEREAS,Global Drilling Inc. completed the project in the amount of$184,320.00 with the daily reports and invoices attached hereto (Exhibit "B"); and, WHEREAS, pursuant to Section 252.022(a)(1) this purchase is authorized because of a public calamity that requires the immediate appropriation of money to relieve the necessity of the municipality's residents or to preserve the property of the municipality; and, WHEREAS, it is authorized pursuant to Section 252.022(a)(3) of the Local Government Code because of the unforeseen damage to public machinery, equipment, or other property. PR No. 23813 6/17/2024 cv Page 2 of 3 NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, THAT, City Council hereby ratifies the City Manager's decision to authorize the emergency installation for the total not to exceed amount of$184,320.00(invoice and daily reports attached as Exhibit "B") from Account No. 405-40-000-8516-00-00-000, Project No. WS0016- CON; and, THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the Meeting of the City Council. READ, ADOPTED, AND APPROVED this day of , 2024 at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote: • AYES: Mayor Councilmembers: • NOES: Thurman Bill Bartie Mayor ATTEST: Sherri Bellard City Secretary APPROVED AS TO FORM: Ja - Black Inte City Attorney PR No. 23813 6/17/2024 cv Page 3 of 3 APPROVED FO ISTRATION: Ronald Burton, CP alvin Matthews, P.E. City Manager Water Utilities Director AP OVED AS TO THE AVAILABILITY OF FUNDS: �e, ) 6k2e/.[.P(mot" atilieLDLA_ Lyn a(Lyn) Boswell, MA, ICMA-CM Clifton Williams, CPPB Director of Finance Purchasing Manager Exhibit "A" Call'of 1,41 nrt rtltur Tip vus INTEROFFICE MEMORANDUM Date: February 19,2024 To: Ronald Burton, City Manager `' From: Calvin Matthews, P.E., Water Utilities Director 4 /NC/ RE: Emergency Installation of Directionally Drilled 16" Casing and 12" Gravity Sewer in Sabine Pass The sanitary sewer that crosses Hwy 87 at Pearl Street in Sabine Pass was found to be a 6"steel pipe. This line was to be pipe burst under the existing Sabine Pass Pipe Bursting Contract, but steel pipe cannot be replaced by pipe bursting and the system cannot upsize a pipe from 6" to 12" which is the size of pipe shown on the City's GIS maps. This 6" line is connected to 12" sewers both upstream and downstream and is causing the sewers on the west side of Hwy 87 to backup causing issues at the school,motel, and residential areas. The only method available to replace this pipe is by directional drilling a 16" HDPE casing under the highway for the insertion of the 12" HDPE sewer line and all related appurtenances. The estimated expenditure for the pipe replacement is expected to be $120,000.00. I, Ronald Burton.hereby approve the emergency change order to Global Drilling, Inc. Ron Bu City anager "Remember, we are here to serve the Citizens of Port Arthur" Exhibit "B" I Exhibit "B" w Ti & O } III z \ / \ 8 , — § 2 { £ ) ` - k as ƒ a ) \ 0 ,. i a' ®� - 2 ) a ( % 5 / I ua ! k 2 / ( { z B z ) k ) ) ^ ,0 _ 1 ? _ +"E . . 2 ) \ 0 { / _ f f ` @k « § _ 1 (3 | ; 1 § < 2o & @i ƒ f o \ G2 ; i < . \ / / ai j • \ - oo csi / 63 ) k } ) J43 ' < a, ! 8 a 4 § § ] ) 2 $ \ 8 \ { 7 § k 3 a - ■ § as _ a £ o ) NI m k § ) ) — 0 % § k _ § o « UJ a. E k \ 0 k - k % 8 ! z 2 \ ( I co - q - ` g ( z L c § cm ! a $ $ k ° ° z, .- o a. § 0 moommli 2 r 3 / Z w : k u ■ § 0 co 2-7 k2 w2 k G .4 § k k - o) 0 _ } 2 o< ' ; a 2 ! 2 } u o \ v 5 & I } K _ $ f f a - J G ) » «a co a qt e = _ @ g \ - fe _ ) § < • 0. _ 1- Jo { GLOBAL DRILLING,INC. GLOBAL DRILLING,INC. CL'B AL MOM Interstate 10 Wnnre.Texas 77885,U6449941nterstate 10 Wm*,texas 71865,USA T'.*18W 950 8720,E iMoQQoWlo111i,wr•1e01 958672t3E Irio098baldnl8,geeulpmem corn )RILLIM6.11t. w wnw.pbaltlrilrmeapipmem.tom w'.ewedewleinlmeausmew.wm INVOICE Date Attn: ACCOUNTING June 21,2024 Port Arthur,TX 77641 Project Name:EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16"CASING AND 12"GRAVITY SEWER IN SABIBNE PASS Ref,No. Ref:INTEROFFICE MEMORANDUM dated February 19,2024 PA2024-009-1 Location Hway 87(Gulfway Dnve)&Pearl St Intersection,Sabine Pass (2nd Invoice) CURRENT CONTRACT ACTUAL COMPLETED COMPLETED WORK REM DESCRIPTION UNIT _- - __ UNITPMCE TOTAL PRICE PEMARKS No. GTE UNIT PRICE TOTAL QV UNIT PRICE TOTAL is PREVIOUS TOO (2nd Invoice-Additional Works) AS OF JUNE 20,2024 1 -Installation of 140LF of 12.HOPE Pipe by Sip Lnng LS 1 65,320.00 65,320.0 10.00% 1 65,320.00 65,320.0 8 Directional Drilling -Service connection In front of Post Once in Tremont St r including tap an existing sanitary sewer pipe.connection to One existing sanitary sewer service line,excavation.bacldll, surface restoration -Wellpont/Dewatenng TOTAL DUE I I 65,320.00 Terms and Conditions: Amount in Words SUS Dollars):Sixty Five Thousand Three Hundred Twenty Only For: GLOBAL DRILLING.INC. JASMIN BERSOBIO EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS APRIL 4, 2024 Discovered more sinkholes in the area '��'� em s.. x'.r. .Fib* # r,5 s+cx . - '7 ,y s rt a :.-mac' .; R R x ono-' wl' }4 a Y • f - `^ r ip + r c > am` .A. f 3 4; � q ,'spy ,#-:-," ,.w Pictures Page 1 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS 1 Mier .il 111! I - : q Ala aa. "`*s Pictures Page 2 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS 4 , .. ___, 4 ..),z -t-if . - _ __,.--,...- 44. ,.... .. . . .., -, -- p i . - - - •- - -Ili, _ r- fit: x14.10 -.;- Tw— `}- - '� �n SAY ,�. ' S INN tr , ? .S — . i„*r�*i.. � .. Pictures Page 3 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS �,"'A7dr" .A" , 4 - �° :ice. ft. a +or r, aL tif . ,_ �... f : .; r a ` 4 ? #' Pictures Page 4 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS APRIL 6, 2024 .'3 rr1". u � - ,,. a �'• 7.4 - f", _ miow, �' E.. r� 1. r t-O __ .�_ it. ,.... . , . .. . it,,,,.' ......... .,H, _....... ,ri, s ' ' s a --> Pictures Page 5 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS • 1A. t r �. ,. :fir � ,, APRIL 9, 2024 �� ..:` . "•- . =.mow " f i 44 , . Ate, ' JO ffi' . r Pictures Page 6 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS • •` >, -. �, A f _ ii. • ,ft IS • ' ‘ y —._ _._ - _ - _ _ 4 . —. �x ,`s,. * ate.: '*.{Y,. :. ♦ 1. _._( V h . � -. 6•k k . ' is Pictures Page 7 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS it may '# 9 1l d6 3 1 i a Pictures Page 8 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS . -� _ torpol34 ri• s r.s ii• : +:" __ - 7...,,.., - ,- ..e.:::„..... ' - N �k+ea, w 1 a . `" _ AP j .. ii..f.r.r.-.......0* . / If '' 4erflow, .. . . X / a, ,k „ it . ... ,,,,,.... ; • \ t C - 74 ..... 1, . .._ 0 _ ....„,.. . .. ,,,,,,:..c.-,, fp *- '�if'��� P.— —' r / 1/i �.. _ 4 ..emsk. �" .^+w £ �" S • e..f M x .. .«- � z 4..4,4 J � .�. _ 4 ' ,-- _ ,- ,, . ... _-„, ,....„. .._, . r . w. Pictures Page 9 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS APRIL 11, 2024 We encountered many obstacles that prevented us to do the 16" HDPE and put inside 12" pipe. 1st-We discovered that there is existing manhole buried next to the manhole that needs to be replaced. 2nd -There is also steel casing connected to that buried manhole. 3rd There is also big slab at the bottom of it. It is not easy to get out with all the utilities next to it. We cannot remove the old existing manhole and replace it. l '•S .' !4 4tiT " SJ' a.W r , it, 'k-, -...1.; .",,i-_-. :`,it.tej‘''''''' - ' f`,410.'-t-,; f may. tip•.. sue .. +-.. y ... a - t. � r' It .t +1,4 f nor �. . 4 �' ;4 ��1 ytr s D� i • sf Pictures Page 10 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS 4, .`' :-- • 1 .! '. *• ` � � ``` aim .*` } ram: ,. 4 ' ate.. < • it • • • . IaR-i. _ ' f .' • ., 4 c c a Mr -t -0'..4 f n :lv. 4 '',411.4.`If• i ,• A t�. .• 4 ,p . 4 / •,ram,'. r- - `r ``_ . v i 1 I w " f >, T *4 .,� *,mow . w .w gym; , _ sn —. • r x'4 , r ,.fir„0 ti Pictures Page 11 a EMERGENCY INSTALLATION OF DIRECTIONALINSABIBNE DRILLEDPASS 16" CASING AND 12" GRAVITY SEWER , A _ _.. Yam, a • ..esg;x.,.�. t i Y �..n.,,„ — 1 n 4.,:i4r,p -2111y, . . , .., Pictures Page 12 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS :a ......1 i 4 ' e <. t.. t .41 Iti^f. tIrvt ' , ♦ g alit . 14164.7— -11' 4,, , ,...„,..,--- , \ l °';e.. '%„ �. Pictures Page 13 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS APRIL 13, 2024 Steel Casing connected to the buried old existing manhole . - ''' 7 ! , - ---, , -- .-.,..."--.. - --,.''.,1,---, . --4- ' 'r'r-'''Zr-, ."' .'it;."-.1444,1.•.1 141--41l'o4o'4-r'4'0..:1-47'-7*.';'‘..!**. ,'-"":"--'.-..- ,'-f4'.''-..,-",':-'-',"4•. -1.;•°•"_-'sJ'ur'ri '} 3,& 4. .!tom �.� .yam * sTt _as. bt " ki*Air se+ t- V '�. k a •. `* .-. x♦{ 7 1 j A �T�t ..- • .. , y �, N d N y ♦� .A tt's ) g y4 ,-yy. �T -is � e1 , f Al I1. w' 'RCN[ \ + N` " x .I x 44 a `■t,' 1 fa+. �. g. ,I,t�. �. t "'- ,- - • a, f3 Y �'''''..--7,...:'. '. 2y'�u { 4.�i .r. • # -"'ems%tsr^ Tls. s ,.. 1 ii h • ,- ''':'. ',%-7.1.,-,411fr.)::•• 'N.; ... ,, 4 -". . (14,4' 4t ,:? ''-'14, :- tar= yt; ' #y. J f . # iy.' �r if' 1r it�,tz 4 #. a Pictures Page 14 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS Big Concrete Slab at the bottom of old existing buried manhole w, "` -ate � wiii, 'w r a,ra " am — g , ` ^ r, ` } 10- . ' ��4- n' r ilt !E • 'yam ., � a=k. o-N ' „� v . t ,+fir+ ..s . �, irk .} "" ,.� ` �> - .' L.. 1.7417, 4�1'"" I..for ` f ' " #a Y ',,,,,i -z-r,�°�,- u ... am. r`s a , ,, . .1,f ti r i 1+ .�yew i. 4e A ,i',� % --,— •1 i. st Pictures Page 15 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS F t �' `'" g if x • ^ 4e .,.- , 44,„ � Y x ; ,a ` ry� `.g �1 fir`e �- `-•; _ _ -:, . _ ,, �';p„ C• A t (II ' I. S a 9 a' y .'" '«F i H. - ..:,--' , i ' ____,---1, ' w d,� t Pictures Page 16 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS .11 44 1 ' iii �, • .. . _44#1 : :i ,7...`,-,17,1....7,771.:;40e:: . ., ,, ',3--'',---.‘'.; , 4, . . 'n:i' ..,-II 7:::T::::;,-1,4‘,,,ifisl, aurivf: 7: �, am ' + - //'' ..d,.�} . ......, k tea,. -1 . "'.•,alb; V s Nig t 0 774* is ' ,' .„4/ii 4 ' , R r « Illr ..i- , ,• �, { t 4 } 1 , a' vet j _y r.s ra *b pt i'- i� t .` , A .b _ j ,/ .• : Pictures Page 17 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS ',;Ie.,,',t, ` s s x fit. " g x Jill�, I1► ' 0(4 40:., a x *V' k )111 3 } z - ;: - ,1,. m f t ‘41k ' 410,,,,, . ..e., „ , P , ._ .. - , . .., ,.. . . Pictures Page 18 EMERGENCY INSTALLATION OFS DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS , , is' ' W i t K _ .,,,. .... , , . / ,„ . ., .' ,?- . .„..., . , ----,k .,. . . , , ,, ,_ -A, 4/ ''" ,,- 7-..i -1,,,,;,...„, 1 . \ Nik, t t \ N Irk + `. ' motlit £ ' ,,, , . , ir,7,-- „.#0,_ 1# - .... . i ..., ,,,„ ,,.. 1 , I. y../ .• Y--, " t it* 1 7. Pictures Page 19 EMERGENCY INSTALLATION OF DIRECTIONAL DRILLED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS ;. * " , r` `. Y.. tiir 1.1 if .' ' f .- E r s } , a ^). 5 =ay 4,,,,' . it . +i..4 Ak.,,,l.„,:\„?..,.,,,, , ''.-4.,,,,,:=.'t . /... , N. • k .. a Pictures Page 20 EMERGENCY INSTALLATION OF DIRECTIONALD1:Il:LED 16" CASING AND 12" GRAVITY SEWER IN SABIBNE PASS , [ , - Mi171 r I ...-- .„.._,_ • -- ..., ,,..- -....„ -*, - r i '6 4 ' \ • - ) `'... !311:: ,. r • ...-7,---.... , . \ \ '.. ' I ....,... , --- -...... _ „........_ . .- - --.,.;---, • . , ... . - Page 21 Pictures