Loading...
HomeMy WebLinkAboutPR 23820: AGREEMENT IWTH INDUSTRIAL AND COMMERCIAL MECHANICAL (ICM), REPAIRS TO THE TWO SECTIONS OF FOUR-INCH CHILL WATER PIPING AT CITY HALL r City of o t rtltu r www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: June 20, 2024 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM,City Manager From: Flozelle C. Roberts, EIT, MEng, MBA, CPM, Public Works Director RE: P.R. No. 23820: Authorizing the City Manager to enter into an agreement with Industrial and Commercial Mechanical (ICM) of Beaumont,Texas for repairs to two sections of four-inch chill water piping at City Hall. Introduction: The intent of this agenda item is to authorize the City Manager to enter into an agreement with Industrial and Commercial Mechanical (ICM) of Beaumont, Texas, through the Buyboard Cooperative Purchasing Program for repairs to two sections of four-inch chill water piping at City Hall for the not-to-exceed amount of$28,273.75. Background: The current heating, ventilation, and air conditioning (HVAC) piping to the water chiller at City Hall has deteriorated over time and requires replacing before any ruptures occur. The heating, ventilation, and air conditioning(HVAC) water chiller is critical to keeping the air condition unit functioning in City Hall. Repairs to the two sections of four-inch chill water piping is quoted at a Buyboard price of$28,273.75 by Industrial Commercial Mechanical (ICM) of Beaumont, Texas. Budget Impact: Funds are available in the Capital Improvement Fund Buildings Account Number 307-21-049- 8512-00-10-000, Project number BU0002-CON. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 Recommendation: It is recommended that the City of Port Arthur's City Council approves PR 23820 authorizing the City Manager to enter into an agreement with Industrial and Commercial Mechanical (ICM) of Beaumont,Texas,through the Buyboard Cooperative Purchasing Program for repairs to two sections of four-inch chill water piping at City Hall for the not-to-exceed amount of$28,273.75. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 P.R.No.23820 06/21/2024 LLJ Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER IN AN AGREEMENT WITH INDUSTRIAL AND COMMERCIAL MECHANICAL (ICM) OF BEAUMONT, TEXAS, THROUGH BUYBOARD CONTRACT 638-21 FOR THE REPLACEMENT OF THE HEATING, VENTILATION AND AIR CONDITIONING(HVAC) WATER CHILLER FOR CITY HALL FOR THE NOT-TO-EXCEED AMOUNT OF $28,273.75. FUNDS ARE AVAILABLE IN THE CAPITAL IMPROVEMENT FUND BUILDINGS ACCOUNT NUMBER 307-21-049-8512-00-10-000,PROJECT NUMBER BU0002-CON WHEREAS, the current heating, ventilation, and air conditioning (HVAC) piping to the water chiller at City Hall has deteriorated over time and requires replacing before any ruptures occur; and, WHEREAS, the heating, ventilation, and air conditioning (HVAC) system water chiller is critical to keep the air condition unit functioning in City Hall; and, WHEREAS,the Public Works Facilities Maintenance staff deems it in the best interest to repair two-sections of a four-inch chill water piping; and, WHEREAS, Industrial and Commercial Mechanical (ICM) of Beaumont, Texas, has provided a quote for $28,273.75 through the Buyboard contract number 638-21 attached herto as Exhibit A; and, WHEREAS, Chapter 271.102 of the Texas Government Code allows a city,by resolution of its governing body, to participate in cooperative purchasing programs, such as the Buyboard Cooperative Purchasing Program, as an alternative to formal bid process; and, WHEREAS, pursuant to Resolution 02-341, the City of Port Arthur entered into an interlocal agreement for cooperative purchasing with the BuyBoard Cooperative Purchasing Program. P.R.No.23820 06/21/2024 LLJ Page 2 of 3 NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, THAT, City Council hereby authorizes the City Manager to enter into an agreement with Industrial and Commercial Mechanical (ICM) of Beaumont, Texas, through the Buyboard Cooperative Purchasing Program, for$28,273.75; and, THAT, funding is available in the Capital Improvement Fund Buildings Account Number 307-21-049-8512-00-10-000, Project number BU0002-CON; and, THAT,a copy of the caption of this resolution be spread upon the minutes of City Council. READ, ADOPTED, AND APPROVED THIS day of 2024, at a Regular Meeting of City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Thurman Bill Bartie Mayor ATTEST: Sherri Bellard, TRMC City Secretary P. R.No. 23820 06/21/204 LLJ Page 3 of 3 APPROVED AS TO FORM: klir 644-- J m M. Black, Esq. In 'm City Attorney APPROVED FOR ADMINISTRATION: 1---Pan•fro c /-71- Xi'IQ Ronald Burton, CPM(= -619 City Manager f( ozelle . Roberts T, MEng, MBA, CPM Public rks Dir r Clifton E. Williams, Jr., CPPB Purchasing Manager (-fie(D 60-j-&-/at-e Lyn a Boswell Finance Director P.R.No.23820 EXHIBIT A CITY OF PORT ARTHUR J'� CITY HALL BLDG-ICM-CHAPMAN PROPOSAL TO REPAIR 2-SECTIONS OF 4 INCH • WATER PIPE ON OVER-TIME-WEEKEND WORK-AT PORT ARYTHUR CITY Industrial and Commercial ro..0001111011101111.111111111111111111, Mechanical TACLA23943C 4445 Westpark Avenue I nn Beaumont,TX 77705 Phone(409)842-3737 Fax (409)842-3738 July 12,2024 CITY OF PORT ARTHUR TEXAS 444 4TH STREET I PORT ARTHUR,TX 177640 ATTN: Mr.MIKE FLORES Subject: PORT ARTHUR CITY HALL—UPDATED JULY 12,2024-ICM-CHAPMAN PROPOSAL TO REPAIR 2-SECTIONS OF 4 INCH CHILL WATER PIPING PERFORMED OVERTIME AFTERHOURS OVER A WEEKEND. Dear Mr.FLORES, Industrial Commercial Mechanical is pleased to offer the following proposal to REPAIR 2 SECTIONS OF CHILL WATER PIPING AS LISTED BELOW FOR YOUR Review. Item QTY Description 1 1 Scope of Work-To remove and replace 2 sections of 4"chill water pipe at the PA City Hall JOB Clarifications: 1.Chapman Ind would dig the rest of the dirt from the concrete sump needed to expose the rest of the 2-4"chill water pipes 2.2 ea bad sections of steel chill water pipe would be removed and replaced with SCH 80 PVC same as the underground 3.New PVC pipe would connect to the existing pipe above the ceiling of the women's restroom on the first floor provided the steel pipe is good at the location 4.Restroom ceiling,toilet and toilet portion may need to be removed and replaced by others 5.This work to be done on OT Friday evening through Sunday 6.Material would have a 3 to 5 day deliver from date of PO 2 2 PROPOSAL INCLUDES 2-ICM HVAC SERVICE TECHNICIANS,AFTER-HOURS ON WEEKEND FOR REFILLING THE CHILL WATER LOOP-AFTER PIPING REPAIRS,RESTARTING WATER FLOW,RESTARTING CHILLER AND TESTING SYSTEM FOR PROPER CHILLER SYSTEM FOR PROPER OPERATIONS. ITEMS NOT INCLUDED IN PROPOSED WORK ➢ Any Changes or Modifications,other than specified as part of proposal,or proposed scope of work. ➢ After Hours Work(All work is performed during regular time man hours Monday—Friday. ➢ Any Changes or Work delays;due to problems beyond our control. ➢ Warranty of any items not furnished and installed by ICM-CHAPMAN PROPOSED LABOR AND MATERIALS PRICE TO PERFORM THE WORK ON WEEKEND-AFTER-HOURS TOTAL $28,273.75-SALES TAX NOT INCLUDED THIS PROPOSAL IS VALID FOR 30 DAYS-FROM THE DATE OF PROPOSAL INDUSTRIAL&COMMERCIAL MECHANICAL IS AN AWARDED VENDOR FOR BUYBOARD CONTRACT#638-21 BUY BOARD PRICING IS UTILIZED WITH THIS PRESENTED PROPOSAL FOR REPAIRS. Thank you for your request for this proposal. We would appreciate the opportunity to provide these services.Please let me know if you would like to proceed with the proposed service repair,and what purchase order number we will utilize,for our billing for services. As always,we thank you for your business and the opportunity to provide our services. Regards, Jerry Johnson ICM SERVICE SALES REPRESENTA I'ACi 23943(_'—Regulated the Texas Department orLieensing and Regulation PO Box 12157 Austin.TX 7871 I I-SOO-803-9202. 12-463-6599