HomeMy WebLinkAboutPR 23829: EMERGENCY PIPE BURSTING OF 12" GRAVITY SEWER IN SABINE PASS Cr
a
y� ,r ,231
„rr ,rh �ur
INTEROFFICE MEMORANDUM
I Date: June 4, 2024
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
I From: Calvin Matthews, P.E., Water Utilities Director
RE: PR No. 23829—Emergency Pipe Bursting of 12" Gravity Sewer in Sabine Pass
Introduction:
The intent of this Agenda Item is for the City Council to ratify the emergency repair of the
existing 12"sanitary sewer that crosses the old marsh between Tremont Street and Pump Station
7 in Sabine Pass.
Background:
The existing 12" sanitary sewer on Tremont Street and Pump Station 7 has failed. Upon
inspection, it was found to have excessive inflow in the section. The section is approximately
420 feet long. The line carries the sewage from the area bounded by Dowling Road to the West,
Tremont to the North, 1st Avenue to the East, and Quinn Street to the South. Its failure was
causing backups and issues for this entire area and very high influent flows at the Wastewater
Treatment Plant (WWTP). The emergency memo was issued to Global Drilling Inc. of Winne,
Texas. The scope included the installation of two manholes, and pipe bursting of the existing
12-inch clay line with 12-inch HDPE pipe.
Budget Impact:
The total budgetary impact is$147,260.00 and funding is available in Account No. 405-40-000-
8516-00-00-000, Project No. WS0006-CON, contingent upon the approval of a budget
Amendment via adoption of proposed ordinance No. 7261.
Recommendation:
It is recommended that City Council approve Proposed Resolution No. 23829, ratifying the
emergency repair as described/outlined above.
PR No. 23829
6/4/2024 cv
Page 1 of 3
RESOLUTION NO.
A RESOLUTION RATIFYING THE CITY MANAGER'S
DECISION TO AUTHORIZE THE EMERGENCY REPAIR
OF 12" GRAVITY SEWER IN SABINE PASS, FOR THE
TOTAL NOT TO EXCEED AMOUNT OF $147,260.00
FROM WATER UTILITIES ACCOUNT NO. 405-40-000-
8516-00-00-000, PROJECT NO. WS0006-CON IS
CONTINGENT UPON THE APPROVAL OF A BUDGET
AMENDMENT VIA ADOPTION OF PROPOSED
ORDINANCE NO. 7261.
WHEREAS, the 12-inch sanitary sewer that crosses the marsh between Tremont Street
and Pump Station 7 failed causing a serious safety and health concerns and also a state violation;
and,
WHEREAS,the emergency memo (Exhibit"A")authorized the emergency repair and the
project was completed including, two manholes installed, and 420 ft of 12-inch pipe replaced
(Exhibit"B"); and,
WHEREAS, pursuant to Section 252.022(a)(1) this purchase is authorized because of a
public calamity that requires the immediate appropriation of money to relieve the necessity of the
municipality's residents or to preserve the property of the municipality; and,
WHEREAS, it is authorized pursuant to Section 252.022(a)(3) of the Local Government
Code because of the unforeseen damage to public machinery, equipment, or other property.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR:
THAT,the facts and opinions in the preamble are true and correct; and,
THAT, City Council hereby ratifies the City Manager's decision to authorize the
emergency repairs for the total not to exceed amount of$147,260.00 (Invoice and daily report
PR No. 23829
6/4/2024 cv
Page 2 of 3
attached as Exhibit "B") from Account No. 405-40-000-8516-00-00-000, Project No. WS0006-
CON; and,
THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the
Meeting of the City Council.
READ, ADOPTED, AND APPROVED this day of , 2024
at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote:
AYES: Mayor
Councilmembers:
NOES:
Thurman Bill Bartie
Mayor
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM:
J. M. Black
I - City Attorney
PR No. 23829
6/4/2024 cv
Page 3 of 3
APPROVED F MINISTRATION:
Ronald Burton, C alvin Matthews, P.E.
City Manager Water Utilities Director
APPROVED AS TO THE AVAILABILITY
OF FUNDS:
L770161641-4 -e,
yn a(Lyn)Boswell, MA, ICMA-CM Clifton Williams, CPPB
Director of Finance Purchasing Manager
Exhibit "A"
Cin of
or! rtfiu'
Terus
INTEROFFICE MEMORANDUM
Date: May 17,2024
To: Ronald Burton, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: Emergency Pipe Bursting of 12" Gravity Sewer in Sabine Pass
The 12-inch sanitary sewer that crosses the marsh between Tremont Street and Pump Station 7
has failed. Upon inspection,it was found to have excessive inflow in the section. The section
is approximately 420 feet long.
This line carries the sewage from the area bounded by Dowling Road to the West, Tremont to
the North, 1st Avenue to the East,and Quinn Street to the South. Its failure is causing backups
for this entire area and very high influent flows at the Wastewater Treatment Plant (WWTP).
These additional flows are preventing the WWTP from meeting permit limits.
The full repair will require the installation of two manholes, and pipe bursting of the existing
12-inch clay line with 12-inch HDPE pipe.
The estimated expenditure for the project by Global Drilling is expected to be approximately
$160,000.00.
I, Ronald Burton,hereby approve the emergency repair to Global Drilling, Inc.
J
Ron Burton.CPM /47)
City Manager
"Remember, we are here to serve the Citizens of Port Arthur"
Exhibit "B"
GLOBAL DRILLING,INC. GLOBAL DRILLING,INC.
GLOBAL 4' Interstate 10 Wpm,Texas 77665 UE449901Merstate 10 Winn,Texas 77e85.USA
.1 800 958 8720,E atoBRobwkell getT.t 8009568720,E'.plorik.SelAkknlppuipme9.wm,
W mess-doteldn0imepuiomeM.com W ww4 alomknnirmw,mmemsom
INVOICE
Date
Attn: ACCOUNTING June 21,2024
Port Arthur,TX 77641
Project Name:EMERGENCY PIPE BURSTING OF 12"GRAVITY SEWER IN SABINE PASS Ref No.
Ref:INTEROFFICE MEMORANDUM dated May 17,2024 PA2024-011
Location Marsh between Tremon Street and Pump Station 7
CURRENT CONTRACT ACTUAL COMPLETED COMPLETED WORK
ITEM DESCRIPTION UNIT -------- --- UNIT PRICE TOTAL PRICE REMARKS
CITE
IT PRICE TOTAL CITY UNIT PRICE TOTAL % PREVIOUS TOT
DATE
AS OF JUNE 20,2024
1 -Installation of 420LF of it HOPE Pipe by Frye Bursting LS 1 160,000.00 160,000.00 1 107,260.00 147,260.00 100.0014 1 147,260.00 147,260.00
-Repair of two(2)Manholes
TOTAL DUE: 147,260.00
Terms and Conditions:
Amount in Words(US Dollars):One Hundred Forty Seven Thousand Two Hundred Slaty Only
Far
GLOBAL DRILLING,INC.
JASMIN SERSOBIO
0x10/l
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
MAY 21, 2024
DELIVERED 420' of 12" HDPE PIPES
MAY 25, 2024
FUSE 420' of 12" HDPE PIPES
Pictures Page 1
2024 Pipe Bursting •of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
MAY 29, 2024
EXCAVATE DRIVING PIT.STUB OUT AND REPAIR THE MANHOLE INVERT
may 29.
Pori }E st.. '"' rtr :. i' am, "
4.444
j., 4....,,,,74 7[:, 4 #r ,
•
,: „_
:.: „.:::-.:,..„ ,.- . ,e A
irk
i . ', # --.-i.- 'f ''% 4‘, j ' .'' —7%.:::.-i'.7,4:-:' '!:.S7,-; -, #'-7
II
r 14e.,,- ,.-4 tick,q,,, ..,-- . ' , ' *,
r
11Jir a 4
may 29. 2024. 3:26:1ms*
2 p c
y S Third Ave
t Port Arthur TX 77fi4Q
�" ` ,�„„ ,, ,...:, . ,, ,-,..! ,.„4:-.„. . --tor , „_
Estados Unidos
s J
4.4
de
: ., r,- ..
Pictures Page 2
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
: :::.:' - '4' '
ill,
' r . , '
4 sr!!
4»Jr
_� ., &
is • P`
>A
'uat.
,v ., x
vi
, � ,*, ; ;4414: „
` 9 . .
i t fi
,� .-Ji. ..r4 ilA
kt
ds,
'y '7F ,ir - 3� Y
4
At
* :
rt,
Pictures Page 3
2024 Pipe Bursting of' Manhole 12in SewerGlobal Tremont
Drilling to PS7 Manhole and New
S�d A64. e
. . Ar 77640
Eslrytk Uncios
, ' 3 ,
4 #' y •,►
•
7 s.'�,.; � ,,"fir'. t �'�►�
a
a
T
Pictures Page 4
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
ot*".11-4
x 4
11
a v;
Pictures Page 5
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
r: 325.
Turd
aF lJrTX 7 .
s •
Pictures Page 6
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
MAY 30, 2024
INSTALLED 420' OF 12" HDPE PIPE BY PIPE BURSTING. CONNECTION TO EXISTING MANHOLE
ALONG TREMONT ST.
-"
, Ai . ‘`fit! ' e.?t Y f ' 111:
." v w \ a0
114111S4.
ryy}' Tpe
♦ ,:..*
. Pam"'-_ 1
is
f
am. J
M
i ,
j 5
it, 4 �.
t•'v+ � i/4w d
Pictures Page 7
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
, i t
9 `/ '1 `
,,,...,4 , ,, 47, .. f-'"'*.:':-„*:'.:r
4,,,- ' *.,.."...4.:— —4.'''' '''':''. -'14,,,, ..., .21 .
4
ilk imomin �,. i;- ,.#: ...
if,„,,,,:
I 14441:10.1—
,,..e',.. , 7
t � _.
,
A
s,
ei .. ' ,-- , N.
-4 N,
r
Pictures Page 8
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
•r..M y, ems.
` ' j `
ate- { £ r -
? A ..-
t
,3:'m .y. ,may
.
ra,
Pictures Page 9
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
i
s..
Ea
� "EMS \ 1 uKn#F
lip
F a
- _#4t,-.�.
s
£i:
# .2 # Y
I?
f y
x
j/� !'•�t v
..at
q .,��ey.� 35 yam,
.r a-r i 'ham# i rf 5 P v 1 M `.
'S
, i
r
r �
Pictures Page 10
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
6 x� P
`.
k4
r
'-lt . i �_
.ft
J
.
-+
'_"may ew y _ # .
'''-. , ki...# -..-.... . .-:.
--.,„ / ._. # „...
yw-,
Pictures Page 11
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
t
-
s
. . -
. .
•, ,',..•f4s, , ,
.'"....
s . ,.•'A , t -
,•-
.
- ..,.
a
.,,,t,
3, it -
‘4.?
I- *: *:,
) cr, . °'
-, - r. ..-7`''* '-• ;7
. ,
..... r::
—
ei
'
• ,i.. 774;.•:••• ir
* P.
ti
..-:
... t
,' 4"1"'
- rr
tilPor
I.,
•ii-a-
oL,
ttr,, 1
Pictures Page 12
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
1,04,, f I
„.„,..,.
r.,. .
,,
+AtY • 4'a' 9t '
r
fi
..;,°,.4--...;*-4:.- "
s _ {
i
Pictures Page 13
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
J U N E 3, 2024
WE GET THE PIPE EXPANDER OUT OF THE GROUND. REPAIRED THE UPSTREAM 1ST MANHOLE.
REMOVED AND RE-SET DOWN THE 2ND BIG MANHOLE
fl-
_ r
".,,' t r+.
r.
F a
y asa ^>-
�4 .` , •fig 1 r
§may, �..'7MY ,
"' 1 3, 2024, 12.30:04 «•-
f •., .. 90'41-4999 Tremont
., , rthur TX
,. ::Est.
€ .. .5 tia
Pictures Page 14
r`
•
2024 Pipe Bursting of 12in Global Drilling
v
'°-;ii
;
..._:, ,nn.„---,,,,.. / n, ,
� �+ fir;
m
lir
r
:.,�
:.:- --; -I
3 ii,.:',•* ,,,.. V
-s .e ,. .. ,a 3 f r,
,,..,, fib`.. x � -•' �_ qi
'�. eel
r� `. b
a
et �
jun 124. . ,
t
•
Port `fi r TX 7 i 65S "'
;';. Esters idol
Iii
' aid,
# gg
:.,
/ S t i
y. F. `y1p }e�' 9 { }
i�"�' � 4 Vk tFaj' 4 a�{ «g .,g _ C r4 _ F
•
� i" 4
"+
Pictures Page 15
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
tun 3, 2024 2 *.s
4k3ikt irlioni St ,
< ` ' ' . ' - •'- Fort, r '►t r 7055
.., f * l t �- .r -t4 sta +�. �#'4.los.
v
z
F
k.
H ,
r,- jun 3. 2024, �3;19-53 p.m.
S Third Ave-
i
', Port Arthur TX 7764G`t
Estados Unici
iliptia.
* „ ...:1,, : i „ ,,,,,1
& Ax
f
1 1 41.. ! t, ` +a tea.
Pictures Page 16
a
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
.
4
.aki Ewa
s
7a
r.
' +
is i,
k.
Pictures Page 17
2024 Pipe Bursting of 12in Sewer Tremont to PS7 Manhole and New
Manhole Global Drilling
I
pw
{Fa
Pictures Page 18