HomeMy WebLinkAboutPR 15566: 9TH AVENUE SANITARY SEWER EXTENSION PROJECTMEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: Stephen Fitzgibbons, City Manager FROM: Kelly Eldridge, Director of Utility Operations ~~ Q~~ DATE: October 9, 2009 *t SUBJECT: Proposed Resolution No. 15566 COMMENTS RECOMMENDATION: I recommend that the City Council approve Proposed Resolution No. 15566 accepting a Certificate of Completion, Contractor's Certificate and Release, and Certificate ofGuarantee for the 9"' Avenue Sanitary Sewer Extension, approving Change Order No. 1 and Final, releasing retainage, and approving the final payment of $19,140.26. BACKGROUND: This project provided for the extension of our gravity sanitary sewer line along 9`" Ave. from the YMCA south to near Our Lady of Guadalupe Church. On August 26, 2008, this project was awazded by Resolution 08-366 and a property owner assessment for the cost of these improvements was approved by Ordinance 08-083. A Notice to Proceed was issued on 10/20/08 and the project was declazed substantially complete on 03/31/09. Change Order No. 1 and Final adjusts quantities to actual usage, and reduces the final contract amount by $113,839.74 to $382,805.26. BUDGET/FISCAL EFFECT: Funds for this final payment aze available inaccount no.419-1622-532.83-00, Project No. 419803. The Finance Department can proceed with collection of assessed fees for this project. STAFF/EMPLOYEE EFFECT: None. SUMMARY: Approval of Proposed Resolution No. 15566 is recommended. P.R. No. 15566 10/09/09 RESOLUTION NO. A RESOLUTION AUTHORIZING ACCEPTANCE OF THE CERTIFICATE OF COMPLETION, CONTRACTOR'S CERTIFICATE AND RELEASE, AND CONTRACTOR'S CERTIFICATE OF GUARANTEE FOR THE 9`" AVENUE SANITARY SEWER EXTENSION PROJECT, APPROVING CHANGE ORDER NO. 1 AND FINAL; AND APPROVING FINAL PAYMENT OF $19,140.26 TO TROY CONSTRUCTION, L.L.C., AND AUTHORIZING THE CITY MANAGER TO SIGN THE CERTIFICATE OF ACCEPTANCE ON BEHALF OF THE CITY OF PORT ARTHUR, TEXAS. FUND N0.419-1622- 532.83-00, PROJECT N0.419803. WHEREAS, the City has issued a Certificate of Completion dated September 30, 2009, copy attached hereto and made a part hereof as Exhibit "A", together with a Contractor's Certificate and Release (Exhibit "B") and Contractor's Certificate of Guarantee (Exhibit "C"), both dated October 6, 2009 and executed by Daniel J. O'Hare of Troy Construction, L.L.C., certifying that the project has been completed; and, WHEREAS, the City of Port Arthur's contract amount with Troy Constmction, L.L.C. is decreased by $113,839.74, making the final contract amount $382,805.76, as shown in Change Order No. One (1) and Final, copy attached hereto and made a part hereof as Exhibit "D"; and, WHEREAS, it has been recommended by the Utility Operations Department that Final payment should be made to Troy Construction, L.L.C., in the amount of Nineteen Thousand One Hundred Forty and 26/100 Dollazs ($19,140.26); NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the City Manager of the City of Port Arthur be and is hereby authorized to execute, on behalf of the City of Port Arthur, Change Order No. One (1) and Final copy attached hereto and made a part hereof as Exhibit "D"; and, THAT, the City Manager of the City of Port Arthur is hereby authorized to execute, on P.R No. 15566 10/09/09 Page 2 behalf of the City of Port Arthur, a Certificate of Acceptance for the 9`~ Avenue Sanitary Sewer Extension Project, copy attached hereto and made a part hereof as Exhibit "E"; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of 2009 at a Regulaz Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councihnembers: NOES: Deloris Prince Mayor ATTEST: APPROVED AS TO FORM: Tem Hanks ~ "" Ci Secre Mark Sokolow / ~ ~ ~ City Attorney l ~ ~~'~'~ P.R No. 15566 10/09/09 Page 3 APPROVED FOR ADMINISTRATION: Stephen Fitzgibbons City Manager ~~ Ross Blackketter, PE Director of Public Works Ke ly El dge~~~~- Director of Utility Operations APPROVED AS TO AVAILABILITY OF FUNDS: l~/~ i~ ~~~,~ Deborah Echols Director of Finance Account No. 419-1622-532.83-00, Project No. 419803 EXHIBIT "A" ENGINEER'S CERTIFICATE OF COMPLETION Project: Sanitary Sewer System Extension along 9ei Avenue (Between Lake Arthur Dr. & 60"' St) City Project #419803 Date of Issuance: Owner(s): CITY OF PORT ARTHUR, TX (Jefferson County) ENGINEER: Mumtaz A. Qureshi, P.E. City of Port Arthur, TX CONTRACTOR: Troy Construction, LLC Houston, TX This Engineer's Certificate of Completion applies to all Work under the Contract Documents and Specification for the above project, between: CITY OF PORT ARTHUR. TX AND Tro Constmction L.L.C. Houston TX The Work to which this Certificate applies has been inspected by the authorized representatives of the Owner, and that Work is hereby declazed to have been completed in accordance with the Contract Documents and Specification as of Sent. 30.2009. Mumtaz A. Qureshi P.E. ~ZA. q(tgESHI 46784 • ...a.. ~, ~o~z(z~a~ EXHIBIT "B" CONTRACTOR'S CERTIFICATE AND RELEASE FROM: Troy Construction. L.L.C. (Name of Contractor) TO• City of Port Arthur (Local Public Agent) CONTRACT NO. 419803 ENTERED INTO THE DAY OF Ausust 26, 2008 ,BETWEEN THE CITY OF PORT ARTHUR OF JEFFERSON COUNTY, TEXAS AND Tmy Construction, LLC (Name of Company) OF Houston Texas (CIT17 (STATE) FOR THE 4th Ave. Sanitary Sewer Extension 419803 (Name of Project) (Project No.) LOCATED IN THE CITY OF PORT ARTHUR, TEXAS. KNOW ALL MEN BY THESE PRESENTS: The undersigned hereby certifies that there is due from and payable by the Local Public Agency to the Contractor under the contract and duly approved Change Orders and modifications, the balance of $19,140.26. 2. The undersigned further certifies that in addition to the amount set forth in paragraph 1, there are outstanding and unsettled the following items which he c]aims are just and due and owing by the City to the Contractor; (a) N/A (b) N/A (c) N/A (d) N/A (Itemize claims and amounts due) (if none, so state) Page 1 of 3 3. The undersigned further certifies that all work required under this contract including work required under change orders numbered #1 has been performed in accordance with the terms thereof, and that there are no unpaid claims for materials, supplies or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract, and that the wage rates paid by the Contractor and all Subcontractors were in conformity with the contract provisions relating to said wage rates. 4. Except for the amounts stated under paragraphs 1 and 2 hereof, the undersigned has received from the City of Port Arthur all sums of money payable to the undersigned under or pursuant to the above mentioned contract or any modification or change thereof. 5. That in consideration of the payment of the amount stated in paragraph 1 hereof the undersigned does hereby release the City of Port Arthur from any and all claims arising under or by virtue of this contract, except the amount listed in paragraph 2 hereof; provided, however, that if for any reason the City of Port Arthur does not pay in full the amour stated in paragraph 1 hereof, said deduction shall not affect the validity of this release, but the amount so deducted shall be automatically included under paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof. The Contractor further certifies that upon the payment of the amount listed in paragraph 2 hereof, and of any amount which may be deducted from paragraph 1 hereof, he will release the City of Port Arthur from any and all claims of any nature whatsoever arising out of said contract or modification thereof, and will execute such further releases or assurances as the City of Port Arthur may request. IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this ~-~1 day of ~C.~~i~ . 20~_. r7i1 ~nn`sh'L1L~10~1, LLB (sue.) QCo~actor~ - lac,('. ( gnature an itle of Officer) I~u(11~-I .~. ~~ ~('F~ ,being first duly sworn on oath, deposes and says, (Affiant) first that he is the V°i/,Z I~fPSi 1~' ~~I (7 of the (Title) (Name of Company) Page 2 of 3 second, that he has read the foregoing certificate by him subscribed as ~t(,~Yi~IGI~~~'~C~ of the (T'itle) (Name of Company) Affiant further states that the matters and things stated herein are trnue. AAA~J// Gant) Subscribed and sworn to before me this 1~_ day of 20~. My commission expires ~~~ °Gt]~7i _ (Date) Sh~~-~° ~,u•• SHNtlFNGHES NOTARYPUSIJC, STATE OFTF7(AS ~O4 ) MYCOMMISSIDN EXWHFS \L, "•`J p5,N3p2012 Page 3 of 3 EXHIBIT "C" CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: Tmv Construction. L.L.C. (Name Contractor) TO• City of Port Arthur (Local Public Agent) CONTRACT NO. 419803 ENTERED INTO THE 26 DAY OF Aueust 2008 BETWEEN THE CITY OF PORT ARTHUR OF JEFFERSON COUNTY, TEXAS AND Trov Construction. L.L.C. OF Houston Texas (CITY) (STATE) FOR THE 9th Ave. Sanitary Sewer Extension #419803 (Name of Project) (Project No.) LOCATED IN THE CITY OF PORT ARTHUR, TEXAS: KNOW ALL MEN BY THESE PRESENTS: Troy Construction. L.L.C. does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every pazticulaz, and &ee from improper workmanship, and against injury from proper and usual wear, and agrees to replace or re-execute without cost to the Owner such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials, due to such required replacement or re-execution. 2. This guarantee shall cover a period of one (1) year from the date of acceptance of all work under this Contract, as evidenced by the City of Port Arthur's Engineer's final certificate. This Certificate is given in connection of the final payment under the contract between the City of Port Arthur and Tmv Construction. L.L.C. and with the knowledge that it will be relied upon in making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. Page 1 of 2 IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this Ip~ day of ~~~i' .201. ~~611SlYilC~7tR1~ u.(:(~ 1,( C. -^ (Sfgnahue and (title of Officer) 17.fi11Ll ~ ~ J~.lru .being fast duly sworn on oath, deposes and says, (Affiant) first, that be/she is the ~'/.~ ~iQcSiC~t",91~~~ of the second, that he bas read the foregoing certificate by him subscribed as (Title) (Name o~Company) of the Affiant further states that the matters and things stated herein tt~ (Affant) Subscribed and sworn to before me this ~ day of ~k'~~1Zf . 20(~ My commission expires ~-~'~~Z! (Date) 6j° BHABI HUGHES . NOTARY PUBLIC, STATE OFTENAS aW AIY COMMISSION E]~IHEB osroano~x 5~~~ ~ (Notary) Page 2 of 2 EXHIBIT "D" CHANGE ORDER NO. 7 8r FINAL DATE: Seot.30.2009 AGREEMENT DATE: August 26, 2008 NAME OF PROJECT: 9th Avenue Sanitary Sewer Extension Project OWNER: City of Port Arthur CONTRACTOR: Trov Construction. LLC The following changes are hereby made to the CONTRACT DOCUMENTS: Adjustment of Final Quantities per the following: 9th Avenue Sanitary Sewer Extension Project #419803 Bid Paekage #11AIL #1 Est Unit Fianl Final Item Description of Work Unit City Price Total gly Total Difference 18" PVC,C905/RJ, DR25,Certa-LOk or Equal, Directional Bore, Complete 1 to in Place per Spec. LF 480 $ 189.00 $ 90,720.00 1035 $ 195,615.00 $ 104,895.00 6" PVC,C900/RJ, OR25, Certa-Lok a Equal, Directional Bore, Complete 2 in Place per Spec. LF 135 $ 94.00 $ 12,690.00 128 $ 12,032.00 $ (658.00) 16" PVC, C905/RJ,DR25, Cena-Lok Complete in Place per Spec. or Equal, inU. Bedtling Matedaf, Backfll, Surface, Restoration, etc. 3 Complete in Place per Spec. LF 270 $ 140.00 $ 37,800.00 4 $ 560.00 $ (37,240.00) 6" PVC,SOR 26, ASTM 02241 intludirg Bedtling, Barkfill, Surface Restoration etc., Complete in Place per 4 Field. - LF 15 $ 89.00 $ 1,335.00 50 $ 4,450.00 $ 3,115.00 6" PVC, SDR 26. Service Connection From New Manhole up to 25 LF, 5 Complete in Place F1~CH 2 $ 1,410.00 $ 2,820.00 3 $ 4,230.00 $ 1,410.00 New Fiberglass MH, ASiM 03573 Complete in Place per Plans antl Specs per 6 Fieltl DepMS EACH 5 $ 3,200.00 $ 16,000.00 3 $ 9,600.00 $ (6,400.00) Crushetl Stone Support Under MH Base inG. Fxt2 Excavation Complete in 7 Place per Dwg LS 1 $1,180.00 $ 1,180.00 1 $ 1,180.00 $ - Piling SuDDoR under MH Base inG. Fxtre F~rcevafion, 8 Complete in Place per Owg. LS 1 $ 2,480.00 $ 2,480.00 D $ - $ (2,480.00) Well Pointing/ Dewatedng System Installation antl Operations Requiretl per 9 Field Condi4ons LS 1 ~## $ 18,000.00 0 $ - S (18,000.00) Installation of Trench Safety System for All Deplhs Over 10 5', Complete LF 500 $ 2.00 $ 1,000.00 250 $ 500.00 $ (500.00) Flagman for Traffic Control Uniformed Peace Officers, when Required antl 11 Approved per Fieltl HOUR 40 $ 42.00 $ 1,680.00 0 $ - $ (1,680.00) Remove & Replace 12-24" Conc. Culvert Aprons, when Required and Approved per 12 Field LF 100 $ 240.00 $ 24,000.00 54 $ 12,960.00 $ (11,040.00) Fxtra C S Sand BaGcfill where Approved, Complete 13 in Place TON 100 $ 42.00 $ 4,200.00 125 $ 5,261.76 $ 1,061.76 Extra Bahama Stone a Equal when Approvetl, 14 Complete in Place TON 100 $ 30.00 $ 3,000.00 60.5 $ 1,815.00 $ (1,165.00) Ex r Bank Santl or Equal when Approved, Complete 15 in Place TON 100 $ 29.00 $ 2,900.00 15 $ 435.00 $ (2,465.00) Extra Excavation b/ Madrine or Hand, when Approved per 16 Field CY 50 $ 30.00 $ 1,500.00 46.5 $ 1,394.70 $ (105.30) Extra Sod Replacement, Surface Restoration where 17 Approved SF 1000 $ 5.00 $ 5,000.00 0 $ - $ (5,000.00) Extra Conc., 3590 psi, wNro Reinf. when Requiretl per 18 Field CY 10 $ 420.00 $ 4,200.00 0 $ - $ (4,200.00) Cash Allowance for Misc. Work as Approved, Invoiced 19 by Others LS 1 $5,000.00 $ 5,000.00 0.31 $ 1,545.00 $ (3,455.00) P-11A-1 Subtotal $235,505.00 $ 251,578.46 $ 16,073.46 Bid Package M2 EsG Unit Fianl Final Item Descriofion of Work Unit C1yt Price Total ~ Total Difference 1B" PVO,SOR 26, ASTM 03634,E 679, inGuding Bedding, Backfill, Surface Restoration etc. Complete in 1 Place per Oc'+9. LF 1050 $133.00 $139,650.00 762 $ 101,346.00 $ (38,304.00) B"PVC, C900R2J, DR25, Certa-LOk a Equal, Directional Bore Complete in 2 Place per Spec LF 135 $196.00 $26,460.00 0 $ - $ (26,460.00) New Fiberglass MH, ASTM 03573 Complete in PWce per Plan and Specs per 3 Field Depths EACH 4 $3,170.00 $12,680.00 3 $ 9,510.00 $ (3,170.00) Cmshetl Stone Support Untler MH Base incl. Extra Excavation Complete in 4 Place per Dwp. LS 1 $1,500.00 $1,500.00 1 $ 1,500.00 $ - Piling Support untler MH Base inG. EMre Excavation, 5 Complete in Place per Dwg. LS 1 $2,600.00 $2,600.00 0 $ - $ (2,600.00) Well Pointlng/Dewatenng System Installation and Operation as requiretl per 6 Field Conditions. LS 1 $18,000.00 $18,000.00 0 $ - $ (18,000.00) Installation of Trench Safety System for all Depms Over 5', Complete in Place, and 7 as per OSHA Std. LF 1125 $2.00 $2,250.00 862 $ 1,724.00 $ (526.00) Flagman for Traffic Control Un"rfortned Peace Officers, when Requiretl and 8 Approved HOUR 200 $42.00 $8,400.00 0 $ - $ (8,400.00) Remove 8 Replace 12-24' Conc. Culvert Aprons, when 9 Required and Approved LF 20 $200.00 $4,000.00 0 $ - $ (4,000.00) Remove 8 Restore Driveway, Parking, etc Saw Cut All Depths, indudes base Preparation. Concw/ 10 Reinforcement per Field. SF 350 $12.00 $4,200.00 0 $ - $ (4,200.00) Remove antl Replace with New Chain Link Fence Materials, where and when 11 Approved LF 100 $42.00 $4,200.00 0 $ - $ (4,200.00) Site Clearing 8 Grubbing. Remove All Shrubs, Trees & Roots from Work Areas as 12 Necessary LS 1 $14,400.00 $14,400.00 1 $ 14,400.00 $ - Fxtm C SSantl Backfll where Approved, Complete 13 in Place TON 100 $42.00 $4,200.00 0 $ - $ (4,200.00) Ezua Bahama Srone or Equal when Approvetl, 14 Complete in Place TON 100 $30.00 $3,000.00 D $ - $ (3,000.00) E#ra Bank Santl or Equal when Approvetl, Complete 15 in Place TON 100 $29.00 $2,900.00 0 $ - $ (2,900.00) Extra Excavation by Machine or Hand, when Approved per 16 Field CY 50 $30.00 $1,500.00 28.6 S 858.80 $ (643.20) Extra Sotl Replacement, Surtace Restoration where 17 Approved SF 1000 $5.00 $5,000.00 0 $ - $ (5,000.00) Extra Conc., 3500 psi, wMro Reinf. when Requiretl per 18 Field CY 10 $420.00 $4,20D.00 4.5 $ 1,890.00 $ (2,310.00) Extra Cash Allowance for Works as Approved, 19 Inwicetl W Omer LS 1 $2,000.00 $2,000.00 0 $ - $ (2,000.00) P-2 Subtotal 5261,140.00 $131,226.SD 5(129,913.20) Contract Total $496,645.00 $382,805.26 $(113,839.74) CHANGE TO CONTRACT PRICE: ($113.839.74) ORIGINAL CONTRACT PRICE: $496.645.00 CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER: $496.645.00 The CONTRACT PRICE due to this CHANGE ORDER will be increased by: 0 davs The new CONTRACT PRICE including this CHANGE ORDER will be: $382,8050.26 CHANGE TO CONTRACT TIME: None DATE OF COMPLETION; March 31.2009 (Substantial Completion). Certified 09/30/09 CHANGE ORDER NO. 1 & FINAL NAME OF PROJECT: 9th Avenue Sanitary Sewer Extension Project No other Terms and Conditions of the Contract are changed as a result of this Change Order. Contractor's acceptance of Change Order relives City of any liability for additional costs incurred by Contractor in his performance of the work covered by the Change Order. RECOMMENDED BY: Engineer Mumtaz Qureshi, PE REQUESTED BY: Contractor CONTRATOR, OFFICER, OR OWNER ATTEST FOR CONTRACTOR CORPORATE SEAL ACCEPTED BY CITY OF PORT ARTHUR MAYOR CITY SECRETARY CITY MANAGER CITY ATTORNEY APPROVED AS TO FORM CITY SEAL EXHIBIT "E" P.R No. 15566 10/09/09 CERTIFICATE OF ACCEPTANCE FOR Stn Avenue Sanitary Sewer Extension Project #419803 IN THE CITY OF PORT ARTHUR To: Troy Construction, L.L.C. Gentlemen: This is to certify that the City of Port Arthur, Texas, accepts the 9th Avenue Sanitary Sewer Extension Project, on the basis of the Contractor's Certificate and Release, executed by Daniel O'Hare, Vice President & CFO, of Trov Construction, L.L.C. Stephen Fitzgibbons City Manager ATTEST: Terri Hanks City Secretary