INTEROFFICE MEMORANDUM
Date: July 25, 2024
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: PR No. 23868—Utilities Service Center Roof Replacement
Introduction:
The intent of this Agenda Item is to seek the City Council's approval to replace the roof of the
Utilities Service Center building with Mike Barnett Construction, Inc. of Port Neches, Texas in
the total amount of$135,030.00.
Background:
The building roof of the Utilities Service Center office has reached the end of its useful life as
the roof leaks when it rains and has resulted in mold growth on the ceiling tiles which poses a
serious health concern. Mike Barnett Construction, Inc. of Port Neches, Texas provided a quote
through the Southeast Texas Purchasing Cooperation Administrated by Region 5 Education
Service Center(Region 5 ESC) for $135,030.00 to remove all old roofing at the Water Utilities
Service Center building and replace it with a new 60 mil single ply TPO roofing system.
Budget Impact:
Budget impact is$135,030.00 and funding is available in Account No. 410-40-215-5312-00-00-
000, Building Maintenance.
Recommendation:
It is recommended that the City Council approve PR No. 23868, authorizing the replacement of
the Utilities Service Center building roof as described/outlined above.
"Remember, we are here to serve the Citizens of Port Arthur"
PR No. 23868
7/25/2024 cm
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO ENTER INTO AN AGREEMENT WITH MIKE
BARNETT CONSTRUCTION, INC. OF PORT NECHES,
TEXAS FOR THE UTILITIES SERVICE CENTER
BUILDING ROOF REPLACEMENT UNDER THE
SOUTHEAST TEXAS COOPERATIVE CONTRACT NO
20240202 ADMINISTRATED BY THE REGION 5
EDUCATION SERVICE CENTER (REGION 5 ESC),
WITH A PROJECTED BUDGETARY IMPACT AMOUNT
OF $135,030.00. FUNDING IS AVAILABLE IN ACCOUNT
NO. 410-40-215-5312-00-00-000, BUILDING
MAINTENANCE.
WHEREAS, the Utilities Service Center building roof has reached the end of its useful
life as the roof leaks when it rains and has resulted in mold growth on the ceiling tiles which poses
a serious health concern; and,
WHEREAS, Mike Barnett Construction, Inc. of Port Neches, Texas provided a Region 5
ESC Cooperative Purchasing Organization quote attached hereto as Exhibit"A" for $135,030.00
to replace the water utilities service center building roof; and,
WHEREAS, pursuant to Chapter 271, Subchapter D, of the Texas Local Government
Code, a city, by resolution of its governing body, may participate in cooperative purchasing
programs established by the State Facilities Commission for the purchase of goods at prices
established through purchase contracts of the Commission; and
WHEREAS,per Resolution No. 20-019,the City entered into an Interlocal Agreement for
cooperative purchasing with Southeast Texas Purchasing Cooperation Administrated by Education
Service Center(Region 5 ESC); and,
WHEREAS,Mike Barnett Construction, Inc. is a vendor on the Region 5 ESC, Southeast
Texas Cooperative Purchasing Organization.
PR No. 23868
7/25/2024 cm
Page 2 of 3
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR,
THAT, facts and opinions in the preamble are true and correct; and,
THAT,the City Manager is hereby authorized to execute an agreement with Mike Barnett
Construction,Inc.of Port Neches,Texas for the replacement of the utilities service center building
roof, in substantially the same form, attached as Exhibit"A".
THAT, a copy of the caption of this resolution be spread upon the minutes of the City
Council.
READ,ADOPTED,AND APPROVED THIS day of ,2024, at
a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor
Councilmembers:
NOES:
Thurman Bill Bartie
Mayor
ATTEST: APPROVED AS AAT.O FO .
Sherri Bellard es M. Black
City Secretary terim City Attorney
PR No. 23868
7/25/2024 cm
Page 3 of 3
APPROVED FOR ADMINISTRATION:
\.
Ronald Burton, ' ' Calvin Matthews, P.E.
City Manage.. Director of Water Utilities
APPROVED AS FOR AVAILABILITY OF FUNDS:
Lynd (Lyn)Boswell, MA, ICMA-CM Clifto E. Williams, Jr., CPPB
Director of Finance Purchasing Manager
EXHIBIT "A"
CONTRACT FOR ROOF REPLACEMENT
THIS AGREEMENT, made this day of , 2024, by and between the
City of Port Arthur, a municipal corporation organized under the laws of the State of Texas,
hereinafter called "OWNER" or "CITY" and Mike Barnett Construction, Inc. of Port Neches,
Texas hereinafter called "CONTRACTOR".
WITNESSETH: That for and in consideration of the payment terms, conditions and
agreements set forth herein, OWNER and CONTRACTOR agree as follows:
1. The CONTRACTOR will commence and complete the Utilities Service Center Roof
Replacement.
2. The CONTRACTOR agrees to perform all the Work described in the Contract Documents and
comply with the terms therein for the total sum of$135,030.00.
3. The term of this Agreement shall be for three (3) months from the start date on the Notice to
Proceed, unless sooner terminated under the provision hereof. The City can terminate this
contract at its convenience which includes, but is not limited to, funding not being available
in any budget cycle within thirty (30) days written notice.
4. During the term of this Contract, the Contractor will furnish at his own expense all of the
materials, supplies, tools, equipment, labor and other services necessary to connection
therewith, excepting those supplies specifically not required of Contractor in the
Specifications.
5. The CONTRACTOR agrees to perform all the work described in the specifications and
contract documents and to comply with the terms in the amounts stated in the bid documents.
6. The term "Contract Documents" means and includes the following:
1) Agreement
2) Scope of Work
3) Bid/Proposals
4) Notice of Award
5) Notice to Proceed
5. This Agreement shall be binding upon all parties hereto and their respective heirs, executors,
administrators, successors and assigns.
6. IN WITNESS WHEREOF,the parties hereto have executed, or caused to be executed by their
duly authorized officials, this Agreement in (2 copies) each of which shall be deemed an
original on the date first written above.
Signed on the day of 2024
ATTEST: CITY OF PORT ARTHUR
BY: BY:
Sherri Bellard, Ronald Burton, CPM,
CITY SECRETARY CITY MANAGER
Signed on the day of , 2024
MIKE BARNETT CONSTRUCTION
WITNESS:
BY: BY:
PRINT NAME: PRINT NAME:
TITLE:
MIKE BARNETT
CONSTRUCTION
7/22/24
City of Port Arthur Water Utilities Office
201 H.O. Mills Blvd
Port Arthur, TX 77640
RE: Water Utilities Office Roof Replacement and Misc. Repairs
We propose to furnish all labor, materials and insurance, to perform the scope of work below,
for a sum of $135,030.00. This price includes 10% discount on materials and a 30%
additional discount for coop membership.
Scope of Work:
Roof
1) Remove all old roofing and insulation down to deck.
2) Install new facia, prime and paint.
3) Remove and replace and paint 2"x 10"wood nailer.
4) Install Poly-ISO insulation.
5) Install a 1/8 taper system with ISO insulation taper.
6) Install 1/ Densdeck.
7) All insulation and securock mechanically fastened to deck.
8) Install new 22 ga galvanized cleat.
9) Install a 60miI single ply TPO roofing system.
10)Install new cap flashing.
11)Install new TPO boots on vent stacks.
12)Install 1 new rain collar on heater vent, prime and paint others as needed.
13)Flash around all penetrations and curbs.
14)Install a 60mi1 single ply TPO roofing system.
15)Clean up and haul off all trash. $86,500.00
• Work will be done as a 20 yr system. Manufacturer's Warranty cost not
included.
This cost can be provided upon request.
Misc. Repairs
1. Tuck point around hose bibs, holes and around penetrations.
2. Mortar caulk corner on rear of building. $ 980.00
3. Pressure wash stained area on brick. $ 150.00
4. Wet Glaze all windows, galss to metal and metal to brick. $ 7,600.00
5. Re-wrap HVAC Duct (no need to replace duct). $37,900.00
Mike Barnett Construction,Inc., 1701 Port Neches Ave.,Port Neches,TX 77651 Phone(409)727-5673 Fax(409)727-2905
MIKE BARNETT
CONSTRUCTION
6. Remove and replace approximately 72 ceiling tiles. $ 1,900.00
Thank you for the opportunity to bid on this project. If we can be of any further assistance please feel
free to call me at any time.
If you would like for us to perform the above scope of work, please sign below and return to us
as soon as possible. At that time, you will be added to the work to perform list.
Payment is due upon completion.
Southeast TX Regional COOP Contract # 20240202
Lance Barnett Accepted
General Manager
Mike Barnett Construction,Inc.,1701 Port Neches Ave.,Port Neches,TX 77651 Phone(409)727-5673 Fax(409)727-2905