HomeMy WebLinkAboutPR 15579: ALLCO - SANITARY SEWER REHABMEMOR!~NDUM CITY OF PORT ARTHUR UTILITY OPERATIGNS DEPARTMENT TO: Stephen Fitzgibbons, City Manager f FROM: Kelly Eldridge, Director of Utility Operations ~L DATE: October 15, 2009 SUBJECT: Proposed Resolution No. 15579 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 15579 authorizing the execution of a contract with ALLCO, Inc., of Beaumont, Texas, in the amount $2,748,577.00 for the Sanitary Sewer Rehabilitation by Pipebursting &Sliplining Methods to Serve Basins PA64C &PA66, Contract No. 6, City Project No. 404PB6. BACKGROUND This is one of our first Phase II SSES projects performed under the ARRA grant administered by the TWDB. This project is for the Port Acres area. We will likely rehabilitate the entire remaining service area by pipe bursting method, enlarging the pipe diameter in some sections. This is a much less disruptive and expensive rehabilitation method compared to conventional removal & replacement. Five (5) contractors attended the mandatory pre-bid meeting, and the following four (4) bids were received on October 7, 2009: Bidder Total Bid _ ALLCO, Inc. $2,748,577.00 Beaumont, TX SIMCO Enterprises, LTD $3,186.981.25 Groves, TX Huff & Mitchell, Inc. $3,075,048.25 Cypress, TX Williamson Construction $2,860,510.00 Lumberton, TX BUDGET/FISCAL EFFECT This bid is 88.4% of the engineer's estimate. Funds axe available in Fund No. 404-1625-532.83-00, City Project No. 404PB6. STAFF/EMPLOYEE EFFECT City staff and our consulting engineer, Arceneaux & Gates, will oversee this 550 day project. SUMMARY 1 recommend that the City Council approve Proposed Resolution No. 15579 authorizing the execution of a contract with ALLCO, Inc., of Beaumont, Texas, in. the amount $2,748,577.00 for the Sanitary Sewer Rehabilitation by Pipebursting &Sliplining Methods to Serve Basins PA64C &PA66, Contract No. 6, City Project No. 404PB6. P.R. No. 15579 10-15-09 RESOLUTION NO. A RESOLUTION AWARDING A CONTRACT AND AUTHORIZING THE EXECUTION OF SAID CONTRACT IN THE AMOUNT OF $2,748,577.00 FOR THE SANITARY SEWER REHABILITATION BY PIPE:BURSTING & SLIPLINING METHODS TO SERVE BASINS PA64CV &PA66, CONTRACT N0.6, BETWEEN THE CITY OF PORT ARTHUR AND ALLCO, INC., OF BEAUMONT, TEXAS, ACCOUNT NO. 404-1625- 532.83-00, CITY PROJECT NO.404PB6. WHEREAS, the City is currently under are Agreed Order with the TCEQ to rehabilitate its sanitary sewer system; and, WHEREAS, there exists a need to reduce flows and eliminate sanitary sewer overflows in our collection and treatment systems; and, WHEREAS, the City of Port Arthur advertised and received bids from four contractors for the Sanitary Sewer Rehabilitation by Pipebursting &Sliplining Methods, Contract No. 6; and, WHEREAS, Arceneaux & Gates Consulting Engineers, Inc. has reviewed the bids and recommends award to the lowest responsive, responsible bidder, ALLCO, Inc.; and, WHEREAS, a copy of their recommendation and bid tabulation is attached hereto as Exhibit "A"; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT the City Council of the City of Port Arthur hereby awards the contract for the Sanitary Sewer Rehabilitation by Pipebursting &Sliplining Methods to Serve Basins PA64C &PA66, Contract No. 6 to the lowest responsive, responsible bidder to-wit; ALLCO, Inc., of Beaumont, Texas, for sewer line construction at $2,748,57'7.00, contingent upon TWDB approval and funding; and, THAT the Mayor and City Manager of t11e City of Port Arthur are hereby authorized to execute on behalf of the City of Port Arthur a contract between the City of Port Arthur and ALLCO, P.R. No. 15579 10-15-09 Page 2 of 3 Inc. in the amount of $2,748,577.00, a copy attached hereto as Exhibit "B", contingent upon TWDB approval; and, THAT the contractor shall not proceed on any phase or segment of this work until a Notice to Proceed is issued with receipt of performance and payment bond and certificate of insurance; and, THAT, the said contract is an exact duplic:ate of a City Standard Form contract except for the changes (if any) shown in the Certificate of Standard Form Contract, a copy of which is attached hereto as Exhibit "C", and said changes are hereby approved; and, THAT, the contractor shall sign the contract documents as well as this resolution agreeing to the terms hereof; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of , 2009 at a Regular Meeting of the City Council of the Ciity of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Deloris Prince Mayor P.R. No. 15579 10-15-09 Page 3 of 3 ATTEST: Terri Hanks City Secretary APPROVED AS TO FORM: dGC ' Mark Sokolow (~ /'~ _ V City Attorney Y APPROVED FOR ADMINISTRATION: Stephen Fitzgibbons City Manager ~ ~~~ Ross Blackketter, PE Director of Public Works '~ ~ ~ Kelly Eld dge t Director of Utility Operations APPROVED AS TO AVAILABILITY OF FUNDS: ~7~1 Deborah Echols Director of Finance Account No.: 404-1625-532.83-00 Project No.: 404PB6 AGREED TO: ALLCO, Inc. Date EXHIBIT A W _ ', ARCENEAUX' GATES ARCENEAUX & GATES Consulting Engineers, Inc. Engineers • Surveyors • Planners October 14, 2009 Mr. Ross Blackketter, PE Director of Public Works CITY OF PORT ARTUR PO Box 1089 Port Arthur, TX 77641-1089 RE: RECOMMENDATION OF A WARD OF CONTRACT FOR CONSTRUCTION OFSANITARYSEWER REHABILIIATIDN BY P/PEBURSTING & SL/PL/N/NG METHODS TO SERWE BASIN #PA64C & PA66, PROJECT NO. CPA-490, CONTRACT NO. 6 TWDB PROJECT NO. IUP#73036 Dear Mr. Blackketter: On October 7, 2009 the City of Port Arthur Purchasing Department received four (4) sealed bids for the above referenced project. The legal notices for this project were advertised in the Port Arthur News for two consecutive Sundays. Additionally, the Plans and Specifications for the project were placed on file locally with the Associated General Contractors, the City and at our offices. The Engineer conducted a mandatory pre-bid meeting on September 23, 2009 with several contractors in attendance. The bids were opened in my presence at 3:15 p.m. and i:he results were read aloud by me. We have checked the bids submitted and have prepared the attached ct~rtified Bid Tabulation for your review. The lowest, responsive, responsible bid was received from the firm oFALLCO, INC. of Beaumont, Texas. Their total amount bid was $2,748,577.00. The firm submitted the required bid surety. In consideration of all bids received, we recommend that the City of Port Arthur approve the award of this contract to ALLCO, INC. on the basis their firm submitted the lowest, responsive, responsible bid. We recommend that the bid surety from the three lowest bidders be retained until a contract is executed. Very truly yours, ARCENEAUX & GATES CONSULTING ENGINEERS, INC. ~~~ ~~ Ronald rceneaux, PE, PLS Presid /CEO Enclosure: Bid Tabulation One Turtle Creek Square 3501 Turtle Creek Dr., Suite 102 Port Arthur, TX 77642 409/724-7888 FAX 409/724-1447 ARCENEAUS GATES CONSIILTINC ENOINEERE, INC. BID TABULATION For The Sanitary Sewer Rehabilitation by Pipe Bursting 8 Sliplining Methods To Serve Basin # PA 64C 8 66 (West of W. Port Arthur Road) Job No. CPA-490, Contract No. 6 BIDS OPENED: October 7, 2009 at 3:15 P.M. ITEM KIND OF WORK # (ITEM DESCRIPTION) 1 CLEANING: 8"-12" Sewer All Depths 2 TV INSPECTION: 8-12" Sewer All Depths 3 POINT REPAIR 8-12" Swr, 0'-10' Depth and 6' in Length 4 REPLACEMENT BEYOND POINT REPAIR 8-12" Swr, 0'-10' Depth ,Over 6' Length 5 POINT REPAIR 8-12" Swr,Over 10' Depth, 0'-10' in Length 6 REPLACEMENT BEYOND POINT REPAIR 8"-12" Swr,Over 10' Depth, Over 10' in Lengtl 7 SLIPLINING: 8 "Sewer, All Depths, SDR 21 8 PIPE BURSTING: 8" to 8.625 " OD All Depths ,SDR 19, Complete in Place 9 PIPE BURSTING: 8" to 10.750" OD All Depths ,SDR 19, Complete in Place 10 PIPE BURSTING: 10" to 12.750" OD All Depths ,SDR 19, Complete in Place 11 PIPE BURSTING:Exising 12" to 16.00" OD All Depths ,SDR 19, Complete in Place 12 Removal 8~ Repl. of Wood/ Chain link Fence All Heights, Std. New Materials. Pre Approve 13 Removal & Repl. of 4"- 1/2" Concrete SW incl. Reinforcement, Base etc. Pre Approved 14 Removal & Repl. of 6"-8" Concrete SW/DW incl. Reinforcement, Base etc. Pre Approved 15 Removal & Repl. of upto 2 "Hot-Mix Asphaltic Conc. (Type D), incl. Tack Coat MEAS UNIT ESTM QTY. BASE UNIT PRICE (Dollar and Cents in Words) LF 83,000 Once Dollar and Fifty Cents LF 83,000 Once Dollar and Thirty Cents EACH 25 Once Thousand Dollars and No Cents LF 3000 Twenty-Seven Dollars and No Cents EACH 10 Fifteen Hundred Dollars and No Cents LF 1000 Thirty-Two Dollars and No Cents LF 7500 Twenty-Two Dollars and No Cents LF 45000 Twenty-Nine Dollars and No Cents LF 7500 Thirty-Two Dollars and No Cents LF 11000 Thirty-Seven Dollars and No Cents LF 1000 Forty-Two Dollars and No Cents LF 1000 Fifteen Dollars and No Cents SF 1000 Four Dollars and Fifty Cents SF 1000 Six Dollars and No Cents SF 1000 Three Dollars and Fifty Cents BASE PRICE TOTAL $ 124,500.00 $ 107,900.00 $ 25,000.00 $ 81,000.00 $ 15,000.00 $ 32,000.00 $ 165,000.00 $ 1,305,000.00 $ 240,000.00 $ 407,000.00 $ 42,000.00 $ 15,000.00 $ 4,500.00 $ 6,000.00 3,500.00 Page 1 of 3 ITEM NO. KIND OF WORK (ITEM DESCRIPTION) MEAS UNIT ESTM QTY. BASE UNIT PRICE (Dollar and Cents in Words) BASE PRICE TOTAL 16 Removal & Repl. of Semi-Rigid Base Course SF 1000 Two Dollars and No Cents $ 2,000.00 17 Removal & Repl. Concrete Curb & Gutter LF 1000 Three Dollars and No Cents $ 3,000.00 18 Saw Cut (Not with Jack Hammer) Conc/Asph LF 500 One Dollar and Fifty Cents $ 750.00 Pavements, All Depths, As Needed 19 Cement Stabilized Sand Backfill Ton 1500 Twenty-Five Dollars and No Cents $ 37,500.00 1.64Tons/CY, Extra, or Approved Alternate 20 Flagmen For Traffic Control Hour 100 Twenty-Five Dollars and No Cents $ 2,500.00 Uniformed Peace Officer, Approved Location 21 Obstruction Removal 8"-12" Sewer, Each 10 Four Hundred Dollars and No Cents $ 4,000.00 All Depths, By Excavation,Complete 22 AdjusUReset Manhole Cover 0"- 12" Each 10 Two Hundred Dollars and No Cents $ 2,000.00 Using Existing Frame & Cover 23 AdjusUReset Manhole Cover 0"-12" Each 10 Four Hundred Dollars and No Cents $ 4,000.00 Using New Frame & Cover 24 AdjusUReset Manhole Cover Over 12 inches VF 30 Twenty-Five Dollars and No Cents $ 750.00 25 New Shallow Manhole Upto 5' Depth Each 5 Twelve Hundred Dollars and No Cents $ 6,000.00 Complete w/Connections (FG or Pre-Cast) 26 New Standard Manhole 5' to 8' Depth Each 10 Twenty-Two Hundred and No Cents $ 22,000.00 Complete w/Connections (FG or Pre-Cast) 27 Extra Height Manhole Over 8' Depth VF 30 Thirty-Five Dollars and No Cents $ 1,050.00 In addition with 22A 28 Additional Manhole Base in Wet Sand w/Piles Each 5 Fifteen Hundred Dollars and No Cents $ 7,500.00 in addition with 22A and/ or 226 29 Rehab of ManholeWall with one inch Coating VF 1000 Ninety-Five Dollars and No Cents $ 95,000.00 Liner material of approved mix Design includes benches, walls,bottom channels etc. 30 Re-Connect Service Connections including Each 500 Three Hundred Fifty Dollars and No Cents $ 175,000.00 Stack to Liner 0'-10' Depth and 10' distance 31 Re-Connect Service Connections including Each 100 Four Hundred Dollars and No Cents $ 40,000.00 Stack to Liner,Over 10' Depth 10' distance 32 As Above Beyond 10' Distance LF 100 Twenty-Five Dollars and No Cents $ 2,500.00 In addition to 24A or 24B 33 Install New Cleanout Beyond 10' Distance Each 27 One Hundred Fifty Dollars and No Cents $ 4,050.00 in addition to 24A or 246 Page ~! of 3 ITEM NO. KIND OF WORK (ITEM DESCRIPTION) MEAS UNIT ESTM QTY. BASE UNIT PRICE (Dollar and Cents in Words) BASE PRICE TOTAL 34 Design of Trench Safety LS 1 Five Thousand Dollars and No Cents $ 5,000.00 35 Trench Safety System, All Types Soil Over 5' LF 2500 Five Dollars and No Cents $ 12,500.00 36 Extra Concrete 3500 psi, w/wo Reinforcement CY 100 Seventy-Five Dollars and No Cents $ 7,500.00 37 Extra Excavation -Machine, Pre Approved CY 1000 Forty-Five Dollars and No Cents $ 45,000.00 38 Extra Excavation - By Hand Pre Approved CY 100 Seventy-Five Dollars and No Cents $ 7,500.00 39 Bypass Pumping per Section 01005 SET U 25 Seven-Hundred Fifty Dollars and No cents $ 18,750.00 40 Groundwater Dewatering per Section 01006 ET-U 10 Three Thousand Dollars and No Cents $ 30,000.00 Total of Base Unit Prices (A) S 3,109,250.00 Contractor Unit Price Ad'ustment Factor Total Amount Bid Allco, Inc. Beaumont, TX 0.884 $ 2,748,577.00 Williamson Construction Lumberton, TX 0.920 $ 2,860,510.00 Huff & Mitchell Cypress, TX 0.989 $ 3,075,048.25 Simco Groves, TX 1.025 $ 3,186,981.25 Ronald J. Arc ux, P.E., P.L.S. ARCENEAU GATES CONSULTING ENGINEERS, INC. ~~ ~E OF '~ w w CJ~• • • '•••• j ~ • ~ " ••~ ~ ••..w•••~N ~ RONALDJ.ARCENEAUX ~~ ' • ~ 50052 l ~O9 ;• ~• t O,c •.<iC .•••• ~ tttlsS,~ s~_`Y.. '~~~~~~~~ rv. X51, pc3 Page cl of 3 EXHIBIT B is available for review in the City Secretary's Office EXHIBIT C (City of Port Arthur) (Law Department) (Required Form) (7/8/88) (10/5/89) (3/15/90) (9-8-94) (p.2 Revised 9/18/90) CERTIFICATE OFSTANDARD FORM CONTRACT FOR LAW DEPARTMENT REVIEW AND CITY COUNCIL AGENDA I certify that the contract (hereinafter called "said contract") affixed to the attached Proposed City Council Resolution No 15579 is an exact duplicate of an applicable standard form contract (the title of which is shown below) previously approved by the Law department and adopted as a standard form by City Council Resolution, except for the blanks that have been filled in with all necessary information and except for the changes described below. The title of the applicable standard form contract is: [X] Federally Funded Construction Contract, Revised 1./5/88, 7/89, 8/89; 4/28/94 [ ]Non-Federally Funded Construction Contract, Reviised 1/5/88, 7/89, 8/89; 4128/94 [ ]Federal -Professional Services -Engineering Contract, Revised 1/5/88, 5/89 (§10) 7/89/(§8); 10/89; 2/91 (§8) [ ]Non-Federal -Professional Services -Engineering Contract, Revised 1/5/88, 5/89(§10), 7/89(§8), 10/89; 2/91(§8) [ ]CDBG -Professional Services -Engineering Contract, Revised 1/5/88, 5/89 (§10), 7/89(§8), 10/89; 2/91 (§8) [ ]Federal -Professional Services -Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ]Non-Federal -Professional Services -Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§ 10), 7/89 (§8); 10/89; 2/91 (§8) [ ]CDBG -Professional services -Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ]Other Standard Form Contract, described as follows: The changes are as follows: (Put an "X" in the appropriate [ ]) [ ]None. [ ]The following described provisions at the indicated page, section, etc. of the standard form have been deleted from said contract: Page 1 of 3 (p.2 Revised 4/18/90) (Certificate of Standard Form Contract, page 2) DELETIONS Subsection or Page Number Section or Paragraph No. Subparagraph No. and Where Deleted Provision and Caption Which Caption Which Contains Is Found On Standard Contains Provision Provision Deleted From Form Deleted From Form Form None. Description of Provision Deleted [X] The following described provisions at the indicated page, section, etc. of the standard form have been altered, modified, replaced or otherwise changed: ALTERATIONS, MODIFICATIONS, REPLACEMENTS, ETC. Page No. § or ¶ No. & Where Caption of Provision Found Standard Form on which Standard Form Contains Provision B-1 thru B-5 Section B C-9 Section C H-lA Section H Sub § or Sub ¶ No. & Caption of Standard Form which Contains Provision Description of Provision in Standard Form Advertisement for Bids Information to Bidders Supplemental General Conditions Part A Page § & caption sub § & caption, etc. of said contract which contains altered, etc. provision; & Description of Alteration etc. added ARRA conditions Includes schedule for mandatory pre-bid meeting. Added specifics about project & scope. Page 2 of 3 p.3 Revised 9/18/90) (Certificate of Standard Form Contract, page 3) [X] The following provisions have been added to Said Contract: Page, Section and Caption Subsection and Caption, etc. of Said Contract Which Contains the Added Provision and Description Thereof Sub § or Sub ¶ No. § or ¶ No. & & Caption of Page No. Where Caption of Standard Standard Form Description of Added to Form which which Contains Addition to Description of Standard Form Contains Addition Addition Standard Form Addition H-iC, pg. l -63 Section H Supplemental General TWDB "ARRA Pink Conditions Part C Sheets" I further certify that said attached proposed City Council Resolution contains the following provision: "That said contract is an exact duplicate of a City Standard 1 orm Contract except for the changes described in the Certificate of Standard Form Contract, a copy of which is attached hereto as Exhibit "C" and is hereby incorporated by reference, and said changes are hereby approved." I understand that this certificate will be relied on by the Law Department in reviewing and approving (or rejecting) as to form and by the City Council in reviewing a~zd adopting (or rejecting) said Resolution and Contract. Signed this i 5~^ day of ~) G~~Y , 2009. ,, / ~~ _ De artment ead Page 3 of 3