Loading...
HomeMy WebLinkAboutPR 15580: SIMCO - SANITARY SEWER REHABMEMORANDUM CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: Stephen Fitzgibbons, City Manager FROM: Kelly Eldridge, Director of Utility Operations 1~~'G' ( ~ / L7'~'U DATE: October 15, 2009 SUBJECT: Proposed Resolution No. 15580 RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 15580 authorizing the execution of a contract with SIMCO ENTERPRISES, LTD., of Groves, Texas, in the amount $2,813,305.63 for the Sanitary Sewer Rehabilitation by Pipebursting &Sliplining Methods to Serve Basins LC73, LC709 &SE435, Contract No. 7, City Project No. 404PB7. BACKGROUND This is one of our first Phase II SSES projects performed under the ARRA grant administered by the TWDB. This project is for work in the Lake Charles LS service area (approx. StilwelUNederland Ave. to Woodworth, from Lakeshore to 19~` St.), in the El. Paso Ave./Memorial area up to around 28`~ St., and in the Foster Estates area. We will likely rehabilitate the entire remaining service area by pipe bursting method, enlarging the pipe diameter in some sections. 'This is a much less disruptive and expensive rehabilitation method compared to conventional removal & replacement. Four (4) contractors attended the mandatory pre-bid meeting, and the following three (3) bids were received on October 7, 2.009: Bidder Total Bid ALLCO, Inc. $2,943867.88 Beaumont, TX SIMCO Enterprises, LTD 52,813.305.63 Groves, TX Williamson Construction $2,996,714.:>0 Lumberton, TX BUDGET/FISCAL EFFECT This bid is 90.5% of the engineer's estimate. Funds are available in Fund No. 404-1625-532.83-00, City Project No. 404PB7. STAFF/EMPLOYEE EFFECT City staff and our consulting engineer, Arceneaux & Gates, will oversee this 550 day project. SUMMARY I recommend that the City Council approve Proposed Resolution No. 15580 authorizing the execution of a contract with SIMCO ENTERPRISES, LTD., of Groves, Texas, in the amount $2,813,305.63 for the Sanitary Sewer Rehabilitation by Pipebursting &Sliplining Methods to Serve Basins LC73, LC709 &SE435, Contract No. 7, City Project No. 404PB7. P.R. No. 15580 10-15-09 RESOLUTION NO., A RESOLUTION AWARDING A CONTRACT AND AUTHORIZING THE EXECUTION OF SAID CONTRACT IN THE AMOUNT OF $2,813,305.63 FOR THE SANITARY SEWER REHABILITATION BY PIPEBURSTING & SLIPLINING METHODS TO SERVE BASINS LC73, LC709 &SE435, CONTRACT NO. 7, BETWEEN THE CITY OF PORT ARTHUR AND SIMCO ENTERPRISES, LTD., OF GROVES, TEXAS, ACCOUNT N0.404-1625-532.83-00, CITY P:E~OJECT N0.404PB7. WHEREAS, the City is currently under ari Agreed Order with the TCEQ to rehabilitate its sanitary sewer system; and, WHEREAS, there exists a need to reduce flows and eliminate sanitary sewer overflows in our collection and treatment systems; and, WHEREAS, the City of Port Arthur advertised and received bids from three contractors for the Sanitary Sewer Rehabilitation by Pipebursting &Sliplining Methods to Serve Basins LC73, LC709 & SE435, Contract No. 7; and, WHEREAS, Arceneaux & Gates Consulting Engineers, Inc. has reviewed the bids and recommends award to the lowest responsive, responsible bidder, ALLCO, Inc.; and, WHEREAS, a copy of their recommendation and bid tabulation is attached hereto as Exhibit "A"; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT the City Council of the City of Port Arthur hereby awards the contract for the Sanitary Sewer Rehabilitation by Pipebursting &Sliplining Methods to Serve Basins LC73, LC709 &SE435, Contract No. 7, to the lowest responsive bidder to~-wit; SIMCO ENTERPRISES, LTD., of Groves, Texas, for sewer line construction at $2,813,30.5.63, contingent upon TWDB approval and funding; and, P.R. No. 15580 10-15-09 Page 2 of 3 THAT the Mayor and City Manager of the City of Port Arthur is hereby authorized to execute on behalf of the City of Port Arthur a contract between the City of Port Arthur and SIMCO ENTERPRISES, LTD. in the amount of $2,813,305.63, a copy attached hereto as Exhibit "B" , contingent upon TWDB approval; and, THAT the contractor shall not proceed on any phase or segment of this work until a Notice to Proceed is issued with receipt of performance and payment bond and certificate of insurance; and, THAT, the said contract is an exact duplicate of a City Standard Form contract except for the changes (if any) shown in the Certificate of Sta~idard Form Contract, a copy of which is attached hereto as Exhibit "C", and said changes are hereby approved; and, THAT, the contractor shall sign the contract documents as well as this resolution agreeing to the terms hereof; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED THIS day of , 2009 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: Deloris Prince Mayor P.R. No. 15580 10-15-09 Page 3 of 3 ATTEST: Terri Hanks City Secretary APPROVED FOR ADMINISTRATION: APPROVED AS TO FORM: al Tizeno Acting City Attorney Stephen Fitzgibbons City Manager Ross Blackketter, PE Director of Public Works 1 Kelly Eld dge Director of Utility Operations APPROVED AS TO AVAILABILITY OF FUNDS: Deborah Echols (,J Director of Finance Account No.: 404-1625-532.83-00 Project No.: 404PB7 AGREED TO: SIMCO ENTERPRISES, LTD. Date EXHIBIT A ~ ARCENEAUX & GATES ', ARCENEAUX Consulting Engineers, Inc. i~ i . GATES Engineers • Surveyors • Planners October 14, 2009 Mr. Ross Blackketter, PE Director of Public Works CITY OF PORT ARTUR PO Box 1089 Port Arthur, TX 77641-1089 RE: RECOMMENDATION OF A WARD OF CONTRACT FOR CONSTRUCTION OF SANITARY SEWER REHABILITATION BY PIPEBURSTING & SLIPL/NING METHODS TO SERVE BASIN #LC73, 709 & SE435, PROJECT NO. CPA-490, CONTRACT NO. 7 TWDB PROJECT NO. IUP#73036 Dear Mr. Blackketter: On October 7, 2009 the City of Port Arthur Purchasing Department received three (3) sealed bids for the above referenced project. The legal notices for this project were advertised in the Port Arthur News for two consecutive Sundays. Additionally, the Plans and Specifications for the project were placed on file locally with the Associated General Contractors, the City and at our offices. The Engineer conducted a mandatory pre-bid meeting on September 24, 2009 with several contractors in attendance. The bids were opened in my presence at 3:15 p.m. and 1;he results were read aloud by me. We have checked the bids submitted and have prepared the attached cE~rtified Bid Tabulation for your review. The lowest, responsive, responsible bid was received from the firm oif S/MCO ENTERPRISES, LTD. of Groves, Texas. Their total amount bid was $2,813,305.63. The firm submitted the required bid surety. In consideration of all bids received, we recommend that the City of Port Arthur approve the award of this contract to SIMCO ENTERPRISES, LTD. on the basis their firm submitted the lowest, responsive, responsible bid. We recommend that the bid surety from the bidders be retained until a contract is executed. Very truly yours, ARCENEAUX & GATES CONSULTING ENGINEERS, INC. .~--._ Ronald ceneaux, PE, PLS Presid n /CEO Enclosure: Bid Tabulation One Turtle Creek Square 3501 Turtle Creek Dr., Suite 102 Port Arthur, TX 77642 409/724-7888 FAX 409/724-1447 BID TABULATION For The ARCENEAtTX Sanitary Sewer Rehabilitation by Pipe Bursting 8 Sliptining Methods & To Serve GATES CONSULTING Basin # LC 73, LC 709 $c SE 435 exGINEERS,INC. Job No. CPA-490, Contract No. 7 BIDS OPENED: October 7, 2009 at 3:15 P.M. ITEM # KIND OF WORK (ITEM DESCRIPTION) MEAS UNIT ESTM QTY. BASE UNIT PRICE (Dollar and Cents in Words) BASE PRICE TOTAL 1 CLEANING: 8-12" Sewer All Depths LF 84,000 One Dollar and Fifty Cents $ 126,000.00 2 CLEANING: 15-24" Sewer All Depths LF 600 Two Dollars and Zero Cents $ 1,200.00 3 TV INSPECTION: 8-12" Sewer All Depths LF 84,000 One Dollar and Thirty Cents $ 109,200.00 4 TV INSPECTION: 15-24" Sewer All Depths LF 600 Once Dollar and Fifty Cents $ 900.00 5 POINT REPAIR EA 25 Once Thousand Dollars and No Cents $ 25,000.00 8"-12" Swr, 0'-10' Depth and 6' in Length 6 REPLACEMENT BEYOND POINT REPAIR LF 6000 Twenty-Seven Dollars and No Cents $ 162,000.00 8"-12" Swr, 0'- 10' Depth ,Over 6' in Length 7 POINT REPAIR EA 10 Fifteen Hundred Dollars and No Cents $ 15,000.00 8"-12" Swr,Over 10' Depth, 0'-10' in Length 8 REPLACEMENT BEYOND POINT REPAIR LF 2000 Thirty-Two Dollars and No Cents $ 64,000.00 8"-12" Swr, Over 10' Depth, Over 10' in Length 9 POINT REPAIR EA 2 Twelve Hundred Dollars and No Cents $ 2,400.00 15"-21" Swr, Over 10' Depth, 0'-10' in Length 10 POINT REPAIR LF 600 Fifty Dollars and No Cents $ 30,000.00 15"-21" Swr, Over 10' Depth,Over 10' in Length 11 SLIPLINING: 8 "Sewer, All Depths, SDR 21 LF 6000 Twenty-Two Dollars and No Cents $ 132,000.00 12 PIPE BURSTING: 8" to 8.625" OD LF 56000 Twenty-Nine Dollars and No Cents $ 1,624,000.00 All Depths ,SDR 19, Complete in Place 13 PIPE BURSTING: 10" to 10.750" OD LF 1000 Thiirty-Two Dollars and No Cents $ 32,000.00 All Depths ,SDR 19, Complete in Place 14 PIPE BURSTING: 12" to 12.750" OD LF 5000 Thiirty-Seven Dollars and No Cents $ 185,000.00 All Depths, SDR 19, Complete in Place 15 PIPE BURSTING:Exising 18" to 21.00" OD LF 500 Forty-Two Dollars and No Cents $ 21,000.00 All Depths ,SDR 19, Complete in Place 16 Removal & Repl. of Wood/ Chain Link Fence LF 1250 Fifteen Dollars and No Cents $ 18,750.00 All Heights, Std. New Materials. Pre Approved Page 'I of 3 ITEM NO. KIND OF WORK (ITEM DESCRIPTION) MEAS UNIT ESTM QTY. BASE UNIT PRICE (Dollar and Cents in Words) BASE PRICE TOTAL 17 Removal & Repl. of 4- 1/2" Concrete SW SF 1250 Four Dollars and Fifty Cents $ 5,625.00 incl. Reinforcement, Base etc. Pre Approved 18 Removal & Repl. of 6-8" Concrete SW/DW SF 1000 Six: Dollars and No Cents $ 6,000.00 incl. Reinforcement, Base etc. Pre Approved 19 Removal & Repl. of upto 2 "Hot-Mix SF 1000 Thiree Dollars and Fifty Cents $ 3,500.00 Asphaltic Conc. (Type D), incl. Tack Coat 20 Removal & Repl. of Semi-Rigid Base Course SF 1000 Two Dollars and No Cents $ 2,000.00 21 Removal & Repl. Concrete Curb & Gutter LF 1000 Three Dollars and No Cents $ 3,000.00 22 Saw Cut (Not with Jack Hammer) Conc/Asph LF 500 One Dollar and Fifty Cents $ 750.00 Pavements, All Depths, As Needed 23 Cement Stabilized Sand Backfill Ton 1500 Twenty-Five Dollars and No Cents $ 37,500.00 1.64Tons/CY, Extra, or Approved Alternate 24 Flagmen For Traffic Control Hour 100 Twenty-Five Dollars and No Cents $ 2,500.00 Uniformed Peace Officer, Approved Location 25 Obstruction Removal 8-21" Sewer, EA 10 Four Hundred Dollars and No Cents $ 4,000.00 All Depths, By Excavation, Complete 26 Adjust/Reset Manhole Cover 0"-12" EA 10 Two Hundred Dollars and No Cents $ 2,000.00 Using Existing Frame & Cover 27 Adjust/Reset Manhole Cover 0"-12" EA 10 Four Hundred Dollars and No Cents $ 4,000.00 Using New Frame & Cover 28 Adjust/Reset Manhole Cover Over 12 inches VF 30 Twenty-Five Dollars and No Cents $ 750.00 29 New Shallow Manhole Upto 5' Depth EA 5 Twelve Hundred Dollars and No Cents $ 6,000.00 Complete wlConnections (FG or Pre-Cast) 30 New Standard Manhole 5 to 8' Depth EA 10 Twenty-Two Hundred Dollars and No Cents $ 22,000.00 31 Extra Height Manhole Over 8' Depth VF 30 Thirty-Five Dollars and No Cents $ 1,050.00 In addition with 30 32 Additional Manhole Base in Wet Sand w/Piles EA 5 Fifteen Hundred Dollars and No Cents $ 7,500.00 In addition with 30 and/ or 31 33 Rehab of ManholeWall with one inch Coating VF 1000 Niinety-Five Dollars and No Cents $ 95,000.00 Liner material of approved mix Design includes benches, walls, bottom channels etc. 34 Re-Connect Service Connections including EA 525 Three Hundred Fifty Dollars and No Cents $ 183,750.00 Stack to Liner, 0'-10' Depth and 10' distance Page ~'. of 3 ITEM NO. KIND OF WORK (ITEM DESCRIPTION) MEAS UNIT ESTM QTY. BASE UNIT PRICE (Dollar and Cents in Words) BASE PRICE TOTAL 35 Re-Connect Service Connections including EA 100 Four Hundred Dollars and No Cents $ 40,000.00 Stack to Liner,Over 10' Depth and 10' distance 36 As Above Beyond 10' Distance LF 100 Twenty-Five Dollars and No Cents $ 2,500.00 In addition to 34 or 35 37 Install New Cleanout Beyond 10' Distance EA 30 One Hundred Fifty Dollars and No Cents $ 4,500.00 In addition to 34 or 35 38 Design of Trench Safety EA 1 Five Thousand Dollars and No Cents $ 5,000.00 39 Trench Safety System, All Types Soil Over 5' LF 2500 Five Dollars and No Cents $ 12,500.00 40 Extra Concrete 3500 psi, w/wo Reinforcement CY 100 Seventy-Five Dollars and No Cents $ 7,500.00 41 Extra Excavation -Machine, Pre Approved CY 1000 Forty-Five Dollars and No Cents $ 45,000.00 42 Extra Excavation - By Hand Pre Approved CY 100 Seventy-Five Dollars and No Cents $ 7,500.00 43 Bypass Pumping per Section 01005 SET U 25 Seven Hundred Fifty Dollars and No Cents $ 18,750.00 44 Groundwater Dewatering per Section 01006 SET-U 10 Three Thousand Dollars and No Cents $ 30,000.00 Total of Base Unit Prices (A) E 3,108,625.00 Contractor Unit Price Ad'ustment Factor Totat Amount Bid Simco Groves, TX 0.905 $ 2,813,305.63 Allco, Inc. Beaumont, TX 0.947 $ 2,943,867.88 Williamson Construction Lumberton, TX 0.964 $ 2,996,714.50 Ronald J. Arce a x, P.E., P.L.S. ARCENEAUX TES CONSULTING ENGINEERS, INC. ~A-~EOF T~.~1~ w S . -''"~i4'' '~~ •• ~ o° RONALD J. ARCENEAiI?}l; J ~. .....r ~~ .~~. 50052 ~; `~...;:.-• Jo.ry• a9 Page 3 of 3 EXHIBIT B is available for review in the City Secretary's Office EXHIBIT C (City of Port Arthur) (Law Department) (Required Form) (7/8/88) (10/5/89) (3/15/90) (9-8-94) (p.2 Revised 9/18/90) CERTIFICATE OF STANDARD FORM CONTRACT FOR LA W DEPARTMENT REVIEW AND CITY COUNCIL AGENDA I certify that the contract (hereinafter called "said contract") affixed to the attached Proposed City Council Resolution No 15580 is an exact duplicate of an applicable standard form contract (the title of which is shown below) previously approved by the Law department and adopted as a standard form by City Council Resolution, except for the blanks that have been filled in with all necessary information and except for the changes described below. The title of the applicable standard form contract is: [X] Federally Funded Construction Contract, Revised 1/5/88, 7/89, 8/89; 4/28/94 [ ]Non-Federally Funded Construction Contract, Reviised 1 /5/88, 7/89, 8/89; 4/28/94 [ ]Federal -Professional Services -Engineering Contract, Revised 1/5/88, 5/89 (§10) 7/89/(§8); 10/89; 2/91 (§8) [ ]Non-Federal -Professional Services -Engineering Contract, Revised 1/5/88, 5/89(§10), 7/89(§8), 1.0/89; 2/91(§8) [ ]CDBG -Professional Services -Engineering Contract, Revised 1/5/88, 5/89 (§10), 7/89(§8), 10/89; 2/91 (§8) [ ]Federal -Professional Services -Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ]Non-Federal -Professional Services -Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ]CDBG -Professional services -Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§ 10), 7/89 (§8); 10/89; 2/91 (§8) [ ]Other Standard Form Contract, described as follows: The changes are as follows: (Put an "X" in the appropriate [ ]) [ ]None. [ ]The following described provisions at the indicated page, section, etc. of the standard form have been deleted from said contract: Page 1 of 3 (p.2 Revised 9/18/90) (Certificate of Standard Form Contract, page 2) DELETIONS Subsection or Page Number Section or Paragraph No. Subparagraph No. and Where Deleted Provision and Caption Which Caption Which Contains Is Found On Standard Contains Provision Provision Deleted From Form Deleted From Form Form None. Description of Provision Deleted [X] The following described provisions at the indicated page, section, etc. of the standard form have been altered, modified, replaced or otherwise changed: ALTERATIONS, MODIFICATIONS, REPLACEMENTS, ETC. Page No. § or ¶ No. & Where Caption of Provision Found Standard Form on which Standard Form Contains Provision B-1 thru B-5 Section B C-9 Section C H-lA Section H Sub § or Sub ¶ No. & Caption of Standard Form which Contains Provision Description of Provision in Standard Form Advertisement for Bids Information to Bidders Supplemental General Conditions Part A Page § & caption sub § & caption, etc. of said contract which contains altered, etc. provision; & Description of Alteration etc. added ARRA conditions Includes schedule for mandatory pre-bid meeting. Added specifics about project & scope. Page 2 of 3 p.3 Revised 9/18/90) (Certificate of Standard Form Contract, page 3) [X] The following provisions have been added to Said Contract: Page, Section and Caption Subsection and Caption, etc. of Said Contract Which Contains the Added Provision and Description Thereof Sub § or Sub ¶ No. § or ¶ No. & & Caption of Page No. Where Caption of Standard Standard Form Description of Added to Form which which Contains Addition to Standard Form Contains Addition Addition Standard Form Description of Addition H-iC, pg. 1-63 Section H Supplemental General TWDB "ARRA Pink Conditions Part C Sheets" I further certify that said attached proposed City Council Resolution contains the following provision: "That said contract is an exact duplicate of a City Standard Form Contract except for the changes described in the Certificate of Standard Form Contract, a copy of which is attached hereto as Exhibit "C" and is hereby incorporated by reference, and said changes are hereby approved." 1 understand that this certificate will be relied on by the Law Department in reviewing and approving (or rejecting) as to form and by the City Council in reviewing a~1d adopting (or rejecting) said Resolution and Contract. Signed this _~ day of D~~.~r~- , 2009. Departure Head Page .. of 3