HomeMy WebLinkAboutPR 23919: EMERGENCY REPAIR OF 8" SEWER AT RAILROAD AND THOMAS 1 3 'I'' r 7 17 t[ INTEROFFICE MEMORANDUM Date: September 11,2024 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR No. 23919—Emergency Repair of 8" Sewer at Railroad and Thomas Introduction: The intent of this Agenda Item is for the City Council to ratify the emergency repair of the existing 8" sanitary sewer that crosses the North shoulder of Thomas Boulevard and West of Railroad Avenue. Background: An 8" clay gravity sanitary sewer approximately 10 feet deep was damaged by an Entergy crew on the west side of the railroad tracks and north shoulder of Thomas Boulevard. The Entergy crew was installing a large power pole when they hit the sewer with the drilling machine. The repair of the sewer line will require the replacement of the line across Thomas Boulevard from manhole to manhole since the damaged area can not be excavated due to its proximity to another large power pole and the potential for it to fall. This failure jeopardizes public health and safety as this sewer serves a large apartment complex on the north side of Thomas Boulevard. Water Utilities staff called MK Constructors and Global Drilling to provide informal bids for this repair. Global Drilling was the lowest bid at $163,000.00. The project was completed with the 10" HDPE sewer pipe replacement on September 7th, 2024. The final cost of the project is $154,400.00. Budget Impact: The total budgetary impact is $154,400.00 and funding is available in Account No. 405-40-000- 8516-00-00-000, Project No. WS0006-CON. Recommendation: It is recommended that City Council approve Proposed Resolution No. 23919, ratifying the emergency repair as described/outlined above. "Remember,we are here to serve the Citizens of Port Arthur" 9/11/2024 cv Page 1 of 3 RESOLUTION NO. A RESOLUTION RATIFYING THE CITY MANAGER'S PR No. 23919 DECISION TO AUTHORIZE THE EMERGENCY REPAIR OF 8" SEWER AT RAILROAD AND THOMAS, FOR THE TOTAL NOT TO EXCEED AMOUNT OF $154,400.00 WITH GLOBAL DRILLING, INC. OF WINNIE, TEXAS, FROM WATER UTILITIES ACCOUNT NO. 405-40-000- 8516-00-00-000, PROJECT NO. WS0016-CON. WHEREAS, the 8-inch sanitary sewer line that crosses Railroad and Thomas Boulevard has been damaged by Entergy crew during a large power pole installation causing a serious safety and health concerns and also a state violation; and, WHEREAS, the emergency memo (Exhibit "A") authorized the emergency repair to Global Drilling, Inc. of Winne, Texas, which is the lowest bid, to install 10-inch HDPE pipe approximately 210 LF by trenchless method including all appurtenances; and, WHEREAS, the project was completed on September 7th, 2024 and the final cost of the project was $154,400.00 (Invoice and daily report attached as Exhibit"B"); and, WHEREAS,pursuant to Section 252.022(a)(1)of the Texas Local Government Code,this purchase is authorized because of a public calamity that requires the immediate appropriation of money to relieve the necessity of the municipality's residents or to preserve the property of the municipality; and, WHEREAS, it is authorized pursuant to Section 252.022(a)(3) of the Local Government Code because of the unforeseen damage to public machinery, equipment, or other property. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, PR No. 23919 9/11/2024 cv Page 2 of 3 THAT, City Council hereby ratifies the City Manager's decision to authorize the emergency repairs for the total not to exceed amount of$154,400.00 (Invoice and daily report attached as Exhibit "B") from Account No. 405-40-000-8516-00-00-000, Project No. WS0016- CON; and, THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the Meeting of the City Council. READ, ADOPTED, AND APPROVED this day of , 2024 at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote: AYES: Mayor Councilmembers: NOES: Thurman Bill Bartie Mayor ATTEST: Sherri Bellard City Secretary APPROVED AS TO FORM: Roxann Pais Cotroneo City Attorney PR No. 23919 9/11/2024 cv Page 3 of 3 APPROVED Fib* INISTRATION: Ronald Burton, C M' Calvin Matthews, P.E. City Manager Water Utilities Director APPROVED AS TO THE AVAILABILITY OF FUNDS: Wata (?)9g(--e_ Lynda(Lyn) Boswell, MA, IC{MA-CM Clifton illiams, CPPB Director of Finance Purchasing Manager Exhibit "A" • a Tr rr INTEROFFICE MEMORANDUM WATER UTILITIES DEPARTMENT-WATER ADMINISTRATION Date: August 23, 2024 To: Mr. Ronald Burton, City Manager 414C7k— From: Calvin Matthews, P.E., Water Utilities Director RE: 8" Sewer Repair at Railroad Avenue and Thomas Boulevard An 8" clay gravity sanitary sewer approximately 10 feet deep was damaged by an Entergy crew on the west side of the railroad tracks and north shoulder of Thomas Boulevard just west of Railroad Avenue. The Entergy crew was installing a large power pole when they hit the sewer with the drilling machine. The repair of the sewer line will require the replacement of the line across Thomas Boulevard from manhole to manhole since the damaged area can not be excavated due to its proximity to another large power pole and the potential for it to fall if additional excavation is performed. This failure jeopardizes public health and safety as this sewer serves a large apartment complex on the north side of Thomas Boulevard. Water Utilities staff called MK Constructors and Global Drilling to provide informal bids for this repair. Global Drilling was the lowest bid at $163,000.00 and we are asking for your approval to mobilize them to do the repair. Funding is available in the Wastewater Fund Account No. 405-40-000-8516-00-00-000. I, Ronald Burton, ' t Manager, approve the emergency rental. e),Q,S C( Ronald Burton Date City Manage "Remember, we are here to serve the citizens of Port Arthur." B AL GLOBAL DRILLING, INC. 44994 Interstate 10 Winnie,Texas 77665,USA T:+1 800 956 8720;F:(407)715 6150 Email:infoaglobaldrillingequipment.cam,Website:www,alobaldntlingeautpmem.com QUOTATION 'Date To: CITY OF PORT ARTHUR August 23,2024 444 4th STREET PORT ARTHUR,TEXAS 776040 Ref. No Location THOMAS BLVD.PORT ARTHUR Q2024-101 Item Description Unit Qty Unit Price Total Price No. (USD) (USD) 1 -Install 10"HDPE Pipe,Approximately 210 LF by LS 1 163,000.00 163,000.00 Trenchless Installation including all necessary ;appurtenances,Complete in Place -Mobilization,Site Clearing,Excavation&Surface Restoration -Installation of 2-Concrete Manholes CCTV Inspection -Shoring&Dewatering/Wellpoint -Including Wilson's Inspector and Flogger TOTAL: $ 163,000.00 � I Terms and Conditions: Amount in Words(US Dollars):One Hundred Sixty Three Thousand Only For GLOBAL DRILLING,INC. / Estimate 4 / www.mkconstructors corn CONSTRUCTORS Client City Of Port Arthur Location Thomas Blvd.&RR Attn Calvin Mathews Client Reference Gravity Sewer Email calvin.matthews@portarthurtx.gov MK Estimate# PMK24-105 Tel Prepared By Mike Suire Cell mikesuire@mkconstructors.com Date Quote Validity Scheduled Start Scheduled Completion Estimated Time On-Site Payment Terms 8/22/24 10 days TBD TBD 15 days See Below Qty Description Unit Price Price Ext. 1 LS Mobilization $2,800.00 $2,800.00 200 If 10"HDPE (owner supplied) $590.00 $118,000.00 2 EA Concrete manholes(8-12'deep) includes surface restoration $27,000.00 $54,000.00 1 RR Observer per shift $1,875.00 1 RR Flagger per shift $1,500.00 Quote excludes TV inspection,RR permit,well pointing,and bypass pumping.MK will set up boring machine behind apartment complex.Quote is contingent upon set up location. Rig&Crew stand-by rate=$600.00/.00/hr.per rig/crew $174,800.00 (10 hours per day maximum,unless MK crews are on-site stand-by beyond 10 hours per day) Steering Technician stand-by rate=$750.00/hr.per technician We appreciate the opportunity to offer our products and services Estimate Notes • MK Constructors,LLC(MK)utilizes surface launched Horizontal Directional Drilling(HDD)equipment to perform all HDD's and Guided Bores.The installation of the specified pipe by way of auger boring,dry boring,or jack and boring is not included in this estimate. • HDD/Guided Bore pricing is based on the proposed footages in the Client's Request for Pricing(RFP).MK reserves the right to re-negotiate pricing based on any variances in the proposed footages. • HDD/Guided Bore pricing is based on"walk-over"tracking of the pilot bore.If pilot bore tracking requires methods other than"walk-over"tracking(ie. "wire-line","gyroscopic",etc.),the pricing will be reflected on the pricing page of this estimate. • Stand-by rates will apply for shutdowns due to unforeseen operations,and/or circumstances beyond the control of MK.Rig&Crew stand-by rates are reflected on the pricing page of this estimate. • Unless specified on the pricing page of this estimate,down-hole pressure monitoring tools,casing set at the entry and/or exit points of the bore,and/or grouting of annular space in bore hole,is not included. MK/Client Scope of Work • MK will place"one calls",based on client provided work locations,prior to mobilization to jobsite. • Upon full acceptance of proposal,MK will mobilize and demo existing manholes allowing continuous sewer flow through existing gravity sewer. • Debris will be hauled offsite to an appropriate location. • Contractor intends to set up boring machine approximately 75'north west of manhole inside of Apartment complex parking lot.The existing gravity line will be used to guide the bore stem through 1'manhole to 2""manhole on the SE side of Thomas BLVD.Owner fumished 10"HDPE will be pulled through the existing 8"gravity line.Fusing of 10"pipe is included. • Upon installation of new gravity line,MK will install new manholes and complete restoration. 1 yf" J' Exhibit "B" GLOBAL DRILLING,INC. s 44994 Interstate 10 Winnie,Texas 77665,USA ate,: ,,, T:+1 800 956 8720;E:info@globaldnllingequipment.com, W:wwa.alobaldrillinaeauipment.com INVOICE Date Attn: ACCOUNTING September 7,2024 444 4th STREET PORT ARTHUR.TEXAS 776040 Project Name:8"Sewer Repair at Railroad Avenue and Thomas Boulevard Ref. No. : Ref:INTEROFFICE MEMORANDUM dated August 23,2024 Location Across Thomas Blvd. Port Arthur Texas PA2022-015 COMPLETED WORK ITEM TOTAL DESCRIPTION UNIT UNIT PRICE TOTAL PRICE REMARKS NO. CCTV TOTAL TO % PREVIOUS DATE 1 Mobilization,Site Clearing,Excavation&Surface 1 LS 100.00% 1 6,300.00 6,300.00 Restoration Install 10"HDPE Pipe,Approximately 210 LF by 2 Trenchless Installation including all necessary 1 LS 100.00% 1 86,700.00 86,700.00 appurtenances,Complete in Place -Actual length 158' 3 Installation of 2-Concrete Manholes 2 EA 100.00% 2 25,000.00 50,000.00 4 Jetting and High Pressure Cleaning&CCTV Inspection 1 LS 100.0096 1 8,000.00 8,000.00 5 Shoring&Dewatering/Wellpoint 1 IS 100.00% 1 12,000.00 12,000.00 6 Including Wilson's Inspector and Flagger 1 LS 8,600.00 TOTAL: 163,000.00 Less:Charge for Wilson's Inspector and Flagger 1 LS IS 5n0 no TOTAL DUE: 154,400.00 Terms and Conditions: Amount in Words(US Dollars):One Hundred Fifty Four Thousand Four Hundred Only For GLOBAL DRILLING,INC. I JASMIN BERSOBIO I Page 1 of 1 8" Sewer Repair at Railroad Avenue and Thomas Boulevard AUGUST 26, 2024 Inspection, Mobilization of Equipment, Planning of Works, Measuring/Laying-outs Flow Control 1 141‘0. • v #Pifii`rii it, li i 1ppi t O. 4 f ...,p k ] . ., 'R : ' - Pictures Page 1 P 8" Sewer Repair at Railroad Avenue and Thomas Boulevard AUGUST 27, 2024 Flow Control, Picked-up HDPE Pipes form the City'store to project site, Locate Existing Utilities,Preparation of Work . i t. 1 \ , \— ` "„ } .. I - vela • .».try _... .,. , , - - . . ,. ,. , _ ... 4 _ __ .,,,r4jilr a,. F AUGUST 28, 2024 Pre-CCTV Inspection—158', Flow Control, Delivery/Unloading of Equipment and Materials �, ',• � .,;v f•'' r - sit • rR 4+! rs � ,v ?. r a '.£ t t .`IV{ , E`. :v 4,4r 4'414 a§ . *.:, :. ,,JR&i 'h alt s a M .. Tr ' r t - t v,• Pictures Page 2 8" Sewer Repair at Railroad Avenue and Thomas Boulevard MH DWNS ' ---- Isi. ,... - at 14 transluon 6"clay to ------, --,-..,_ 6" CI (metal) at 39' Corrosion can't pass end survey .., ,., *f' i ' . .....,,.. , A . , osorroto g , _ ,.. . _ . . , , -- ,, / . . . , . __„„„, ,, . 4 . , A.„ . Pictures Page 3 G 8" Sewer Repair at Railroad Avenue and Thomas Boulevard S ' t` 4 ,y S" „I*. ,:v. .. •--. " '-... „k... ..1/4i,.: ,. . .'4#.;',.. ' .74',,, tio( 4 $ ,y3 � ; , t a g ." 1 •* w M. .. _ P. " . _� r, o �>. j t �' S ^v -,!".....4,,,,,, tw r a,z Pictures Page 4 8" Sewer Repair at Railroad Avenue and Thomas Boulevard r-; 01/4 } # ' f" .: . „...... ..-, ,,,,, - e4 '' it f. , s + ,I 4,1 t*r*"--,0 : .,.*i': le "tle „, .,.ice, ".;tt .., ..- r ,0 \1/4. 4'** *'''.2 * 'c r ar k x r. r s t _ .,•�«-. _ .. arc. r _ - 4 iE. .- € Pictures Page 5 8" Sewer Repair at Railroad Avenue and Thomas Boulevard ../..1*-:. ._. .,1,- Win # A . $' :`` it-. .# l finis aa�t��e tally+sia� 5 .'� Pictures Page 6 8" Sewer Repair at Railroad Avenue and Thomas Boulevard $i 4 it w_ w.v.s 0....11111. 1 - — tt4 k' 1 41:,„,.''.„I—1''1 w » Y 5 x.r _ , k.,,,.. ‘C-- ..'_,----- iq .y ittill i 4 � 4 i tom* •+,t'. ,3 .'f' •� s� �' }' sr ry Pictures Page 7 8" Sewer Repair at Railroad Avenue and Thomas Boulevard .- ,,,.: ._:,,,,c,„ - t..._ ctht -a-. ... -," - O. '4°' '''''. ,, \'''\\\ f ter. J . a, ,IS . w n 4 r,..„.„0. *,., ,, , ... ,.. .,, „............„ Pictures Page 8 8" Sewer Repair at Railroad Avenue and Thomas Boulevard �.� c 4014. shy �� ,: • �;. se • Z ! '. t 4/� AUGUST 29, 2024 Flow Control, Unloading equipment t� � _ Pictures Page 9 8" Sewer Repair at Railroad Avenue and Thomas Boulevard - 1 i- tr __-- 41, • • 1 Pictures Page 10 8" Sewer Repair at Railroad Avenue and Thomas Boulevard AUGUST 30, 2024 (Raining) Fussing 10"SDR17 HDPE Pipes, Stopped the work due to the Lift Station Surcharge due to the rain - Mri € t +. `tt � ' i a ._ ,16. '• •tea»$."`, �a °� �� . 1 1 . . - -='-.,''-''' ,4' 1,11,,i,--t--iii'-iiiitigig - i - 9. AIM i 1R �. ■■E 5 - sr , pis r" �'.t s_° q uic +may .- .lr 1 T ;::jam a , f �; N :.c K,v ,�. � 2 � +T..' .,� .i°; �� ,. Pictures Page 11 8" Sewer Repair at Railroad Avenue and Thomas Boulevard --- : • y { f`Y. LK � ,ti sr <:. .... . .. • ) Pictures Page 12 8" Sewer Repair at Railroad Avenue and Thomas Boulevard ;, �, x 46, v. Ilk: : $. ." w s s Y �. - r i • y t tif rt +ter - f' is k7'- y #.#bat hOpe ' x I• • ..�h , Pictures Page 13 8" Sewer Repair at Railroad Avenue and Thomas Boulevard September 3, 2024 Excavate Entry Pit(18'x 8'x 8'), Set-up for Pipe Burst, Begin the Pipe Bursting of 10"Pipes— 158'& Flow Control f 0 }} '. .•k - , . j i "vim ., , vf v. r A :„.4s » , ' ih0144.=, fo, -?IP' .,,A, , A. 4 . ' "' ', Pictures Page 14 8" Sewer Repair at Railroad Avenue and Thomas Boulevard 4 as Jam'. i ,, \\t _ , f w. ... . „ 4 Pictures Page 15 t 8" Sewer Repair at Railroad Avenue and Thomas Boulevard 't a' 2a `_ ., i 3 ,t , -5 7 - , - ' * . . 'Y - -4 } 3 , r q't 44, ' of , ..y. f .. . 10 { f ' /// r i• x +Y", Pictures Page 16 r. •;,, I _f. r 8" Sewer Repair at Railroad Avenue and thomas Boulevard ----,\----„„14' iiw of t ;1, ., �ri it al kk , .,,,. ,- : - - '. • '. _ '' tom. 3 _ems its - e , A A, `. ...„ . \ _, - m r / " 1 -4 . y r „ it° p�r x - 4 \, [", a1 1 �i e `'fir # {. af:' r c{' 4E n 9{ a+ e � r a „ Pictures Page 17 . r t 8" Sewer Repair at Railroad Avenue and Thomas Boulevard -, �a �R fe - '44' a x September 4, 2024 Completed the Pipe Bursting of 10"Pipes-158', Downstream Manhole Rehab., Set-up new base for Upstream Manhole and Flow Control ,r ';..- '.1..— /' 40 tts # /em s- ,? * f«_ .— - ' .'''. ,,/ o 8 , Pictures Page 18 •k 8" Sewer Repair at Railroad Avenue and Thomas Boulevard T I a _t e � r 1r . • Pictures Page 19 • A 8" Sewer Repair at Rai.Rai .1roacji,Avenue and Thomas Boulevard - ,:'-:\It' S' It:.-•:,,4,ne.- , ..- Iv 4F • ,x • l • +� ... +`` «+J i. • �r r le $ x si r : x 46 a Page 20 Pictures .,... . .4 .j, ThO MaS Boulevard Avenue and ... . . ....... 8" Se!-_::e1:....":.:::1:a::..,,:atR::::oad4' ,.:*;:','''''. - *1 447.;:=11;"Z;•g-7',:*j*,''',.t'.**14''',*11.7* • ''''''.•''''''*-14#...**4'‘' * ' - ***2..*:*8',.";*`'*. *'-'1'*" ..' Ipir'.1'.'—,••' .•tr...,.;.i.,:. *,.i 'i.\,,, • s,. '. . .., •..# ,.. .,.•k. . ,. . t' • . ..- -- • ,0.• ,,..., , :.,. • ,,,,, .4hdis„,:f ,, ip .e. - :: .-..„: 41: A_-. ...„ _. •, ' t •-. -1, , : . .., . , I.- ...„,„,--.. ,_. . . .. .. -.... \ ,.... ..„. _ ,.., ..., .. .„.. . ._ „..... .. _ ..._.-:.: .,., . . ., .. . . .. ,, t- .„... , .,„,... ..„,,_.,. .......,:t,,, , • ...... •.,,-;.,--4....,-.. ... , , ,.; ,,,_,.,,,...._ -,-. ... :;-,,-..„ ..„...,-.. ......„.... . .,„.. ,_.- --,--.,„,,,-.--„,-._--,,..„,„4„,--,,,r.,444-,..,-,-„..... --„,..,- -----.,:ri7-:,Iiis.;-•k",*",._.*:::".*,- '''. .' ,—;.-..:',-:—C,...is,-;,,.. ..,e. -,..,-.„---t , -:'-i,..‘:7,.:!:431i.:;;-e..:,1;" • Page 21 Pictures e i 1 .i 8" Sewer Repair at Railroad Avenue and Thomas Boulevard i i ''''L 41:: ....- 5 f` (11 � ��M1 i F - -.I:„ s a r • q G tea } .-.4• y.T 1 Page 22 Pictures • a ', i . t i 8" Sewer Reair at Railroad Avenue and Thomas Boulevard ,; . _ 1 ..„, t . , . . ... ,. } I IX t �F' . .,. . .. .,,, , .. ,,,,,, _ . , , . , ."-„,:. ,,.„,,. , :,...,,,, -=-.' - ti ill bra , s • - . , Y eT. drq `x�, �. ..; - - ' Pictures Page 23 1 .1 f r 8" Sewer Repair at Railroad(Avenue and Thomas Boulevard . `k-T _ •- . ti # t v' , cis" Y T - x.�'t s x '` : <' ,� *s . Pictures Page 24 i 8" Sewer Repair at Railroad Avenue and Thdmas Boulevard September 5, Lift Station fail to flow2024, Secure Work Area September 6, 2024 Furnish and Install Manhole 8'10"complete in place including Manhole) all connections(Downstream &Backfil(RAINING)ling \. * ;7- ! r 33 r r_ k -. If F. a s c0 a. 4 e a; Pictures / Page 25 i' 8" Sewer Repair at Railroad Avenue and Thomas Boulevard a M { < 4 .: ' ,. -f 'r:S^ J1�. r' `x 3 »-' ,ors - r .,, y„T r. r '. a K aj ."a:1 sk V A It s, 1 x Pictures Page 26 1 • 8" Sewer Repair at Railroad Avenue and Thomas Boulevard & c „,q,. '.- . F , -, -. y Lam, ''m.. _ i�.± ? "' .-'T fi'!kz #,:.a ,,,,e yr f ./L7 # _ rI Tit'yr _ • . ' _ .* ',..Vps.,,,, ,.. .. : - « .fig >� :-_ie ,yam �j . r �` i r 7- Y .a �-• . �. +yam* • s° ,wz Pictures Page 27