Date: December 17, 2024
To: The Honorable Mayor and City Council
Through: Ronald Burton, City Manager, CPM
From: Pamela Langford, Director of Development Services
RE: P.R. No. 24079
Introduction:
This agenda item seeks the City Council's approval to execute a Memorandum of
Understanding (MOU) between the City of Port Arthur and the Public Works Department
for the 9th Avenue Surface Restoration Project.
Background:
The City of Port Arthur was awarded $990,000.00 from the Texas General Land Office
for utility relocation along 9th Avenue from Main B Canal to the Outfall of southbound 2 —
12' lanes. The utility relocation and the other street improvements will aid in the 9th
Avenue emergency evacuation route project.
The total cost of the project is $1,597,968.05. The City of Port Arthur will commit
$607,968.05 to the 9th Avenue emergency evacuation route project, and a grant from the
Texas General Land Office will provide the remaining $990,000.00.
S:\grants2\Resolution\MOU - 9th Avenue Street Project and GLO - MP Comments.docx
Budget Impact:
The Public Works Department budget will commit $607,968.05; funding available in
Capital Street Account: 307-21-053-8517-00-10-000. The remaining funds in the
amount of $990,000 will come from a grant from the Texas General Land Office.
Recommendation:
It is recommended that the City Council approve P.R. NO. 24079.
S:\grants2\Resolution\MOU - 9th Avenue Street Project and GLO - MP Comments.docx
P.R. No. 24079
12/6/2024-MEE-Grants Management
Page 1 of 10
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A
MEMORANDUM OF UNDERSTANDING WITH THE PUBLIC WORKS
DEPARTMENT FOR THE 9TH AVENUE SOUTHBOUND
RECONSTRUCTION PROJECT BY COMMITTING $607,968.05 IN CITY
STREET FUNDS; AVAILABLE IN CAPITAL ACCOUNT: 307-21-053-
8517-00-10-00, AND $990,000.00 WILL BE PAID BY THE 2019 HUD
INFRASTRUCTURE GRANT.
WHEREAS, the City of Port Arthur is designated to accept and administer funds
from the Texas General Land Office for $990,000.00 for surface reconstruction along 9th
Avenue from Main B Drainage District #7 Canal to the Outfall of southbound 2-12' lanes.
The surface restoration, in addition to other street improvements, will aid in the 9th
Avenue emergency evacuation route project; and,
WHEREAS, the total cost of the project is $1,597,968.05, and the City of Port
Arthur will commit $607,968.05 for the total 9th Avenue emergency evacuation route
project, with the remaining $990,000.00 will come from the 2019 HUD Infrastructure
grant with the Texas General Land Office; and,
WHEREAS, the Texas General Land Office ("TX-GLO") currently requested that
the city council commit to the remaining city funds in the amount of $607,968.05 in order
to enter into a grant agreement with the City; Funding available in Capital Street Account:
307-21-053-8517-00-10-000; and,
WHEREAS, the City of Port Arthur Public Works Department will execute the
expenditure of the appropriated funds under the direction of the City Manager; and,
WHEREAS, the parties desire to enter into this MOU or agreement to memorialize
their understanding of the work to be performed.
P.R.No. 24079
12/6/2024-MEE-Grants Management
Page 2 of 10
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR, TEXAS:
Section 1. THAT the facts and opinions in the preamble are true and correct.
Section 2. THAT the City Manager is authorized to execute the Memorandum of
Understanding between the City and the Public Works Department, see Attachment "A".
Section 3. THAT a copy of the caption of this Resolution be spread upon the
minutes of the City Council.
READ, ADOPTED AND APPROVED this day of December A.D., 2024, at
a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following
vote:
AYES: MAYOR
COUNCILMEMBERS:
NOES:
MAYOR
ATTEST:
SHERRI BELLARD, TRMC,
CITY SECRETARY
S:\grants2\Resolution\MOU - 9th Avenue Street Project and GLO - MP Comments.docx
P.R.No. 24079
12/6/2024-MEE-Grants Management
Page 3 of 10
APPROVED AS TO F
ROXANN PAIS COTRONEO,
CITY ATTORNEY
APPROVED FO ADMINISTRATION:
At- 's--\--7-
RONALD BURTON,' PM
CITY MANAGER
JOH CANNATELLA, P.E.
CITY GINEER
APPROVED AS FOR AVAILABILITY OF FUNDS:
-),-(16',_) kq2J-e,t.i_Li)(
LYND SW LL, MA, ICMA-CM
FINANCE DIRECTOR
S:lgrants2\Resolution\MOU - 9th Avenue Street Project and GLO - MP Comments.docx
P.R.No. 24079
12/6/2024-MEE-Grants Management
Page 4 of 10
ATTACHMENT "A"
S:1grants2lResolution1MOU - 9th Avenue Street Project and GLO - MP Comments.docx
MEMORANDUM OF UNDERSTANDING
BETWEEN
CITY OF PORT ARTHUR AND THE PUBLIC WORKS DEPARTMENT
This Memorandum of Understanding ("MOU") is entered into by and between the
[Executive] ("City of Port Arthur City Manager) and the [Department] ("Department of
Public Works"), hereinafter the Parties. In consideration of those mutual undertakings,
the Parties agree as follows:
WHEREAS, The City of Port Arthur is designated to accept and administer funds from
the Texas General Land Office; and
WHEREAS, the City of Port Arthur City Council, in accordance with their powers,
appropriated ARPA funds for specific programs and purposes; and
WHEREAS, the City Manager has the duty to supervise, direct, and control the
administration of all departments, offices, and functions of the City of Port Arthur, a
municipal government; and
WHEREAS, the City of Port Arthur Public Works Department executes the expenditure
of duly appropriated funds under the direction of the City Manager; and
WHEREAS, the Parties desire to enter into this MOU to memorialize their
understanding of the work to be performed.
NOW, THEREFORE, the Parties agree to the terms and conditions set forth below:
I. Purpose
The purpose of this MOU is to memorialize an agreement to obligate the funding from
the Texas General Land Office and Local Fiscal Recovery Funds ("Funds") for those
purposes set forth below.
II. Conditions and Scope
The City Council appropriated funds and the City Manager agrees to expend the Funds
to perform the "Scope of Work," as set forth in Attachment B.
III. Amount
The City Manager agrees to obligate the Funds in an amount not to exceed
$607,968.05 to complete the "Scope of Work," as set forth in Attachment B, and the
Public Works Department agrees to expend the Funds in such amount.
S:lgrants21Resolution\MOU - 9th Avenue Street Project and GLO - MP Comments.docx
IV. Term
The MOU shall be effective from the date executed below.
V. Binding Effect
The MOU shall be binding upon the Parties hereto and upon any respective
successors and assignees of the Parties.
VI. Obligation of the Parties
The Parties agree to the following obligations under this MOU:
a. The City Council appropriated funds for the Capital Projects Programs,
which includes funds for the "Scope of Work," set forth in Attachment B.
b. The Public Works Department shall expend the Funds in an amount not to
exceed the amount set forth in Paragraph III to pay for the cost of the Scope of
Work.
c. c. The Public Works Department shall follow federal, state, and local
procurement and expenditure requirements as required by the Texas
General Land Office, including 2 CFR, 200 et al.
d. The Public Works Department and Purchasing Director shall ensure a
complete procurement file for each contract necessary to perform the Scope
of Work is retained.
e. Notwithstanding reasonable and necessary modifications in quantities,
method, and approach, the Scope of Work in Attachment B shall not be
modified in its scope, focus, intent, purpose, and location.
VII. Applicable Law
This MOU shall be governed by and construed in accordance with the laws of the
State of Texas and the Ordinances of the City of Port Arthur.
Executed this day of December 2024.
CITY OF PORT ARTHUR, TEXAS,
A Texas home-rule municipality,
By:
Ronald "Ron" Burton, CPM, City Manager
By:
Public Works Department/City Engineer
S:\grants2\Resolution\MOU - 9th Avenue Street Project and GLO - MP Comments.docx
Associated Resolution No. 24- ; Executed this day of December 2024
ATTEST:
Sherri Bellard, TRMC, City Secretary
APPROVED AS TO FORM:
Roxann Pais Cotroneo, City Attorney
S:lgrants2\Resolution\MOU - 9th Avenue Street Project and GLO - MP Comments.docx
ATTACHMENT "B"
S:\grants2\Resolution\MOU - 9th Avenue Street Project and GLO - MP Comments.docx
9TH AVENUE SOUTHBOUND RECONSTRUCTION PROJECT
9th Ave South Bound Lanes - Reconstruction from the Main B Drainage District#7 Canal to
Station 24+00 for 2517 linear feet(LF).
Severe flooding during Hurricane Havey left the Stonegate subdivision along Jimmy Johnson
Blvd and 9th Ave from Jimmy Johnson to SH73 inundated and impassable for vehicular traffic
(see below picture).
„iwictEiti .,� .
Hurricane "Harvey" -9th Ave in front of the YMCA
As a part of this Hurricane"Harvey"2017 flooding 9d'Ave has deteriorated and the concrete
paving is cracking and spalling along the south bound lanes.
The City of Port Arthur has awarded an$18,672,548.00 construction contract funded by FEMA
404 HMGP funds along with CDBG Disaster relief funds.As a part of this project the storm
sewer system has been upgraded to convey the storm waters along 9th Ave to the detention pond
located on the Babe Zaharias golf course.
Stonegate 9th Ave roadway
scopeC:\Users\messex\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\JI6COGY3\Stonegate 9th
Ave roadway scope.docx
The City of Port Arthur as part of these drainage improvements would like to raise the elevation
of 9th Avenue for a length of 2200 ft and a width of 24 ft. This would entail a construction scope
of,
1. Remove the existing concrete pavement.
2. Roll and compact the existing subgrade.
3. Install compact flexible base material for support of the concrete pavement.
4. Form and install a 24-foot wide- 10"depth reinforced concrete pavement for the
south bound lanes of 9th avenue.
5. Install a 6-inch curb and gutter to accommodate drainage for the newly installed
storm drainage system.
6. Install roadway stripping and pavement markings along 9th Ave including the golf
course cart path crossing.