Loading...
HomeMy WebLinkAboutPR 24086: PORT ACRES WASTEWATER TREATMENT PLANT CLAIFIER 403 DRIVE UNIT AND RAKE ARMS r Orr of Port rthu�_ Teas tt INTEROFFICE MEMORANDUM Date: December 19, 2024 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR No. 24086—Port Acres Wastewater Treatment Plant Clarifier 403 Drive Unit And Rake Arms. Introduction: This Agenda Item intends to seek the City Council's approval for the repairs of Clarifier 403 drive unit and rake arms at the Port Acres Wastewater Treatment Plant by Environmental Improvements, Inc. of Humble, Texas. The clarifier's drive unit and rake arms have failed. Background: Clarifier 403 is currently out of service and in need of repairs and rehabilitation to bring it back into service to ensure the proper treatment of the Port Acres Wastewater Treatment Plant. Clarifier 403 drive unit and rake arms have failed. The rake arms have rusted and deteriorated to a point where they began dragging on the floor of the clarifier which increased the torque on the rake arm thus damaging the drive unit.For the repairs and rehabilitation,we intend to rebuild the drive unit in the shop and repair the damaged rake arms on site. Three vendors were approached for quotes on the project of which 2 submitted quotes and 1 submitted a no quote as shown in Exhibit "A". Environmental Improvements, Inc. submitted the lowest quote for the total amount of$49,500.00. Budget Impact: The project has a projected budgetary impact of$49,500.00. Funding is available in Account No. 410-40-225-5318-00-00-000, Equipment Maintenance. Recommendation: It is recommended that City Council approve PR No.24086,authorizing payment for the repairs of the Port Acres Wastewater Treatment Plant Clarifier 403 drive unit and rake arms, as discussed/outlined above. "Remember,we are here to serve the Citizens of Port Arthur" Prr PR No. 24086 12/19/24 cm Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH ENVIROMENTAL IMPROVEMENTS, INC., OF HUMBLE, TEXAS, FOR THE REPAIR OF THE PORT ACRES WASTEWATER TREATMENT PLANT CLARIFIER 403 DRIVE UNIT AND RAKE ARMS, WITH A TOTAL PROJECTED BUDGETARY IMPACT OF $49,500.00; FUNDING IS AVAILABLE IN WATER UTILITY ACCOUNT NO. 410-40-225-5318-00-00-000,EQUIPMENT MAINTENANCE. WHEREAS, Clarifier 403 of the Port Acres Wastewater Treatment Plant is out of service and is need of repairs and rehabilitation to return the clarifier back into service to ensure the proper wastewater treatment of the Port Acres Wastewater Treatment Plant; and, WHEREAS, the Clarifier 403 drive unit and rake arms have rusted and deteriorated to the point where they began dragging on the floor of the clarifier which damaged the rake drive unit; and, WHEREAS, the scope of work for the repairs and rehabilitation include rebuilding the clarifier drive unit, repairing the damaged rake arms and walkway, test run and test alarm along with shutdown limit switches, and provide the training along with start-up report; and, WHEREAS, three companies were contacted to provide quotes for rebuilding the drive unit and repairing the rake arms; two companies submitted quotes, while the third company declined to submit a quote, as detailed in the bid tabulation attached as Exhibit"A", and WHEREAS, it is recommended that the repairs to Clarifier 403 be awarded to the lowest bidder, Environmental Improvements, Inc. of Humble, Texas, in the amount of$49,500.00. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, PR No. 24086 12/19/24 cm Page 2 of 3 THAT,the City Council hereby authorizes the City Manager to enter into a contract with Environmental Improvements, Inc. of Humble, Texas, for the repairs and rehabilitation of the Port Acres Wastewater Treatment Plant Clarifier 403 drive unit and rake arms, with a total projected budgetary impact of$49,500.00, in a form substantially similar to Exhibit"B"; and THAT, the funding is available in Water Utility Account No. 410-40-225-5318-00-00- 000, Equipment Maintenance; and, THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. READ, ADOPTED, AND APPROVED, this day of , 2025, AD, at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following Vote: AYES: Mayor: Councilmembers: • NOES: Thurman Bill Bartie Mayor ATTEST: APPROV -� Sherri Bellard Roxann Pais Cotroneo City Secretary City Attorney PR No.24086 12/19/24 cm Page 3 of 3 APPROVED FOR ADMINISTRATION: Ronald Burto M City Mana r iiiiiiii , Calvin Matthews, P.E. Water Utilities Director APPROVED AS TO FUND AVAILABILITY:Ib�Lei y, "1,}LL-_______ 00 I 1L Acl�t I5OSW? '/ Lynda(Lyn Boswell, MA, ICMA-CM Finance Director LIX, LA-ibiet, , Clifton, E. Williams Jr., CPPB Purchasing Manager EXHIBIT "A" (Bid Tabulation) CITY OF PORT ARTHUR TEXAS Bid Tabulation December 19, 2024 Repairs for the Clarifier 403 Rake Drive and Rake Arms at the Port Acres Wastewater Treatment Plant Environmental IPS Pump Service AlIco, LLC. Improvements, Inc. (IE2) Location Houston,TX Beaumont,TX Humble,TX Price No Bid $72,648.00 $49,500.00 EXHIBIT "B" (Contract) CONTRACT FOR REPAIR OF CLARIFIER 403 THIS AGREEMENT is made this the of , 2025, by and between an individual, firm, partnership, or corporation, Environmental Improvements, Inc., of Humble, Texas hereinafter called "Vendor", and the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas, hereinafter called the "Owner" or "City". WITNESSETH: That for and in consideration of the payments, terms, conditions, and agreements set forth herein, Owner and Vendor agree as follows: 1 . This Agreement shall be 35 days from the start day on the Notice to Proceed. 2. The City can terminate this contract at its convenience, which includes, but not limited to, funding not being available in any budget cycle with thirty (30) days written notice. 3. During the term of this Contract, the Vendor will furnish all of the materials and supplies, as stated in the specifications, described as: Repairs for The Clarifier 403 at Port Acres WWTP 4. The CONTRACTOR agrees to perform all the work described in the specifications and quotation documents and to comply with the terms therein for the cost per bid dated December 13, 2024. DESCRIPTION Total Cost Repair Clarifier 403 at Port Acres WWTP $49,500.00 5. The term "Contract Documents" means and includes the following: 1) Agreement 2) Bid/Quote/Proposal 3) Notice of Award 4) Notice to Proceed 6. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in two (2) copies each of which shall be deemed an original on the date first above written. SIGNED AND AGREED to on the day of , 2025. ATTEST: CITY OF PORT ARTHUR: Sherri Bellard Ronald Burton, CPM City Secretary City Manager SIGNED AND AGREED to on the day of , 2025. WITNESS: ENVIRONMENTAL IMPROVEMENTS, INC., BY: BY: PRINT NAME: PRINT NAME: TITLE: 2 environmental improvements, 1962 South Houston Ave. P Humble,TX 77396 281-723-3430 To:Joe Teslar Date:December 13,2024 Project:Port Arthur TX(Clarifier 403) We are pleased to have the opportunity to offer you the following quotation. E12 Service will perform the following: • Pick up and rebuild existing Ovivo Gear Drive from customer. • Disconnect existing electrical. • Block up rake arm&center cage assembly. • Remove the walkway/bridge. • Remove existing Ovivo Gear Drive. • Repair Rake arms. • Install rebuilt Ovivo Gear Drive. • Reinstall walkway/bridge assembly. • Reconnect electrical. • Test run&test alarm/shutdown limit switches for proper operation.(If applicable) • Shoot elevation in eight quadrants around circumference of clarifier. • Establish true-plane measurements and adjust rake/drive assembly,as necessary. • Provide operator training along with start-up report. Inclusions/Exclusions • Environmental Improvements will provide manpower,superintendence and crane for the removal and reinstallation of the rebuilt Ovivo Gear Drive. • Center pier,center cage,concrete,anchoring,rakes,and sweep arms creating out of plumb condition are NOT included.If it is found that any of the internal components need repaired,it will be quoted under a separate proposal. • This quote is based on using existing electrical.If it is found that any electrical will need to be repaired or replaced,it will be quoted under a separate proposal. • De-watering of clarifier by plant operator. • All hardware to facilitate installation is included. • Access to the site is guaranteed by the owner or assigned agent. • Environmental Improvements is NOT responsible for damage to soils,grass,pavement,underground electrical or piping of any kind due to moving in or out of heavy equipment. • Taxes and permits are NOT part of this scope. • Environmental Improvements will perform a 1-year quarterly maintenance program with semi-annual oil changes.(Will include reports with pictures etc.) • Environmental Improvements will provide a 1-year warranty from start-up provided all electrical,mechanical operational requirements are met. Cost:$49,500.00 Luke Funk Environmental Improvements,Inc. Houston Service Manager o:713-228-7055 I c:281-723-3430 I f:713-228-6713 TEXAS OKLAHOMA www.ei2texas.com