Loading...
HomeMy WebLinkAboutPR 24140: PROCTER STREET ELEVATED STORAGE TANK REHABILITATION CHANGE ORDER NO. 1 City of ft,, )7` ^�1J ort rtitur INTEROFFICE MEMORANDUM Date: January 16, 2024 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR No. 24140—Procter Street Elevated Storage Tank Rehabilitation Change Order No. 1 Introduction: This Agenda Item is to seek the City Council's approval for Change Order No. 1 for the Procter Street Elevated Storage Tank Rehabilitation Project with M.K. Painting, Inc. of Wyandotte, Michigan. Background: The elevated storage tank,located at Procter Street Extension is in urgent need of rehabilitation. Schaumburg&Polk,Inc. (SPI)of Beaumont,Texas designed the project and are the construction manager and engineer. Resolution No. 24-122 awarded the project to M.K. Painting, Inc. of Wyandotte, Michigan for$669,000.00. The scope of the change order includes installing repair plates and vapor blasting with a total amount of $135,000.00 and 232 days of contract time extension. City staff,with the recommendation from Schaumburg & Polk, Inc. engineer, is recommending Change Order No. 1 for the Procter Street Extension Elevated Storage Tank Rehabilitation Project to make the aforementioned changes. "Remember,we are here to serve the Citizens of Port Arthur" 9-4 114D Ciry of ort rthu T INTEROFFICE MEMORANDUM Date: January 16, 2024 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR No. 24140—Procter Street Elevated Storage Tank Rehabilitation Change Order No. 1 Introduction: This Agenda Item is to seek the City Council's approval for Change Order No. 1 for the Procter Street Elevated Storage Tank Rehabilitation Project with M.K. Painting, Inc. of Wyandotte, Michigan. Background: The elevated storage tank, located at Procter Street Extension is in urgent need of rehabilitation. Schaumburg&Polk, Inc. (SPI)of Beaumont,Texas designed the project and are the construction manager and engineer. Resolution No. 24-122 awarded the project to M.K. Painting, Inc. of Wyandotte, Michigan for $669,000.00. The scope of the change order includes installing repair plates and vapor blasting with a total amount of $135,000.00 and 232 days of contract time extension. City staff, with the recommendation from Schaumburg & Polk, Inc. engineer, is recommending Change Order No. 1 for the Procter Street Extension Elevated Storage Tank Rehabilitation Project to make the aforementioned changes. "Remember,s e are here to serve the Citizens of Port Arthur" City of nr4iIr Teyxu> Budget Impact: The initial contract amount was $699,000.00 Change Order No. 1 will increase the contract amount by$135,000.00 to the new total contract amount of$804,000.00. Funding is available in Account No. 405-40-000-8516-00-00-000 Project No. WS0004-CON. Recommendation: It is recommended that City Council approve Proposed Resolution No.24140 to approve Change Order No. 1 for the Procter Street Elevated Storage Tank Rehabilitation Project as discussed and/or outlined above. "Remember,we are here to serve the Citizens of Port Arthur" PR No. 24140 1/16/25 cm Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE PROCTER STREET EXTENSION ELEVATED STORAGE TANK REHABILIATION PROJECT WITH M.K. PAINTING, INC. OF WYANDOTTE, MICHIGAN, INCREASING THE CONTRACT AMOUNT BY $135,000.00 TO THE NEW TOTAL CONTRACT AMOUNT OF $804,000.00 WITH EXTENDED CONTRACT TIME OF 232 DAYS; FUNDS ARE AVAILABLE IN ACCOUNT NO. 405-40-000-8516-00- 00-000, PROJECT NO. WS0004-CON. PENDING BUDGET AMENDMENT PROPOSED ORDINANCE #7308 APPROVAL. WHEREAS, pursuant to Resolution No. 24-122, the Procter Street Extension Elevated Storage Tank Rehabilitation Project was awarded to M. K. Paining, In. of Wyandote, Michigan with a total projected budgetary amount of$699,000.00; and, WHEREAS,with Schaumburg & Polk, Inc. as project engineers, the contractor proposes the Change Order No. 1, and; WHEREAS, Schaumburg & Polk, Inc., along with City Staff, is proposing Change Order No. 1 (EXHIBIT "A") to install repair plates to the roof of the tank and vapor blast the tank increasing the contract amount by $135,000.00 to a new total contract amount of $804,000.00 and extend the contract time by 232 days due to alternate surface preparation method. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT,the facts and opinions in the preamble are true and correct; and, PR No. 24140 1/16/25 cm Page 2 of 3 THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. READ, ADOPTED, AND APPROVED, this day of , 2025, AD, at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following Vote: AYES: Mayor: Councilmembers: NOES: Thurman Bill Bartie Mayor ATTEST: APPROVED AS TO FORM: Sherri Bellard Roxann Pais Cotroneo City Secretary City Attorney PR No. 24140 1/16/25 cm Page 3 of 3 APPROVED FOR ADMINISTRATION: fig Ronald Burton City Manager 4/4 Calvin Matthews, P. . Water Utilities Director APPROVED AS TO FUND AVAILABILITY: 1(4, YlC ,Jndez,__,07d7 Lyn Boswell Finance Director / I/. tudhez;ht. Clifton illiams, CPPB Purchasing Manager EXHIBIT "A" (Change Order No. 1) APPROVAL OF CONTRACT CHANGE CHANGE ORDER No.One(1) DATE: January 15,2025 PROJECT: City of Port Arthur Procter Street EST Rehabilitation Bid Number P24-016 OWNER: City of Port Arthur,Texas 444 4th Street Port Arthur,Texas 77640 CONTRACTOR: M.K.Painting,Inc. 4157 7th St. Wyandotte,MI 48192 TO THE OWNER: Approval of the following contract change is requested. Reason for Change: to adjust bid proposal bid items to provide vapor blasting instead of conventional blasting ORIGINAL CONTRACT AMOUNT: $ 669,000.00 THIS CHANGE ORDER 2 Tank Coating.Revise bid item as follows, a. Shrouding.DELETE 1L5 @$150,000.00/LS $ (150,000.00) b. Initial Pressure Washing Exterior of Tank.DELETE 1 LS @$10,000.00/LS $ (10,000.00) 22 Miscellaneous Tank Repairs-To adjust the allowance by$9,000.00 for installation repair plates on roof.Remaining $ (9,000.00) Allowance=$25,000.00-$9,000.00=$16,000.DELETE$9,000.00/ALLOW 23 Install 12"x12"repair plates on roof.ADD 30 EA @$300/EA $ -9,000.00 24 Provide Exterior Srface Preparation by Vapor Blasting.ADD 1LS @ 295,000.00 $ 295,000.00 TOTAL AMOUNT OF THIS CHANGE ORDER: $ 135,000.00 TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER: $ 804,000.00 CONTRACT TIME Original Contract Time: 180 calendar days Additional time due to alternate surface preparation method 232 calendar days Revised Contract Time per this Change Order 412 calendar days CONDITION OF CHANGE: "Contractor acknowledges and agrees that the adjustments in contract price and contract time stipulated in this Change Order represents full compensation for all increases and decreases in the cost of,and the time required to perform the entire work uhder the Contract arising directly or indirectly from this Change Order and all previous Change Orders. Acceptance of this waiver constitutes an agreement between Owner and Contractor that the Change Order represents an all inclusive,mutually agreed upon adjustment to the Contract,and that Contractor will waive all rights to file a claim on this Change Order after it is properly executed." Recom nde Approved by: Accepted by: J " Schaumburg&P Ik,Inc. City of Port Arthur MK Painting,In . Engineer Owner Contractor' Date: f/a/ Date: Date: t /J ;31�3 04;5 • Page 1 of 1