HomeMy WebLinkAboutPR 24152: EMERGENCY REPAIR OF SEWER BLOCKAGE ON 9TH AVE. AND HWY 73 ort rthu
INTEROFFICE MEMORANDUM
Date: January 30, 2025
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: PR No. 24152—Emergency Repair of Sewer Blockage on 9th Avenue and Hwy
73.
Introduction:
The intent of this Agenda Item is for the City Council to ratify the Emergency Repair of the
Sewer Blockage on 9th Avenue and Hwy 73.
Background:
The 8" sanitary sewer line between the Civic Center and Ambroise Village Apartments was
blocked and caused the manhole at 9th Avenue and Hwy 73 to overflow. The Water Utilities
large Vactor is in the City Shop being repaired. The Collection crews had been trying to open
the sewer with the smaller flush trucks but they were not able to open the line. A Vactor was
borrowed from Public Works to open the line. However, the whole line was extremely blocked
from the Ambroise Village Apartments to the Lift Station. This problem caused a serious TCEQ
violation with public health and safety issues.
Global Drilling of Winnie was the only company that could come with all the equipment needed
during that time. The scope includes the sewer line clean by the super Vactor, bypass pumping,
and a new manhole to provide access to clean the sewer line.
The job was completed and the total cost is $96,800.00.
Budget Impact:
The total budgetary impact is $96,800.00 and funding in Account No. 405-40-000-8516-00-00-
000 is contingent upon the approval of budget amendment in Proposed Ordinance No. 7309.
"Remember,we are here to serve the Citizens of Port Arthur"
I
City of ''�>+`7 )-;
urt rtJttt
Recommendation:
It is recommended that City Council approve Proposed Resolution No. 24152, ratifying the
emergency repair as described/outlined above.
"Remember, He are here to serve the Citizens of Port Arthur"
PR No. 24152
1/3/25 cv
Page 1 of 3
RESOLUTION NO.
A RESOLUTION RATIFYING THE CITY MANAGER'S
DECISION TO AUTHORIZE THE EMERGENCY REPAIR
OF SEWER BLOCKAGE ON 9TH AVENUE AND
HIGHWAY 73, FOR THE TOTAL NOT TO EXCEED
AMOUNT OF$96,800.00 WITH GLOBAL DRILLING,INC.
OF WINNIE, TEXAS, FUNDING IN WATER UTILITIES
ACCOUNT NO. 405-40-000-8516-00-00-000 IS
CONTINGENT UPON THE APPROVAL OF THE BUDGET
AMENDMENT IN PROPOSED ORDINANCE NO. 7309.
WHEREAS, the 8-inch sanitary sewer line between the Civic Center and Ambroise
Village Apartments was blocked and caused the manhole at 9th Avenue and Highway 73 to
overflow causing a serious safety and health concerns and also a state violation; and,
WHEREAS,the emergency memo signed by the city manager on January 3, 2025 (Exhibit
"A") authorized the emergency repair by Global Drilling, Inc. of Winne, Texas, which was the
only company that could come at the time to clean out the sewer line by using the super Vactor,
bypass pumping, and reinstall new manhole; and,
WHEREAS,the project final cost was $96,800.00 (Invoice attached as Exhibit"B"); and,
WHEREAS,pursuant to Section 252.022(a)(1)of the Texas Local Government Code,this
purchase is authorized because of a public calamity that requires the immediate appropriation of
money to relieve the necessity of the municipality's residents or to preserve the property of the
municipality; and,
WHEREAS, it is authorized pursuant to Section 252.022(a)(3) of the Local Government
Code because of the unforeseen damage to public machinery, equipment, or other property.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR:
THAT,the facts and opinions in the preamble are true and correct; and,
PR No.24152
1/3/25 cv
Page 2 of 3
THAT, the City Council hereby ratifies the City Manager's decision to authorize the
emergency repairs for the total not to exceed amount of$96,800.00 (Invoice attached as Exhibit
"B") from Account No. 405-40-000-8516-00-00-000 contingent upon the approval of the budget
amendment in Proposed Ordinance No. 7309; and,
THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the
Meeting of the City Council.
READ, ADOPTED, AND APPROVED this day of , 2025
at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote:
AYES: Mayor
Councilmembers:
NOES:
Thurman Bill Bartie
Mayor
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM:
Roxann Pais Cotroneo
City Attorney
PR No. 24152
1/3/25 cv
Page 3 of 3
APPROVED FOR DMINISTRATION:
Ronald Burton, CP Calvin Matthews, P.E.
City Manager Water Utilities Director
APPROVED AS TO THE AVAILABILITY
OF FUNDS:
Lyn a(Lyn) Boswell, MA, ICMA-CM Clifton illiams, CPPB
Director of Finance Purchasing Manager
Exhibit "A"
City of - '
nrt rth«�
Terus
INTEROFFICE MEMORANDUM
Date: January 3, 2025
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
From: Calvin Matthews, P.E.,Director of Utilities
RE: Emergency Repair of Sewer Blockage on 9th Avenue and Hwy 73
The 8" sanitary sewer line between the Civic Center and Ambroise Village Apartments is
blocked and caused the manhole at 9th Avenue and Hwy 73 to overflow. The Water Utilities
large Vactor is in the City Shop being repaired. The Collection crews have been trying to
open the sewer with the smaller flush trucks but they are not able to open the line. The utility
also borrowed the Vactor of Public Work to open the line. However, the whole line is
extremely blocked from the Ambroise Village Apartment to the Lift Station. This problem
caused a serious TCEQ violation with public health and safety issues.
The sewer line needs to be cleaned by the super Vactor, directional drilling machine, bypass
pumping, and a new manhole to provide access to clean the sewer line.
The estimated expenditure for the repair is expected to be approximately $100,000.00.
I, Ronald Burton, hereby approve this emergency repair.
4,11114 .-
.
Ro. :urton,CPM
ity Manager
"Remember,we are here to serve the Citizens of Port Arthur"
Exhibit "B"
GLOBAL DRILLING,INC.
4
94 Interstate 10
ie,Texas
5,USA
GLG B A L T49++1 800 956 8720;E:info@Jg oba dnbl ngequipment.com,
IRIltING, INC W:www.alobaldnllinaequioment.com
INVOICE
Date
Attn: ACCOUNTING January 29,2025
444 4th STREET PORT ARTHUR.TEXAS 776040
Project Name:Emergency Repair of Sewer Blockage on 9th Avenue and Hwy 73 Ref. No. :
Ref:INTEROFFICE MEMORANDUM dated January 3,2025
Location 9th Avenue and Hwy 73, Port Arthur Texas PA2025-001
COMPLETED WORK
ITEM TOTAL
DESCRIPTION UNIT UNIT PRICE TOTAL PRICE REMARKS
W.V TOTAL TO
NO. % PREVIOUS
DATE
Emergency Repair of Sewer Blockage on 9th Avenue
and Hwy 73
1.1 Mobilization&Demobilization and Site Clearing 1 L5 100.0056 1 5,000.00 5,000.00
1.2 Bypass Pumping and High Pressure Cleaning of 6" 1 LS 100.0056 1 56,040.00 56,040.00
Sewer Line,Pumping out waste on manholes
Manhole 1 to Manhole 2
Manhole 2 to Manhole 3
Manhole 3 to Manhole 4
Manhole 5 to Manhole 6
Manhole 6 to Manhole 7
Manhole 7 to Lift Station
1 3 High Pressure Jetting of Sewer Lines,using Vacuum 1 LS 100.00% 1 10,360.00 10,360.00
Truck
1.4 Disposal of Sewer Wastes 1 L5 100.00% 1 400.00 400.00
1 5 Remove(1)old existing manhole#7 and Install(1)New 1 LS 100.00% 1 23,000.00 23,000.00
Manhole,including excavation and Trench Protection
1.6 Sureface Restoration(Cementing works for sidewalk) 1 LS 100.00% 1 2,000.00 2,000.00
TOTAL DUE: 96,800.00
Terms and Conditions:
Amount in Words(US Dollars):Ninety Six Thousand Eight Hundred Only
For.
GLOBAL DRILLING,INC.
JASMIN BERSOBIO
Dose 1 of 1