Loading...
HomeMy WebLinkAboutPR 23968: WOODWORTH BOULEVARD STREETSCAPES IMPROVEMENT PROJECT, CHANGE ORDER 1, $32,98.00 AND 54 CALENDAR DAYS r.g; Cir of Cin 40, art rtltu� Trs u www.Po rtArth u rTx.gov INTEROFFICE MEMORANDUM Date: March 7, 2025 To: The Honorable Mayor and City Council Through: Ron Burton, CPM City Manager From: Pamela D. Langford, Assistant City Manager-Operations/Director of Development Services RE: P.R. No. 23968: Woodworth Boulevard Streetscapes Improvements Project — Change Order 1: Excavate and backfill waterlines in the southbound inside lane for the amount of$32,980.00 and the addition of fifty-four(54) calendar days. Project ST4014. Introduction: The intent of this Agenda Item is to seek the Port Arthur City Council's approval for the City Manager to execute Change Order No. 1 with BDS Constructors, LLC, dba MK Constructors, LLC, (MK Constructors) of Vidor, Texas, for the Woodworth Streetscape Improvements Project from Lakeshore Drive to State Highway 87(Gulfway Drive)to excavate and backfill waterlines in the southbound inside lane for the amount of$32,980.00 and the addition of fifty-four (54) calendar days. Project ST4014. Background: Woodworth Boulevard has been nominated for improvements and beautification for its primary entryway from Memorial Boulevard into downtown Port Arthur. Pursuant to Resolution 21-542, approved by the Port Arthur City Council on December 20, 2021, $3,000,000.00 was allocated for the design, engineering, and construction for improvements to Woodworth Boulevard from Lakeshore Drive to State Highway 87 (Gulfway Drive). Pursuant to Resolution 22-284, approved by the City Council on June 21, 2022, the City Manager was authorized to enter into an agreement with Arceneaux, Wilson & Cole, LLC (AWC) of Port Arthur, Texas, to provide professional engineering services associated with the reconstruction of Woodworth Boulevard from Lakeshore Drive to Gulfway Drive (Highway 87) for $383,410.00 Subsequentially, AWC provided construction budgets and renderings of the Woodworth Boulevard Project, and it was determined that the original $3,000,000.00 allocated under Resolution 21-542 would only be sufficient to repair and rehabilitate the project successfully from Lakeshore Drive to 7th Street. Staff identified $14,945,286.00 available from Total Funds from years 1-5 Street Allocations, of which $4,200,000.00 was assigned to the project. Resolution No. 23-149, approved by Council, requested that the City "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 E:\Huy Desktop\Agenda Items\Agenda Memo WOODWORTH CO 1.dotx Manager amend Resolution No. 21-542 to reflect the addition of $4,200,000.00 to the Woodworth Boulevard Streetscapes Improvements Project for the total budgeted project amount of$7,200,000.00. Arceneaux, Wilson, and Cole, Inc. (AWC) finalized engineering and design plans that were bid out through the competitive bidding process. The Purchasing Department advertised for interested parties to bid on the project on September 20, 2023 and September 27, 2023 under Bid No. P23-073. On November 8, 2023, the City received and opened two (2) sealed bids for the Woodworth Boulevard Streetscape Improvement Project from BDS Constructors, LLC, dba MK Constructors, LLC, of Vidor, Texas and Allco, LLC, of Beaumont, Texas. After review by the Engineering Department and staff, it was determined that BDS Constructors, LLC, dba MK Constructors, LLC, of Vidor, Texas, was the lowest responsible bidder for the amount of$13,426,347.92. It was determined that the current funding was insufficient to cover the total cost of the project as there was a deficit of $6,700,000.00. Pursuant to Resolution No. 24-016, the City of Port Arthur's City Council approved amending Resolution No. 23-149 to reflect the addition of $7,000;000.00 to the project for a total budgeted amount of$14,200,000.00. Pursuant to Resolution 24-050, the City entered into an agreement with BDS Constructors, LLC, dba MK Constructors, LLC, of Vidor, Texas for the Woodworth Boulevard Streetscape Improvements Project for$13,426,347.92. Additionally, City Council approved Resolution 24-171, authorizing City Manager to amend the professional services agreement with Arceneaux, Wilson, & Cole, LLC (AWC) of Port Arthur, Texas, increasing the original contract amount by $448,493.00 to a new total contract amount not to exceed $831,903.00 for construction management services associated with the project; and, Change Order No. 1 is being submitted by MK Constructors to excavate and backfill waterlines in the southbound inside lane for the amount of $32,980.00 changing the original contract amount of $13,426,347.92 to the new contract amount of$13,459,327.92. Additionally, Change Order No. 1 is requesting the addition of fifty-four(54)calendar days due to weather delays and material availabilities, changing the original contract completion date of December 24, 2025 to the new contract completion date of February 16, 2026. Budget Impact: Funds are available in the Street Capital Fund Account: 307-21-053-8517-00-10-000. Project No. ST4014. Recommendation: It is recommended that the City of Port Arthur's City Council approve PR No. 23968 authorizing the City Manager to accept Change Order No. 1 from BDS Constructors, LLC, dba MK Constructors, LLC, of Vidor, Texas, for the Woodworth Boulevard Streetscape Improvements Project from Lakeshore Boulevard to State Highway 87 (Gulfway Drive) to add $32,980.00 changing the original contract amount of$13,426,347.92 to the new contract amount of$13,459,327.92; and for the addition of fifty- four(54)calendar days changing the original contract completion date of December 24,2025 to the new contract completion date of February 16, 2026. Project ST4014. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 PR No. 23968 3/7/2025 mje Page 1 of 5 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT WITH BDS CONSTRUCTORS, LLC, DBA MK CONSTRUCTORS, LLC, OF VIDOR, TEXAS, FOR THE WOODWORTH BOULEVARD STREETSCAPE IMPROVEMENTS PROJECT FROM LAKESHORE DRIVE TO STATE HIGHWAY 87 (GULFWAY DRIVE) TO EXCAVATE AND BACKFILL WATERLINES FOR THE AMOUNT OF $32,980.00 INCREASING THE CONTRACT AMOUNT TO $13,459,327.92 AND ADDING FIFTY-FOUR (54) CALENDAR DAYS TO THE PROJECT. FUNDS ARE AVAILABLE IN THE STREET CAPITAL FUND ACCOUNT 307-21-053-8517-00-10-000. PROJECT NO. ST4014. WHEREAS, the Port Arthur City Council believes that the improvement of infrastructure along Woodworth Boulevard between Lakeshore Drive and State Highway 87 (Gulfway Drive) will increase the opportunity for investment and expand economic development in the City of Port Arthur; and, WHEREAS, pursuant to Resolution No. 21-542, City Council authorized the allocation of $3,000,000.00 for the engineering, design, and construction of improvements to Woodworth Boulevard from Lakeshore Drive to State Highway 87 (Gulfway Drive); and, WHEREAS, pursuant to Resolution 22-284, the City Manager was authorized to enter into an agreement with Arceneaux, Wilson & Cole, LLC (AWC) of Port Arthur, Texas, to provide professional engineering services associated with the reconstruction of Woodworth Boulevard from Lakeshore Drive to Gulfway Drive (Highway 87) for $383,410.00; and, WHEREAS, subsequently, AWC provided construction budgets and renderings of the Woodworth Boulevard Project, and it was determined that the original $3,000,000.00 allocated under Resolution 21- 542 would only be sufficient to repair and rehabilitate the project successfully from Lakeshore Drive to 7th Street; and, PR No. 23968 3/7/2025 mje Page 2 of 5 WHEREAS, city staff identified $14,945,286.00 in Total Unallocated Funds from years 1-5 of the Street Program; and, WHEREAS, pursuant to Resolution No. 23-149, City Council approved amending Resolution No. 21-542 to reflect the addition of $4,200,000.00 to the Woodworth Project from the Total Unallocated Funds creating at total improvements budget of $7,200,000.00; and, WHEREAS, the City of Port Arthur publicized its Invitation to Bid for the Woodworth Boulevard Streetscapes Improvements Project for interested parties on September 20, 2023 and September 27, 2023, under Bid Number P23-073; and, WHEREAS, a total of two bids were received and opened on November 8, 2023, and the Purchasing Department, Public Works staff, and AWC determined that BDS Constructors, LLC, dba MK Constructors, LLC, of Vidor, Texas, was the lowest responsible bidder with a bid amount of $13,426,347.92 and a completion time of 591 calendar days; and, WHEREAS, the current funding was insufficient to cover the total cost of the project, resulting in a deficit of $6,700,000.00; therefore, the City of Port Arthur's City Council approved Resolution No. 24-016, amending Resolution No. 23-149, to increase the project's allocation by $7,000,000.00, establishing a revised budget of $14,200,000.00; and, WHEREAS, pursuant to Resolution 24-050, the City entered into an agreement with BDS Constructors, LLC, dba MK Constructors, LLC, of Vidor, Texas for the Woodworth Boulevard Streetscape Improvements Project for $13,426,347.92; and, WHEREAS, pursuant to Resolution 24-171, City Council authorized the City Manager to amend the professional services agreement with Arceneaux, Wilson, & Cole, LLC (AWC) of Port Arthur, Texas, increasing the original contract amount by $448,493.00 to a new total contract amount not to exceed $831,903.00 for construction management services associated with the project; and, PR No. 23968 3/7/2025 mje Page 3 of 5 WHEREAS, Change Order No. 1 is now being submitted by MK Constructors to excavate and backfill waterlines in the southbound inside lane for the amount of $32,980.00, see Exhibit "A", changing the original contract amount of $13,426,347.92 to the new contract amount of $13,459,327.92; and, WHEREAS, Change Order No. 1 is also requesting the addition of fifty-four (54) calendar days due to weather delays and material availabilities, changing the original contract completion date of December 24, 2025 to the new contract completion date of February 16, 2026; and, WHEREAS, approval of PR No. 23968 for Change Order No. 1 is herein deemed an appropriate action. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: THAT, the facts and recitals in the preamble are true and correct; and, THAT, the City Council herein approve Change Order No. 1 and authorize the City Manager to execute said Change Order to the contract with BDS Constructors, LLC, dba MK Constructors, LLC, of Vidor, Texas, to excavate and backfill waterlines in the southbound inside lane for the amount of $32,980.00, changing the original contract amount of $13,426,347.92 to the new contract amount of $13,459,327.92; and, THAT, Change Order No. 1 adds fifty-four (54) calendar days to the project due to weather delays and material availability issues, changing the original contract completion date of December 24, 2025, to the new completion date of February 16, 2026; and, THAT, a copy of the Resolution shall be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2025 at a meeting of the City of Port Arthur, Texas by the following vote: PR No. 23968 3/7/2025 mje Page 4 of 5 Ayes: Mayor: Councilmembers: Noes: Thurman Bill Bartle Mayor ATTEST: Sherri Bellard City Secretary APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: Roxann Pais Cotroneo, Esquire Ron Burton, CP City Attorney City Mana PR No. 23968 3/7/2025 mje Page 5 of 5 APPROVED AS FOR AVAILABILITY OF FUNDS: Lyn a "Lyn" Boswell, MA, ICMA-CM Director of Finance John Cannat: a PE City Engin- •r ,l)1LJL Clifton Williams, CPPB Purchasing Manager EXHIBIT A CITY OF PORT ARTHUR Public Works Engineering DATE: MARCH 7,2025 PROJECT: WOODWORTH BLVD STREETSCAPES IMPROVEMENT PROJECT OWNER: CITY OF PORT ARTHUR CONTRACTOR: ME CONSTRUCTORS CHANGE ORDER NO.: 1 THE FOLLOWING CHANGES IN THE PLANS AND/OR SPECIFICATIONS ARE HEREBY MADE: Adjust the Estimated Quantities to reflect the Actual Quantities used in the completion of the project: Item Original Description Unit Unit Price Original Amount Total Quantity New Amount No. Quantity SCOPE Excavation around waterline in the south bound outside lane-8'W x 12'L x 1 4"D 2 Excavation of area where pavement was skipped;15'W x 60'L x 1'D to remove unstable soil 3 Backfill areas with cement stabilized sand and place to grade 4 Set concrete pavement forms $ 32,980.00 CLARIFICATIONS/EXCLUSIONS 5 All excavation wil be mechanical;no hydro excavation included MK will make every reasonable effort to protect the Asbestos-Cement NOTE line but cannot guarantee it will not be damaged. In the event of damage and the City wants MK to repair it,that cost will be additional to the change order. 6 Addition of fifty-four(54)calendar days TOTAL CHANGE ORDER $ 32,980.00 NEW CONTRACT ORIGINAL CONTRACT AMOUNT $ 13,426,347.92 AMOUNT $ 13,459,327.92 ORIGINAL CONTRACT AMOUNT:I$ 13,426,347.92 TOTAL AMOUNT OF CHANGE ORDER NO.1: $ 32,980.00 TOTAL PERCENT CHANGE ORDER No.1: 0 2', NEW CONTRACT AMOUNT: $ 13,459,327.92 FIFTY-FOUR(54)CALENDAR DAYS HAVE BEEN ADDED TO CHANGE ORDER NO.1 NOTICE TO PROCEED DATE: May 13,2025 ORIGINAL NUMBER OF CALENDAR DAYS: 591 ORIGINAL CONTRACT COMPLETION DATE: December 24,2025 NUMBER OF CALENDAR DAYS REQUESTED: 54 UPDATED NUMBER OF CALENDAR DAYS: 645 NEW CONTRACT COMPLETION DATE: February 16,2025 PAREPARED BY: APPROVED BY: M.Jennifer Edwards,BAAS,MPA;CIP Manager John Cannatella,PE,City Engineer APPROVED BY: APPROVED BY: Michael Kelley,Project Manager Clifton Williams,CPPB,Purchasing Manager APPROVED BY: APPROVED BY: Dr.Hani Tohme,PE,Consultant Ron Burton,City Manager C:\Users\htran\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\RMO8S4AK\Woodworth CO 1 MK • www.mkconstructors.com t CONSTRUCTORS February 19, 2025 Mr. Derek Graffagnino AWC, Inc. Reference: Unstable subgrade Mr. Graffagnino, We have estimated the cost for the following scope of work as a change order to the Woodworth Blvd.Street Scape Project. Upon completion of the scope below,our work area will be restored back to the condition that it was in before locating the leaking waterline. Scope: • Excavation of area around waterlines in the South bound outside lane, we will excavate an area that is 8' wide by 12' long and 4'deep, to remove much that was placed there by the contractor who worked on the water lines. • Excavation of area where pavement was skipped,we will excavate an area that is 15'wide by 60'long and 1'deep,to remove unstable soil • Backfill excavated areas with cement stabilized sand and place to grade • Set concrete pavement forms Total cost of$32,980.00 We request 10 days be added to our contract duration for this work and the impact that this issue has had on our schedule. CLARIFICATIONS/EXCLUSIONS • All excavation will be mechanical,no hydro excavation is included. • We will make every reasonable effort to protect the Asbestos-Cement line but we cannot guarantee that it will not be damaged. If it is Damaged and the city wants us to repair it,that cost will be in addition to this change order. We hope that we have provided a clear and concise proposal. However,should you have any questions feel free to call. Sincerely, MK Constructors Mike Kelley Estimator/Project Manager Page 1 of 1 16736 IH 10,Vidor,Texas 77662 • PO Box 1208,Vidor,Texas 77670• Phone:(409)769-0089 • Fax: (409)769-1288 ira emc Vildf ARCENEAUX WILSON&COLE engineering I surveying l planning February 7, 2025 Jennifer Edwards City of Port Arthur Project Manager 444 4th Street, 3rd Floor Port Arthur, Texas 77640 RE: Pay Application No. 9 for Woodworth Blvd Streetscape Improvements City of Port Arthur Contract No. 24-050 AWC Job No. CPA-1100 Dear Mrs. Edwards: Attached is Pay Application No. 9 for the Woodworth Boulevard Streetscape Improvement project. This invoice will pay MK Constructors, LLC for the work performed from January 1, 207)to January 31, 2025. The amount due to MK Constructors, LLC is $280,982.18. Based on this invoice the project is approximately 22% complete and has used 45% of the contract time with a current scheduled completion date of December 24,2025. In addition, MK Constructors has submitted the Time Extension Request Form for May 2024 through January 2025 to equal a total number of 44 calendar days.We have confirmed the dates and agree with the recommended 44 calendar days requested for the City to consider approving for the current contract. If you have any questions or require further information, please contact me at my office. Sincerely, ARCENEAUX WILSON & COLE LLC Derek Graffagnino, E.I.T. Graduate Engineer 409.724.7888 3120 Central Mall Drive Port Arthur,TX 77642 Engineering Surveying awceng.com F-16194 10194049 REQUEST FOR EXTENSION OF TIME DUE TO WEATHER OR SUPPLIES CITY OF PORT ARTHUR DA 1'h: 2 ( MONTH OF: 20 WOODWORTH BLVD STREET CAPE IMPROVEMENTS NAME OF PROJECT: BDS Constructors,LLC DBA Mk Constructors CONTRACTOR: TO: CITY OF PORT ARTHUR ATTENTION: Gentlemen: We request extension of completion time on our Contract due to the days of work lost as specified (circle dates actually lost; do not include days not normally worked, such as Saturdays, Sundays,or holidays): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 DAYS LOST( ) — 5 X 7 = CALENDAR DAYS REQUESTED CROVAttikei cJOw,J) Reason(s) for Request: Wedil et BDS Constructors,LLC DBA Mk Constructors [Name of Contractor] BY: Mike Kelley ****************************************************************************** Approved for extension of calendar days. Disapproved. Date: ,20 CITY OF PORT ARTHUR BY: Distribution: Original: City Manager Copy: Engineer Contractor Ill REQUEST FOR EXTENSION OF TIME DUE TO WEATHER OR SUPPLIES J�/ CITY OF PORT ARTHUR DATE: tiiL/t L� MONTH OF: Ale 20 Z WOODWORTH BLVD STREETSCAPE IMPROVEMENTS NAME OF PROJECT: BDS Constructors,LLC DBA Mk Constructors CONTRACTOR: TO: CITY OF PORT ARTHUR ATTENTION: Gentlemen: We request extension of completion time on our Contract due to the days of work lost as specified (circle dates actually lost; do not include days not normally worked, such as Saturdays, Sundays,or holidays): 1 2 3 4 9 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DAYS LOST( t� ) ÷ 5 X 7 = ! CALENDAR DAYS REQUESTED 14 Reason(s) for Request: j,/40 di BDS Constructors,LLC DBA Mk Constructors [Name of Contractor] BY: Mike Kelley ****************************************************************:************** Approved for extension of calendar days. Disapproved. Date: , 20 CITY OF PORT ARTHUR BY: Distribution: Original: City Manager Copy: Engineer Contractor 1/1 REQUEST FOR EXTENSION OF TIME DUE TO WEATHER OR SUPPLIES CITY OF PORT ARTHUR DA 1'E: - z`i MONTH OF: 44-t, 20 WOODWORTH BLVD SI'EEETSCAPE IMPROVEMENTS NAME OF PROJECT: BDS Constructors,LLC DBA Mk Constructors CONTRACTOR: TO: CITY OF PORT ARTHUR ATTENTION: Gentlemen: We request extension of completion time on our Contract due to the days of work lost as specified (circle dates actually lost; do not include days not normally worked, such as Saturdays, Sundays,or holidays): �(92 . 4 (5,7 6 7 (87 9 10 11 12 13 14 15 16 19 ) YB' 20 21 22a VI2 27 289 30 31 DAYS LOST( [ i ) = 5 X 7 = CALENDAR DAYS REQUES 1'ED Reason(s) for Request: A) iL r BDS Constructors,LLC DBA Mk Constructors [Name of Contractor] BY: Mike Kelley ********************************** =***: **** :******* :************************** Approved for extension of calendar days. Disapproved. Date: , 20_ CITY OF PORT ARTHUR BY: Distribution: Original: City Manager Copy: Engineer Contractor 1/1 REQUEST FOR EXTENSION OF TIME DUE TO WEATHER OR SUPPLIES CITY OF PORT ARTHUR DATE: 74/7.1 MONTH OF: AvvS7' 20 Li/ . WOODWORTH BLVD STREETSCAPE IMPROVEMENTS NAME OF PROJECT: BDS Constructors,LLC DBA Mk Constructors CONTRACTOR: TO: CITY OF PORT ARTHUR ATTENTION: Gentlemen: We request extension of completion time on our Contract due to the days of work lost as specified (circle dates actually lost; do not include days not normally worked, such as Saturdays, Sundays,or holidays): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 DAYS LOST( ) 4- 5 X 7 = / CALENDAR DAYS REQUESTED IPMvwl dares Reason(s) for Request: tuLAI` BDS Constructors,LLC DBA Mk Constructors [Name of Contractor] BY: Mike Kelley ************************************* :*****: ********************************** Approved for extension of calendar days. Disapproved. Date: , 20 CITY OF PORT ARTHUR BY: Distribution: Original: City Manager Copy: Engineer Contractor 1/1 REQUEST FOR EXTENSION OF TIME DUE TO WEATHER OR SUPPLIES CITY OF PORT ARTHUR DATE: /�l ' J 11 MONTH OF: EVoilths.r. 1- 20 /-.? WOODWORTH BLVD STREETSCAPE IMPROVEMENTS NAME OF PROJECT: BDS Constructors,LLC DBA Mk Constructors CONTRACTOR: TO: CITY OF PORT ARTHUR ATTENTION: Gentlemen: We request extension of completion time on our Contract due to the days of work lost as specified (circle dates actually lost; do not include days not normally worked, such as Saturdays, Sundays,or holidays): 1 2 3 4 , 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DAYS LOST( I ) - 5 X 7 = I CALENDAR DAYS REQUESTED ,67./ ed LJU f Reason(s) for Request: 1 i /14 P. BDS Constructors,LLC DBA Mk Constructors [Name of Contractor] BY: Mike Kelley ****************************************************************************** Approved for extension of calendar days. Disapproved. Date: , 20 CITY OF PORT ARTHUR BY: Distribution: Original: City Manager Copy: Engineer Contractor 1/1 REQUEST FOR EXTENSION OF TIME DUE TO WEATHER OR SUPPLIES CITY OF PORT ARTHUR DATE: f(� Lit MONTH OF: f 9( /dig f 20 r NAME OF PROJECT: WOODWORTH BLVD STREETSCAPE IMPROVEMENTS BDS Constructors,LLC DBA Mk Constructors CONTRACTOR: TO: CITY OF PORT ARTHUR ATTENTION: Gentlemen: We request extension of completion time on our Contract due to the days of work lost as specified (circle dates actually lost; do not include days not normally worked, such as Saturdays, Sundays,or holidays): 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DAYS LOST( O ) = 5 X 7 = 0 CALENDAR DAYS REQUESTED Reason(s) for Request: BDS Constructors,LLC DBA Mk Constructors [Name of Contractor] BY: Mike Kelley ****************************************************************************** Approved for extension of calendar days. Disapproved. Date: , 20_ CITY OF PORT ARTHUR BY: Distribution: Original: City Manager Copy: Engineer Contractor I/l REQUEST FOR EXTENSION OF TIME DUE TO WEATHER OR SUPPLIES CITY OF PORT ARTHUR DATE: / L MONTH OF: 411 20 L . WOODWORTH BLVD STREETSCAPE IMPROVEMENTS NAME OF PROJECT: BDS Constructors,LLC DBA Mk Constructors CONTRACTOR: TO: CITY OF PORT ARTHUR ATTENTION: Gentlemen: We request extension of completion time on our Contract due to the days of work lost as specified (circle dates actually lost; do not include days not normally worked, such as Saturdays, Sundays,or holidays): 1 2 3 4 (0 # 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DAYS LOST( Z ) _ 5 X 7 = CALENDAR DAYS REQUESTED ,F t Reason(s)for Request: t('t, 11 BDS G BDS Constructors,LLC DBA Mk Constructors [Name of Contractor] BY: Mike Kelley ****************************************************************************** Approved for extension of calendar days. Disapproved. Date: , 20 CITY OF PORT ARTHUR BY: Distribution: Original: City Manager Copy: Engineer Contractor 1/1 REQUEST FOR EXTENSION OF TIME DUE TO WEATHER OR SUPPLIES CITY OF PORT ARTHUR DATE: J Z MONTH OF: Pete`MLf 20 Z� WOODWORTH BLVD STREETSCAPE IMPROVEMENTS NAME OF PROJECT: BDS Constructors,LLC DBA Mk Constructors CONTRACTOR: TO: CITY OF PORT ARTHUR ATTENTION: Gentlemen: We request extension of completion time on our Contract due to the days of work lost as specified (circle dates actually lost; do not include days not normally worked, such as Saturdays, Sundays,or holidays): 1 2 3 4 5 6 7 8 l 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 g 28 29 l 31 DAYS LOST( I ) = 5 X 7 = 6 CALENDAR DAYS REQUES 1'kD Reason(s) for Request: W C11'Pe BDS Constructors,LLC DBA Mk Constructors [Name of Contractor] BY: Mike Kelley **************************************************************************'*** Approved for extension of calendar days. Disapproved. Date: , 20_ CITY OF PORT ARTHUR BY: Distribution: Original: City Manager Copy: Engineer Contractor 1/1 REQUEST FOR EXTENSION OF TIME DUE TO WEATHER OR SUPPLIES CITY OF PORT ARTHUR DATE: `� MONTH OF: G�V� y 20 ZS WOODWORTH BLVD STREETSCAPE IMPROVEMENTS NAME OF PROJECT: BDS Constructors,LLC DBA Mk Constructors CONTRACTOR: TO: CITY OF PORT ARTHUR ATTENTION: Gentlemen: We request extension of completion time on our Contract due to the days of work lost as specified (circle dates actually lost; do not include days not normally worked, such as Saturdays, Sundays, or holidays): 1 2 3 4 5 6 7 810 o 11 12 13 14 a 16 17 18 19 20 gfr ' ' 25 26 27 28 29 30 31 DAYS LOST( ) = 5 X 7 = /O CALENDAR DAYS REQUES 1'1;D Reason(s) for Request: lit/e0.141l BDS Constructors,LLC DBA Mk Constructors [Name of Contractor] BY: Mike Kelley ****************************************************************************** Approved for extension of calendar days. Disapproved. Date: , 20_ CITY OF PORT ARTHUR BY: Distribution: Original: City Manager Copy: Engineer Contractor 1/1