HomeMy WebLinkAboutPR 15602: ALLCO, INC. - WASTEWATER TREATMENT PLANT REHAB PROJECTMEMOR!~NDUM
CITY OF PORT ARTHUR
UTILITY OPERATIC-NS DEPARTMENT
TO: Stephen Fitzgibbons, City Manager
FROM: Kelly Eldridge, Director of Utility Operations ~~C-~o~-,~
DATE: October 29, 2009
SUBJECT: Proposed Resolution No. 15602
RECOMMENDATION
I recommend that the City Council approve Proposed Resolution No. 15602 authorizing the execution of a
contract with ALLCO, Inc., of Beaumont, Texas, in the estimated amount $8,141,753.00 for the Wastewater
Treatment Plant Rehabilitation Project, Contract No. 5, City Project No. 404WWT.
BACKGROUND
This ARRA grant funded project will rehabilitate noted deficiencies found at our Main and Port Acres
WWTP's. Five (5) contractors attended the mandatory pre-bid meeting, and the following two (2) bids were
received on October 28, 2009:
Recommended Recommended
Bidder Total Bid Changes* Total Award
ALLCO, Inc. $ 9,845,708.00 $1,703,955.00 $8,141,753.00
Beaumont, TX
REYTEC Construction Resources, Inc. $10,585,460.00**
Houston, TX
* Recommended reductions include: $500,000 in emergency generator(s) now funded in an ORCA grant, all
Supplemental ]terns, which are used only at the direction of the Engineer, and all Alternate Bid Items except
for the FEMA-funded media replacement.
** The bid submitted by REYTEC acknowledged receipt of Addendum No. 1, which changed the bid form,
but submitted their bid on the old form, which excluded some bid items.
The apparent low bid submitted by ALLCO, Inc. was over our available ARRA funding, so City staffmet with
the consulting engineer and the apparent low bidder to discuss items we maybe able to remove and still meet
the requirements of our Attorney General's Judgement and TCEQ Design Criteria. The contractor and engineer
are also discussing several other items that we may be able to reduce or eliminate with more field verification
and specification clarification afterwards. Much of our Main WWTP electrical system is an unknown, as it is
comprised of the original., two WWTP upgrades, and 48 years of maintenance repairs. The contractor, his
electrical subcontractor, City staff, and our consultant will meet on site next week to better define a scope of
work in an effort to reduce costs. We anticipate Change; Order No. 1 to be ready for approval at the next City
Council meeting.
BUDGET/FISCAL EFFECT
We have approximately $5.5 million remaining in ARRA grant funds, no. 404-1625-532.83-00, City Project
No. 404WWT. A FEMA Project Worksheet for Hurricane Ike damages has been approved that will cover at
least the Alternate Bid Item at $306,000, and the balance will be funded through savings from other ARRA
contracts and our existing bond fund we allocated for this work before this grant became available.
STAFF/EMPLOYEE EFFECT
City staff and our consulting engineer, Arceneaux & Glates, will oversee this project.
SUMMARY
I recommend that the City Council approve Proposed Resolution No. 15602 authorizing the execution of a
contract with ALLCO, Inc., of Beaumont, Texas, in the estimated amount $8,141,753.00 for the Wastewater
Treatment Plant Rehabilitation Project, Contract No. 5, City Project No. 404WWT.
P.R. No. 15602
10-29-09
RESOLUTION NO.
A RESOLUTION AWARDING A CONTRACT AND
AUTHORIZING THE EXECUTION OF SAID CONTRACT IN
THE ESTIMATED AMOUNT OF $8,141,753.00 FOR THE
WASTEWATER TREATMENT PLANT REHABILITATION
PROJECT, CONTRACT NO. S, BETWEEN THE CITY OF PORT
ARTHUR AND ALLCO, INC.., OF BEAUMONT, TEXAS,
ACCOUNT NO. 404-1625-532.83-00, CITY PROJECT NO.
404WWT.
WHEREAS, the City is currently under an Agreed Order with the TCEQ to rehabilitate its
sanitary sewer system; and,
WHEREAS, there exists a need to reduce flows and eliminate sanitary sewer overflows in
our collection and treatment systems and bring our treatment plants into permit compliance; and,
WHEREAS, the City of Port Arthur advertised and received bids from two contractors for
the Wastewater Treatment Plant Rehabilitation Project, Contract No. 5; and,
WHEREAS, Arceneaux & Gates Consulting Engineers, Inc. has reviewed the bids, met with
the apparent low bidder in order to make recommendations for cost reductions at the time of award,
and recommends award to the lowest responsive, responsible bidder, ALLCO, Inc.; and,
WHEREAS, a copy of their bid tabulation ,and recommendation is attached hereto as Exhibit
"A"; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT the City Council of the City of Port Arthur hereby awards the contract for the
Wastewater Treatment Plant Rehabilitation Project, Contract No. 5 to the lowest responsive,
responsible bidder to-wit; ALLCO, Inc., of Beaumont, Texas, for wastewater treatment plant
rehabilitation at $8,141,753.00, contingent upon TWDB approval and funding; and,
THAT the City Council of the City of Port Arthur hereby acknowledges and awards the unit
prices shown for Supplemental Bid Items in the biid tabulation provided by Arceneaux & Gates
P.R. No. 15602
10-29-09
Page 2 of 3
Consulting Engineers, Inc., attached hereto as Exhibit "A"; and,
THAT the Mayor and City Manager of the City of Port Arthur are hereby authorized to
execute on behalf of the City of Port Arthur a contract between the City of Port Arthur and ALLCO,
Inc. in the amount of $8,141,753.00, a copy attached hereto as Exhibit "B", contingent upon
TWDB approval; and,
THAT the contractor shall not proceed on any phase or segment of this work until a Notice
to Proceed is issued with receipt of performance and payment bond and certificate of insurance; and,
THAT, the said contract is an exact dupli<;ate of a City Standard Form contract except for
the changes (if any) shown in the Certificate of Sta~r~dard Form Contract, a copy of which is attached
hereto as Exhibit "C", and said changes are hereby approved; and,
THAT, the contractor shall sign the contract documents as well as this resolution agreeing to
the terms hereof; and,
THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City
Council.
READ, ADOPTED AND APPROVED THIS day of , 2009
at a Regular Meeting of the City Council of the Ciity of Port Arthur, Texas, by the following vote:
AYES: Mayor
Councilmembers:
NOES:
Deloris Prince, Mayor
P.R. No. 15602
10-29-09
Page 3 of 3
ATTEST:
Terri Hanks
City Secretary
APPROVED AS TO FORM:
f
Valecia Tizeno
Acting City Attorney
APPROVED FOR ADMINISTRATION:
Stephen Fitzgibbons
City Manager
Ross Blackketter, PE
Director of Public Works
L
Kel y Eldri e
Director of Utility Operations
APPROVED AS TO AVAILABILITY OF FUNDS:
Deborah Echols
Director of Finance
Account No.: 404-1625-532.83-00
Project No.: 404WWT
AGREED TO:
ALLCO, Inc.
Date
EXHIBIT A
EXHIBIT B is available for review
in the City Secr. etary's Office
EXHIBIT C
(City of Port Arthur)
(Law Department)
(Required Form)
(7/8/88)
(10/5189)
(3/15/90)
(9-8-94)
(p.2 Revised 9/18/90)
CERTIFICATE OFSTANDARD FORM CONTRACT FOR LAW
DEPARTMENT REVIEW AND CITY COUNCIL AGENDA
I certify that the contract (hereinafter called "said contract") affixed to the attached Proposed City Council
Resolution No 15602 is an exact duplicate of an applicable standard form contract (the title of which is shown
below) previously approved by the Law department and adopted as a standard form by City Council
Resolution, except for the blanks that have been filled in with all necessary information and except for the
changes described below.
The title of the applicable standard form contract is:
[X] Federally Funded Construction Contract, Revised 1./5/88, 7/89, 8/89; 4/28/94
[ ]Non-Federally Funded Construction Contract, Revised 1/5/88, 7/89, 8/89; 4/28/94
[ ]Federal -Professional Services -Engineering Contract, Revised 1/5/88, 5/89 (§10) 7/89/(§8); 10/89;
2/91 (§8)
[ ]Non-Federal -Professional Services -Engineering Contract, Revised 1/5/88, 5/89(§10), 7/89(§8),
10/89; 2/91(§8)
[ ]CDBG -Professional Services -Engineering Contract, Revised 1/5/88, 5/89 (§10), 7/89(§8), 10/89;
2/91 (§8)
[ ]Federal -Professional Services -Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§ 10),
7/89 (§8); 10/89; 2/91 (§8)
[ ]Non-Federal -Professional Services -Non-Engineering (Consultant} Contract, Revised 1/5/88, 5/89
(§10), 7/89 (§8); 10/89; 2/91 (§8)
[ ]CDBG -Professional services -Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10),
7/89 (§8); 10/89; 2/91 (§8)
[ ]Other Standard Form Contract, described as follows:
The changes are as follows: (Put an "X" in the appropriate [ ])
[ ]None.
[ ]The following described provisions at the indicated) page, section, etc. of the standard form have been
deleted from said contract:
Page 1 of 3
(p.2 Revised 9/18/90)
(Certificate of Standard Form Contract, page 2)
DELETIONS
Subsection or
Page Number Section or Paragraph No. Subparagraph No. and
Where Deleted Provision and Caption Which Caption Which Contains
Is Found On Standard Contains Provision Provision Deleted From
Form Deleted From Form Form
None.
Description of
Provision Deleted
[X] The following described provisions at the indicated) page, section, etc. of the standard form have been
altered, modified, replaced or otherwise changed:
ALTERATIONS, MODIFICATIONS, REPLACEMENTS, ETC.
Page No. § or ¶ No. &
Where Caption of
Provision Found Standard Form
on which
Standard Form Contains Provision
B-1 thru B-5 Section B
C-9 Section C
H-1A Section H
Sub § or Sub ¶ No.
& Caption
of
Standard Form
which
Contains Provisic~n
Description
of
Provision
in
Standard Form
Advertisement for Bids
Information to Bidders
Supplemental General
Conditions Part A
Page § & caption
sub § & caption, etc.
of said contract
which contains altered,
etc. provision; &
Description of
Alteration etc.
added ARRA conditions
Includes schedule for
mandatory pre-bid
meeting.
Added specifics about
project & scope.
Page 2 of 3
p.3 Revised 9/18/90)
(Certificate of Standard Form Contract, page 3)
[X] The following provisions have been added to Said Contract:
Page, Section and Caption
Subsection and Caption, etc. of Said Contract Which
Contains the Added Provision and Description Thereof
Sub § or Sub ¶ No.
§ or ¶ No. & & Caption of
Page No. Where Caption of Standard Standard Form Description of
Added to Form which which Contains Addition to Description of
Standard Form Contains Addition Addition Standard Form Addition
H-iC, pg. 1-63 Section H Supplemental General TWDB "ARRA Pink
Conditions Part C Sheets"
I further certify that said attached proposed City Council Resolution contains the following provision:
"That said contract is an exact duplicate of a City Standard Form Contract except for the changes described in the
Certificate of Standard Form Contract, a copy of which is attached hereto as Exhibit "C" and is hereby incorporated
by reference, and said changes are hereby approved."
I understand that this certificate will be relied on by the Law Department in reviewing and approving (or
rejecting) as to form and by the City Council in reviewing acid adopting (or rejecting) said Resolution and Contract.
Signed this ~ ~` day of 0 ~~ , 2009.
Department ad
Page 3 of 3