HomeMy WebLinkAboutPR 24253: RATIFICATION OF EMERGENCY CLEANING OF HIGHWAY 365 18 INCH SEWER LINE stoN
Cm of
ort rthuurr`�-
INTEROFFICE MEMORANDUM
Date: March 27,2025
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: PR 24253—Ratification of Emergency Cleaning of Highway 365 18-inch Sewer
Line
Introduction:
The intent of this Agenda Item is for the City Council to ratify the emergency cleaning and TV
of Highway 365 18-inch sewer line by Chief Solutions, Inc. of Houston, Texas for$25,032.00.
Background:
The 18" sanitary sewer line in the North ROW of Highway 365 at 1051 Highway 365 was
overflowing at three manholes. This gravity sewer line receives the flow from the Highway
365 Lift Station and these manholes are immediately downstream of the manholes which
caused the city to agree to a Supplemental Environmental Project(SEP), resulting in the design
of a replacement force main which will begin construction soon and will take approximately
one year to finish. However, as per TCEQ, the overflows must be addressed immediately due
to public health and safety issues. Approximately 3,300 feet of sewer line needed to be
cleaned and televised to address the situation. An emergency memo was issued on February
26, 2025 and the project was completed by Chief Solutions, Inc. for the total amount of
$25,032.00
Budget Impact:
The total budgetary impact is $25,032.00 and funding in Account 405-40-000-8516-00-00-000
is contingent upon the approval of budget amendment in Proposed Ordinance No. 7324.
Recommendation:
It is recommended that the City Council approve Proposed Resolution No. 24253, ratifying the
emergency cleaning and TV of the sewer line as described/outlined above.
"Remember,we are here to serve the Citizens of Port Arthur"
Pr
PR No.24253
3/27/25 cm
Page 1 of 3
RESOLUTION NO.
A RESOLUTION RATIFYING THE CITY MANAGER'S
DECISION TO AUTHORIZE THE EMERGENCY
CLEANING OF THE 18-INCH SEWER LINE ON
HIGHWAY 365 BY CHIEF SOLUTIONS, INC. OF
HOUSTON, TEXAS IN THE TOTAL NOT TO EXCEED
AMOUNT OF $25,032.00. FUNDING IN WATER SYSTEM
MAINTENANCE ACCOUNT NO. 405-40-000-8516-00-00-
000 IS CONTINGENT UPON THE APPROVAL OF THE
BUDGET AMENDMENT IN PROPOSED ORDINANCE
NO. 7324.
WHEREAS, the 18-inch sanitary sewer line in the North ROW of Highway 365 at 1051
FM365 was overflowing at three manholes, as depicted in aerial map of the emergency memo
signed by the City Manager, attached hereto as Exhibit"A"; and,
WHEREAS, this condition presented a significant public health and safety concern that
required immediate action in accordance with Texas Commission on Environmental Quality
(TCEQ)regulations; and,
WHEREAS, per TCEQ, the City previously agreed to a Supplemental Environment
Project(SEP)resulting in the design of the replacement force main that will address this overflow,
which construction will begin soon and take approximately one year to complete; and,
WHEREAS,in accordance with TCEQ guidelines,the City cannot delay the construction
of the force main to address this issue and action must be taken immediately; therefore, the City
Manager authorized the emergency cleaning and TV of the 18-inch sewer line by Chief Solutions,
Inc. of Houston, Texas on February 26, 2025; and,
WHEREAS,Chief Solutions,Inc. completed the cleaning and TV of approximately 3,300
linear feet of sewer line and submitted invoices with project details totaling $25,032.00 (Exhibit
"B"); and
WHEREAS,pursuant to Section 252.022(a)(1)of the Texas Local Government Code,this
purchase is authorized because of a public calamity that requires the immediate appropriation of
money to relieve the necessity of the municipality's residents or to preserve the property of the
municipality; and,
WHEREAS, it is further authorized pursuant to Section 252.022(a)(2) of the Texas local
Government Code to preserve or protect the public health or safety of the municipality's residents.
PR No. 24253
3/27/25 cm
Page 2 of 3
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR,TEXAS:
THAT,the facts and recitals in the preamble are true and correct; and,
THAT,City Council hereby ratifies the emergency cleaning and TV on the 18-inch sewer
line in the total not to exceed the amount of$25,032.00 from Account No. 405-40-000-8516-00-
00-000, contingent upon the approval of the budget amendment in Proposed Ordinance No. 7324;
and,
THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the
Meeting of the City Council.
READ, ADOPTED, AND APPROVED this day of , 2025
at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote:
AYES: Mayor
•
Councilmembers:
NOES:
•
CITY OF PORT ARTHUR,TEXAS:
Thurman Bill Bartie
Mayor
ATTEST:
Sherri Bellard
City Secretary
PR No. 24253
3/27/25 cm
Page 3 of 3
APPROVED AS TO FORM:
Roxann Pais Cotroneo
City Attorney
APPROVED R A INISTRATION:
Ronald Burton, CP Calvin Matthews, P. .
City Manager Water Utilities Director
APPROVED AS TO THE AVAILABILITY
OF FUNDS:
'v e/r'vz39 h/J4
Ly (Lyn) Boswell, MA ICMA-CM Clifton illiams, CPPB
Finance Director Purchasing Manager
Exhibit "A"
(Emergency Memo)
kAl
City of
nrt rthu��
Texas
INTEROFFICE MEMORANDUM
Date: February 26, 2025
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
From: Calvin Matthews, P.E., Director of Utilities
RE: Emergency Cleaning and TV of Sewer on Hwy 365 to Stop SSO
The 18" sanitary sewer line in the North ROW of Hwy 365 at 1051 Hwy 365 is overflowing
at three manholes. This gravity sewer line receives the flow from the Hwy 365 Lift Station
and these manholes are immediately downstream of the manholes which caused the City to
agree to a SEP, resulting in the design of a replacement force main which will be going into
construction soon. However, TCEQ has stated (see attached email) that the City must stop
these overflows immediately and cannot wait for the construction of the force main which is
expected to take approximately one year due to public health and safety issues. The Water
Utilities large Vactor is currently being repaired and is not available to do this work.
Approximately 3,300 feet of sewer line (see attached map)needs to be cleaned and televised
to determine if the line has cavities or if it is just blockage from grease and other debris.
The estimated expenditure for the repair is expected to be approximately $50,000.00.
I, Ronald Burton, hereby approve of this emergency repair.
1
,4//
eft
Ro• :urton, CPM
ity Manager
"Remember,we are here to serve the Citizens of Port Arthur"
•
Calvin Matthews
From: Floyd Riley
Sent: Wednesday, February 26, 2025 9:03 AM
To: Calvin Matthews
Cc: JESS LIAO; Darrell Harmon
Subject: FW: [NON-CoPA] RE:Sewer Overflow
Hi Calvin,
I received the below email last week from the TCEQ regarding sewer bypass at 1057 FM 365.The facility is an
abandoned gas plant(DCP Midstream). I visit the facility on yesterday and observed large volume of sewer on the
ground. Sewer also overflow from at least two manhole on the site. I informed the TCEQ that the City has plans to
replace the FM 365 force main from the FM 365 lift station to West Port Arthur Road and that construction should begin
in 2-4 weeks and may take approximately one year to complete. State regulations require that we immediately cease all
unauthorized discharges of sewer. I was informed by TCEQ that this discharge cannot continue for a year and the City
must find a way to immediately stop this unauthorized discharge.
Thanks,
Floyd Riley
Utility Compliance Manager
Water Utilities Department
Regulatory Services Division
City of Port Arthur
444 4th St/Annex Bldg/rt Floor
(409)983-8290
From:Abu Mornya<Albert.Mornya@tceq.texas.gov>
Sent:Tuesday, February 18, 2025 3:41 PM
To: Floyd Riley<floyd.riley@portarthurtx.gov>
Subject: [NON-CoPA] RE:Violations at Sabine Pass
Floyd,
TCEQ just got sewage complaint at 1051 HWY 365, Port Arthur,TX 77640. The complainant stated it appeared the
City of Port Arthur's system is overwhelmed or not working properly in that area allowing potentially contaminated
water to just hit the ground and enter surface water.There are 3 manhole covers near exterior fence line at the
DCP Port Arthur Gas Plant located on Hwy 365.Two of the manholes are inside the fence,and one is located
outside the fence.All 3 manholes leak and release water to the surrounding area.They leak excessively during
heavier rain events.Operations has notified the city several times regarding these leaking manholes, but no action
has been taken.The site is not currently operating;however,operations personnel still visit the site regularly to
check on company property,equipment,etc.When the manholes teak, it floods parts of the facility along the road
and has a strong(sewer)odor.Two of the manways are located adjacent to a drainage ditch that leads to the LNVA
canal,and the foul-smelling water entering that is concerning.
1
1.
fl
i
c
y o''ca. U_
rW 4 �>
L Y
i
LL
Cn cc
J M
IL U
W
C'•) = i w
I U -.-I
Fes' to
71i ,
co
a.)
c cn O
c�
. to / ...
e 3 Ij
i
t
C
Ix CC
w RI
Ki n PrIme ma e E Cl)
- LO
,� 1 ci
' i _
c - i tit.i
:-
coc t#i e;
v
- ..-
c mA 1
.� , n..
U .a _
N •Davas+
Cn
a) n.
H
♦♦/
v! • j,
i .L
r 4
•
` t , S
aiimr c.; .i
7,
Exhibit "B"
(Invoices with the project details)
List of Invoices Generated for HWY 365 18-Inch
Invoice Date Invoice No. Amount
3/26/2025 72938 $ 1,500.00
3/26/2025 72939 $ 2,500.00
3/26/2025 72940 $ 1,500.00
3/26/2025 72941 $ 5,360.00
3/26/2025 72942 $ 8,560.00
3/26/2025 72943 $ 5,612.00
Total: $ 25,032.00
(
Chief Solution,Inc
11500 North Houston Rosslyn Rd ,;
Houston,TX 77088 US I
+17136823231
lorip@chiefsolutionsinc.com
BILL TO INVOICE 72938
City of Port Arthur, TX
Jess Liao,444 4th Street
Port Arthur,TX 77641 US DATE 03/26/2025 TERMS Net 30
DU.E DATE 04/25/2025
JOB TRANSMITTAL#
HWY 365 02262025- 35444
SERVICE/SIZE MHi MH2 OTYJ-LF HATE AMOUNT
HOURLY FOR-INVESTIGATION OF SURCHARGED LINES 2-26-2025 3 500.00 1,500.00
Hourly 18"4-5 0 0.00 0.00
Hourly 18"5-6 0 0.00 0.00
Hourly 18"6-7 0 0.00 0.00
_ Hourly 18"7-8
0 0.00 0. _
Hourly 18"8-9 0 0.00 0.00
SUBTOTAL 1,500.00
•
TAX 0.00
TOTAL 1,500.00
TOTAL DUE $15OO OO
•
Thank you for your business.
If payment of this Invoice Is not received by Its due date,seller reserves the right to promptly send all notices which seller deems necessary or
advisable In order to protect seller's lien or bond rights to secure payment of the invoice.
Chief Soluttions,lne �, • •
11500 North Houston Rosslyn Rd i, :'
Houston,TX 77088 US •
+17136823231
lorip@chiefsolutionsinc.com
BILL TO SHIP TO INVOICE 72939
City of Port Arthur,TX City of Port Arthur,TX
Jess Liao, 444 4th Street DATE 03/26/2025 TERMS Net 30
Port Arthur,TX 77641 US
DUE DATE 04/25/2025
JOB TRANSMITTAL#
HWY 365 02262025- 35445
SERVICE]SIZE MH1 MI-12 QTY I LF RATE AMOUNT
HOURLY FOR-REMOVAL OF DEBR1 INSIDE MANHOLES OF 5 500.00 2,500.00
SURCHARGED LINES 2-27-2025
Clean 18"4-5 0 0.00 0.00
Clean 18"5-6 — 0 0.00 _0.00
Clean 18"6-6A 0 0.00 0.00
SUBTOTAL 2,500.00
TAX 0.00
TOTAL 2,500,00
TOTAL DUE $ ,-5JOO OO
Thank you for your business.
if payment of this invoice is not received by its due date,seller reserves the right to promptly send all notices which seller deems necessary or
advisable in order to protect seller's lien or bond rights to secure payment of the invoice.
Chief Solutions,Inc
11500 North Houston Rosslyn Rd F;'„4
Houston,TX 77088 US
+17136823231
lorip@chiefsolutionsinc.com
BILL TO -SHP TO INVOICE 72940
City of Port Arthur, TX City of Port Arthur, TX
Jess Liao, 444 4th Street
Port Arthur,TX 77641 US DATE 03/26/2025 TERMS Net 30
DUE DATE 04/25/2.025
JOB TRANSMITTAL#
HWY 365 02262025- 35446
SERVICE/SIZE MH1 MH2 QTYJLF RATE AMOUNT
HOURLY FOR-INVESTIGATION OF MANHOLES INSIDE PLANT 2-28- 3 500.00 1,500.00
2025
Hourly 18" 01 B-02 0 500.00 0.00
SUBTOTAL 1,500.00
TAX 0.00
TOTAL 1,500.00
TOTAL DUE $1,500.00
Thank you for your business.
If payment of this invoice is not received by ts due date,seller reserves the right to promptly send all notices which seller deems necessary or
advisable In order to protect seller's lien or bond rights to secure payment of the invoice,
. .
' .
in
1150D North Houston Roem|ynRd
Houston,TX 77088US
+17136823281
|or|p@chie(oo)udonoino.corn
U���U��� �����
�U-LI0 ���PT0 ...°`=,~~,_ ,,_=-^ ,
City of Port Arthur, TX City of Port Arthur,TX
4444thStreet Jess Liao.
DATED3/26/2O25 TERMS Net 3O
Port Arthur,TX 77641 U8
DUE DATE O4/26/2025
JOB TRmvSmmTcvm-�
HVVY36502282025' 35447
^
SERVICE]SIZE MH1 MH2 CTY/LF RATE JAMOUNT
- Q 380 4
non &TV 18"O1'D1A .00 1.520.00_____
Clemn &TV 18" 01A'01B 447_ 4.00 1,78800
C|oan &TV 18`01B'O2 53 4.00 212.00
— 48OO
O�an &TV 18.03{ 57 0A � -_ �__'-��_0O 2�__--_ ._______
C|oon &TV 18"03A-04 370 4.00 1,480-00
Clean &TV 6"04'06E8 _ 11 4.00 44.00
A Clean 8`'04'U5��N 11 4.0D 44.00
U -- - ---'
` Clean &TV 8''04'05VVG 11 4.00 44.00
SUBTOTAL 5.360.00
TAX 0.00
TOTAL 5'380.00
�
TOTAL DUE $5
,360.00
Thank you for your IoLslnmm.
|f payment dthis imm|cm is not received by its due umo,seller reserves the right to promptly send all notices which seller deems necessary or |
advisable|n order tu protect seller's lion or bond rights tv secure pa*mantof the invoice. /
Chief Solutions,lne
•
11500 North Houston Rosslyn Rd ` t
Houston,TX 77088 US i
I r..
+17136823231
lorip@chiefsolutionsinc.com
BILL TO SHIP TO INVOICE 72942
City of Port Arthur, TX City of Port Arthur, TX
444 4th Street Jess Liao,
Port Arthur, TX 77641 US DATE 03/26/2025 TERMS Net 30
DUE DATE 04/25/2025
JOB TRANSMITTAL#
HWY 365 02262025- 35448
SERVICE/SIZE Mill MH2 QTX/LF RATE AMOUNT
HOURLY FOR-EXTRA CLEANING PER-JESS 3-4-2025 _ 10 500.00 5,000.00
HOURLY FOR-EXTRA CLEANING PER-JESS 3-5-2025 3 500.00 1,500.00
Clean &TV 18"02-03 515 4.00 2,060.00
Clean 18"02-03 0 0.00 0.00
SUBTOTAL 8,560.00
TAX 0.00
TOTAL 8,560.00
TOTAL DUE $84560-00
4
ThanK you for your business.
If payment of this invoice Is not received by its due date,seller reserves the right to promptly send all notices which seller deems necessary or
advisable In order to protect seller's lien or bond rights to secure payment of the Invoice.
r
>
,
,
bne
11500 North Houston RoonlynHd /
}
Houston,TX 77088U8 '
+17136823231
lodp@oh|ofooluUonninc.unm
U������K^�� �����
E�LTO ��,TO .^�,=',=� . �=�~,
City o/Port Arthur, TX City of Port Arthur, TX
4444thStreet Jess Liao. DATEO3/26/2O25 TERMS Net 3O
Port Arthur, TX 77641 US
DUE DATE 84/25/2025
JOB T,`mm^mmITv,L,
HVVY86502262025' 85449
SERVICE/-SIZE &8H1 -MH2 QTY/LF BATE AMOUNT
C|mon &TV 18"06'06 88 4
______' -_-___ 'OO 156'OO_____
Clean 4
aen&TV 8" 36'0$AE8T .DD 52.00
Clean 8TV 8"08'06A CN 13 4.00 52.00
&TV 8" 0 13 4�� ��
�\emn ��' GAVVE@ _ _ __ - ___ �________�6�.
- -- ----- -Clean&TV 18"06A-06B 82 4.00 328.00
Clean&TV 18"068-07 188 4.00 744.00
Clean&TV 10''07'07A 103 4.00 412.00
Clean&TV 18''07A'08 398 4.00 1.592.00
Q ��� 4�0 �56
Clean 1�"��'�S ____-__-____ .O0
O�an8TVM� 0810 1 �4.0� _ 4
92.00
— ----Clean&TV 18" 10'11 13 4.00 52.00
lean�TV 18'' 1 1 42 _ 38 ��OU 1 __
Clean &TV 18"12'13 143 4.00 572.00 _____
SUBTOTAL 5'612.00
TAX 0.00
TOTAL 5.612.00
TOTAL DUE $5,612-00
Thank you for your business.
If payment md this Invoice iv not received bv its due date,sailer reserves the right to promptly send ail notices which seller deems necessary or
advisable in order to protect seller's lien or bond nghts to secure payment of the invoico.