INTEROFFICE MEMORANDUM
Date: March 28, 2025
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: PR No. 24246—Procter Street Elevated Storage Tank Rehabilitation Change
Order No. 2
Introduction:
This Agenda Item is to seek the City Council's approval for Change Order No. 2 for the Procter
Street Elevated Storage Tank Rehabilitation Project with M.K. Painting, Inc. of Wyandotte,
Michigan.
Background:
The elevated storage tank, located at Procter Street Extension is in urgent need of rehabilitation.
Schaumburg&Polk,Inc.(SPI)of Beaumont,Texas designed the project and are the construction
manager and engineer. Resolution No. 24-122 awarded the project to M.K. Painting, Inc. of
Wyandotte, Michigan for $669,000.00. Resolution No. 25-049 approved Change Order No. 1
to install repair plates and vapor blast with a total amount of $135,000.00 and 232 days of
contract time extension. The contractor, along with SPI and City Staff, is proposing Change
Order No. 2 to repair holes in the roof, bowl, wet riser, and drain pipe by installing patch plates
and filling the holes by welding. Change Order No. 2 will increase the contract amount by
$8,700.00 to a new total contract amount of$812,700.00 and extend the contract time by 4 days
for the additional time due to such repairs.
City staff, with the recommendation from Schaumburg&Polk, Inc. engineer, is recommending
Change Order No. 2 for the Procter Street Extension Elevated Storage Tank Rehabilitation
Project to make the aforementioned changes.
"Remember,we are here to serve the Citizens of Port Arthur"
Gin of.
ort rtlrat.
Budget Impact:
The initial contract amount was $669,000.00
Change Order No. 1 increased the contract amount by $13 5,000.00 to a new total contract
amount of$804,000.00.
Proposed Change Order No. 2 will increase the contract amount by $8,700.00 to a new total
contract amount of$812,700.00.
Funding in Capital Improvement Projects (CIP) Account No. 405-40-000-8516-00-00-000
Project No. WS0004-CON is pending the approval of the budget amendment in Proposed
Ordinance No. 7324
Recommendation:
It is recommended that City Council approve Proposed Resolution No.24246 to approve Change
Order No. 2 for the Procter Street Elevated Storage Tank Rehabilitation Project as discussed
and/or outlined above.
"Remember,we are here to serve the Citizens of Port Arthur"
PR No. 24246
3/25/25 cm
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO EXECUTE CHANGE ORDER NO. 2 TO THE PROCTER
STREET EXTENSION ELEVATED STORAGE TANK
REHABILIATION PROJECT WITH M.K. PAINTING, INC.
OF WYANDOTTE, MICHIGAN, INCREASING THE
CONTRACT AMOUNT BY $8,700.00 TO THE NEW TOTAL
CONTRACT AMOUNT OF $812,700.00, WITH EXTENDED
CONTRACT TIME OF 4 DAYS; FUNDING IN CIP
ACCOUNT NO. 405-40-000-8516-00-00-000, PROJECT NO.
WS0004-CON. IS CONTINGENT UPON THE APPROVAL
OF THE BUDGET AMENDMENT IN PROPOSED
ORDINANCE NO. 7324
WHEREAS, pursuant to Resolution No. 24-122, the Procter Street Extension Elevated
Storage Tank Rehabilitation Project was awarded to M. K. Paining, In. of Wyandote, Michigan
with a total projected budgetary amount of$669,000.00; and,
WHEREAS, pursuant to Resolution No. 25-049, Change Order No. 1 was approved to
install repair plates to the roof of the tank and vapor blast the tank increasing the contract amount
by $135,000.00 to a new total contract amount of$804,000.00 and extend the contract time by
232 days due to alternate surface preparation method; and,
WHEREAS, with Schaumburg & Polk, Inc. as project engineers, the contractor proposes
Change Order No. 2; and,
WHEREAS, Schaumburg & Polk, Inc., along with City Staff, is proposing Change
Order No. 2 (EXHIBIT "A") to repair holes in the roof, bowl, wet riser, and drain pipe by
installing patch plates and filling the holes by welding, which will increase the contract amount
by $8,700.00 to a new total contract amount of$812,700.00 and extend the contract time by 4
days for the additional time due to such repairs.
PR No. 24246
3/25/25 cm
Page 2 of 3
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF PORT ARTHUR:
THAT,the facts and opinions in the preamble are true and correct; and,
THAT, the City Council hereby approves Change Order No. 2 (EXHIBIT "A") to
increase the amount by $8,700.00 to the new total contract amount of$812,700.00 and extending
the contract time by 4 days; and,
THAT, the funding in CIP Account No. 405-40-000-8516-00-00-000, Project No.
WS0004-CON is contingent upon the approval of the budget amendment in Proposed Ordinance
No. 7324; and,
THAT, a copy of the caption of this resolution be spread upon the minutes of the City
Council.
READ, ADOPTED, AND APPROVED, this day of , 2025, AD,
at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following
Vote: AYES:
Mayor:
Councilmembers:
•
NOES:
Thurman Bill Bartie
Mayor
ATTEST:
Sherri Bellard
City Secretary
PR No. 24246
3/25/25 cm
Page 3 of 3
APPROVED AS TO FORM:
Roxann Pais Cotroneo
City Attorney
APPROVED FOR ADMINISTRATION:
Ronald Burton M
City Mana
Calvin Matthews, P. .
Water Utilities Director
APPROVED AS TO FUND AVAILABILITY:
1)-,dt. ‘6)6U-A-teti 13:2t(
Lyn Boswell, MA, ICMA-CM
Finance Director
!',, c9
Clifton Williams, CPPB
Purchasing Manager
EXHIBIT "A"
(Change Order No. 2)
APPROVAL OF CONTRACT CHANGE
CHANGE ORDER No.Two(2)
DATE: March 25,2025
PROJECT: City of Port Arthur
Procter Street EST Rehabilitation
Bid Number P24-016
OWNER: City of Port Arthur,Texas
444 4`h Street
Port Arthur,Texas 77640
CONTRACTOR: M.K.Painting,Inc.
4157 7th St.
Wyandotte,MI 48192
TO THE OWNER: Approval of the following contract change is requested.
Reason for Change: to adjust bid items and add new item to provide for repair of holes in the tank roof,bowl,wet riser and drain pipe
ORIGINAL CONTRACT AMOUNT: $ 669,000.00
REVISED CONTRACT AMOUNT PER PREVIOUS CHANGE ORDERS $ 804,000.00
THIS CHANGE ORDER
22 Miscellaneous Tank Repairs-To adjust the allowance by$16,000.00 for repairing holes in roof,bowl,wet riser and $ (16,000.00)
drain pipe.Remaining Allowance=$16,000.00-16,000.00=$0.00.DELETE$16,000.00/ALLOW
New Item
25 Repair holes in roof,bowl,wet riser and drain pipe by installing patch plates and filling holes by welding.ADD 1LS $ 24,700.00
@$24,700.00/LS
TOTAL AMOUNT OF THIS CHANGE ORDER: $ 8,700.00
TOTAL REVISED CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER: $ 812,700.00
CONTRACT TIME
Original Contract Time: 180 calendar days
Revised Contract Time per Previous Change Orders 412 calendar days
Additional time due to repairng holes on tank surfaces 4 calendar days
Revised Contract Time per this Change Order 416 calendar days
CONDITION OF CHANGE:
"Contractor acknowledges and agrees that the adjustments in contract price and contract time stipulated in this Change Order represents full
compensation for all increases and decreases in the cost of,and the time required to perform the entire wodc,under the Contract arising directly or
indirectly from this Change Order and all previous Change Orders. Acceptance of this waiver constitutes an agreement between Owner and
Contractor that the Change Order represents an all inclusive,mutually agreed upon adjustment to the Contract,and that Contractor will waive all
Ir rights to file a claim on this Change Order after it is properly executed."
, 7
Recomme ded A 'o4ed : Inc.
Scharg&Pk,Inc. City of Port Arthur
Engineer
yam 7v nn Owner �7 Contractor
25
Date: 03 ✓ Date: 27/1f//4v'C'% G_=_S Date: ��J�
Page 1 of 1