HomeMy WebLinkAboutPR 24266: CHANGE ORDER NO. 1 CONTRACT WITH KRAFTSMAN COMMERCIAL PLAYGROUNDS & WATER PARKS FOR PARK IMPRVEMENTS www.PortArthurTx.gov
INTEROFFICE MEMORANDUM
Date: April 8, 2025
To: The Honorable Mayor and City Council
Through: Ron Burton, CPM, City Manager
From: Chandra Alpough, CPM, CPRP, Director of Parks and Recreation WA-,
RE: P.R. 24266—Change Order No.1 to the Contract with Kraftsman Commercial
Playgrounds & Water Parks for Park Improvements at Roosevelt Park, London
Bridge Park and Babe Zaharias Park
Introduction:
The intent of this Agenda Item is to request the City Council's approval of P.R. No. 24266
authorizing the City Manager to execute Change Order No. 1, to the contract with Kraftsman
Commercial Playgrounds&Water Parks of Spring,Texas for park improvements to Roosevelt
Park, London Bridge Park and Babe Zaharias Park through Buyboard Cooperative Purchasing
Contract No. 679-22 to add sports court surfacing, striping and inground mounting of the nets
and posts at Babe Zaharias Park increasing the contract amount by$45,743.39 to a new contract
amount of$545,395.57.
Background:
The City of Port Arthur City Council has clearly indicated that "quality of life" concerns are a
key focus for The City of Port Arthur. City administration has been actively engaged in research
planning, designing, and programming efforts to address such issues. The area of Parks and
Recreation has been an active focal point for these efforts.
Pursuant to Resolution No. 25-066, the City Council entered into a contract with Kraftsman
Commercial Playgrounds & Water Parks of Spring, Texas for park improvements to Roosevelt
Park, London Bridge, and Babe Zaharias Park.
Six pickleball courts will be built at Babe Zaharias Park. To ensure a durable, safe, and visually
appealing experience, a sports court surface is designed for longevity and provides the ability to
play in all weather conditions. By installing sports court surfacing,the community will enjoy an
enhanced playing experience, which can help foster the growth of pickleball in Port Arthur.
Additionally, it will reduce the need for expensive repairs in the future.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
Kraftsman Commercial Playgrounds & Water Parks of Spring, Texas submitted a change order
that will add the sports court surfacing, striping and provide inground mounting of the nets and
posts at Babe Zaharias Park.
Budget Impact:
Funding in the amount $545,395.57 is available for this purpose in the Parks and Recreation
Capital Improvement Account Number 307-25-067-8525-00-20-000
Recommendation:
It is recommended that the City Council approve P.R.No. 24266 authorizing the City Manager
to execute Change Order No. 1, to the contract with Kraftsman Commercial Playgrounds &
Water Parks of Spring, Texas for park improvements to Roosevelt Park, London Bridge Park
and Babe Zaharias Park through Buyboard Cooperative Purchasing Contract No.679-22 to add
sports court surfacing, striping and inground mounting of the nets and posts at Babe Zaharias
Park increasing the contract amount by $45,743.39 to a new contract amount of$545,395.57.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294
P. R. # 24266
04/08/2025 ca
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE
CHANGE ORDER NO. 1, TO THE CONTRACT WITH KRAFTSMAN
COMMERCIAL PLAYGROUNDS & WATER PARKS OF SPRING, TEXAS
FOR PARK IMPROVEMENTS TO ROOSEVELT PARK, LONDON BRIDGE
PARK, AND BABE ZAHARIAS PARK TO ADD SPORTS COURT
SURFACING, STRIPING AND INGROUND MOUNTING OF THE NETS
AND POSTS AT BABE ZAHARIAS COURT, THROUGH BUYBOARD
COOPERTIVE PURCHASING CONTRACT NUMBER 679-22, INCREASING
THE CONTRACT AMOUNT BY $45,743.39 TO A NEW CONTRACT
AMOUNT OF $545,395.57. FUNDS ARE AVAILABLE IN THE PARKS AND
RECREATION CAPITAL IMPROVEMENT ACCOUNT NUMBER 307-25-
067-8525-00-20-000
WHEREAS,the City Council has made"quality of life"for citizens a priority; and,
WHEREAS, pursuant to Resolution No. 25-066, the City Council entered into a contract
with Kraftsman Commercial Playgrounds & Water Parks of Spring, Texas for park
improvements to Roosevelt Park, London Bridge, and Babe Zaharias Park; and,
WHEREAS, in order to allow for a more durable, safe and aesthetically pleasing
pickleball court,the court needs to have sports court surfacing; and,
WHEREAS, Kraftsman Commercial Playgrounds & Water Parks of Spring, Texas,
submitted Change Order No. 1 through Buyboard Cooperative Purchasing Contract Number 679-
22, to add sports court surfacing to the pickleball courts, striping and inground mounting of the
nets and posts at Babe Zaharias Park increasing the contract amount by $45,743.39 for new
contract amount of$545,395.57;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PORT ARTHUR, TEXAS:
Section 1. That the facts and opinions in the preamble are true and correct.
Section 2. That the City Manager of the City of Port Arthur is hereby authorized and
directed to execute, on behalf of the City of Port Arthur, Change Order No. 1 to add sports court
surfacing to the pickleball courts, striping and inground mounting of the nets and posts at Babe
P. R. #24266
04/08/2025 ca
Zaharias Park increasing the contract amount by $45,743.39 attached hereto as Exhibit "A" for a
new contract amount of$545,395.57.
Section 3. That a copy of the caption of this Resolution be spread upon the Minutes
of the City Council.
READ, ADOPTED AND APPROVED THIS day of , A.D., 2025, at a
Regular Meeting of the City Council of the City of Port Arthur, by the following vote:
AYES: (Mayor)
Councilmembers:
NOES:
Thurman"Bill" Bartie
Mayor
ATTEST:
Sherri Bellard
City Secretary
APPROVED AS TO FORM:
Roxann Pais Cotroneo, Esq.
City Attorney
P. R. #24266
04/08/2025 ca
APPROVED AS TO ADMINISTRATION:
Ron Burton, CPM
City Manager
Chandra Alpough, CPM
Director of Parks and Recreation
APPROVED AS TO AVAILABILITY OF FUNDS:
n?LT61,--.)-(tr e
Lyn Boswell
Director of Finance
64.63,444:::
Clifton Williams, CPPB
Purchasing Manager
Exhibit "A"
CHANGE ORDER NO. 1
ORIGINAL AGREEMENT DATE: February 11, 2025
PROJECT DESCRIPTION: CPark Improvements to Roosevelt Park, London Bridge Park and Babe
Zaharias Park
CHANGE IN SCOPE: Add Sports Court Surfacing
Striping
Inground Mounting of Nets and Posts
CHANGE TO CONTRACT AMOUNT:
Radd Sports Court Surfacing, Striping and Inground
Mounting of Nets and Posts $45,743.39
ORIGINAL CONTRACT PRICE: $499,652.18
CURRENT CONTRACT PRICE(adjusted by previous CHANGE ORDER): $499,652.18
The Contract Amount due to this CHANGE ORDER will increase by: $45,743.39
Total Percent of Change Order: 9.16%
The new CONTRACT AMOUNT including the CHANGE ORDER will be: $545,395.57
ORIGINAL CONTRACT DAYS: NA
NEW CONTRACT DAYS: NA
SIGNED AND AGREED TO on the_day of , 2025.
KRAFTSMAN COMMERCIAL PLAYGROUNDS &
WATER PARKS
Print Name:
Title:
SIGNED AND AGREED TO on the_day of , 2025.
CITY OF PORT ARTHUR
BY:
RON BURTON
CITY MANAGER
Kraftsman QUOTE#Q84156
COMMERCIAL PLAYGROUNDS& Date:03/31/2025
KRAFTSMAN WATER PARKS Project:32329
19535 Haude Road Created By:Ryan Slott
4✓ .colt Spring,TX 77388 Quote Name:Change Order
°`Ts4,ANc t Phone:(281)353-9599 Fax:(281)353-2265
Page 1 of 6
BILL TO SHIP TO
Port Arthur,City of ` 409-983-8152 Port Arthur,City of ` 409-983-8152
Ms. Chandra Alpough, MA, CPRP Ms. Chandra Alpough, MA, CPRP 0 409-549-4077
Port Arthur-Babe Zaharias Port Arthur-Babe Zaharias
PO Box 1089 3500 Jimmy Johnson
ap@portarthurtx.gov Port Arthur,TX 77642
Port Arthur,TX 77641
Terms:
Net 30 days
QTY Code Description Size Color Unit Price Ext. Price
DISCBB Proposal includes Discount on BuyBoard Purchase,BuyBoard
Contract#679-22
View:Surfacing Plan
Date:3.5.2025
Items to Remove from 083447
-1 STRIPING $7,000.00 -$7,000.00
Additions
20443 KRAFTKOURT KraftKoat Play Deck coating,Sport court surfacing $1.81 $37,001.83
3 GSTNPERDB Tennis posts,3"tubular steel,powdercoated Black $520.00 $1,560.00
3 GSTNGSERD Heavy duty PVC ground sleeves for 3"round tennis posts,by $173.00 $519.00
Gared
3 GSTNETAUS 42'Tennis Net made from braided 3 mm polyethylene with thick $274.00 $822.00
vinyl-coated headband,by Gared
6 PIER CUTS Concrete cutting for piers,through existing 4"concrete slab. $800.00 $4,800.00
Includes capping/repairing removed cut out section of concrete,
By:Kraftsman
6 FOUND-CUST Custom Concrete Foundation $1,335.75 $8,014.50
Item Subtotal: $45,717.33
Shipping & Handling: $861.43
Discount: -$2,285.87
Equipment Subtotal: $44,292.89
Tax: $0.00
Install: $1,450.50
Total: $45,743.39
Special Terms and Conditions
Delivery and Unloading:
If Installation is purchased: Kraftsman is responsible for ensuring that adequate staff and equipment resources are
available for timely off-loading, safe handling, and secure storage of equipment upon receipt from motor freight carrier of
installed product shipments. Unloading of materials from the truck will potentially require material handling equipment, i.e.
forklift, pallet jack(s), to properly remove equipment from the delivery truck. In Most Cases when Kraftsman is installing a
project the product will be received at Kraftsman's Warehouse and stored until needed on the project. Then transported
to the site at the time of installation.
Initials
%)" B K rafts m a n QUOTE#Q84156
COMMERCIAL PLAYGROUNDS& Date:03/31/2025
KRAFTSMAN WATER PARKS Project:32329
19535 Haude Road Created By:Ryan Slott
r�. ` �4' Spring,TX 77388 Quote Name:Change Order
4TSMANv0P'`. Phone: (281)353-9599 Fax:(281)353-2265
Page 2 of 6
Installation of Surfacing and Tennis Divider Posts/Nets:
Installation quoted includes:
A. Receiving and unloading of equipment
B. Excavation of required footings
C.Assembly of tennis nets/post
D. Concrete for footings
E. Surfacing of 6 Pickleball Courts and Striping
E. All labor, tools, machinery, and equipment as necessary for installation.
Project Completion Playgrounds:
Allow 2 to 4 weeks for preparation of plans, drawings, and submittals after acceptance of proposal provided that the
following has been completed and approved by the customer:
• Project product submittals reviewed, approved and returned.
• Completed Color selection sheet(signed and dated)
• Physical project address
• All contact names and phone numbers
• Exemption certificate
• Deposit per contract
Allow adequate time for processing and procuring construction permits if required.
Allow approximately 3 to 6 weeks for project completion upon equipment delivery from manufacturer(see Lead Time
Note for ship times from manufactures), issuance of building permits if required, weather permitting.
Initials
iota
'1 s t)/`OF K rafts m a n QUOTE#Q84156
4. COMMERCIAL PLAYGROUNDS& Date:03/31/2025
KRAFTSMAN WATER PARKS Project:32329
19535 Haude Road Created By:Ryan Slott
+q✓ ` ?, Spring,TX 77388
Quote Name:Change Order
9`>sM,,Npt.0 Phone: (281)353-9599 Fax:(281)353-2265
Page 3 of 6
Lead Times Playgrounds:
Lead Times are after approval of all Initial submittals/colors (see Project Completion Note for additional information on
submittal times), and begin once the order is placed with the manufacturer.
Waterslides- lead time for waterslide to ship is 8-10 weeks
Greenfields Outdoor Fitness- lead time for items to ship is 6-8 weeks
Kay Park- lead time for items to ship is 6-8 weeks.
Superior Playground - lead time for items to ship is 5-8 business days for Quick Ship playgrounds, 2-3 weeks for musical
play equipment, 9-12 weeks for steel playgrounds, 10-13 weeks recycled plastic playgrounds, 11-14 weeks for standard
rope climbers, 11-16 weeks for custom rope climbers, 12-18 weeks for natural element, 6-8 weeks for Action Fit products
Superior Themed Playgrounds and FX Tower playgrounds- lead time for items to ship is 10-13 weeks for previously
engineered/manufactured units and 13-16 weeks for units that require engineering
Superior Site Amenities- lead time for items to ship is 5-7 days for UltraLeisure items,4-6 weeks for standard items, 6-8
weeks for steel Uptown and custom products, 10-12 weeks for Uptown Recycled products, 10-12 weeks for dog park play
equipment, 2-4 weeks for Recycled products.
Shade Canopies- lead time to ship is 6-8 weeks for standard shade canopies, 9-10 weeks for custom shade canopies,
10-14 weeks for highly custom shade canopies, 7-8 weeks for replacement shade fabric
Shade Sealed Drawings- lead time is 4-6 weeks for engineer sealed drawings
Shade Sails -the lead time for the shade columns to ship is 9-10 weeks, and 5-7 weeks to manufacture sail fabrics once
posts are installed and measurements sent to the factory.
Shelters-the lead time for engineering/drafting is 6-8 weeks, lead time for fabrication is 14-16 weeks upon drawing
approval
Themed Concepts- lead time for items to ship is 16 weeks.
YALP Interactive Play-lead time for items to ship is 16-18 weeks.
YALP Lappset Wooden Play-lead time for items to ship is 14 weeks
Items not included:
These items are not included (unless separately listed in line-items of proposal):
• Finish landscaping, sodding or seeding of disturbed areas. All disturbed areas to be leveled and raked out.
• Concrete lead walks or adjoining observation concrete deck areas.
• Excavation and Drainage of area for fall surfacing.
• Removal of existing fall surface materials.
• Storm Water Pollution Controls for project site.
• Temporary security fence during construction.
• Site usage signage for use instructions, rules, safety, or emergency notifications as needed or required.
• Shade systems or site amenities.
• Anything not specifically listed in line items of proposal.
Initials
14
0J-4 B loto Kraftsman QUOTE#Q84156
~ ^ COMMERCIAL PLAYGROUNDS& Date:03/31/2025
KRAFTSMAN WATER PARKS Project:32329
19535 Haude Road Created By:Ryan Slott
r�4✓ `�`PO4. Spring,TX 77388 Quote Name:Change Order
TSM,,No.1,1• Phone: (281)353-9599 Fax: (281)353-2265
Page 4 of 6
Sales Tax Exempt:
Sales tax is not included in prices quoted. Customer is to supply Sales Tax Exemption or Sales Tax Resale certificate at
time of acceptance of proposal, or sales tax will be added to final contract and invoicing for the project.
Buy Board:
Proposal is submitted with applicable discounts per Buy Board program to reflect established discounts.
Insurance Terms:
Kraftsman will supply a certificate of insurance verifying the limits of coverage. See terms page for details and charges
for naming additional insured parties or adding special coverage's if required.
Credit Card Terms:
If paying by American Express, there is a 6% processing fee charge. If paying by Visa or Master Card, there is a 4%
processing fee charge.
Monthly Progress Billings:
All work completed and materials stored as of the last day of the month shall be billed on or before the 25th of said
month. Payments to be received by the 15th of the following month.
Shipping Charges:
Unless noted otherwise on quote, all shipping and handling charges on quote are firm for duration of 90 days.
No Bonding Included:
No performance, or payment bonds, and/or maintenance bonds are included. These are available upon request at
additional cost for the bonds and processing.
Force Majeure:
Each Party shall be excused from liability for the failure or delay in performance of any obligation under this Agreement
(other than failure to make payment when due) by reason of any event beyond such Party's reasonable control including
but not limited to Acts of God, fire, flood, explosion, earthquake, pandemic flu, or other natural forces, governmental
orders or directives, war, civil unrest, acts of terrorism, accident, destruction or other casualty, any lack or failure of
transportation facilities, any lack or failure of supply of raw materials, or any other event similar to those enumerated
above. Such excuse from liability shall be effective only to the extent and duration of the event(s) causing the failure or
delay in performance and provided that the Party has not caused such event(s)to occur. Notice of a Party's failure or
delay in performance due to force majeure must be given to the other Party within (20) days after its occurrence has
become identified by the Party. All delivery dates under this Agreement that have been affected by force majeure shall be
tolled for the duration of such force majeure. In no event shall any Party be required to prevent or settle any labor
disturbance or dispute, or to act outside of compliance with governmental orders or directives.❑
Concealed Conditions:
If Contractor should encounter concealed conditions that were not reasonably anticipated by Contractor at the time of
execution of this Construction Agreement, Contractor shall bring the existence and nature of such concealed conditions
to the attention of Owner. If such concealed conditions prevent, preclude, or obstruct performance by Contractor of the
work herein prescribed, or burden the scope of work as herein defined by requiring additional work by Contractor to
address, correct, and/or rectify such concealed defects, then the scope of work and contract price as herein above
defined shall be adjusted in accordance with account for all courses of action necessary to address, correct, and/or rectify
such concealed conditions.
Initials
0JN B Uito K rafts m a n QUOTE#Q84156
~�^ COMMERCIAL PLAYGROUNDS& Date:03/31/2025
KRAFTSMAN WATER PARKS Project:32329
19535 Haude Road Created By:Ryan Slott
✓ `�o� Spring,TX 77388 Quote Name:Change Order
`rsMANp P Phone: (281)353-9599 Fax:(281)353-2265
Page 5 of 6
Extra Work& Deviations from Original Contract Work:
Should Owner, construction lender if any, or any public or governmental agency or inspector direct any deletion from,
modification of, or addition to the work as herein above specified, the costs of such deletion(s), modification(s), or addition
(s) shall be added to or deducted from the contract price, as herein above defined, as the circumstances dictate. Any and
all deletions from, modifications of, or additions to the scope of work prescribed by this Construction Agreement together
with the adjustment to contract price shall be made or otherwise memorialized in a writing signed by Owner and
Contractor prior to any obligation in kind or character on the part of the Contractor to recognize, honor, or adhere to such
changes.
Initials
ivN BU4O ,r, Kraftsman QUOTE#Q84156
COMMERCIAL PLAYGROUNDS& Date:03/31/2025
KRAFTSMAN WATER PARKS Project:32329
19535 Haude Road Created By:Ryan Slott
+,P✓ , �4' Spring,TX 77388 Quote Name:Change Order
QFsMgNPLP*1 Phone: (281)353-9599 Fax: (281)353-2265
Page 6 of 6
General Terms and Conditions
Bill To: Ship To:
Port Arthur, City of Port Arthur, City of
Terms:
Net 30 days
CONDITIONS OF SALE
1. Any alteration or deviation from above specifications involving extra costs will be executed only upon written orders,and will become an extra
charge over and above the contract.
2. No returns of merchandise will be accepted unless previously authorized in writing by Kraftsman.All returns are subject to restocking fee of 25%
plus freight charges incurred for return to original shipment origination.
3. Title for all equipment is reserved by Kraftsman Commercial Playgrounds and Water Parks until payment in full is received.The right to enter the
property and repossess said equipment is hereby granted to Kraftsman Commercial Playgrounds and Water Parks if payment is not rendered in
accordance with the terms above. All payments made prior to repossession under this contract shall be forfeited to Kraftsman Commercial
Playgrounds and Water Parks as cost incurred to recover the equipment. Repossession of product does not waive any damages or costs due as
awarded by the court.
4. All collections or litigation concerning this contract shall be governed by the laws of the State of Texas,with venue in Harris County.
5. Kraftsman warranties the merchandise and workmanship on this proposal to be up to the manufacturers'published standards upon receiving full
payment.See catalogs or attached drawings for specific layouts,warranties,and specifications.
6. Kraftsman reserves the right to review contract for final acceptance by management and to make corrections of clerical errors.
7. A service charge of 1.5%per month will be assessed on all past due amounts.
8. Payments to Kraftsman by credit card will incur a processing fee of 4%for Visa and MasterCard,and 6%for American Express
9. Installation services include all labor,equipment required to complete the job,and insurance coverage's as required by law. Extra installation
charges will incur for abnormal sub surfaces,ie.rock,landfill,etc. Price quoted includes Kraftsman's standard insurance coverages of$2 million
in General Liability&Completed operations,$1 million in Automobile Liability,$1 million in Workman's Compensation. Any charges by
Kraftsman's insurance carrier or agents for adding General Contractor or Owner as additional insured,waivers of subrogation,or changes to
standard coverage shall be added to contract charges. No performance and/or payment bonds shall be provided by Kraftsman,unless listed as
individual line item in proposal.
10. Kraftsman Commercial Playgrounds and Water Parks is not liable for damages to unmarked underground utilities,and irrigations systems during
installation.It is the customers responsibility to locate all underground utilities.
11. Building permits required by local or state authorities&municipalities are not included and are the responsibility of the owner of the property,
unless specifically included as a line item in the proposal. If Kraftsman is to handle required permitting,Kraftsman will provide a quote if not
included as a line item within this proposal.
12. This proposal may be withdrawn by Kraftsman if not accepted within thirty(30)days.
Respectfully Submitted
IS40.416fr
w■
March 31, 2025
Ryan Slott Date
Acceptance of Proposal:
The prices, specification and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified.
Payment will be made as outlined above. If contract is placed with an attorney for suit or collection through probate, bankruptcy or
other legal proceedings, customer agrees to pay all expenses and reasonable attorney fees incurred. Any verbal instructions,
agreements, or promises are not valid unless written as part of this contract.
Authorized Signature PO#:
Printed Name& Title Date of Acceptance
Authorized Signature
Printed Name& Title
WE STRONGLY RECOMMEND A RESILIENT FALL SURFACE BE INSTALLED UNDER ALL PLAY&FITNESS EQUIPMENT
Thank You! We Appreciate Your Business!