Loading...
HomeMy WebLinkAboutPR 24274: PORT ACRES DRAINAGE IMPROVEMENT PROJECT, CHANGE ORDER NO. 6 Orr of • ore rthu www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: April 11, 2025 To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: Pamela D. Langford,Assistant City Manager-Operations/Director of Developmental Services RE: PR No. 24274: Port Acres Drainage Improvement Project — Change Order No. 6: Relocation of a 16" Water Main for the amount of$201,667.00; Stabilize the Edge of 65th Street adjacent to the box installation for the amount of $19,180.00; and the Removal of Three Pipelines on FM 365 for the amount of$611,159.00. Project No. DR1P03A. Introduction: The intent of this Agenda Item is to seek Port Arthur City Council's approval for the City Manager to execute Change Order No. 6 with Allco,LLC,(Allco)of Beaumont,Texas,for the relocation of a 16" water main for the amount of $201,667.00; stabilize the edge of 65th Street adjacent to the box installation for the amount of$19,180.00; and the removal of three (3) pipelines on FM 365 for the amount of$611,159.00. Project No. DR1P03A. Background: Pursuant to Resolution No. 18-231, the City of Port Arthur adopted the 2018 Disaster Recovery and Resiliency Plan(DRRP)for recovery activities following Hurricane Harvey. The City of Port Arthur, as part of DRRP recovery activities, identified flood and drainage problems within the community of Port Acres that were in dire need of mitigation and repair. The Port Acres Project was let for bidding. Pursuant to Resolution No.23-485,the City of Port Arthur's City Council approved awarding the Port Acres Drainage Improvement Project to the lowest responsible bidder, which was Allco, LLC, of Beaumont, Texas, for the amount of$34,891,106.81. City staff, Arceneaux, Wilson & Cole (AWC) of Port Arthur, Texas, and Allco, LLC, of Beaumont, Texas, performed Value Engineering on the project proposal, lowering the contract price by $1,736,424.04 in order to keep it within budget. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 S:\Engineering\PUBLIC WORKS\PW-ENGINEERING\C.I.P.PROJECTS\Year 2023\DRAINAGE PROJECTS\Port Acres\Change Orders\Change Order 6\Agenda Memo Port Acres CO 6.do. Pursuant to Resolution No. 24-032, the City of Port Arthur's City Council approved Change Order No. 1,that detailed the Value Engineering Breakdown from Allco,LLC, (Allco)of Beaumont,Texas, that reduced the contract amount of$34,891,106.81 by $1,736,424.04,to the new contract amount of $33,154,682.77. The Port Acres Drainage Improvement Project encountered additional costs due to necessary relocations of existing infrastructure. These relocations are critical to ensure successful completion and to avoid conflicts with the proposed drainage improvements. The additional costs for the project are essential to achieve the project's goals and ensure durability. Given the current workload of City personnel, outsourcing these tasks is the most feasible and efficient solution. To that end, a Field Order No. 1 was issued to Allco ensuring that critical work would continue since work stoppage at this juncture would be impractical, impact safety to the community, and incur excessive costs. Field Order No. 1 informed the City Manager of the work that was required with the understanding that it would go to the Port Arthur City Council in the form of Change Order No. 2. Pursuant to Resolution No.24-302,Change Order No.2,approved by Port Arthur's City Council,was submitted by Allco for the relocation of the sanitary sewer services and sewer main, and the addition of eighteen (18) calendar days. Change Order No. 2 increased the contract amount by $159,385.00 from$33,154,682.77 to the new contract amount of$33,314,067.77. Additionally,Change Order No. 2 added eighteen(18) calendar days amending the original completion date of June 25, 2025 to the new completion date of July 13, 2025. Pursuant to Resolution No.24-339,Change Order No.3,approved by Port Arthur's City Council,was submitted by Allco for the installation of a sanitary sewer main on 64 ' Street,the addition of fifteen (15)calendar days and the addition of 150 LF of water line relocations for the amount of$196,037.00. Change Order No. 3 also increased the contract amount of$33,314,067.77 by$196,037.00 to the new contract amount of$33,510,104.77. Additionally, Change Order No. 3 added fifteen (15) calendar days to the original contract completion date of July 13, 2025, changing it to the new contract completion date of July 28, 2025. Pursuant to Resolution No.24-512,Change Order No.4,approved by Port Arthur's City Council was submitted by Allco for the relocation of a water lateral and replacing a fire hydrant,adding corrugated pipe,reduction in linear footage of RCB,relocating sanitary sewer service,and the addition of a storm conflict structure, for the amount of $55,790.42, changing the previous contract amount of $33,510,104.77 to the new contract amount of$33,565,895.19. It was necessary to issue a Field Order to perform the work in order to keep the project safe and on schedule. To that end, an Emergency Letter, dated October 25, 2024, was submitted to the City Manager approving the Field Order with the change order subsequently going before Council. Additionally, Change Order No. 4 added fifteen (15) calendar days to accommodate the additional work performed by the Field Order, changing the previous contract completion date of July 28, 2025 to the new contract completion date of August 12,2025. Pursuant to PR No. 23969, Change Order No. 5 is being submitted for approval by Allco for the addition of four hundred fifty-five(455)calendar days to the project's originally scheduled reduction of days, utility relocation delays, and weather related delays that were beyond control according to "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 contract guidelines in Section F—General Conditions,Article 54.Time for Completion and Liquidated Damages-Item"d"(Pages F 21-22). Change Order No. 5 also proposes to change the original contract completion date of August 12, 2025 to the new contract completion date of November 9, 2026. It was discovered during the course of construction of the project that there was an immediate need to perform work in order to ensure the successful completion of the work and keep the project on schedule. A Field Order was issued for the relocation of a 16"water main to the north side of FM 365 and the stabilization of the edge of 65th Street adjacent to a box installation. The Field Order was accepted, approved and signed by the City Manager with the understanding that it would be presented at the next Council Meeting for approval of this authorization. This work is included in Change Order No. 6. Change Order No. 6 is being submitted by Allco for the relocation of the 16"water main to the north side of Highway 365 for the amount of$201,667.00. This pricing includes 460 LF of C900 PVC pipe, two 16" gate valves, one 10" gate valve, associated fittings, and labor. Additionally, Change Order No. 6 includes stabilization of the edge of 65th Street adjacent to the box installation for the amount of$19,180.00. This pricing includes 500 LF of stabilized sand 1'-6" Wide by 4'-0" Deep, material, labor and equipment. Lastly, Change Order No. 6 includes the removal of three pipelines discovered during construction for the amount of$611,159.00. These pipelines are located on FM 365 between the Drainage District 7 (DD7) drainage canal and Garnet Avenue. These pipelines were not marked and there was no signage indicating their existence. Failure to remove them poses a significant obstacle to the planned drainage improvements for this project. Change Order No. 6 proposes to increase the contract amount of $33,565,895.19 by $832,006.00 to the new contract amount of $34,397,901.19. Budget Impact: Funds are available in Drainage System Account No.307-21-055-8515-00-10-000 pending approval of Budget Amendment No. 7329. Project No. DR1P03A. Recommendation: It is recommended that the City of Port Arthur's City Council approve PR No. 24274, authorizing the City Manager to accept Change Order No. 6 from Allco,LLC,of Beaumont, Texas, for the relocation of a 16" water main for the amount of$201,667.00; stabilize the edge of 65th Street adjacent to the box installation for the amount of$19,180.00; and the removal of three (3)pipelines on FM 365 for the amount of$611,159.00 increasing the contract amount of$33,565,895.19 by $832,006.00 to the new contract amount of$34,397,901.19. Project No. DR1P03A. "Remember.we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 PR No. 24274 4/11/20255 mje Page 1 of 6 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 6 TO THE CONTRACT BETWEEN THE CITY OF PORT ARTHUR AND ALLCO, LLC, OF BEAUMONT, TEXAS, FOR THE PORT ACRES DRAINAGE IMPROVEMENT PROJECT, TO RELOCATE A 16"WATER MAIN; STABILIZE THE EDGE OF 65TH STREET, AND REMOVE THREE PIPELINES ON FM 365, INCREASING THE CONTRACT BY $832,006.00 TO THE NEW CONTRACT AMOUNT OF $34,397,901.19. FUNDING IS AVAILABLE IN THE DRAINAGE SYSTEM ACCOUNT 307-21-055-8515-00-10-000. PROJECT NO. DR1P03A. WHEREAS, pursuant to Resolution No. 18-231, the City of Port Arthur (City) adopted the 2018 Disaster Recovery and Resiliency Plan (DRRP) for recovery activities following Hurricane Harvey; and, WHEREAS, the DRRP included mitigation planning and investment in infrastructure to rebuild/repair streets, utilities, public facilities, water, sewer, and drainage; and, WHEREAS, the community of Port Acres was selected as an area that has experienced significant flooding due to rain events, flash flooding and drainage related issues; and, WHEREAS, pursuant to Resolution No. 20-023, the engineering firm of Arceneaux, Wilson & Cole, LLC (AWC) of Port Arthur, Texas, was approved to provide a master drainage plan, provide design specifications, and provide construction management services for the Port Acres Drainage Project; and, WHEREAS, the Port Acres Drainage Improvement Project was let for bidding with Allco, LLC, of Beaumont, Texas, being the lowest qualified bidder for $34,891,106.81; and, WHEREAS, pursuant to Resolution No. 23-485, the City of Port Arthur's City Council approved awarding the Port Acres Drainage Improvement Project to Allco, LLC, (Allco) of Beaumont, Texas; and, :..\Users\htran\AppData\Local\Microso' Boa-6a0e33d-dod7-41c9-ba60c37a3731639fd1c1a6a67efde61fa5d7Sb8de27aacba729e02413ea4d47106747ddc2e321c90\PR 24274 Port Acres CO 6.doca PR No.24274 4/11/2025 mje Page 2 of 6 WHEREAS, pursuant to Resolution No. 24-032, the City of Port Arthur's City Council approved Change Order No. 1 for the performance of value engineering by City staff, AWC, and Allco, LLC, of Beaumont, Texas, decreasing the contract amount of $34,891,106.81 by $1,736,424.04 to the new contract amount of $33,154,682.77; and, WHEREAS, pursuant to Resolution No. 24-302, the City of Port Arthur's City Council approved Change Order No. 2 for the relocation of the sanitary sewer services and sewer main; increased the contract amount by $159,385.00 from $33,154,682.77 to the new contract amount of $33,314,067.77 and added eighteen (18) calendar days amending the original completion date of June 25, 2025 to the new completion date of July 13, 2025; and, WHEREAS, pursuant to Resolution No. 24-339, Change Order No. 3, approved by Port Arthur's City Council, was submitted by Allco, LLC, for the installation of a sanitary sewer main on 64th Street, the addition of fifteen (15) calendar days and the addition of 150 LF of water line relocations for the amount of $196,037.00; and, WHEREAS, Change Order No. 3 also increased the contract amount of $33,314,067.77 by $196,037.00 to the new contract amount of $33,510,104.77 and added fifteen (15) calendar days to the original contract completion date of July 13, 2025, changing it to the new contract completion date of July 28, 2025; and, WHEREAS, pursuant to Resolution No. 24-512, Change Order No. 4, approved by Port Arthur's City Council, was submitted by AlIco, LLC, of Beaumont, Texas, for the relocation of a water lateral and replacing a fire hydrant, adding corrugated pipe, reduction in linear footage of RCB, relocating a sanitary sewer service, and the addition of a storm conflict structure, for the amount of $55,790.42 changing the previous contract amount of $33,510,104.77 to the new contract amount of $33,565,895.19; and, PR No. 24274 4/11/20255 mje Page 3 of 6 WHEREAS, a Field Order was issued addressing revisions to the drainage project to keep the project safe and on schedule; and, WHEREAS, an Emergency Letter dated October 25, 2024, addressing the Field Order was prepared, submitted to, and approved by the City Manager with the change order subsequently going before Council; and, WHEREAS, the Port Acres Drainage Improvement Project, to date, has encountered several delays which warrants an extension of time to ensure drainage improvements are completed effectively to benefit the residents of Port Acres and the City of Port Arthur, as a whole; and, WHEREAS, to that end, pursuant to PR No. 23969, Change Order No. 5, was submitted previously by Allco, to add four hundred fifty-five (455) calendar days to the original contract completion date of August 12, 2025 changing it to the new contract completion date of November 9, 2026, approval is pending; and, WHEREAS, it was discovered during construction that immediate work needed to be performed to ensure the successful and safe completion of work, so a Field Order was created and submitted to the City Manager for approval; and, WHEREAS, the Field Order was accepted, approved, and signed by the City Manager with the understanding that the work it covered would be presented at the next Council Meeting under Change Order No. 6, See Exhibit A; and, WHEREAS, Change Order No. 6 is being submitted by Allco for the relocation of the 16" water main to the north side of Highway 365 for the amount of $201,667.00 that includes 460 LF of C900 PVC pipe, two 16" gate valves, one 10" gate valve, associated fittings, and labor, see Exhibit B; and, S:\Engineering\PUBLIC WORKS\PW-ENGINEE RING\C.I.P.PROJECTS\Year 2023\DRAINAGE PROJECTS\Port Acres\Change Orders\Change Order 6\PR 24274 Port Acres CO 6.d000 PR No.24274 4/11/2025 mje Page 4 of 6 WHEREAS, Change Order No. 6 also includes stabilization of the edge of 65th Street adjacent to the box installation for the amount of $19,180.00 which includes 500 LF of stabilized sand 1'-6" Wide by 4'-0" Deep, material, labor and equipment, see Exhibit C; and, WHEREAS, Change Order No. 6 additionally includes the removal of three pipelines discovered during construction for the amount of $611,159.00 that are located on FM 365 between the Drainage District 7 (DD7) drainage canal and Garnet Avenue and must be removed as it poses a significant obstacle to the planned drainage improvements for this project, see Exhibit D; and, WHEREAS, Change Order No. 6 proposes to increase the contract amount of $33,565,895.19 by $832,006.00 to the new contract amount of $34,397,901,19; and, WHEREAS, approval of PR No. 24274 for Change Order No. 6 is herein deemed an appropriate action; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the facts and opinions in the preamble are true and correct; and, THAT, Change Order No. 6 is herein approved and the City Manager is hereby authorized to execute said Change Order No. 6 to the contract between the City of Port Arthur and Allco, LLC, of Beaumont, Texas; and, THAT, Change Order No. 6 is being submitted by Alico for the relocation of the 16"water main to the north side of Highway 365 for the amount of $201,667.00 that includes 460 LF of C900 PVC pipe, two 16" gate valves, one 10" gate valve, associated fittings, and labor; and, THAT, Change Order No. 6 also includes stabilization of the edge of 65th Street adjacent to the box installation for the amount of $19,180.00 which includes 500 LF of stabilized sand 1'- 6" Wide by 4'-0" Deep, material, labor and equipment; and, PR No.24274 4/11/20255 mje Page 5 of 6 THAT, Change Order No. 6 additionally includes the removal of three pipelines discovered during construction for the amount of $611,159.00, that are located on FM 365 between the Drainage District 7 (DD7) drainage canal and Garnet Avenue and must be removed as it poses a significant obstacle to the planned drainage improvements for this project; and, THAT, Change Order No. 6 proposes to increase the contract amount of $33,565,895.19 by $832,006.00 to the new contract amount of $34,397,901.19; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2025, at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Thurman Bill Bartie Mayor ATTEST: Sherri Bellard City Secretary S:\Engineering\PUBLIC WORKS\PW-ENGINEERING\C.I.P.PROJECTS\Year 2023\DRAINAGE PROJECTS\Port Acres\Change Orders\Change Order 6\PR 24274 Port Acres CO 6.docx PR No.24274 4/11/2025 mje Page 6 of 6 APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: 1 Roxann Pais Cotroneo, Esquire Ron :urto ro City Attorney City Ma -r APPROVED AS FOR AVAILABILITY OF FUNDS: ,� '� PO liDeatt --Th,)6) Lynda (Lyn) Boswell, MA, ICMA-CM Director of Finance 4)6iim 4 0 Lia-\41:12 John Cannatella, PE ( 00 behalf 0-P) City Engineer . LJ Clifton Williams, CPPB Purchasing Manager EXHIBIT A art Artur 7iru1 vA-w\,,t,1.°C r t t.r FIELD ORDER Date: April 10, 2025 To: Ron Burton, City Manager From: Engineering Division RE: Port Acres Drainage Improvement Project;Project No.DR1P03A—Relocate 16" Water Main to north side of Highway 365; and Stabilize the edge of 65th Street adjacent to box installation. Pursuant to Resolution No.18-231, the City of Port Arthur adopted the 2018 Disaster Recovery and Resiliency Plan (DRRP) for recovery activities following Hurricane Harvey. The City of Port Arthur, as part of the DRRP recovery activities, identified flood and drainage problems within the community of Port Acres. Pursuant to Resolution 23-485,the City of Port Arthur entered into an agreement will Allco,LLC(Allco)of Beaumont, Texas, for the Port Acres Drainage Improvement Project. Arceneaux, Wilson & Cole, LLC (AWC), who is providing professional engineering services for the project, has submitted a proposal from Allco for the relocation of a 16" water main to the north side of Highway 365. Additionally, pricing has been submitted regarding stabilizing the edge of 65th Street adjacent to box installation. Due to the uncertainty of scope,this task has been priced at $38.36 per linear foot which includes material, labor and equipment. Both submissions are attached. These revisions, in the form of a Field Order, are in need of immediate execution in order to ensure the successful completion of the work and keep the project on schedule.This Field Order increases the project by$201,667.00 for the water main and the completed price of the stabilization on 65th Street upon its completion. A change order in the form of a resolution will be sent to the upcoming City Council meeting for the ratification of this authorization. Funding is available in the Drainage System Account No. 307-21-055- 8515-00-10-000.Project No.DR1PO3A. I, Ronald Burton, approve the additional costs associated with implementing this Field Order for the Port Acres Drainage Improvement Project. Signed: Ronald Burton, t nager Attachments—(1)Wate ain;(2)65th Street -Rem ent her.'se are here to serve the Citizens of Port Artliair" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 I r4414,_ P7 P,LI( 114IEc}.,5 P11—,_t,I:.L i ,4(:C !1 i l i, c+t_ I'f' I.4_i ". cr Attachment 1 DESIGN BUILD ,, CONSTRUCTION LIANAz nFS GENERAL CONTRACTI514 111.1. P.O.Box 3684, Beaumont,Texas 77704 Phone:409-860-4459 Fax:409-860-3857 Email: allco@allco.com April 1, 2025 Attn: Marc Ochoa,PE Arceneaux Wilson&Cole LLC 3120 Central Mall Drive Port Arthur,Texas 77642 Transmitted via email to: Ma►ti.{)chow til__awceng.com Re: Port Acres Drainage Project—City of Port Arthur Dear Marc: Please fmd below, pricing to relocate the 16"water main to the north side of Highway 365. This pricing includes 460 LF of C900 PVC pipe,two 16"gate valves,one 10"gate valve and associated fittings. A breakdown is as follows: Material $ 66,584.00 Labor 39,900.00 Payroll taxes 20,748.00 Equipment 48,131.00 $ 175,363.00 Overhead&Profit 26,304.00 $ 201,667.00 If this is acceptable,please issue a change order to our contract. Sincerely, Keith Burrell Attachment 2 DESIGN BUILD C NSTRUCTION MA f GENERAL CONTRACTORlbw L P.O. Box 3684, Beaumont, Texas 77704 Phone: 409-860-4459 Fax:409-860-3857 Email: allco@allco.com April 1, 2025 Attn: Marc Ochoa,PE Arceneaux Wilson&Cole LLC 3120 Central Mall Drive Port Arthur,Texas 77642 Transmitted via email to: Marc.Ochoau',awcentu.coni Re: Port Acres Drainage Project—City of Port Arthur Dear Marc: Please find below, pricing to stabilize the edge of 65th Street adjacent to the box installation. We figured stabilized sand 1'-6" wide by 4'-0" deep. Due to the uncertainty of scope of this stabilization,we have priced this work by the linear foot. Our price including material, labor and equipment for this work, is Thirty-Eight Dollars and Thirty-Six Cents per linear foot($38.36.00/LF). If this is acceptable, please issue a change order to our contract. Sincerely, Keith Burrell EXHIBIT B Attachment 1 t _ �+Ali, , 9,0,,,, — Lt.." DESIGN 8U1LD , CONSTRUCTION MANAGEMENT ....,r-N------- .__._.__ _ GENERAL CONTRACTOR P. O. Box 3684. Beaumont,Texas 77704 Phone: 409-860-4459 Fax: 409-860-3857 Email: allco@allco.com April 1. 2025 Attn: Marc Ochoa, PE Arceneaux Wilson& Cole LLC 3120 Central Mall Drive Port Arthur,Texas 77642 Transmitted via email to: Marc.Ochoawawceng.com Re: Port Acres Drainage Project—City of Port Arthur Dear Marc: Please find below, pricing to relocate the 16" water main to the north side of Highway 365. This pricing includes 460 LF of C900 PVC pipe,two 16"gate valves,one 10"gate valve and associated fittings. A breakdown is as follows: Material $ 66,584.00 Labor 39,900.00 Payroll taxes 20,748.00 Equipment 48,131.00 $ 175,363.00 Overhead&Profit 26,304.00 $ 201,667.00 If this is acceptable,please issue a change order to our contract. Sincerely, Keith Burrell EXHIBIT C ll DESIGN BUILD CONSTRUCTION MANAGEMENT GENERAL CONTRACTOR P. O. Box 3684, Beaumont, Texas 77704 Phone: 409-860-4459 Fax: 409-860-3857 Email: allco@allco.com April 1,2025 Attn: Marc Ochoa,PE Arceneaux Wilson& Cole LLC 3120 Central Mall Drive Port Arthur,Texas 77642 Transmitted via email to: Marc.Ochoa(a,,awceng.com Re: Port Acres Drainage Project—City of Port Arthur Dear Marc: Please find below,pricing to stabilize the edge of 65th Street adjacent to the box installation. We figured stabilized sand 1'-6" wide by 4'-0" deep. Due to the uncertainty of scope of this stabilization,we hake priced this work by the linear foot. Our price including material, labor and equipment for this work, is Thirty-Eight Dollars and Thirty-Six Cents per linear foot ($38.36.00/LF). If this is acceptable,please issue a change order to our contract. Sincerely, Keith Burrell EXHIBIT D *Ale cow VIA" ARCENEAUX WILSON&COLE engineering!surveying I planning MEMORANDUM Date: March 5, 2025 To: City of Port Arthur From: Marc A. Ochoa, PE /Senior Project Manager Project: Port Acres Subdivision Drainage Improvements Subject: Pipeline Removal along FM 365 Overview: This memo is to provide information to justify the additional project costs associated with the removal of three pipelines discovered during the construction of the Port Acres Drainage Improvement project.The discovery of these pipelines required additional work beyond the original project scope, resulting in increased labor, equipment usage, and disposal costs. Background: The construction contract with ALLCO, LLC, was based on the assumption that no such obstructions were present within the project area. During the design phase,AWC requested utility locations for the project site and there were no markings or signs that these pipelines existed. However, upon excavation, three pipelines were encountered that posed a significant obstacle to the planned drainage improvements. Pipeline Removal Execution: To ensure the safe and efficient continuation of the project, it was necessary to: 1. Assess and Identify the Pipelines- Determine ownership, content, and potential hazards. 2. Coordinate with Relevant Authorities-Secure permissions and approvals for removal. 3. Perform Safe Extraction and Disposal- Implement safety measures and specialized techniques to remove the pipelines without impacting adjacent infrastructure. 4. Mitigate Construction Delays-Adjust project timelines and reallocate resources to minimize the overall impact on the schedule. 409 724.7888 3120 Central Mall Drive Port Arthur,TX 77642 Engineering Surveying awceng.com F-16194 10194049 *Ili awn wAir Payment for Pipeline Removal: The estimated cost for removing an unknown amount of the three pipelines located on FM 365 between DD7's drainage canal and Garnet Avenue is approximately$611,159.00. Given these circumstances, the additional cost incurred is necessary to maintain project integrity and ensure compliance with regulatory requirements.ALLCO, LLC, has provided a detailed cost breakdown,which includes labor, equipment, and material expenses directly related to pipeline removal. This cost is an unavoidable expenditure required to complete the project in accordance with safety and engineering standards. Below is the breakdown of the cost: 4" Pipeline Removal -* $67.69/LF* 3,900 LF (estimated) = $263,991.00 6" Pipeline Removal -* $77.32/LF* 1,900 LF (estimated) = $146,908.00 10" Pipeline Removal -* $105.40/LF* 1,900 LF (estimated) = $200,260.00 Conclusion: We appreciate your consideration of this request for additional funding. If you require further clarification or supporting documentation, please do not hesitate to contact me. Thank you for your time and attention to this matter. Best Regards, Marc A. Ochoa, PE Senior Project Manager I.( DESIGN BUILD A CONSTRUCTION MANAGEMENT GENERAL CONTRACTOR P. O. Box 3684, Beaumont, Texas 77704 Phone: 409-860-4459 Fax: 409-860-3857 Email: allco@allco.com February 19, 2025 Attn: Marc Ochoa,PE Arceneaux Wilson & Cole LLC 3120 Central Mall Drive Port Arthur,Texas 77642 Transmitted via email to: Marc.Ochoa@awceng.com Re: Port Acres Drainage Project—City of Port Arthur Dear Marc: Please find below,pricing for removal of steel pipelines in the Hwy. 365 right-of-way which were not shown on the plans. These lines have been tested and found to have an asbestos coating,so an asbestos abatement contractor will need to be involved in the removal. In addition,an environmental consultant will be needed for air monitoring during removal. Since the length of these lines is unknown, our pricing is per linear foot. We have broken down the pricing to the different sizes,based on what has been found. 10" pipeline HES Consulting/air monitoring $ 10.24/LF Sitek/Omni Asbestos Abatement/Disposal $ 48.30/LF ALLCO Removal/Handling $ 47.00/LF $ 105.40/LF 6" pipeline HES Consulting/air monitoring $ 7.02/LF Sitek/Omni Asbestos Abatement/Disposal $ 36.80/LF ALLCO Removal/Handling $ 33.50/LF $ 77.32/LF February 19, 2025 Mr. Marc Ochoa,PE Page 2 4" pipeline HES Consulting/air monitoring $ 6.33/LF Sitek/Omni Asbestos Abatement/Disposal $ 32.20/LF ALLCO Removal/Handling $ 29.16/LF $ 67.69/LF We are assuming these lines are decommissioned, so this work is not included. I talked with Drainage District No.7,who had several pipelines decommissioned due their work at the hurricane levee. We believe these lines are part of that scope of work,however we are still investigating. If you have any questions,please let me know. Sincerely, Keith Burrell