INTEROFFICE MEMORANDUM
Date: May 9, 2025
To: The Honorable Mayor and City Council
Through: Ronald Burton, C.P.M., City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: P.R. No. 24315—Purchase and Installation of a New Hoist and Trolley System
For Water Purification Plant Chlorine Storage Building.
Introduction:
The intent of this Agenda Item is to seek City Council's approval to authorize the City Manager
to approve the purchase and installation of the new hoist and trolley system from lowest bidder,
Ace Industries Crane & Hoist of Houston, Texas with a total projected budgetary impact of
$34,112.87.
Backvround:
The hoist and trolley system at the Water Purification Plant is routinely used to lift and move
chlorine tanks and cylinders within the Chlorine Storage Building. The system has suffered
from mechanical wear over time due to regular use, leading to the deterioration of components
such as gears, chains,brakes,and wheels,thereby compromising its reliability and raising safety
concerns
Three vendors were selected for quotes to supply and install the hoist and trolley and ACE
Industries submitted the lowest quote for the total amount of$34,112.87.
Budget Impact:
The hoist equipment and installation to be purchased have a total projected budgetary impact of
$34,112.87. Funds are available in Account No. 405-40-000-8522-00-00-000, Equipment
Maintenance.
Recommendation:
It is recommended that City Council approve P.R. No. 24315 authorizing the City Manager to
purchase and install the hoist and trolley system as discussed and/or outlined above.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
PR No. 24315
04/29/25 es
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO PURCHASE A NEW HOIST AND TROLLEY SYSTEM
FOR THE WATER PURIFICATION PLANT FROM ACE
INDUSTRIES CRANE & HOIST OF HOUSTON, TEXAS,
WITH A TOTAL PROJECTED BUDGETARY IMPACT OF
$34,112.87; FUNDS ARE AVAILABLE IN WATER
UTILITIES NO. 405-40-000-8522-00-00-000 (EQUIPMENT
MAINTENANCE).
WHEREAS, the current hoist and trolley system at the Water Purification Plant is
routinely used to lift and move heavy chlorine tanks and cylinders within the Chlorine Storage
Building; and
WHEREAS,the system has suffered from mechanical wear over time due to regular use,
leading to the deterioration of the gears, chains, brakes, and wheels, reducing the system's
reliability and creating safety concerns; and
WHEREAS, three vendors were solicited for quotes for the supply and installation of a
new hoist and trolley system,with Ace Industries Crane&Hoist of Houston,Texas submitting the
lowest quote in the total amount of$34,112.87, as detailed in the attached Exhibit"A"; and
WHEREAS,Water Utilities recommend that the City Council authorize the City Manager
to approve the purchase and installation of the new hoist and trolley system from lowest bidder,
Ace Industries Crane & Hoist.
NOW THEREFORE,BE IT RESOLVED BY CITY COUNCIL OF CITY OF PORT
ARTHUR,TEXAS:
THAT,the facts and opinions in the preamble are true and correct; and,
PR No. 24315
04/29/25 cs
Page 2 of 3
THAT, the City Council hereby authorizes the City Manager to purchase the new hoist
and trolley system with installation from Ace Industries Crane & Hoist of Houston, Texas with a
total projected budgetary impact of$34,112.87, as delineated in Exhibit"B"; and,
THAT, funding for this equipment is available in Account No. 405-40-000-8522-00-00-
000, Equipment Maintenance; and,
THAT,a copy of the caption of this resolution be spread upon the minutes of City Council.
READ, ADOPTED, AND APPROVED THIS day of
2025 at a Regular Meeting of City Council of the City of Port Arthur, Texas, by the following
vote:
AYES: Mayor
Councilmembers:
NOES:
CITY OF PORT ARTHUR:
Thurman"Bill" Bartie
Mayor
ATTEST: APPROVED AS TO FORM:
Sherri Bellard Roxann Pais Cotroneo
City Secretary City Attorney
PR No. 24315
04/29/25 es
Page 3 of 3
APPROVED FOR ADMINISTRATION:
OtY°
bin .\A?1 ,(://5://4.4:1
Ronald Burtonir7 7 Calvin Matthews, P.E.
City Manager Water Utilities Director
APPROVED AS TO AVAILABILITY OF
FUNDS:
ir&,
Lyn a Boswell, A, ICMA-CM Clifton Williams, CPPB
Finance Director Purchasing Manager
EXHIBIT "A"
(Bid Tabulation)
P
z
o y z AI
x d
n
g°
H *V
7.
`e °z x
0
0
= n
a "
a „-
to O o p
6to La CD VI
.11
w C n ke bd b
t y C o: C
N O E.
cn IV tnil
gig s•
• rn ) )
2
to
oo = o.
c 0
b
.r
0
n
CD tml
5' o-, d
0
y y
cA
EXHIBIT "B"
(Quote)
4 ACE INDUSTRIES (800)733-2231
CRANE & HOIST ACEINDUSTRIES.COM
May 30, 2025
Garrett Elizondo
City of Port Arthur
1101 H.O. Mills Blvd.
Port Arthur,Texas 77640
Re: Monorail Upgrade
Quote#SDB-City_of_Port_Arthur-Monorail-05-30-2025
Thank you for the opportunity to quote the 3-ton curved monorail upgrade.We have reviewed your
request for proposal and respectfully submit this bid package for review.
Ace was founded in 1932 and specializes in custom overhead bridge crane applications, as well as
aftermarket service and inspections for cranes. Our experience with overhead material handling makes
Ace uniquely qualified to perform the requirements of this project. This experience manifests itself by
ensuring that the crane portion of this project is done correctly,efficiently and within budget.
Again, we appreciate the opportunity to provide this proposal package for your review. Please do not
hesitate to contact me with any questions.
Sincerely,
ShaMn.D. BrandevtIntrg,
Shawn D. Brandenburg
Branch Manager-Houston
shawn.brandenburg@aceindustries.com
281.380.8338
5)CMAR certified Bmamma
'47-541Q ACE INDUSTRIES (800)733-2231
CRANE 8 HOIST ACEINDUSTRIES.COM
Investment Summary
Item Description Tax&Freight Total
1 Labor:Install VAHLE bar/hoist w/MTZ trolley Not Included $ 5,620.25
2 VAHLE enclosed track(curved application) Not Included $ 5,840.23
3 3-ton Yale Y80 wire rope hoist and trolley Not Included $ 22,652.38
4 Not included $
Load weights and freight
5 Not Included $
Ace lift PER DAY-WAIVED
$ 34,112.87
Additional Summary
• Customer to provide free and clear access to equipment.
• Ace to provide rental equipment
• Will require 2 technicians/2 10-hour days
Quote Validity
• All quotes are valid for ten (10) business days from the date of issuance. Orders placed after the ten
(10)day window may be subject to pricing increases.
Terms&Conditions:
Delivery: Equipment Delivery: 75 working days.
Tax: Not Included
Freight: Not included
Payment: 30%Down
40% Due Before Shipping of Materials
Balance Due Net 30 after Completion
*All orders subject to Ace Industries Standard Terms and Conditions
4anaff certified
n.wa.w.cna ��rare « �
YOG.+OMauIGAn,rG YY u
'—'474QACE INDUSTRIES (800)733-2231
CRANE 8 HOIST ACEINDUSTRIES.COM
Standard Terms and Conditions:
• Warranty:One (1)year Ace Industries STANDARD WARRANTY.
• All pipes, fights, structures, etc.that obstruct the crane and/or runway path shall be removed by the
customer prior to installation.
• Ace Industries will work to complete this job during normal business hours,unless otherwise
specified in this quote. Installation is based on work performed during regular straight time hours,
8AM to 4PM, Monday through Friday.Work delayed by inability to freely access site or request for
non-standard work hours shall result in additional charges.
• If electrical service is not available when installation is completed and a return trip is required to
start up and test the crane,the trip will be invoiced at standard service rates plus mileage and per
diem if required.
• Customer shall maintain a safe work area around work site during installation of cranes and
runways.
• Customer to supply main line power with junction box and a fused and lockable floor mounted
disconnect to each runway system within 3'of the location of the conductor bar.
• Field Check: If requested,Ace Industries will perform a field check of any existing columns and
runway systems to verify clearances at an additional charge.
• Drawings: Ace Industries shall provide clearance approval drawings for cranes, runways and other
equipment. Fabrication will not commence until signed copies of all approval drawings are received.
• Customer shall be held responsible for existing building footers,foundation loads, and pre-existing
runway systems.
• Footers, if required,to be provided by others and are not included in this proposal.
• If footers are required and requested by Customer,Ace Industries can provide our standard isolated
footer at an additional cost.
• Customer shall be responsible for verifying the adequacy of the subgrade to support the loads
indicated in the approval drawings and quote.
• Any associated costs, including in-situ tests, laboratory tests, etc.,are the responsibility of the
Customer.
• Customers supplying lifts and/or mobile equipment shall be held liable for the appropriate
capacities and safety of all supplied equipment.
• A down payment is required with a purchase order. Approval drawings will be sent within 10
working days of receipt of purchase order. Upon receipt of down payment and signed approval
drawing(s),Ace will schedule all manufacturing required. Manufacturing will not commence
without receipt of down payment.
• Cancellations or Returns:All products included on this quote are considered custom and are not
returnable. Any orders cancelled prior to order completion will be subject to a cancellation charge
including all costs incurred up to the point of cancellation.
• All orders become effective upon acceptance at the corporate headquarters of Ace Industries. All
quoted prices expire thirty(30)days from the quote date. No quotation is effective unless signed by
an authorized representative of Ace Industries, Inc. No modifications or additional conditions,
whether written or oral,will be binding on Ace Industries, Inc. unless agreed to in writing and signed
by an authorized representative of Ace Industries, Inc.
• All of the information contained in this proposal is confidential and has been prepared for your
exclusive use in considering the purchase of the equipment described herein. Transmission of any
part of this information or use for other reasons than those described above is prohibited without
written consent from Ace Industries, Inc.