INTEROFFICE MEMORANDUM
Date: July 30, 2025
To: The Honorable Mayor and City Council
Through: Ronald Burton CPM, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: PR No. 24459—Authorize City Manager to Participate in the TWDB FY2022
Drinking Water State Revolving Fund—Water Line Replacement Program
Application
Introduction:
This Agenda Item intends to seek the Council's approval to submit an application to the Texas
Water Development Board's (TWDB) State Fiscal Year (SFY) 2022 Drinking Water State
Revolving Fund (DWSRF) for the Water Line Replacement Project.
Background:
The City's water distribution system is approximately 70% old cast iron pipes and asbestos
cement pipes. Replacing deteriorated water lines with adequately sized pipes and with new PVC
material will increase pressure, decrease the color water issues, and reduce the number of leaks
throughout the distribution system. The City is eligible to apply for grant funds from the TWDB
— DWSRF Funding Program for $16,500,520 for the Design/Construction of the Water Line
Replacement Project, which was first designed in 2019. The City must submit the complete
application to TWDB by August 26,2025.
Budget Impact:
The project is eligible for $16,500,520 TWDB funding. The project has been identified as
eligible for principal forgiveness.However,principal forgiveness is subject to the availability of
funds. The loan portion of the financial assistance must include the 2%loan origination fee. The
funding appropriation will be required upon award.
Recommendation:
It is recommended that the City Council approve PR No. 24459, authorizing the City Manager
to submit the application for grant funding as discussed and/or outlined above.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
PR No. 24459
7/30/2025 JL
Page 1 of 3
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER
TO SUBMIT A GRANT APPLICATION TO THE TEXAS
WATER DEVELOPMENT BOARD'S (TWDB) STATE
FISCAL YEAR (SFY) 2022 DRINKING WATER STATE
REVOLVING FUND (DWSRF) FOR THE POSSIBLE
GRANT AWARD OF $16,500,520.00 FOR THE WATER
LINE REPLACEMENT PROJECT; FUNDING
APPROPRIATION IS REQUIRED ONCE THIS
APPLICATION IS SELECTED FOR AWARD.
WHEREAS, the City of Port Arthur continually seeks funding opportunities to improve
the safety and integrity of its water and sanitary sewer lines, utilities and critical infrastructure for
its citizens; and,
WHEREAS,the City has been applying for grant funds from the TWDB—Drinking Water
State Revolving Fund(DWSRF) for over several years; and,
WHEREAS, pursuant to Resolution 20-057, the City's Utilities Department staff, in
collaboration with Arceneaux Wilson & Cole, LLC, completed the design plans for a proposed
Water Line Replacement Project and submitted an application seeking DWSRF funding for the
improvement project; and
WHEREAS, in 2022, the City's Utilities Department staff, in collaboration with
Arceneaux Wilson& Cole,LLC, completed the technical portion of the application, including the
Project Information Form(attached hereto as Exhibit"B"); and
WHEREAS, the City's Water Line Replacement Project was not initially selected for
funding because it did not rank high enough, due to limited funds, strong competition, and the
Texas Water Development Board's focus on projects with more urgent health, safety, or
environmental needs; and
WHEREAS, on June 26, 2025, the City received a formal invitation to submit an
application for funding(Exhibit A)for its Water Line Replacement Project,originally designed in
2019, which is now deemed eligible to receive funding for the project cost of$16,500,520.00,
including potential principal forgiveness, subject to the availability of funds; and,
WHEREAS, in accordance with Section V(2) of the SFY 2022 Intended Use Plan, any
loan portion of the financial assistance will require the inclusion of a 2%loan origination fee; and,
WHEREAS, a funding appropriation will be required if application is selected for award.
PR No. 24459
7/30/2025 JL
Page 2 of 3
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR,TEXAS:
THAT, the facts and opinions in the preamble are true and correct; and,
THAT, the City Manager is hereby authorized to submit the complete application
document, in substantially the same form as referenced in Exhibit "B", for Texas Water
Development Board's (TWDB) State Fiscal Year (SFY) 2022 Drinking Water State Revolving
Fund (DWSRF) for the Water Line Replacement Project, with an application deadline of August
26, 2025; and
THAT, upon award of the application, the City shall be responsible for the 2% loan
origination fee in accordance with Section V (2) of the SFY 2022 Intended Use Plan.
THAT, a funding appropriation will be required if application is selected for award for
DWSRF Water Line Replacement Project.
THAT a copy of the caption of this resolution is spread upon the minutes of the City
Council.
READ,ADOPTED,AND APPROVED THIS day of ,2025 at
a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor
Councilmembers:
•
NOES:
Charlotte M. Moses
Mayor
ATTEST: APPROVED AS TO FORM:
Sherri Bellard Roxann Pais Cotroneo
City Secretary City Attorney
PR No. 24459
7/30/2025 JL
Page 3 of 3
APPROVED FOR ADMINISTRATION:
Ronald Burton, Calvin Matthews, P.E.
City Maria Director of Water Utilities
APPROVED AS FOR AVAILABILITY OF FUNDS:
LL
N/ I �I% lci
Lynda(Ly Boswell, MA, ICMA-CM Cliftv E. Williams, Jr., CPPB
Director of Finance Purchasing Manager
EXHIBIT A
TEXAS WATER
1 DEVELOPMENT BOARD
P.O.Box 13231, 1700 N.Congress Ave.
Austin,TX 78711-3231,www.twdb.texas.gov
Phone(512)463-7847,Fax(512)475-2053
June 26, 2025
Mr. Flozelle Roberts
Director of Public Works
City of Port Arthur
flozelle.roberts(a�portarthurtx.qov
Re: State Fiscal Year 2022 Drinking Water State Revolving Fund
Application Invitation
Dear Mr. Roberts:
Congratulations! We are pleased to notify you that the City of Port Arthur is hereby
invited to submit an application for funding through the Texas Water Development
Board's (TWDB) Drinking Water State Revolving Fund (DWSRF).
Your project is listed in the Intended Use Plan (IUP) as being eligible to receive funding
as shown below:
Project Description Water Line Replacement Project
Eligible Phases Design & Construction
Project Information Form Number 14054
Eligible Project Cost $ 16,500,520
The maximum loan/bond commitment amount a project may receive under the State Fiscal
Year(SFY)2022 IUP is$24 million.
Principal Forgiveness Eligibility
Your project has been identified as eligible for principal forgiveness. However, principal
forgiveness is subject to the availability of funds. The final principal forgiveness eligibility is
determined following a detailed review of the full application budget and will be documented
in a Funding Determination Letter prior to the Board taking formal action on the funding
request.
Our Mission Board Members
Leading the state's efforts L'Oreal Stepney,P.E.,Chairwoman I Tonya R.Miller, Board Member
in ensuring a secure
water future for Texas Bryan McMath,Executive Administrator
Mr. Flozelle Roberts
June 26, 2025
Page 2
Please note that TWDB records indicate that one or more issues of debt covenant
noncompliance presently exist with your organization and could affect the ability to
successfully apply for and receive funding from TWDB. Noncompliance with existing TWDB
debt covenants may result in special conditions being added to future debt covenants for
financial assistance received from the TWDB. In some cases, applications for financial
assistance may be rejected if noncompliance is not appropriately addressed. Prior to any
new applications being considered for review, either compliance with existing TWDB debt
covenants must be restored, or a corrective action plan must be adopted which is
acceptable to the TWDB Executive Administrator. Please contact our Financial Compliance
staff by email at fmfinancetwdb.texas.gov with any questions regarding the resolution of
your organization's noncompliance items.
Emergency Preparedness Funding Option
For SFY 2022, $75,000 per project is available as principal forgiveness for the
preparation of an emergency preparedness evaluation/audit plan that determines future
needs to ensure compliance with statutory and regulatory standards of emergency
operations that directly affect operation of a water system during an extended power
outage caused by severe weather that impacts the system. You are encouraged to
include funds for these activities in your application if interested, even if they were not
reflected in the project costs at the time the Project Information Form (PIF) was
submitted.
Asset Management Funding Option
If you indicated in your PIF that you will be preparing an asset management plan as part
of your project, you may be eligible for up to $100,000 in loan funding with an interest
rate of 0% to prepare the plan under the DWSRF Program. Please include the asset
management plan in your project scope and ensure funds for these activities are specified
in your application budget.
Required Documentation and Deadlines
To be considered for funding under the SFY 2022 DWSRF Program, please follow the
requirements stated below:
(1)You must submit your Intent to Apply form to DWSRF(a�twdb.texas.gov by
5:00 P.M., CST on July 11, 2025. If you fail to complete and submit the Intent to
Apply Form by the deadline, your project will not be considered for funding. This
will allow the TWDB to invite, in rank order, additional projects on the lists if an
invited entity does not wish to pursue SRF funding for their project at this time.
(2) If you intend to apply, your complete application must be received by TWDB
no later than 5:00 P.M., CST on August 26, 2025. Applications will not be
accepted after the deadline. We encourage you to submit your application before
the deadline, which will allow us to begin a review of your application earlier.
Application materials, such as submittal instructions, guidance documents,
frequently asked questions, and a link to our online application portal may be
found on our website at www.twdb.texas.qov/financial/applications/.
Mr. Flozelle Roberts
June 26, 2025
Page 3
(3)A pre-application meeting is required for all DWSRF projects to ensure that
the applicant and the corresponding TWDB staff discuss the project and ask
initial questions prior to the application being submitted.
If you submit an Intent to Apply, please contact Ms. Diana Sanchez by phone at
512-475-1554 or by e-mail at Diana.Sanchez(cr�twdb.texas.gov to schedule a pre-
application meeting with wsi-rwpd-team4(c�twdb.texas.gov. She will be able to
assist you with scheduling a meeting prior to your submission of the application.
Please take note of the following tips and reminders:
• Applicants who will be requesting an SRF loan will most likely be selling bonds to
the TWDB. As such, a financial advisor and bond counsel will be required. We
highly encourage you to engage these consultants prior to submitting the
application and follow the DBE requirements (equivalency only) if you seek to
fund their work using SRF monies.
• Be sure any changes to the project amount are reflected in both the Intent to
Apply Form and the application budget.
• For bond purposes only, TWDB SRF loan amounts must be rounded up to the
nearest $5,000. Please round up any loan numbers in the application budget and
confirm the dollar amounts with your TWDB project team before passing
resolutions to minimize adjustment during the review period.
We look forward to working with the City of Port Arthur on its SRF project and are
committed to providing excellent customer service and prompt responses to any
questions as you complete your application. Should you have any questions or
concerns, please contact Heather O'Keefe, Team Lead SRF General Activities, by
phone at (512) 475-1835 or by email at DWSRF(c�twdb.texas.gov.
Sincerely,
Marvin Cole-Chaney
Director, Program Administration and Reporting
Water Supply and Infrastructure
Attachment: Intent to Apply Form
cc: Joe Wilson, P.E., Arceneaux Wilson & Cole, LLC-jwilson(c�ageng.com
Nancy Richards, Team Manager; wsi-rwpd-team4@a.twdb.texas.gov
WSI-RWPD-Applications(a�twdb.texas.gov
OAK
.4VIALtifAr
ARCENEAUX WILSON&CODE
engineering I surveying I planning
July 2, 2025
Mr. Marvin Cole-Chaney
Director, Program Administration & Reporting
Water Supply & Infrastructure
1700 N. Congress Ave.
P.O. Box 132311026 Marion Street
Austin, Texas 78711-3231
RE: City of Port Arthur
SFY 2022 DWSRF Application Invitation
Change of Contact Information
Dear Mr. Cole-Chaney:
I am writing this letter as the City of Port Arthur's consulting engineer regarding the State
Fiscal Year 2022 Drinking Water State Revolving Fund. The City recently received an
Application Invitation for PIF No. 14054 Water Line Replacement Project. The
communications for this project are currently being addressed and sent to individuals that
are no longer applicable to the project. Please consider this letter as an official request
to remove and replace the below listed individuals for all future correspondence.
Remove:
Flozelle Roberts, Director of Public Works, City of Port Arthur
Donald Stanton, Interim Director of Utilities, City of Port Arthur
Joe Wilson, P.E., Arceneaux Wilson & Cole, LLC
Add:
Calvin Matthews, P.E., Director of Water Utilities, City of Port Arthur
(calvin.matthews(a�portarthurtx.gov)
Jess Liao, P.E., Utility Assistant Director, City of Port Arthur
(jess.liao a(�portarthurtx.gov)
Hani Tohme, P.E., Golden Triangle Consulting Engineers
(tohmehaniyahoo.com)
Keith Zotzky, P.E., Arceneaux Wilson & Cole, LLC
(keith.zotzkyawcenq.corn)
409.724.7888
3120 Central Mall Drive
Port Arthur,TX 77642 Engineering Surveying
awceng.com F-16194 10194049
1 1smut
varm
If you have any questions or concerns, please give me a call.
Sincerely,
ARCENEAUX WILSON & COLE
Keith Zotzky, P.E., CFM
Vice President of Engineering Services
EXHIBIT B
Texas Water(r=-
STATE OF TEXAS Development Board
Intended
s
U e Plan
Drinking Water State Revolving Fund
www.twdb.texas.gov/financial/programs/DWSRF
•
440
a roa
s"
g `}‘ 1 __15'W
2022 PO BOX v13231DEVEALO M�ENTXBO8ARD
Drinking Water State Revolving Fund
SFY 2022 Intended Use Plan
Effective September 1 , 2021
Contents
I. Overview 5
II. Purpose 5
III. Projects to Fund 6
A. Eligible Applicants 6
B. Eligible and Ineligible Use of Funds 6
IV. Significant Program Changes 7
V. Amount Available 7
VI. Funding Options and Terms 10
VII. Goals 21
A. Short-Term Goals 21
B. Long-Term Goals 22
VIII. Participating in the DWSRF Program 23
A. Solicitation of Project information 23
B. Updating Projects from the Prior Intended Use Plan 24
C. Evaluation of the Project Information Received and Priority Rating System 24
D. Ranking and Creation of the Project Priority List and Initial Invited Projects List 25
E. Bypassing Projects 26
F. Phases for Invited Projects 26
G. Invitations and Application Submissions 27
H. Addressing Any Water Loss Mitigation within the Application 28
I. Self-Certification for Certain Systems Serving 500 or Fewer Persons 28
J. Commitment Timeframes for Projects with Principal Forgiveness Component(s) 28
K. Closing Deadlines 29
L. Limits 29
M. Leveraging to Provide Additional Funding 30
N. Funds from Prior Years 30
O. Transfer of Funds 31
P. Updates to the Intended Use Plan 31
IX. Set-Asides 31
A. Texas Water Development Board Administration and Technical Assistance Activities 32
B. Texas Commission on Environmental Quality Activities 32
C. Coordination of Activities with the Texas Commission on Environmental Quality 33
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 2
X. Financial Status 33
A. Sources of State Match 33
B. Binding Commitment Requirement 33
C. Leveraging 33
D. Cross-collateralization 34
E. Inter-fund Loan / Investment 35
F. Method of Cash Draw 35
G. Long-Term Financial Health of the Fund 35
H. Interest Rate Policy 35
I. Fees 36
J. EPA Program Evaluation Report and Audit 36
XI. TWDB Special Program Initiatives 36
XII. Navigating the Lists 41
Appendix A. Public Review and Comment 43
Appendix B. Projected Sources and Uses of Funds 45
Appendix C. Rating Criteria 46
Appendix D. Affordability Criteria to Determine Disadvantaged Community Eligibility 51
Appendix E. Federal Requirements and Assurances 55
Appendix F. Bypass Procedures 61
Texas Water Development Board rules governing the Drinking Water State Revolving Fund program
(Texas Administrative Code, Title 31, Part 10, Chapter 371) may be accessed online at
http://texreq.sos.state.tx.us/public/readtac$ext.ViewTAC?tac view=4&ti=31&pt=10&ch=371
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 3
Drinking Water State Revolving Fund
Acronyms
ACS American Community Survey
AIS American Iron & Steel
AMHI Annual Median Household Income
CWSRF Clean Water State Revolving Fund
DWSRF Drinking Water State Revolving Fund
EPA Environmental Protection Agency
FFY Federal Fiscal Year
FMT Financial, Managerial, and Technical
GPR Green Project Reserve
HCF Household Cost Factor
IUP Intended Use Plan
IIPL Initial Invited Projects List
MCL Maximum Contaminant Level
NEPA National Environmental Policy Act
PIF Project Information Form
PPL Project Priority List
PWS Public Water System
SDWA Safe Drinking Water Act
SFY State Fiscal Year
SRF State Revolving Fund
TCEQ Texas Commission on Environmental Quality
TWDB Texas Water Development Board
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 4
I. Overview
The Drinking Water State Revolving Fund (DWSRF) assists communities by providing below
market-rate financing and various levels of principal forgiveness for a wide range of projects
that facilitate compliance with primary drinking water standards or otherwise significantly
further the health protection objectives of the Safe Drinking Water Act (SDWA). The
program provides year-round funding of water projects after they have been included in the
Intended Use Plan.
For State Fiscal Year(SFY) 2022, at least $150 million is available under the DWSRF for all
financing options including $30 million in principal forgiveness. Of the total amount available,
at least$120 million will be offered at subsidized interest rates or at zero percent for special
funding categories. These savings directly lower the overall cost of providing safe,
affordable water to every customer.
The $150,000,000 level for SFY 2022 will be allocated to the following funding options:
Funding Option Allocation
Disadvantaged Community—as Principal Forgiveness $16,000,000
Disadvantaged Community—for Small / Rural only—as $2,000,000
Principal Forgiveness
Subsidized Green (incl. Water Conservation) —as Principal $2,000,000
Forgiveness
Very Small Systems—as Principal Forgiveness $2,000,000
Very Small Systems—"Securing Safe Water Initiative—as $1,000,000
Principal Forgiveness
Emergency Preparedness- for Severe Weather— as
Principal Forgiveness $3,000,000
Urgent Need —"Securing Safe Water" Initiative/Contaminants $2,000,000
(Lead, Radionuclides, Arsenic) —as Principal Forgiveness
Urgent Need —Other than Contaminants (Disasters, etc.) —as $2,000,000
Principal Forgiveness
Bonds/Loans $120,000,000
Total $150,000,000
II. Purpose
In 1996 Congress passed federal amendments to the SDWA that established the DWSRF
program. The Texas Water Development Board (TWDB) is authorized by state law to
administer this program for Texas.
The TWDB is the financing agency for the DWSRF and has a contractual relationship with
the state's primacy agency, the Texas Commission on Environmental Quality (TCEQ), to
perform DWSRF activities. TCEQ performs DWSRF activities that include rating proposed
projects, state program management, small systems technical assistance, assessments for
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 5
ground water sources, source water technical assistance, sanitary surveys, complaint
investigations, enforcement activities, disaster assistance, and implementation of the State
of Texas approved Capacity Development Strategy.
Annually, the State must prepare an Intended Use Plan (IUP) that describes how it intends
to use DWSRF program funds to support the overall goals of the program. The IUP must
contain a number of elements required by the Environmental Protection Agency (EPA)
covering the operation of the DWSRF and is a central component of the TWDB's application
to EPA for the capitalization grant.
The IUP contains the state's priority list of projects to receive funding under the DWSRF.
This list is subdivided further into an Initial Invited Projects List (Appendix K), which
represents the projects that will be invited to submit applications after Board approval of the
IUP. Applications for funding under this SFY 2022 IUP will be accepted based on invitation
only until the program reaches funding capacity or the SFY 2023 IUP is approved.
Ill. Projects to Fund
A. Eligible Applicants
Applicants eligible to apply for assistance are:
• Existing community Public Water Systems (PWSs) including political subdivisions,
nonprofit water supply corporations and privately-owned community water systems
• Non-profit, non-community public water systems
• State agencies
B. Eligible and Ineligible Use of Funds
1. Examples of eligible project costs include planning, acquisition, design, and
construction of projects to:
• Correct water system deficiencies including water quality, capacity, pressure, and
water loss
• Upgrade or replace water systems
• Provide new or existing water service to other water systems through
consolidation projects
• Purchase capacity in water systems
• Purchase water systems
• Implement green projects (pursuant to EPA guidance)
• Implement source water protection projects
• Pay for other costs necessary to secure or issue debt
All projects funded through the DWSRF must be consistent with the most
recently adopted TWDB State Water Plan.
2. Examples of ineligible project costs include:
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 6
• Projects primarily intended to facilitate growth
• Water rights, unless owned by a system being purchased through consolidation
• Construction of reservoirs
• Dams or rehabilitation of dams
• Projects for systems in significant noncompliance, unless funding will ensure
compliance
• Projects for systems that lack adequate financial, managerial, and/or technical
(FMT) capability, unless assistance will ensure compliance
• Routine laboratory fees or ongoing operational expenses
• Fire protection projects (unless incidental to the main project scope)
IV. Significant Program Changes
Significant program changes from the previous year's IUP are highlighted below.
1. As mentioned in the published SFY 2022 Project Information Form (PIF) Guidance,
establishment of a new interest rate reduction methodology. The interest rate will be
a percentage reduction from the Thomson Reuters Municipal Market Data (MMD)
rate adjusted for yield to maturity that is applicable to the entity's rating, with non-
rated entities using the Baa rate, as follows:
(a) Equivalency projects: 35% reduction
(b) Non-Equivalency projects: 30% reduction (Sections V and X).
2. Emergency Preparedness—for Severe Weather—allocation of$3,000,000 in
principal forgiveness for the preparation of an emergency preparedness
evaluation/audit plan. Entities could receive funding to determine compliance with
statutory and regulatory standards of emergency operations that directly affect
operation of a public water system during an extended power outage from severe
weather that impacts the system. The maximum amount available for a public water
system is $75,000. The evaluation/audit must be submitted to TWDB (Section VI).
V. Amount Available
1. Allocations
Texas is eligible for a federal capitalization grant from funds appropriated by Congress
for Federal Fiscal Year(FFY) 2021. The TWDB will use the grant, along with other
available sources of funds, to offer up to $150,000,000 for projects in this SFY 2022 IUP.
The sources of funds include the FFY 2021 capitalization grant, state match, principal
and interest repayments from financial assistance, investment earnings, additional cash
resources, and if demand warrants, the net proceeds from bond issues.
The DWSRF program offers subsidized interest rates and additional subsidization in the
form of principal forgiveness. Principal forgiveness funds are not considered "grant"
funds under Title 2 Code of Federal Regulations Part 200 nor the Texas Grant
Management Standards found at Texas Government Code Title 17 Chapter 783. The
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 7
principal forgiveness is offered to eligible disadvantaged communities, very small
systems, urgent need projects, and green projects. Throughout the IUP, this principal
forgiveness may be referred to as Additional Subsidization, Disadvantaged Community
funding, including Disadvantaged Community funding for Small/ Rural only, Subsidized
Green funding, Very Small Systems funding, Emergency Preparedness or Urgent Need
funding.
2. Allocations and Terms Available Under Each Funding Option:
Interest Rates
Funding Option Amount**** Principal Non- Origination
Forgiveness Equivalency Fee
Equivalency
30%, 50%, or Interest rate
Disadvantaged Community $16,000,000 0 * reduction of N/A 2.0%***
70/0 35%
Maximum
Disadvantaged Community amount per
—Small/Rural only- $2,000,000 project/entity N/A N/A N/A
Principal Forgiveness vrom
$aries 00,000 to
$500,000
Up to 15%of
Subsidized Green Principal DWSRF-funded
Forgiveness $2,000,000 Green Costs— N/A N/A N/A
Maximum of
$1,000,000
Very Small Systems $3,000,000 Up to$300,000 N/A N/A N/A
Principal Forgiveness per project
Emergency Preparedness $3,000,000 Up to$75,000 N/A N/A N/A
per entity
Maximum
Urgent Need— amount per
Contaminants Principal $2,000,000 project/entity N/A N/A N/A
varies from
Forgiveness $500,000 to
$800,000
Maximum
Urgent Need—Other than amount per
Contaminants Principal $2,000,000 project/entity N/A N/A N/A
Forgiveness varies from
$500,000 to
$800,000
Urgent Need—Bond/Loan $4,000,000 N/A 0% 2.0%
Disadvantaged Community
—Small/Rural only— $9,000,000 0% N/A 2.0%
Bond/Loan
Asset Management
Bonds/Loans(AMPSS)—for
preparation of asset $2,000,000 0% 0% 2.0%
management plans and
implementation of plans
Interest rate Interest rate
Bond/Loan-Regular $105,000,000 N/A reduction of reduction of 2.0%
35%** 30%**
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 8
* Percentage of DWSRF-funded project costs remaining after subtracting other DWSRF
principal forgiveness
** Based on a level debt service schedule
*** Not assessed on the principal forgiveness portion of project funding
****An amount equal to principal forgiveness and zero interest loan funds from any funding category not
allocated may be used for regular bond/loan funding.
3. Interest rate reduction methodology:
The interest rate will be a percentage reduction from the Thomson Reuters Municipal Market
Data (MMD) rate adjusted for yield to maturity that is applicable to the entity's rating, with
non-rated entities using the Baa rate, as follows:
(a) Equivalency projects: 35% reduction
(b) Non-Equivalency projects: 30% reduction
Exclusions from the interest rate reduction methodology- the interest rate reduction
methodology does not apply to any portion of financing that is offered at zero percent. The
full benefit of the zero percent financing under the respective special funding option will be
incorporated into the total of the maturities for bonds or the total loan payments for loans.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 9
4. Allocation of Principal Forgiveness:
DWSRF SFY 2022 -Grants totaling $87,015,000 % of Grant
Maximum& Minimum-Principal Forgiveness
Minimum (Disadvan. Comm.) $5,220,900 6%
Minimum (Any DWSRF-eligible recipient) $12,230,880 14%
Minimum (Total) $17,451,780 20%
Optional Additional Amount for Disadvan. Comm. $25,234,350 29%
Maximum $42,686,130 49%
Current Allocation of Principal Forgiveness
Disadvantaged Community (Minimum of$5,220,900) $16,000,000 18%
Disadvantaged Community-for Small/ Rural only $2,000,000 2%
Subsidized Green (incl. Water Conservation) $2,000,000 2%
Very Small Systems $2,000,000 2%
Very Small Systems - "Securing Safe Water" Initiative $1,000,000 1%
Emergency Preparedness - Severe Weather $3,000,000 3%
Urgent Need - "Securing Safe Water" Initiative/Contaminants $2,000,000 2%
Urgent Need - Other $2,000,000 2%
Total Currently Allocated $30,000,000 34%
Additional amount that could be allocated to principal forgiveness $12,686,130 15%
Total Breakdown
Total Principal Forgiveness Allocated to Projects $30,000,000 34%
TWDB Administration & Technical Assistance-FFYs 2021 & 2019 $3,480,600 4%
TCEQ-FFYs 2021 and 2019 $12,241,800 14%
Loans/Bonds $41,292,600 48%
Total $87,015,000 100%
VI. Funding Options and Terms
The DWSRF has two tiers of funding: Equivalency projects and Non-Equivalency projects.
Equivalency projects (Federal Requirements) -A portion of the DWSRF funded projects
must follow all federal requirements commonly known as"cross-cutters". This type of
financial assistance is referred to broadly as"Equivalency". A portion of the available
Equivalency funds may be reserved for projects receiving Additional Subsidization. More
information on the federal cross-cutters may be found in Appendix E.
Non-Equivalency projects (State Requirements) - Non-Equivalency projects are not
subject to federal cross-cutter requirements, with the exception of the federal anti-
discrimination laws, also known as the "super cross-cutters".
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 10
1. Funding Options Available:
Entities listed on the Initial Invited Projects List (IIPL) and subsequent Project Priority
Lists (PPLs) may be invited to apply for one or more of the funding options.
a. Disadvantaged Community Funding (Equivalency only)
For an entity to qualify as a disadvantaged community, the community must meet the
DWSRF's affordability criteria based on income, unemployment rates, and
population trends. In summary, the Annual Median Household Income (AMHI) of the
entity's area to be served must be less than or equal to 75 percent of the State's
AMHI and the Household Cost Factor that considers income, unemployment rates,
and population trends must be greater than or equal to 1 percent if only water or
sewer service is provided or greater than or equal to 2 percent if both water and
sewer service are provided. The percent of principal forgiveness is based on the
difference between the calculated and minimum required household cost factors.
The maximum principal forgiveness as a percentage of DWSRF-funded project costs
remaining after subtracting other DWSRF principal forgiveness is provided in the
following table:
Principal Forgiveness as a % of
Household Cost Factor Difference DWSRF-funded project costs
remaining after subtracting other
DWSRF principal forgiveness
>_ 0% and < 1.5% 30%
>_ 1.5% and < 3% 50%
3% 70%
This funding option offers a financial assistance component with the interest rate
subsidy and 30 percent, 50 percent, or 70 percent of the DWSRF-funded project cost
in principal forgiveness. TWDB will calculate the Disadvantaged Communities
principal forgiveness amount based on the amount of State Revolving Fund (SRF)-
funded project costs remaining after subtracting all other DWSRF principal
forgiveness funding being provided in SFY 2022 to the proposed project. (As an
option at TWDB's discretion, if the DWSRF loan portion would be less than
$100,000, the entity may reduce the amount of DWSRF funds requested by the
amount of the loan portion and the Disadvantaged Communities percentage
calculation will be based on the amount of DWSRF-funded costs before other
DWSRF program principal forgiveness amounts are subtracted from the total
requested. Similarly, at TWDB's discretion for projects receiving Urgent Need funds
and determined necessary to enhance feasibility and other considerations, the
Disadvantaged Communities percentage calculation will be based on the amount of
DWSRF-funded costs before other DWSRF program principal forgiveness amounts
are subtracted from the total requested.) The maximum repayment period is 30
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 11
years. The origination fee will not be applied to project costs that are funded with
principal forgiveness. Additional information may be found in Appendix D.
Maximum Allocation to Any Entity in SFY 2022
Not more than 25 percent of the total regular Disadvantaged Community allocation,
or $4,000,000, may be provided to any particular entity for their projects in the SFY
2022 IUP, with one exception. If the Household Cost Factor in excess of the base
(i.e., the HCF difference) for an entity's project is greater than 5 percent, the
maximum amount provided would be not more than 33 percent of the total regular
Disadvantaged Community allocation, or $5,280,000.
The Household Cost Factor will be established based on the PIF, and associated
Disadvantaged Community worksheets and income information, submitted by the
PIF deadline for inclusion in the IUP.
b. Disadvantaged Community Funding —Small / Rural only (Equivalency only)
An entity qualified as a disadvantaged community and that additionally meets the
definition of either a small community or a rural project may receive funding under
this option. The entity must submit to TWDB acceptable evidence that it meets the
qualification criteria to be eligible for this funding option.
Small Community—an entity serving a population of not more than 10,000.
Rural project— a project that fits any of the following:
i. An entity that provides services predominately in a rural area. Using the U.S.
Bureau of the Census definitions of a rural area, not more than 20 percent of the
residential service connections are in urbanized areas and not more than 50
percent are in urban clusters according to the most recent data available to
TWDB. The calculation will be based on the utility service(s) associated with the
proposed project;
ii. A project from a political subdivision with a population of 10,000 or less and
located outside the extraterritorial jurisdiction of a city with a population of
500,000 or greater; or
iii. A project in a county in which no urban political subdivision exceeds 50,000 in
population based upon the most current data available from the U.S. Bureau of
the Census or TWDB-approved projections.
Amount of Funding available as Principal Forgiveness and a 0% Loan
Entities may be eligible to receive 100 percent of the total project cost in principal
forgiveness up to the amount specified in the chart below. The maximum amount of
principal forgiveness that an entity may receive per project is based on eligibility for
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 12
Disadvantaged Community funding as described in Appendix D.
If eligible project costs that would have qualified for this option exceed the maximum
principal forgiveness allowable or available for the project, the entity may receive
funding with an interest rate of zero percent up to the limits established in the chart
below.
Disadvantaged Maximum Amount of Maximum Amount of 0% Loan
Community- Principal Principal Forgiveness per per Project/ Entity (excluding
Forgiveness Eligibility Project/Entity additional funds for rounded
Percentage Level bond increment and the
associated fee financed at 0%)
30% $300,000 $1,000,000
50% $400,000 $2,000,000
70% $500,000 $3,000,000
The definition of a "project" includes the planning, acquisition, design and
construction phases. In addition, a particular recipient may only receive the
maximum eligible amounts in principal forgiveness or 0% loans under this funding
option in a program year for all of its projects.
Amount of funding available in SFY 2022 with an Interest Rate of Zero Percent
To ensure the long-term viability of the program, the amount of funding with an
interest rate of zero percent made available during SFY 2022 is $9 million. The
TWDB Executive Administrator may establish a higher amount consistent with
maintaining the DWSRF in perpetuity and any other appropriate factors. Any
unallocated zero interest rate funding may be allocated to another funding option
offering zero percent funding.
An entity may receive funds that are a combination of rates. For example, a portion
of the funding may be available at an interest rate of zero percent and the remainder
required for the project may be available at the standard reduced interest rate.
An entity allocated program funding in SFY 2022 under the regular Disadvantaged
Community Funding option that is less than the eligible project costs specified in the
IUP and meets either the small community or rural definition is eligible to receive
principal forgiveness and a 0% loan under this option up to the maximum amounts
established in the chart above. The maximum principal forgiveness amount is based
on the sum of the amount received under the regular Disadvantaged Community
Funding option and the remaining allowable amount received this option.
This means that an entity/project that qualifies as a small or rural disadvantaged
community and is allocated the maximum of principal forgiveness under the regular
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 13
Disadvantaged Community funding option (i.e., $4,000,000 or $5,280,000 as
applicable) may not receive an additional allocation of principal forgiveness under
this funding option. Similarly, an entity/project that is allocated from the regular
Disadvantaged Community funds an amount greater than the amount in the chart
above, such as $1,000,000, may not receive an additional allocation of principal
forgiveness under this funding option. However, an entity/project that received less
than $300,000 to $500,000 in regular Disadvantaged Community funding, as
applicable based on their disadvantaged level in the chart above, may receive the
shortfall under this funding option. For example, if the small or rural disadvantaged
community was allocated only $125,000 of principal forgiveness under the regular
Disadvantaged Community option yet is eligible to receive $500,000 based on the
chart above, it would be eligible to receive the remainder of$375,000 in principal
forgiveness from this funding option.
Funds not allocated by March 1, 2022 for entities and projects that qualify for this
option may be reallocated to other funding options.
c. Subsidized Green Funding (Equivalency or Non-Equivalency)
Entities may be eligible to receive Subsidized Green principal forgiveness if their
project has elements that are considered green and the cost of the green portion of
their project is 30 percent or greater than the total project cost. This funding option
offers principal forgiveness for up to 15 percent of the total DWSRF-funded eligible
green component costs.
Maximum allocation —A maximum of$1,000,000 of subsidized green funding may
be provided to any project. The definition of a "project" for SFY 2022 includes the
planning, acquisition, design and construction phases. Subsidized green funding
received by the project prior to SFY 2019 IUP funding will not count against this limit.
Additional information may be found in Appendix E.
d. Very Small Systems Funding (Equivalency or Non-Equivalency)
The TWDB recognizes the difficulty for very small systems to secure financial
assistance. In an effort to extend resources to address critical issues with these
public water systems, the TWDB will allocate up to $3,000,000 in Additional
Subsidization to target systems with populations of 1,000 or fewer for projects
addressing public health, compliance, or water quantity issues, of which $1,000,000
will be allocated to the Securing Safe Water initiative through the first round of
funding.
To be eligible to receive Very Small Systems funding the AMHI for the project must
not exceed 150 percent of the state's AMHI. To lessen the need for the applicant to
conduct income surveys, the TWDB will consider on a case by case basis making
the presumption that the average (mean) of the AMHI of all U.S. Census Bureau
Block Groups containing any portion of the project service area is the AMHI for the
project. The applicant has the option of proving otherwise by submitting more
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 14
information on the number of customers in each Block Group or conducting an
income survey. Applicants must provide a detailed map of the proposed service area
to be considered for this option and the TWDB will determine the associated Block
Groups. The Executive Administrator will then determine whether this option would
result in a reasonable estimate of the AMHI for the project service area and may be
used for the AMHI threshold calculation. (The income data used in the calculation
will be the same data source as described in "Affordability Criteria to Determine
Disadvantaged Community Eligibility, found in Appendix D.)
Entities may be eligible to receive 100 percent of the total project cost in principal
forgiveness up to a total of$300,000 per project. A particular public water system
may only receive a total of$300,000 in principal forgiveness of Very Small Systems
funds in a program year. The definition of a "project" for SFY 2022 includes the
planning, acquisition, design and construction phases. In the event funding does not
fully cover total project costs, the entity will need to secure additional financial
assistance to complete the proposed project.
e. Emergency Preparedness for Severe weather- Evaluation/Audit(Non-
Equivalency)
Emergency Preparedness principal forgiveness may be available for the preparation
of an emergency preparedness evaluation/audit plan. It would determine future
needs to ensure compliance with statutory and regulatory standards of emergency
operations that directly affect operation of a public water system during an extended
power outage from severe weather that impacts the system. The maximum amount
available for a public water system is$75,000. The evaluation/audit must be
submitted to TWDB.
Entities that submitted a Project Information Form by March 10, 2021 may amend
their project to incorporate the evaluation/audit and these projects would receive
priority based on ranking in allocating the available principal forgiveness, subject to
the Disadvantaged / Small / Rural Set-aside.
Disadvantaged /Small/ Rural Set-aside
A portion of the total amount available under the Emergency Preparedness funding
will be reserved for entities and projects that qualify for the
Disadvantaged/Small/Rural set-aside. Entities that qualify for two out of the three
criteria will be eligible for this set-aside funding. A total of 50 percent of the principal
forgiveness made available for Emergency Preparedness funding will be reserved for
this set-aside.
Set-aside criteria:
a. Disadvantaged Community—a entity/project eligible as described in Appendix D.
b. Small Community—an entity serving a population of not more than 10,000.
c. Rural project—a project that fits any of the following:
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 15
i. An entity that provides services predominately in a rural area. Using the U.S.
Bureau of the Census definitions of a rural area, not more than 20 percent of the
residential service connections are in urbanized areas and not more than 50
percent are in urban clusters according to the most recent data available to
TWDB. The calculation will be based on the utility service(s) associated with the
proposed project;
ii. A project from a political subdivision with a population of 10,000 or less and
located outside the extraterritorial jurisdiction of a city with a population of 500,000
or greater; or
iii. A project in a county in which no urban political subdivision exceeds 50,000 in
population based upon the most current data available from the U.S. Bureau of
the Census or TWDB-approved projections.
Reserved funds not fully allocated may be reallocated to other projects on the PPL.
f. Urgent Need (Non-Equivalency)
Urgent Need projects must address situations that require immediate attention to
protect public health and safety. They may result from (1) an unanticipated reduction
in the adequate supply of water due to prolonged drought that will result in the loss of
water service to customers within the next 180 days; (2) a catastrophic natural event
or accident resulting in the loss of over 20 percent of the water service connections
or 20 percent of the total water provided to customers; (3) situations that require
immediate attention to address a substantial, imminent public health issue affecting
at least 20 percent of the water provided to customers, such as contamination in
excess of water quality standards; (4) situations that require immediate attention to
address a substantial, imminent public health issue affecting at least 20 percent of
the water provided to customers from severe flood damage that occurred during a
Governor or Presidential-declared natural disaster; and (5) other situations as
established by TWDB guidelines.
Urgent Need projects submitted after the March 10, 2021 project information form
submission deadline may be invited in the first round of invitations for SFY 2022
funding. To recover from a disaster, an entity may change the scope of an existing
project in the IUP by simply providing the proposed new scope and budget to the
TWDB without the need to submit a new Project Information Form. The Executive
Administrator may bypass projects to provide funding to Urgent Need projects. An
Urgent Need project may qualify and receive funding concurrently as a
Disadvantaged Community, Very Small System, and Subsidized Green project,
provided funding is available. The proposed project must not be for replacement of
facilities that have failed because they exceeded their useful life or failed due to lack
of adequate maintenance. The TWDB may request the applicant provide a sealed
response from a licensed professional engineer to assist the TWDB in making its
determination. For projects addressing contamination levels in excess of water
quality standards, the system must currently be in noncompliance with TCEQ
requirements and the proposed project must be designed to bring the system into
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 16
compliance to the extent financially practical. Funds will not be provided for
acquisition or construction in a Special Flood Hazard Area in a community that the
Federal Emergency Management Agency (FEMA) considers a sanctioned
jurisdiction or area.
Amount of Urgent Need Funding available as Principal Forgiveness
Entities may be eligible to receive 100 percent of the total project cost in principal
forgiveness up to the amount specified in the chart below. The maximum amount of
principal forgiveness that an entity may receive per project is based on eligibility for
Disadvantaged Community funding as described in Appendix D.
Maximum Amount
of Principal Disadvantaged Community - Principal
Forgiveness per Forgiveness Eligibility Percentage Level
Project/ Entity
$500,000 0% - Project Not Eligible Under
Disadvantaged Community Criteria.
$600,000 30%
$700,000 50%
$800,000 70%
In addition, a particular recipient may only receive the maximum eligible amount in
principal forgiveness under Urgent Need in a program year for all of its projects.
Entities that previously received principal forgiveness under the Urgent Need funding
option for a particular project may not receive additional principal forgiveness for that
project if the total amount of principal forgiveness provided under the Urgent Need
funding option would exceed the amount specified in the chart above. The definition
of a "project" includes the planning, acquisition, design and construction phases.
If eligible project costs that would have qualified for Urgent Need exceed the
maximum principal forgiveness allowable or available for the project, the entity may
receive funding for the remainder with an interest rate of zero percent for the term of
the financing. For disaster recovery, special terms and conditions on loan/bond
financing, including the repayment terms, may be available that are not offered under
other funding options.
Any commitment receiving Urgent Need funds will be considered non-equivalency
funds, even if the project concurrently receives Disadvantaged Community funds.
Amount of Urgent Need funding available with an Interest Rate of Zero Percent
To ensure the long-term viability of the program, the amount of funding made
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 17
available for Urgent Need projects with an interest rate of zero percent for SFY 2022
is $4 million, or such other higher amount as the TWDB Executive Administrator may
establish consistent with maintaining the DWSRF in perpetuity and any other
appropriate factors. The funds will be obligated only as the TWDB Board makes
commitments. Any unallocated zero interest rate funding may be allocated to
another funding option offering zero percent funding.
Urgent Need Principal Forgiveness Set-asides
The TWDB will set aside $2,000,000 of principal forgiveness to address
contaminants such as lead, radionuclides and arsenic and its Securing Safe Water
initiative as described in Section XII. The TWDB will set aside $2,000,000 out of the
$4,000,000 of Urgent Need of principal forgiveness allocation for SFY 2022 for
addressing purposes other than addressing contamination in excess of water quality
standards, such as addressing drought or disaster recovery. Reserved funds not
allocated by March 1, 2022 for entities and projects that qualify for this set-aside may
be reallocated to projects that address contamination or the Securing Safe Water
initiative.
Disadvantaged /Small / Rural Set-aside
A portion of the total amount available under the Urgent Need funding will be
reserved for entities and projects that qualify for the Disadvantaged/Small/Rural set-
aside. Entities that qualify for two out of the three criteria will be eligible for this set-
aside funding. A total of 50 percent of the principal forgiveness and 20 percent of the
funds with an interest rate of zero percent made available for Urgent Need funding
will be reserved for this set-aside.
Set-aside criteria:
a. Disadvantaged Community— a entity/project eligible as described in Appendix D.
b. Small Community—an entity serving a population of not more than 10,000.
c. Rural project—a project that fits any of the following:
i. An entity that provides services predominately in a rural area. Using the U.S.
Bureau of the Census definitions of a rural area, not more than 20 percent of the
residential service connections are in urbanized areas and not more than 50
percent are in urban clusters according to the most recent data available to
TWDB. The calculation will be based on the utility service(s) associated with the
proposed project;
ii. A project from a political subdivision with a population of 10,000 or less and
located outside the extraterritorial jurisdiction of a city with a population of 500,000
or greater; or
iii. A project in a county in which no urban political subdivision exceeds 50,000 in
population based upon the most current data available from the U.S. Bureau of
the Census or TWDB-approved projections.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 18
Reserved funds not allocated by July 1, 2022 for entities and projects that qualify for
this set-aside may be reallocated to other projects that met the Urgent Need funding
criteria.
Mitigation
Facilities being replaced or repaired for an Urgent Need disaster recovery project
must be built to mitigate future damage and destruction, to the extent it is practical
based on the nature of the project activities.
Co-fundinq
DWSRF funds may only be used for project costs that are reasonable and necessary
and must not result in the entity receiving a duplication of benefits from other
sources, including the U.S. Housing and Urban Development Community
Development Block Grant(CDBG) Disaster Recovery or FEMA grant funds. A
duplication of benefits occurs when an entity receives and permanently retains
funding to cover the same cost from more than one entity or source. Reimbursement
of interim financing is not a duplication of benefits. Entities that anticipate being
reimbursed for a portion of their project with a federal source such as the Federal
Emergency Management Agency's Public Assistance funding must follow the federal
procurement rules found in 2 CFR Part 200 and other federal requirements.
g. Asset Management(Preparation of Asset Management tools)— Bonds/Loans
(Equivalency or Non-Equivalency)
An eligible entity, not just small system, may be eligible for up to $100,000 with an
interest rate of zero percent to prepare all of the Asset Management/ Financial
Planning tools required in the current Asset Management Program for Small
Systems (AMPSS) initiative's Scope of Work and deliverables as described in
Section XII. The AMPSS initiative's scope of work has been revised in SFY 2022 to
require a section on emergency preparedness, weatherization, and resiliency. The
entity's asset management program may include enhancements or tools that extend
beyond the minimum requirements of the AMPSS program's Scope of Work. Any
zero percent funding would be blended with any other repayable SRF financial
assistance to create one interest rate on the bond or loan. The maximum amount
available for this option and the zero percent funds for implementing AMPSS-like
tools in SFY 2022 is $2,000,000 (excluding the additional funds for the rounded bond
increment and associated fee that may also be financed at zero percent). Allocation
of any available funding at an interest rate of zero percent for this option would occur
concurrently with the allocation of any other funding for the project. Any unallocated
zero interest rate funding may be allocated to another funding option offering zero
percent funding.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 19
h. Asset Management—(Implementation of Asset Management Plans)—
Bonds/Loans (Equivalency or Non-Equivalency)
A small system eligible under AMPSS may receive up to $500,000 at zero percent
(0%) for a portion of the total TWDB funding for a project if it has implemented
substantially all of the Asset Management/ Financial Planning tools required in the
current AMPSS initiative's Scope of Work and deliverables as described in Section
XII and the proposed project is included in its current plan. The AMPSS initiative's
scope of work has been revised in SFY 2022 to require a section on emergency
preparedness, weatherization, and resiliency. The small system's asset management
program may include enhancements or tools that extend beyond the minimum
requirements of the AMPSS initiative's Scope of Work. The total amount of funding
available in SFY 2022 at zero percent for implementation of asset management tools
is included in the total of$2,000,000 for asset management incentives. Any
unallocated zero interest rate funding may be allocated to another funding option
offering zero percent funding.
i. Bond/Loan Funding (Equivalency or Non-Equivalency)
All entities listed on a PPL that are invited to submit applications are eligible to
receive funding through the TWDB's purchase of the entity's bonds or through a loan
agreement as allowed under the entity's governing law.
An origination fee of 2.0 percent is assessed at closing on the portion of a
commitment that requires repayment. The origination fee does not apply to any
principal forgiveness amounts. The financial assistance recipient has the option of
financing the origination fee or paying this fee up front at closing.
An entity may receive Disadvantaged Community, Disadvantaged Community—
Small/Rural only, Green, Very Small System, Emergency Preparedness and Urgent
Need principal forgiveness, concurrently with a bond or loan. The entity may also be
eligible for a maximum repayment period of 30 years provided the extended term
reserve has not been met.
An amount equal to the principal forgiveness and zero interest loan funding from any
category that was not allocated may be used for regular bond/loan funding.
2. Terms of Financial Assistance
Loans may be offered for a term of up to 30 years for the planning, acquisition, design,
and/or construction phases. For the purchase of bonds, up to 75 percent of available
funds according to TWDB determined guidelines and in accordance with the SDWA
may be offered with a term of up to 30 years. The remainder of available bonds
purchased may be offered for a term up to 20 years. The term of financial assistance
offered may not exceed the expected design life of an eligible project. The TWDB may
allow principal and interest payments on a bond or loan to commence not later than
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 20
18 months after completion of the project, if considered appropriate as determined by
the Executive Administrator.
3. Federal Requirements on Available Funds
Funds are subject to federal requirements such as Davis-Bacon Act prevailing wages
and American Iron and Steel provisions. DWSRF-funded projects must follow all
federal "cross-cutter" requirements and EPA's signage requirements. These
requirements are outlined in Appendix E.
A portion of the DWSRF funds, in an amount at least equal to the federal
capitalization grant, must follow all federal cross-cutters. These DWSRF-funded
projects are referred to as Equivalency projects. The federal cross cutters that apply
to Equivalency projects include compliance with EPA's Disadvantaged Business
Enterprise program administered by TWDB. Equivalency projects receive an
additional interest rate reduction over the reduction for non-equivalency projects.
(see Appendix E for details of Federal Requirements)
VII. Goals
The primary goal of the Texas DWSRF program is to improve public health protection. In
addition, the overall goals of the Texas DWSRF program are to identify and provide funding
for maintaining and/or bringing Texas' PWSs into compliance with the SDWA; to support
affordable drinking water and sustainability; and to maintain the long-term financial health of
the DWSRF program fund. Specific goals to achieve those ends are listed below.
A. Short-Term Goals
1. Finance priority projects that enhance emergency preparedness, weatherization, and
resiliency of public water systems during severe weather events.
2. Encourage the use of green infrastructure and technologies by offering principal
forgiveness for green infrastructure, energy efficiency, water efficiency, or
environmentally innovative portions of projects and allocating an equivalent of 10
percent of the capitalization grant to approved green project costs.
3. Offer terms of up to 30 years for the planning, acquisition, design, and/or
construction for up to 75 percent of available funds in accordance with TWDB
determined guidelines and the SDWA.
4. Increase the amount of DWSRF program funding available by leveraging the
program as necessary to meet the demand for funding additional drinking water
projects.
5. Continue to enhance the DWSRF by cross-collateralizing the program with the Clean
Water State Revolving Fund (CWSRF) program in accordance with state and federal
law.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 21
6. Enhance our current level of outreach on the SRF programs by hosting virtual or in
person regional financial assistance workshops in conjunction with the continued use
of social media.
7. Assist water systems with urgent needs through financial assistance in the form of
principal forgiveness and loans with an additional interest rate subsidy from the
Urgent Need reserve.
8. Provide outreach, technical assistance and special allocations of funding to reduce
the number of public water systems with unresolved health issues as part of the
Securing Safe Water initiative.
9. Continue to implement the TWDB's AMPSS and CFO to Go initiatives.
B. Long-Term Goals
1. Maintain the fiscal integrity of the DWSRF in perpetuity.
2. Employ the resources in the DWSRF in the most effective and efficient manner to
protect public health and assist communities in maintaining compliance with SDWA
requirements and maintain a strong financial assistance program that is responsive
to changes in the state's priorities and needs.
3. Assist borrowers in complying with the requirements of the SDWA by meeting the
demands for funding eligible water projects by providing financial assistance with
interest rates below current market levels and with Additional Subsidization in the
form of principal forgiveness.
4. Support the development of drinking water systems that employ effective utility
management practices to build and maintain the level of financial, managerial and
technical (FMT) capacity necessary to ensure long-term sustainability.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 22
VIII. Participating in the DWSRF Program
Below are the major steps in the production of the initial IUP for SFY 2022.
Project
Information
Forms Due Draft
Intended Use
Plan Public
Published Comment —
Period Intended Use
Plan —
Approved Applications
Due —
Solicitation of Project information
Project information was solicited from eligible entities across the state using direct
emails, notices posted on the TWDB website, and financial assistance workshops held
throughout the State. Potential applicants submitted PIFs by the response deadline of
March 10, 2021.
The required information submitted on a PIF consisted of:
•A detailed description of the proposed project.
• A map(s) showing the location of the service area.
• An estimated total project cost that is certified by a registered professional engineer
if project costs are greater than $100,000.
• A checklist and schedule of milestones to determine a project's readiness to
proceed to construction.
• The population currently served by the applicant.
• Green project information, if applicable.
• Signature of the applicant's authorized representative.
• Additional information detailed within the solicitation for projects as needed to
establish the priority rating.
Any survey being used for income determination must be completed within five years of
the date the TWDB receives the PIF.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 23
A. Updating Projects from the Prior Intended Use Plan
For SFY 2022, a potential applicant must update, at a minimum, the readiness to
proceed information, and if seeking disadvantaged community eligibility, the
socioeconomic economic census data and utility rate information. The requirement to
update the readiness to proceed information will apply to an entity that previously
received a commitment for Planning, Acquisition and/or Design only and desires to be
considered for the construction portion of the project.
B. Evaluation of the Project Information Received and Priority Rating System
All PIFs received an initial review by TWDB staff. The TWDB evaluated submissions
requesting eligibility for disadvantaged community status using the affordability criteria,
which is described in detail in Appendix D. The TWDB rated projects based on effective
management criteria presented in Appendix C. The scores are based on information
received by any established PIF deadline. Throughout the evaluation process, entities
were contacted by staff if additional information was needed for clarifying their eligibility
for disadvantaged status or effective management points.
Concurrent with TWDB's rating process for disadvantaged community status, effective
management, and Planning, Acquisition, and Design (PAD) projects, TCEQ performed
the priority rating for water system projects. The general rating criteria for projects are
briefly described below, with details provided in Appendices C and D. For information on
scoring for specific projects, a report detailing the scoring for each project will be posted
on the TWDB's website.
1. Rating Criteria for Water System Projects
• Health and Compliance—factors regarding public health concerns/issues or
violations of Maximum Contaminant Levels (MCLs) pursuant to 40 Code of
Federal Regulations Part 141 (see Appendix C)
• Secondary Compliance—factors regarding secondary chemicals and/or
physical deficiencies (see Appendix C)
• Effective Management—factors relating to the implementation of effective
management practices (see Appendix C)
• Affordability/ PAD—factor applied to an entity that qualifies as a disadvantaged
community or had TWDB PAD financing for the project (see Appendix D)
2. Rating Criteria for Source Water Protection Projects
• Groundwater System Vulnerability—factor relating to vulnerability of
groundwater systems (see Appendix C)
• Surface Water System Vulnerability—factor relating to vulnerability of surface
water systems (see Appendix C)
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 24
• Effective Management—factors relating to the implementation of effective
management practices (see Appendix C)
• Affordability/ PAD—factor applied to an entity that qualifies as a disadvantaged
community or had TWDB PAD financing for the project (see Appendix D)
C. Ranking and Creation of the Project Priority List and Initial Invited Projects List
Each project submitted by the initial deadline and determined to be eligible is ranked
from highest to lowest by the combined rating factors and included on the PPL. In the
event of ties in the rating, priority is given to the project serving the smaller total
population. Project information submitted after the March 10th deadline was not
considered for rating purposes prior to adoption of the initial PPL. Following approval of
the IUP, changes to a ranked project that result in a project no longer addressing the
issues for which it was rated will require the project to be re-rated and re-ranked.
Changes in the project that do not trigger re-rating and re-raking are:
1. The applicant for a proposed project changes but the project does not change;
2. The number of participants in a consolidation project changes and the change does
not result in a change to the combined rating factor; and
3. The fundable amount of a proposed project does not increase by more than 10
percent of the amount listed in the approved IUP. The Executive Administrator may
waive the 10 percent limit to incorporate additional elements to the project; however,
any Additional Subsidization awarded may not exceed the original IUP amount's
allocation.
The IIPL presented in the IUP (Appendix K) refers to a subset of projects from the PPL
and includes only the projects to be invited to apply for funding during the initial invitation
round following the Board's approval of the IUP. The IIPL includes the type and amount
of funding necessary to meet requirements and goals of the DWSRF, such as Additional
Subsidization and Reserve requirements. Based on a review of readiness to proceed to
construction, the TWDB determined which phases would be eligible to receive funding
during SFY 2022. The phases indicated on the IIPL represent the phases deemed
eligible based on that review.
An entity that previously received a commitment for Planning, Acquisition and/or Design
only and desires to be considered for the construction portion of the project must update,
at a minimum, the readiness to proceed information. It will then be added to the PPL for
construction phase funding based on the same number of points, or higher, they
received in the year they were rated. Any invitation for construction phase funding is
contingent upon the project having met the required ready to proceed milestones.
A project submitted for the SFY 2022 IUP that received a commitment for all requested
phases from TWDB prior to creation of the initial PPL has not been included on the initial
PPL. Those projects that already received the commitment are shown as being
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 25
ineligible for funding in SFY 2022. A project that previously received a commitment from
TWDB for only the initial phase of the project, such as planning, acquisition, and/or
design, and also provided an update of the project's readiness to proceed to the
construction phase, has been listed on the initial PPL.
For SFY 2022, the IIPL represents projects with costs exceeding the available amount of
funds allocated for Equivalency projects. Once the amount of funds allocated to
Equivalency projects has been reached, funds will be allocated to Non-Equivalency
projects.
E. Bypassing Projects
The TWDB's Executive Administrator may decide to bypass, or skip, higher ranked
projects in favor of lower ranked projects to ensure that funds available are utilized in a
timely manner and that statutory and capitalization grant requirements are met, including
federal additional subsidization requirements. In addition, if an entity is offered funding
for any project that has an interrelated project ranked lower on the list, the Executive
Administrator has discretion to also offer funding for the interrelated project. Reasons for
bypassing projects are discussed in Appendix F.
F. Phases for Invited Projects
1. Pre-Design Funding Option (or Planning, Acquisition, Design and Construction
Funding)
The pre-design funding option allows an applicant to receive a single commitment for
all phases of a project. The construction portion of the project must be deemed
ready to proceed before funds for the construction phase will be released.
2. Construction Funding Only
All projects that were determined to be ready to proceed to construction based on
the current status of their planning, acquisition, and design activities were included
on the IIPL and will receive an invitation to fund the construction portion of the
project.
3. Planning, Acquisition, and Design
A project that was not deemed ready to proceed to construction may receive an
invitation to fund only the Planning, Acquisition, and/or Design portion of the project.
4. Viability and Feasibility of Projects
A project must demonstrate to the TWDB that it is viable, feasible, and sustainable
prior to being invited to submit an application and prior to receiving a commitment for
any funding option, including principal forgiveness, for the acquisition, design or
construction phases of the project. A project may receive funds for the planning
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 26
phase to assess the viability and feasibility of a project, including funds to prepare an
asset management plan.
G. Invitations and Application Submissions
Entities with projects on the IIPL will be informed of the opportunity to submit an
application for the project phases shown on the list using the available funding options.
An entity on the list may not submit an application until it receives an invitation from
TWDB. TWDB will consider the need to meet the minimum federal additional
subsidization requirements when deciding whether it needs to bypass projects on the
IIPL.
Intent to Apply
As part of the invitation process the TWDB may require the applicant to submit an intent
to apply form or information by a specified deadline showing the applicant's intent to
request up to the eligible amount of funding in the IUP. Failure to submit the requested
intent to apply information by the established deadline will result in TWDB bypassing the
project on the IUP list.
Prior to submitting an application, entities are required to participate in a pre-application
meeting to discuss the application process and project requirements. Invited
applications from projects on the IIPL that are received during the initial invitation round
after Board approval of the IUP will be allotted available Additional Subsidization
(principal forgiveness) based on rank order. All projects must be determined
administratively complete as submitted or within 14 days from the date the applicant
receives a notice to correct deficiencies or any Additional Subsidization may be
reallotted on a first-come, first-served basis.
Each application received by the TWDB will be reviewed to ensure that the required
milestones have been met to allow funding of the phase(s) being requested. If the
application review determines that a project is not ready to proceed for funding for the
phase(s) being requested, the project may be bypassed for any additional subsidy
amounts or receive limited phases of funding.
Projects may be bypassed if an applicant fails to timely submit a complete application or
additional requested information.
Deadline for Receipt of Invitation
The TWDB will establish a deadline for receipt of the application. If the application is not
received by the established deadline, the project will be bypassed.
Subsequent Invitations
After the initial invitation period, if any funds remain unallocated then other projects on
the PPL will be invited in rank order. Applicants may submit a PIF at any time for a
project to be considered for inclusion on the amended PPL. The new projects will be
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 27
considered after those on the original PPL list have been invited. Amendments to the
project lists will undergo a 14-day public review period that will be advertised on the
agency website. Projects requesting Urgent Need funding may undergo a 7-day public
review period if the TWDB determines it is necessary to protect public health and safety.
H. Addressing Any Water Loss Mitigation within the Application
If an applicant that is a retail public utility providing potable water has a water loss that
meets or exceeds the threshold for that utility in accordance with §358.6 of Title 31, Part
10, Texas Administrative Code, the retail public utility must use a portion of any financial
assistance received from the DWSRF, or any additional financial assistance provided by
the TWDB, to mitigate the utility's water loss. However, at the request of a retail public
utility, the TWDB may waive this requirement if the TWDB finds that the utility is
satisfactorily addressing the utility's system water loss. Mitigation, if necessary, will be in
a manner determined by the retail public utility and the TWDB's Executive Administrator
in conjunction with the project proposed by the utility and funded by TWDB.
I. Self-Certification for Certain Systems Serving 500 or Fewer Persons
The Water Infrastructure Improvements for the Nation Act (Public Law 114-322) requires
DWSRF assistance recipients serving 500 or fewer persons to consider publicly-owned
wells (individual, shared or community) as an option for their drinking water supply. Any
applicable project involving the construction, replacement or rehabilitation of a drinking
water system which is not already using a publicly-owned well for the source are required
to self-certify. If the community already uses a publicly-owned well (including a privately-
owned well for a public water system)and the project does not involve a new water source,
then the self-certification is not needed. The self-certification is only for projects which do
not involve a publicly-owned well source to ensure that this was one of the water supply
options considered but not selected as the best alternative.
J. Commitment Timeframes for Projects with Principal Forgiveness Component(s)
Due to the high demand and limited availability of subsidized funding, it is imperative that
applicants offered these funds proceed in a timely manner. Therefore, the TWDB has
established commitment timeframes for projects that qualify and have been designated
to receive Additional Subsidization in the form of principal forgiveness. If an applicant
does not submit an application by the established deadline and then proceed through
the application process and obtain a funding commitment within the timeframes listed
below, the Additional Subsidization may be reallocated to another eligible project. In
extenuating circumstances, if the application was received by the established deadline
then TWDB may grant an extension of time for obtaining a commitment if an applicant
demonstrates sufficient reason for a delay.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 28
Principal Forgiveness Type Commitment
Deadline
Disadvantaged Community/Disadvantaged Community— 4 months
Small/Rural only
Very Small Systems 4 months
Green Subsidy 4 months
Emergency Preparedness 4 months
Urgent Need 3 months
K. Closing Deadlines
The deadline to close a commitment is dependent on whether the commitment includes
Additional Subsidization in the form of principal forgiveness. Commitments that include
only principal forgiveness must close within four months from the date of commitment.
All commitments that include principal forgiveness funding concurrently with bonds/loan
funding must close within six months from the date of the commitment. All commitments
for bonds/loan funding without any principal forgiveness funding must close within one
year from the date of commitment. In extenuating circumstances, the Board may grant
extensions of time to close if an applicant demonstrates sufficient reason for a delay.
The TWDB may extend these closing deadlines if necessary to confirm to the closing
schedule for concurrent financing for the project from another TWDB financing program.
Type of Financial Assistance Closing Deadline
Commitments that include only principal forgiveness 4 months
All commitments that include principal forgiveness and 6 months
bonds/loan
All commitments for bonds/loan without any principal 12 months
forgiveness
L. Limits
1. Proportionate Share/Capacity
The TWDB may limit the amount of funding available to an individual entity or project
based on a proportionate share of total funds available. Initially, the maximum
loan/bond commitment amount a project may receive under the SFY 2022 IUP is $24
million; however, after all projects on the PPL as of March 31, 2022 have received an
invitation and the last application deadline has occurred, if funds remain available
then the TWDB may increase the maximum as the Executive Administrator
determines is appropriate to fully allocate funds. Allocation of remaining funds will
consider first those projects on the initial IUP PPL in rank order and then any projects
that were subsequently added in order of receipt of a fully completed PIF. The
TWDB may elect to provide financing in excess of the capacity level if the Board
approves the increase consistent with maintaining the DWSRF in perpetuity and after
consideration of other relevant factors.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 29
2. Equivalency funding limits
For SFY 2022, the maximum initial amount of equivalency funds made available is
$100 million , with no more than $24 million of equivalency funds being available to
one entity or project in a single year, unless it is a Disadvantaged Community. There
may be an exception for those projects receiving a loan/bond commitment in excess
of$24 million as described under"Proportionate Share/Capacity." The TWDB may
elect to provide financing in excess of these initial capacity levels if the Board
approves the increase consistent with maintaining the DWSRF in perpetuity and after
consideration of other relevant factors.
3. Additional Project Funding Before Closing
The total project costs may be increased if the entity shows that additional funds are
necessary to implement the project. If the project includes Additional Subsidization,
the total amount of Additional Subsidization in the form of principal forgiveness
allocated to the project may not increase from the amount listed in the IUP unless
Additional Subsidization funding is available. The amount of Additional Subsidization
may increase at TWDB's discretion for projects receiving Urgent Need funds and
determined necessary to enhance feasibility and other considerations as described
in Section VI(1)(a).
4. Cost Overruns After Closing
In the event of cost overruns on projects funded from a previous commitment,
additional funding may be considered on a case by case basis.
5. Reduction in Closing Amount
For commitments that consist of both principal forgiveness and loans/bonds, if the
closing amount is reduced from the commitment amount, then the principal
forgiveness amount for the closing will be reduced on a pro rata basis. Any
remaining principal forgiveness may be applied to subsequent closings of the
remaining commitment amount, subject to the closing requirements of paragraph K
of this section.
M. Leveraging to Provide Additional Funding
The TWDB may leverage the DWSRF program as necessary to meet the demand for
funding additional drinking water projects.
N. Funds from Prior Years
Additional funds that may become available through unobligated previous grant funds, or
deobligation or closure of previous commitments will be available for eligible projects.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 30
O. Transfer of Funds
1. Reserving Transfer Authority for Future Use
Section 302 of the SDWA Amendments of 1996 provides states the authority to reserve
and transfer funds between the DWSRF and the CWSRF programs. In accordance with
Section 302, the TWDB hereby reserves the authority to transfer an amount up to thirty-
three percent(33 percent) of the DWSRF program capitalization grant(s) to the CWSRF
program or an equivalent amount from the CWSRF program to the DWSRF program.
2. Ongoing cash flow transfer mechanism
The TWDB may transfer in accordance with the authority in Section 302 of the SDWA up
to $200,000,000 of funds derived from repayments between the CWSRF and DWSRF.
No grant funds would be transferred under this standing transfer mechanism. Funds
derived from repayments from each SRF may flow from one SRF to the other SRF in
both directions throughout the year. This mechanism will use surplus funds in one SRF
to temporarily meet loan demand in the other SRF. It will achieve savings by eliminating
issuance costs from bond sales that would otherwise be necessary to meet cash flow
demands in a particular SRF. The actual amount TWDB transfers at any time
throughout the year will be based on the cash flows needs of the each SRF program.
TWDB will track the transfers on an absolute basis for reporting purposes and also a net
basis to ensure the net amount of transfer does not exceed the limit under law of thirty-
three percent of the respective program's capitalization grants. This will result in a
positive impact on funds being available to finance projects in both SRFs. The SRF that
receives the funds will be able to fund projects more efficiently and rapidly. The
transferred funds will be returned to the originating SRF so it will be able to meet its
project funding needs. In addition, because both SRFs are leveraged they may borrow
funds to finance projects if necessary. The long-term impact on both SRFs is positive
because of the improved operational efficiencies and ability to achieve program savings.
The TWDB will include any amount that was transferred in SFY 2022 in the DWSRF
program's SFY 2022 Annual Report. (See Appendix E for the calculation demonstrating
that$200,000,000 may be transferred in accordance with Section 302 of the SDWA
Amendments of 1996.)
P. Updates to the Intended Use Plan
Substantive changes to the IUP may be made through an amendment after a 14-day
public review and comment period. Non-substantive changes may be made by the
TWDB without public notification.
IX. Set-Asides
Federal regulations allow states to set aside up to 31 percent of the capitalization grant
funds for purposes other than financing construction projects for water systems. The set
asides for SFY 2022 will be allocated as follows: 4 percent for the TWDB for
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 31
administration/technical assistance, 10 percent for TCEQ for State Program Management, 2
percent for TCEQ for Small Systems Technical Assistance, and $1,800,000 (approximately
2 percent) for TCEQ for Local Assistance and Other State Programs. Set-asides from the
reallotted FFY 2019 funds from another state totaling $813,000 are included as well.
A. Texas Water Development Board Administration and Technical Assistance
Activities
The SDWA allows a state to set aside funds to cover the reasonable costs of
administering the DWSRF and to provide technical assistance to public water systems.
The amount that may be taken for these purposes is the amount of any fees collected by
the State, regardless of the source; and the greatest of(1) $400,000, (2) one-fifth of one
percent of the current valuation of the DWSRF (both loan and set-asides), and (3) an
amount equal to four percent of all grant awards to the DWSRF for the particular fiscal
year.
The TWDB will draw administrative and technical assistance set-asides from the FFY
2021 Capitalization Grant in the amount of$3,448,080. An additional $32,520 of
administrative and technical assistance set-aside will be taken from the FFY 2019
reallotted funds. This amount is based on the option of using four percent of the FFY
2021 capitalization grant. These funds will be used for allowable expenses such as
reporting activities, payment processing, application assistance, project development
and monitoring, and technical assistance to public water systems. In addition, the TWDB
assesses fees for the purpose of recovering administrative costs. These fees are placed
in a separate account for future administrative expenses. The fees are generated by an
assessment of 2.0 percent of the portion of the DWSRF financial assistance that is
repaid and is assessed at closing. Fees collected will be deposited into the
Administrative Cost Recovery Fund.
Federal regulations governing the DWSRF program permit a state to reserve its
authority to take an amount equal to 4 percent of the current year's grant from a future
grant to defray the cost of administering the program. The TWDB, as it has done since
SFY 1998, is reserving that authority.
B. Texas Commission on Environmental Quality Activities
Funds for TCEQ Set-Aside activities from the FFY 2021 capitalization grant totaling
$12,144,240 may be used in SFY 2022. Remaining funds from the previous DWSRF
grant, except for funds for Local Assistance and Other State Programs, may also be
used in SFY 2022.
State Program Management Set Aside from FFY 2021 grant $8,620,200
Small Systems Technical Assistance Set Aside from FFY 2021 grant $1,724,040
Local Assistance and Other State Programs Set Aside from FFY 2021 $1,800,000
grant
Total TCEQ Set-Aside amount from FFY 2021 grant $12,144,240
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 32
FFY 2019 reallotted funds from another state may be used in SFY 2022 as follows:
State Program Management Set Aside from FFY 2019 reallotted funds $81,300
Small Systems Technical Assistance Set Aside from FFY 2019 reallotted $16,260
funds
Total TCEQ Set-Aside amount from FFY 2019 reallotted funds $97,560
A detailed description of SFY 2022 activities may be found in TCEQ's DWSRF Set-Aside
Work Plans. Activities are expected to be completed by August 31, 2022.
C. Coordination of Activities with the Texas Commission on Environmental Quality
The TWDB and TCEQ regularly communicate to discuss projects in need of financial
assistance through the DWSRF program. The two agencies hold periodic DWSRF
coordination meeting and TCEQ staff attend many of TWDB's pre-application meetings
and financial assistance workshops.
X. Financial Status
The total base amount of funding available for SFY 2022 is set at $150,000,000. The
amount of the FFY 2021 capitalization grant allotment for the DWSRF program is
$86,202,000, with a match of$17,240,400 to be provided by the state. As demand
warrants, the TWDB will leverage the DWSRF to provide additional financial assistance to
projects. The TWDB will comply with the requirements associated with the FFY 2021
allotment in SFY 2022. An additional $813,000 of FFY 2019 reallotted funds from another
state, with a state match of$162,600, are included in the total for SFY 2022. These
reallotted funds will carry the terms and conditions from the FFY 2019 federal
appropriations.
A. Sources of State Match
The deposit of required state match will occur in advance or at the time of the scheduled
grant payment and the source of funding for the match, which may include the proceeds
of bonds sales or state appropriations, varies based upon availability.
B. Binding Commitment Requirement
The TWDB will enter into binding commitments with entities during SFY 2022 that total
120 percent of the amount of a FFY 2021 grant payment allocated to projects within one
year after the receipt of the grant payment. A binding commitment occurs when the
TWDB's Board adopts a resolution to commit funds to a project.
C. Leveraging
The DWSRF program will be leveraged as necessary to provide funds to meet the needs
of public water systems in the state. The TWDB will leverage funds through the
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 33
issuance of debt obligations in accordance with a Master Resolution and supplemental
resolutions covering the issuance of each bond series.
D. Cross-collateralization
On March 1, 2018, the TWDB has cross-collateralized the CWSRF and the DWSRF as a
source of revenue and security for the payment of the principal and interest on bonds for
the DWSRF and CWSRF programs. State authority is provided under Section 15.6042
of the Texas Water Code. The TWDB has received a certification from the state
Attorney General that state law permits the TWDB to cross-collateralize the assets of the
CWSRF and the DWSRF. Cross-collateralization of the CWSRF and DWSRF will
enhance the ability of the DWSRF to leverage its funds and increase its lending capacity
without detriment to either of the SRF programs.
1. Summary of the cross-collateralization structure:
a.The type of moneys which will be used as security— Pledged Political Subdivision
Bonds and certain other funds included in the Master Resolution (program account,
portfolio account, and revenue account) will secure the bonds.
b. How moneys will be used in the event of a default- In the cross-collateralized
scenario, Political Subdivision Bonds from the non-defaulting program will be used to
cover the debt service delinquency on the defaulting program. If, for any reason,
insufficient Political Subdivision Bonds exist in both programs, then program equity
will be utilized.
c. Whether or not moneys used for a default in the other program will be repaid; and,
if it will not be repaid, what will be the cumulative impact on the funds- While a
decision to repay or not repay would be made at the time of default, the TWDB would
either require repayment when funds are available or transfer repayment funds.
2. Proportionality—The proceeds generated by the issuance of bonds will be allocated
to the purposes of the CWSRF and the DWSRF in the same proportion as the assets
from the two funds that are used as security for the bonds.
3. State Match — In accordance with Texas Water Code §§ 17.853(c)(1) and 17.859,
the TWDB intends to provide state match through the issuance of one or more
revenue bonds in a program series that will fund the two SRF programs.
Supplemental bond resolutions for the issuance of each series will provide detail on
what specific money is pledged as security for each program (CWSRF or DWSRF)
within the series. As required, the CWSRF and DWSRF will continue to be operated
separately. The cash flows for the DWSRF program and the CWSRF program will
be accounted for separately. Repayments on loans in the CWSRF program will be
paid to the CWSRF and repayments on loans made in the DWSRF program will be
paid to the DWSRF.
Similar to other states' financing methods where state match is not provided by
appropriation and is instead generated through debt issuance, the TWDB cross-
collateralization structure allows the TWDB to retire bonds for the State Match with
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 34
interest earnings payments only, not principal, earned from each SRF in accordance
with 40 CFR § 35.3550(g)(3).
E. Inter-fund Loan / Investment
During SFY 2022, the TWDB may invest funds from the CWSRF in the DWSRF in an
amount not to exceed $150 million. If the TWDB elects this option, it will execute an
inter-fund loan agreement between the CWSRF and the DWSRF with a term that will not
exceed three years. Any CWSRF recycled funds deposited in accordance with the inter-
fund loan agreement would be used exclusively for DWSRF eligible purposes. The
TWDB would also issue a reimbursement resolution providing for repayment of funds to
the CWSRF using the proceeds of a DWSRF bond issuance once the DWSRF program
is leveraged. The TWDB received EPA approval for this option on March 8, 2017.
F. Method of Cash Draw
The method of cash draw for the FFY 2021 capitalization grant is to expend the required
state match first, and then federal funds will be drawn at a rate of 100 percent.
G. Long-Term Financial Health of the Fund
The long-term financial health of the DWSRF is monitored through ongoing cash flow
and capacity modeling. The TWDB lending rate policy has been established to preserve
the corpus of the capitalization grants and state match funds, excluding the amount of
principal forgiveness, set-aside amounts from each grant, and net transfers. The TWDB
will continue to manage the DWSRF to ensure funds will be available in perpetuity for
activities under the SDWA.
H. Interest Rate Policy
The interest rate will be a percentage reduction from the Thomson Reuters Municipal
Market Data (MMD) rate adjusted for yield to maturity that is applicable to the entity's
rating, with non-rated entities using the Baa rate, as follows:
(a) Equivalency projects: 35% reduction
(b) Non-Equivalency projects: 30% reduction
Exclusions from interest rate reduction methodology -the interest rate reduction
methodology does not apply to any portion of financing that is offered at zero percent
(0%). The full benefit of the 0% financing under the respective special funding option will
be incorporated into the total of the maturities for bonds or the total loan payments for
loans.
Rates are set five business days prior to the adoption of the political subdivision's bond
ordinance or resolution or the execution of the financial assistance agreement, but may
be based on interest rate levels determined as of an earlier date, and are in effect for
forty-five days.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 35
I. Fees
The only fee is an origination fee of 2.0 percent that is assessed at closing. Fees are not
deposited into the DWSRF. The accumulated fees may be used for any eligible activity,
including administrative costs, such as project oversight, long-term financial monitoring,
and Special Program Initiatives described in Section XII.
J. EPA Program Evaluation Report and Audit
EPA has conducted an annual program review of the DWSRF program for SFY 2020
and will send their final report to TWDB upon completion.
The Texas State Auditor's Office published the results of the SFY 2020 Single Audit of
the DWSRF on February 26, 2021 (Report 21-015). There were no findings as a result
of the review.
Xl. TWDB Special Program Initiatives
Asset Management Program for Small Systems (AMPSS) Initiative
Purpose and Overview:
Smaller water and wastewater utilities often operate reactively rather than proactively,
usually due to a lack of resources and planning tools. For some of the smaller utilities,
system components are replaced only after failure, while system expansion occurs only as
requested by users or mandated by regulatory agencies. The TWDB has developed and
implemented an initiative to assist these water and wastewater utilities in creating a plan for
managing their systems in a financially and technically sustainable manner by delivering
management tools developed by the Texas Commission on Environmental Quality (TCEQ).
TWDB will contract with qualified entities to evaluate the existing system and create an
asset management plan in accordance with the guidelines created by TCEQ's Small
Business and Governmental Assistance Section. This plan will become the basis for
planning for system sustainability by identifying replacement dates and estimated costs,
developing best practices for operation and maintenance, and developing financial plans for
obtaining funding for future needs.
The system will receive the following tangible assistance:
a. Asset Management Plan.
b. Sustainability Plan.
c. System Operations and Maintenance Manual.
d. Training for system management and staff.
e. A Compliance Manual.
f. Installation of all tools that were developed on the system's computer system.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 36
Funding —Administrative Costs
The funds to cover the contracted services for these smaller systems come from origination
fees from the CWSRF and DWSRF. The TWDB considers the planned activities to be
administrative activities under the CWSRF program and administration /technical
assistance under the DWSRF program. The benefit to wastewater systems would be
covered through CWSRF origination fees while projects that benefit water systems would be
covered through DWSRF origination fees.
a. The TWDB will pay not more than $100,000 per project.
b. Match -There is no match requirement for the system; however, the system will be
required to contribute 80 hours of staff participation to the development of the plan.
(TWDB may waive the required contribution requirement if the TWDB determines it
would constitute a serious hardship on the operations of a system with only a few or no
full-time staff.)
Systems to be Assisted
The target systems are defined as (a) having 5,000 service connections or less or (b) an
entity that has a population of less than 10,000 and one that is not located within the borders
of any municipality with a population over 10,000, including its extra-territorial jurisdiction.
Selection of Contractors
The TWDB may select multiple contractors according to qualifications that are specified in a
RFQ. The procurement process will follow all state procurement laws and requirements,
including use of Historically Underutilized Businesses.
Scope of Work to be Performed by Contractors for Selected Systems
The work must meet the following requirements:
a. Asset Management—(1) Conduct a system evaluation (asset identification, location,
and date of service or approximate age), as needed, resulting in an inventory of the
system and prioritization of assets, (2) develop a comprehensive plan for managing
system assets, (3) develop a budget for managing system assets, (4) develop an
implementation plan, including a time schedule, for implementing and updating the asset
management plan, and (5) determine whether a rate study is necessary.
The resulting asset management plan must fulfill the general requirements of a Fiscal
Sustainability Plan as outlined in the Federal Water Pollution Control Act.
Further, in the section of the asset management plan that discusses funding sources, it
must identify current TWDB financial assistance programs, including the CWSRF and
DWSRF programs as applicable, that may be utilized to meets the system's needs. The
asset management plan must include an analysis of whether current utility rates would
provide adequate revenue to meet future system needs but it does not have to include a
full rate study that establishes a new rate structure.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 37
1
b. Emergency Preparedness/Weatherization/ Resiliency —recommendations related to
emergency preparedness and operations.
c. For Water Systems: Source Assessment and Planning - Identify the utility's drinking
water source, develop any appropriate best management practices for sustaining the
source (at a minimum develop or update the system's conservation and drought
contingency plans), and, if needed, identify options for alternative sources. It will discuss
plans for water conservation and detecting and minimizing water loss.
For Wastewater Systems: Sustainable Systems- Create a plan to manage the system
more efficiently by conducting an energy assessment of the system and including
recommendations for energy-efficiency improvements, and potential public-participation
programs.
d. Operations and Maintenance - Create an operations and maintenance manual for the
utility that includes a plan for scheduling and performing preventative and general
maintenance. The plan may identify other resources available to the system such as
TCEQ's financial, managerial, and technical assistance.
e. Compliance - Train the utility's management and staff on monitoring, reporting, and
record-keeping requirements, the TCEQ's investigation and enforcement process
(including an enforcement scenario), and develop a compliance manual that includes
copies of all required reports, compliance checklists and tables for keeping track of State
and/or Federal requirements. The compliance manual may be incorporated into the
Operations and Maintenance manual.
f. Other Requirements- As part of the project, all tools that are developed, such as
spreadsheets and manuals, shall be nonproprietary and will be installed on the system's
computer system and key staff members will be trained sufficiently to implement the
plan. The TWDB-procured contractor must coordinate development activities, including
the training of key system staff members, with the utility's management. The utility's
management and the TWDB must be kept informed quarterly of the status of the project
while it is under development and be provided an opportunity to provide ample input on
the development of plans.
The project activities conducted by the TWDB-procured contractor must include at least
one presentation to the system's governing body or owner that provides an overview of
the developed plans, the benefits to the system of implementing the plans, and any
recommendations.
The TWDB-procured contractor must return to the system between 12 months and 18
months after delivery of the final plans to assess the system's implementation progress
and provide TWDB and the system's governing body or owner a written analysis of the
system's implementation of the plans.
The TWDB-procured contractor and the smaller system will negotiate and execute a
contract in a form acceptable to TWDB covering the development of the project prior to the
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 38
contractor initiating any work. The contractor must complete the project within 9 months
after the date of the contract between the contractor and the system.
Initial Round:
In the Fall of 2018, a total of$225,000 was made available from the SRF for three small
systems in the initial round to address their water system The work was completed in 2020.
Reserve of Accumulated Fees:
The TWDB is reserving $500,000 of accumulated DWSRF fees for the AMPSS initiative,
along with another$500,000 of CWSRF program accumulated fees, for a total of
$1,000,000. Funds will be used to contract for services to assist small systems develop
asset management tools. Additional accumulated fees may be used by TWDB to manage
the program, oversee implementation, and promote the benefits of the asset management
tools being provided through AMPSS.
Subsequent Rounds:
The TWDB anticipates awarding additional contracts under this initiative in a total amount to
be determined during the year.
Reporting:
The TWDB will report on the amount of fees allocated, recipients assisted, and outcomes
under this initiative in its Annual Report.
CFO to Go Initiative
Similar in concept to the AMPSS program, the TWDB has developed and implemented a
pilot program called "CFO to Go" using origination fees collected under the Clean and
Drinking Water State Revolving Fund programs. Under this program, the TWDB will
contract with Certified Public Accountants (CPAs) to provide technical assistance services to
designated recipients of TWDB funding under the State Revolving Fund (SRF) programs.
The TWDB will select recipients determined to be in need of special assistance from a CPA
to maintain adequate compliance with the requirements of the SRF programs.
The contracted CPA's anticipated work activities would fall into two broad categories of
services for the designated recipients.
First, the contracted CPA would evaluate regulatory and financial assistance covenant
compliance procedures in the following areas for designated recipients:
• Activities allowed/unallowed, including compliance with financial instrument covenants,
•Allowable costs/cost principles,
• Federal funding eligibility, and/or
• Financial Reporting.
Second, the CPAs will provide professional services in areas such as the following:
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 39
•Advising recipients on the design and implementation of internal control procedures,
particularly those addressing Internal Controls Over Financial Reporting in response to
control weaknesses identified in audits of Comprehensive Annual Financial Reports
and/or in Single Audit Reports and Management Letters (or the equivalent),
•Assisting recipients in the design of procedures for preparing financial statements
required by the covenants of loan and other financial commitment documents that
require compliance with Generally Accepted Accounting Principles and Generally
Accepted Government Accounting Standards. This assistance will not include actually
performing the independent audit of the entity's financial statement, or
•Assisting recipients in the identification and interpretation of funding commitment
provisions and covenants and best practices related to compliance disclosure.
While these provide examples of the contracted CPA services contemplated at this time, the
TWDB may alter the scope of services under this program to reflect the needs of the agency
and the recipients.
The expenditures under the CPA contracts will be allocated to the respective SRF programs
based on the initial amount provided under existing SRF loans with the designated recipient.
The TWDB considers the planned activities to be administrative activities under the CWSRF
program and administration /technical assistance under the DWSRF program.
Reserve of Accumulated Fees - The TWDB is reserving $500,000 of accumulated DWSRF
program fees for the CFO to Go initiative, along with another$500,000 of CWSRF program
accumulated fees, for a total of$1,000,000. Funds will be used to contract for services to
provide technical assistance services to designated recipients of TWDB funding under the
SRF programs. Additional accumulated fees may be used by TWDB to manage the
program, oversee implementation, and promote the benefits of the technical assistance
being provided through CFO to Go.
The TWDB will report on the amount of fees allocated and the recipients assisted under this
initiative in its Annual Report.
Securing Safe Water—Outreach, Technical Assistance and Funding Initiative
TWDB is in the process of developing and implementing an initiative to reduce the number
of public water systems in Texas with unresolved health violations. This initiative will support
EPA's Strategic Plan's goal of significantly reducing the number of systems with health
violations. As of June 16, 2021, TCEQ reported 229 public water systems had unresolved
health violations in Texas. Below is an outline of TWDB's overall strategy.
1. Funding
In the SFY 2022 IUP, the TWDB has specifically allocated a portion of the available
principal forgiveness in the Very Small Systems and Urgent Need funding options for
this initiative. In addition to these special allocations, the TWDB will use principal
forgiveness, zero-interest loans, and regular low-cost loans from the Disadvantaged
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 40
Communities, Disadvantaged Communities—Small/ Rural and Urgent Need funding
options to support this initiative.
2. Outreach & Determining Need
a. Contacting systems—letters, telephone calls, and notifications of workshops
b. Site visits
c. Special workshops
d. Developing outreach documents or videos
3. Technical Assistance
a. Determining the appropriate first steps for the public water system.
b. Application assistance
c. Income survey assistance
d. Developing technical guidance such as pamphlets and videos
e. Partnering with others such as TCEQ
f. Facilitating the appropriate involvement of professional entities such as
engineering firms to prepare and seal the Project Information Forms and assist with
project implementation
4. Based on feedback received, assessing viable long-term options that may be
deployed in subsequent years in support of this initiative, including
a. Consider using the AMPSS and CFO to Go initiatives
b. Determine whether a fee-supported program would be beneficial to provide
engineering or other assistance
5. Tracking outcomes
a. Develop special reports to track: Outreach Contacts, Technical Assistance
provided, Type of violation, TWDB funding provided, and date removed from TCEQ's
list.
b. Report outcomes in the Annual Report.
XII. Navigating the Lists
Appendices G — K are a series of lists that detail the proposed project information of each
project based upon the PlFs received.
• Appendix G - The alphabetical list is the PPL sorted alphabetically. It contains the
project information; the name of the applying entity, their total number of points and
associated priority order rank, the type of system, the system's PWS ID number, the
total population based on TCEQ data, a detailed description of the proposed project, all
project phases requested by the entity, the estimated construction start date, total
project cost, the percentage of principal forgiveness if the project is eligible to receive
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 41
disadvantaged funding, information regarding included green components, and a
reference to any other related PIFs from the current or previous IUPs. A grand total for
all of the projects is listed on the last page of the appendix.
• Appendix H — Lists projects that were deemed ineligible to receive DWSRF funding with
a brief description as to why they were deemed ineligible.
• Appendix I — Lists projects that were deemed ineligible to receive disadvantaged
funding with a brief description as to why they were deemed ineligible. The project may
still be eligible to receive other funding options.
• Appendix J — Lists projects in order of highest priority to receive funding. The content is
the same as the alphabetical list in Appendix G.
• Appendix K— Is the list of projects that will be invited in the initial invitation round. The
information provided in this list is similar to the alphabetical and priority order lists. The
TWDB has determined which project phases are eligible to receive funding during this
SFY, which is depicted in the Phase(s) column. Projects on this list will receive an
invitation letter from the TWDB upon Board approval of the IUP. Pertinent notes and the
definitions of acronyms and footnotes are listed on the last page of the appendix along
with a grand total for the projects.
• Appendix L- The Initial Invited Green Projects List is a subset of the IIPL of only
projects with green components. The information detailed includes a description of the
green components, the categories of those green components, the eligible phases of the
project, the total project cost, the total of the green component costs, the type of green
project, and whether the proposed project is eligible to receive subsidized green funding.
A grand total for the projects is listed on the last page of the appendix along with any
pertinent notes and the definitions of acronyms and footnotes.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 42
Appendix A. Public Review and Comment
Public Participation in the Development of the Intended Use Plan
Public participation is an important and required component of the IUP development
process. The TWDB takes seriously its responsibility in administering these funds and
considers public input necessary and beneficial.
A. Notice
To seek public comment on the proposed uses of funds, the draft IUP, including the
associated lists, was made available for a 30-day public comment period. The draft SFY
2022 DWSRF IUP was announced as follows:
• Public notification of the draft IUP, the public comment period, and public hearing
notice was posted on the TWDB website at www.twdb.texas.gov.
• The notice was sent via email to all entities that submitted projects for the SFY 2022
IUP and everyone who had signed up to receive TWDB email notifications.
• A copy of the draft IUP was sent to EPA.
B. Comment
Comments were accepted via the following three options from July 21, 2021, until 5:00
P.M. on August 19, 2021.
1. Attending a public hearing on August 18, 2021 at 9:00 A.M. at the Stephen F. Austin
State Office Building, Room 170, in Austin, Texas.
2. Emailing comments to the following electronic mail address and specifying in the
subject line "DWSRF comments".
iupcomments(a�twdb.texas.gov.
3. Mailing comments to the following postal mail address:
Mr. Mark Wyatt
Director, Program Administration and Reporting
Texas Water Development Board
P.O. Box 13231
Austin, TX 78711-3231
In accordance with federal requirements, all comments on the proposed IUP were
responded to on an individual basis.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 43
C. Effective Date
The SFY 2022 DWSRF IUP is considered final on the effective date.
D. Documentation
The final IUP will be formally submitted to the EPA and posted on the TWDB website.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 44
Appendix B. Projected Sources and Uses of Funds
From 6/1/2021 to 8/31/2022
(As of May 31, 2021)
SOURCES:
FFY 2021 Federal Capitalization Grant and reallotted FFY 2019 funds of$813,000 $87,015,000
State Match-for FFY 2021 Federal Capitalization Grant and reallotted funds $17,403,000
Undrawn previous grants $24,420,080
Principal Repayments $90,850,704
Interest Repayments $23,257,386
Investment Earnings on Funds $324,717
Cash available $279,089,839
Additional net leveraging bond proceeds(based on"Projects to be Funded") $73,792,617
TOTAL SOURCES: $596,153,343
USES:
Set-Asides from FFY 2021 Grant and reallotted FFY 2019 funds:
TWDB Administrative Set-Aside $3,480,600
Total TWDB Set-Aside: $3,480,600
TCEQ Small Systems Technical Assistance Program Set-Aside $1,740,300
TCEQ Texas State Management Program Set-Aside $8,701,500
TCEQ Local Assistance and Other State Programs Set-Aside $1,800,000
Total TCEQ Set-Asides $12,241,800
Set-Asides from prior grant $12,943,072
Protects to be Funded:
SFY 2022 IUP Commitments—Additional Subsidization $30,000,000
SFY 2022 IUP Commitments—Bonds/Loans(Available Amount less Addit. Subsidy) $120,000,000
Total Projects To Be Funded- SFY 2022: $150,000,000
Projects with Commitments/Apps Being Processed
Commitments 1 $267,277,500
Applications $71,509,050
Installment closings $1,750,000
Total Projects with Commitments or being processed: $340,536,550
Debt Service:
Principal Payments $48,376,544
Interest Payments $28,574,777
Total Debt Service: $76,951,321
TOTAL USES: $596,153,343
NET SOURCES (USES): $o
Fees are not deposited into the Fund;therefore,based on EPA guidance they are not included in the Sources and Uses for the Fund.
1.Excludes multi-year commitments closing after SFY 2022
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 45
Appendix C. Rating Criteria
TCEQ Ratings
All TCEQ ratings will be summed then multiplied by 10 before adding effective management
and affordability points.
Combined Rating, Health and Compliance, and Primary Compliance Factors
Microbiological Factors Points
The sum of the total coliform MCL violations, total acute coliform (TCV=s)+(ACV=s)+(TT)-1
MCL violations, and the treatment technique violations (including all
exceedances of the 0.5 Nephelometric Turbidity Units standard),
disregarding one violation.
Chronic Chemical
The compliance result above the MCL for any chronic exposure Result/MCL
chemical, divided by the MCL level.
Acute Chemical
Three times the compliance result above the MCL for Nitrate or (Result/MCL) X 3
Nitrite, divided by the MCL level.
Carcinogen
Two times the compliance result above the MCL for any (Result/MCL) X 2
carcinogenic chemical, divided by the MCL level.
Lead/Copper
Two times the greater of the 90th percentile lead level divided by the [Greater of(Pb90/0.015)
lead action level or the 90th percentile copper level divided by the or (Cu90/1.3)] X 2
copper action level.
Filtration
Awarded to any system with one or more sources identified as 12.00
surface water or groundwater under the direct influence of surface
water for which no filtration is provided.
Groundwater Rule Factor
Awarded to any system with one or more sources of water identified 12.00
as groundwater requiring 4-log viral inactivation for which 4-log
inactivation is not provided.
Population Factor
Added to the sum of the other Primary compliance factors to determine the overall compliance
rating.
Population Range
0-100 0.00
101-1,000 1.00
1,001-10,000 2.00
10,001-100,000 3.00
100,001+ 4.00
Secondary Compliance Factors
Secondary Chemical
One half the compliance result above the MCL for any secondary (Result/MCL) X 0.5
chemical violation for sulfate, chloride, and total dissolved solids,
divided by the MCL level. (Maximum of 1 pt.)
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 46
Physical Deficiency Factor
A rating based on the confirmed existence of physical deficiencies within the water system.
This rating will be used to prioritize systems with no other Health and Compliance Factors or
Affordability Factors.
Deficiency:
Pressure <20 psi 1.00 Water Loss >25% 0.25
No disinfection 1.00 Pressure >20 & <35 psi 0.25
Production >85% total 0.25 Other Secondary MCLs 0.25
capacity
Storage >85% total 0.25
capacity
Consolidation Factor
The sum of all factors for each system which will be consolidated. One half the sums of all
factors for each system which will be provided wholesale water.
TWDB Ratings
Effective Management
An adopted asset management plan that contains an inventory of 2.50
assets, an assessment of the criticality and condition of assets, a
prioritization of capital projects, and a budget.
Entity has adopted an Asset Management/ Financial Planning tools 5
within the past 5 years that contains the product deliverables under
the AMPSS initiative as described in Section XII.
Entity plans to prepare an asset management plan with completion of 0.50
proposed project
Providing asset management training for the entities governing body 0.50
and employees
Project addresses a specific goal in a water conservation plan 1.00
Project involves the use of reclaimed water 1.00
Project addresses a specific goal in an energy assessment, audit, or 1.00
optimization study conducted within the past three years
Project is consistent with a municipal and/or state watershed 2.00
protection plan, water efficiency plan, integrated water resource
management plan, a regional facility plan, regionalization or
consolidation plan, or an approved Total Maximum Daily Load
implementation plan
Disadvantaged Eligibility
Awarded to any entity that qualifies as a disadvantaged community 10.00
(see Appendix D for eligibility criteria)
Previously Received TWDB Planning, Acquisition or Design Funds
The project is requesting construction financing and previously 10.00
received a TWDB commitment for Planning, Acquisition, and/or
Design (PAD) financing within the prior five years (60 months) of the
PIF due date under the DWSRF program or the TWDB's
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 47
Economically Distressed Areas Program, the entity has completed
and received TWDB completion approval for all of the PAD activities
and is ready to proceed to the construction phase, TWDB has
released from escrow at least eighty percent of the PAD funds, and
the project has not received any TWDB funding for construction.
Tie Breaker
Equal combined rating factors will be ranked in descending order with priority given to the least
population first.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 48
Source Water Protection Rating Criteria and Process
This program provides financial assistance to assist communities in implementing source water
protection Best Management Practices recommended by TCEQ. The TWDB will determine
annually the amount of capitalization grant funds to be reserved for source water protection
projects and will include this information in the intended use plan, provided however that no more
than 10 percent of any DWSRF capitalization grant can be so reserved. All projects classified as
source water protection projects are subject to the requirements established in 31 Texas
Administrative Code §371.4 (relating to Other Authorized Activities: Source Water Protection and
Technical Assistance) and those set forth in this intended use plan. If funds which have been
reserved for source water protection projects are unused after all applicants have been provided
an opportunity to submit an application, such funds may be made available for other projects in the
DWSRF program.
Rating Process—To be eligible for consideration, PWS must be willing to participate in TCEQ's
Source Water Assessment and Protection program. Eligible entities that seek consideration for
source water protection funding will be rated according to the following criteria:
a. Groundwater System Vulnerability Factor Table 1.
(1) Groundwater systems without the Organic Chemical Contaminants
necessary water well geologic 2,4,5-TP Endrin
protection will receive 4 points. 2,4-D Epichlorohydrin
(2) Groundwater systems with Acrylamide Ethylbenzene
documented Nitrate concentrations of Alachlor Glyphosate
greater than two milligrams/liter will Aldicarb Heptachlor
receive 1 point. Aldicarb sulfone Heptachlor epoxide
(3) Groundwater systems obtaining water Aldicarb sulfoxide Hexachlorobenzene
from selected vulnerable aquifers will Benzine Hexachlorocyclopentadiene
Benzene Lindane
receive 1 point. Carbofuran Methoxychlor
(4) Groundwater systems with confirmed Carbon tetrachloride Monochlorobenzene
detections of organic chemical Chlordane Oxamyl (vydate)
contamination identified in Table 1 will Cyanide PAHs[Benzo(a)pyrene]
receive 2 points. DBCP PCBs
(5) No groundwater system may receive Dalapon Pentachlorophenol
more than 6 system vulnerability Di(ethylhexyl)adipate Picloram
points. Groundwater systems that Di(ethylhexyl)phthalate Simazine
receive no system vulnerability points Dichlorobenzene ortho- Styrene
will not be considered for source Dichlorobenzene para- TCDD-2,3,7,8 (Dioxin)
Dichloroethane 1,2- Tetrachloroethylene
water protection funding. Dichloroethylene 1,1- Toluene
Dichloroethylene cis- Toxaphene
b. Surface Water System Vulnerability 1,2- Trichlorobenzene 1,2,4-
Factor Dichloroethylene tran- Trichloroethane 1,1,1-
(1) Surface water systems with 1,2 Trichloroethane 1,1,2-
contributing watersheds of 20 square Dichloromethane Trichloroethylene
miles or less as determined by TCEQ Dichloropropane 1,2- Vinyl chloride
will receive 3 points. Dinoseb Xylene
(2) Surface water systems with confirmed Diquat
detections of organic chemical EDB
Endothall
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 49
contamination identified in Table 1 will receive 3 points.
(3) No surface water system may receive more than 6 system vulnerability points. Surface
water systems that receive no system vulnerability points will not be considered for
source water protection funding.
c. No combination ground and surface water system may receive more than 6 system
vulnerability points.
d. Ability to Implement Best Management Practices Factor
(1) Systems that receive system vulnerability points and that possess the ability and
authority to implement land use controls including but not limited to zoning or
ordinances, will receive 2 points.
(2) Systems that receive system vulnerability points and that possess the ability to
implement other non-land use controls such as public education, contingency planning,
or conducting toxic/hazardous waste collection events will receive 1 point.
(3) Systems that receive system vulnerability points and that propose to plug abandoned
wells within the delineated source water protection area will receive 1 point.
(4) Systems that receive system vulnerability points and that have confirmed siting or well
construction problems listed on the most recent TCEQ sanitary survey will receive 1
point for proposals which will correct these problems.
(5) Systems that receive no Ability to Implement Best Management Practices points will not
be considered for source water protection funding.
e. The total points for Groundwater or Surface Water System Vulnerability and the Ability to
Implement Best Management Practices will be summed and multiplied by 10 before adding
Affordability Factor points.
f. Disadvantaged Community Eligibility Factor—Ten points awarded to any entity that qualifies
as a disadvantaged community (see Appendix D for eligibility criteria)
g. The total source water protection rating score will be the sum of points generated from
ground and surface water system vulnerability, ability to implement Best Management
Practices and affordability factors.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 50
Appendix D. Affordability Criteria to Determine Disadvantaged Community
Eligibility
A disadvantaged community is a community that meets the DWSRF's affordability criteria based
on income, unemployment rates, and population trends. For the initial allocation round, the
determination will be based on information received by the applicable PIF deadline. An eligible
disadvantaged community consists of all of the following:
1. The service area of an eligible applicant, the service area of a community that is located
outside the entity's service area, or a portion within the entity's service area if the
proposed project is providing new service to existing residents in unserved areas; and
2. meets the following affordability criteria:
(a) Has an Annual Median Household Income (AMHI) that is no more than 75 percent of
the state median household income using an acceptable source of socioeconomic
data, and
(b)the Household Cost Factor (HCF) that considers income, unemployment rates, and
population trends must be greater than or equal to 1 percent if only water or sewer
service is provided or greater than or equal to 2 percent if both water and sewer
service are provided.
Acceptable Source of Socioeconomic Data for SFY 2022
For SFY 2022, the TWDB will utilize:
(1) U.S. Census 2015-2019 American Community Survey (ACS) 5-year estimates, along with
the 2011-2015 ACS 5-year estimates for determining whether there was a decline in
population, or
(2) Data from a survey approved by the Executive Administrator of a statistically acceptable
sampling of customers in the service area completed in accordance with the most current
Socioeconomic Surveys Guidelines (WRD-285) posted on the TWDB website. Any survey
being used for income determination must be conducted within five years of the date the
TWDB receives the PIF. An entity must submit documentation that substantiates the
inadequate or absent Census data that led to the need to conduct a survey. All entities
must obtain prior approval to use survey data instead of the most recently available
American Community Survey data.
Affordability Calculation and Disadvantaged Community Eligibility
Step 1. Comparison to State annual median household income.
The AMHI for the project service area (either entire or portion) must be 75 percent or less than
the state's AMHI using an acceptable source of socioeconomic data for SFY 2022.
Step 2. Determining the Household Cost Factor
The total HCF is comprised of a household cost factor based on the AMHI, plus an additional
household cost factor based on unemployment rates (if the unemployment rate for the service
area is greater than the state average) plus an additional household cost factor based on
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 51
population decline (if there has been a decline in the population of the service area over a
period of time). The HCF used in the affordability criteria takes into consideration the potential
burden that the cost of a proposed project will place on a household. The entity's total HCF,
which consists of the Income HCF (the percentage of annual household income that goes
toward water, sewer, fees/surcharges, and project financing costs) combined with the
Unemployment Rate HCF (not to exceed 0.75 percent) and the Population Decline HCF (not to
exceed 0.5 percent), must be:
• 1.0 percent or greater if the entity currently offers either water or sewer service, or
• 2.0 percent or greater if the entity currently offers both water and sewer service.
The 1.0 and 2.0 percentage levels are known as the "base" levels in determining the maximum
allocation amount.
The Unemployment Rate HCF and Population Decline HCF can only increase the total HCF, not
decrease it.
Step 3. Principal Forgiveness Eligibility and Levels
The eligible level of principal forgiveness for a project is based on the difference between the
calculated total HCF under Step 2 and the minimum HCF of 1 percent (if only water or sewer
service is provided) and 2 percent (if both water and sewer services are provided) as shown in
the chart below:
Principal Forgiveness as a % of
Household Cost Factor Difference DWSRF-funded project costs
remaining after subtracting other
DWSRF principal forgiveness
>_ 0% and < 1.5% 30%
>_ 1.5% and < 3% 50%
3% 70%
Individual projects will be reviewed for disadvantaged community eligibility as stand-alone
projects. However, if an entity submits an application covering multiple PIFs or multiple
applications for multiple PlFs within the SFY prior to any receiving a funding commitment, the
disadvantaged community eligibility may be re-evaluated based on the combined costs of all the
projects.
In instances where the ACS data does not adequately reflect an entity's service area (e.g. an
entity serves a community outside of its Certificate of Convenience and Necessity, an entity
serves another system, the entity is a system without a Census Bureau defined boundary, etc.),
a prorated analysis of ACS block group data will be performed to calculate the AMHI. An
example of this method follows:
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 52
ACS
2015- Calculatio ACS 2015-
From Entity Calculation 2019 n 2019 Calculation Calculation
Total
Number of %of TTL Prorated Entity's
Census Block Household Connection Prorated Average Average Population
County Tract Group Connections s AMHI AMHI HH Size HH Size Served
Jefferson 69 1 848 62.26% $33,807 $21,049 2.39 1.49 2,063
Jefferson 69 2 309 22.69% $43,304 $9,824 2.64 0.60 752
Jefferson 69 3 205 15.05% $43,889 $6,606 2.30 0.35 499
1.362 100.00% $37,479 2.43 3,314
ACS 2015- ACS 2011-
ACS 2015-2019 Calculation 2019 2015 Calculation
Census Block Unemployment Prorated Population Population Prorated Pop.
County Tract Group Rate Unemployment Rate 2018 2014 Change
Jefferson 69 1 5.13% 3.19% 1,765 1,821 -35
Jefferson 69 2 8.75% 1.99% 928 888 9
Jefferson 69 3 13.73% 2.07% 401 499 -15
7.25% 3,094 3,208 -41
For entities that serve retail customers with differing rate structures, prorated rates are used, in
some instances, to calculate each entity's household cost factor in SFY 2022. The following
tables are an example of the method used. The TWDB will require use of prorated rates to
determine an entity's water and/or sewer bills when applicable.
Prorated Average Monthly Water Bill
A B C 1 D E F I G H I J K I L
Number of Average Average Average
Household Monthly Average Mo.Water Mo.Water Prorated
Connections Percentage Water Household Flow I HH First Initial Additional Additional Other Bill ME- Mo.Water
(HH) of Total HH Flow Size (CxD) Tier Rate Use Rate Changes F)IH)xl)+G) Bill(BxK)
Entity A 1,823 33.95% 2,325 2.56 5,952 2,000 $ 14.45 1,000 $ 6.70 $ 2.00 $ 42.93 $ 14.58
Entity B 1,135 21.14% 2,325 2.47 5,743 3,000 $ 23.41 100 $ 0.57 $ - $ 39.04 $ 8.25
Entity C 1,836 34.20% 2,325 2.78 6,464 3,000 $ 29.85 1,000 $ 6.81 $ - $ 53.44 $ 18.27
Entity D 575 10.71% 2,325 2.53 5.882 1.500 $ 16.00 1,000 $ 4.00 $ - $ 33.53 $ 3.59
Totals 5,369 100.00% amp IENE__,- Average Monthly Water Bill $ 44.69
Prorated Average Monthly Sewer Bill
A B C D E F G H I J K L
Number of Average Average Average
Household Monthly Average Mo.Water Mo.Water Prorated
Connections Percentage Water Household Flow I HH First Initial Additional Additional Other Bill(lIE- Mo.Water
(HH) of Total HH Flow Size (CxD) Tier Rate Use Rate Changes F)IH)xl)+G) Bill(BxK)
Entity A 1,823 33.95% 1,279 2.56 3,274 3,000 $ 10.95 1,000 $ 2.25 $ 2.00 $ 13.57 $ 4.61
Entity B 1,135 21.14% 1,279 2.47 3,159 3,000 $ 17.00 100 $ 0.83 $ - $ 18.32 $ 3.87
Entity C 1,836 34.20% 1,279 2.78 3,556 - $ 20.79 1 $ - $ - $ 20.79 $ 7.11
Entity D 575 10.71% 1,279 2 53 3.236 1 500 $ 10.00 1.000 $ 2.00 $ - $ 13.47 $ 1.44
Totals 5,369 I 100.00% I f 1 Average Monthly Sewer Bill $ 17.03
If an entity is requesting disadvantaged community status for a portion of its service area, the
combined household cost factor is calculated in the same manner as described above with the
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 53
exception that the annual project financing cost per customer is calculated using the total
household service connections in the full service area (not the portion).
If taxes, surcharges, or other fees are used to subsidize the water and/or sewer system, the
average annual amount per household may be included in calculating the household cost factor
or the combined household cost factor.
Systems owned and operated by a public school or school district will be evaluated for their
annual median household income for their school district boundary. Since school districts
typically do not have individual user costs, a household cost factor calculation cannot be
performed. Therefore, districts with an AMHI less than or equal to 75 percent of the state's
AMHI will automatically receive Disadvantaged Community status with the lowest available level
of principal forgiveness.
If recent reliable data is unavailable for the school district to determine the AMHI, the TWDB will
use information from the Texas Education Agency's Title I, Part A program to determine income
eligibility. If more than 50 percent of the school districts campuses are eligible for the program,
the district's AMHI will be assumed to be less than or equal to 75 percent of the State's AMHI.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 54
Appendix E. Federal Requirements and Assurances
A. Federal Requirements
1. Davis-Bacon Wage Rate Requirements
A subrecipient must comply with the requirements of section 1452(a)(5) of the Safe Drinking
Water Act (42 U.S.C. 300j-12(a)(5)) in all procurement contracts and must require
contractors to include compliance with section 1452(a)(5) of the Safe Drinking Water Act in
all subcontracts and other lower tiered transactions. All contracts and subcontracts for the
construction project must contain in full in any contract in excess of$2,000 the wage rate
requirements contract clauses prescribed by TWDB. Section 1452(a)(5) requires
compliance with 40 U.S. Code Sections 3141 to 3144, 3146, and 3147 covering wage rate
requirements. TWDB guidance is available at
http://www.twdb.texas.gov/financial/instructions/doc/DB-0156.pdf.
2. American Iron and Steel (AIS)
The TWDB and all DWSRF financial assistance recipients will comply with the American
Iron and Steel (AIS) requirement in applicable federal law, including federal appropriation
acts. Federal law requires DWSRF assistance recipients to use iron and steel products that
are produced in the United States for projects for the construction, alteration, maintenance,
or repair of a public water system or treatment works.
The term "iron and steel products" means the following products made primarily of iron or
steel:
• lined or unlined pipes and fittings
• manhole covers and other municipal castings
• hydrants
• tanks
• flanges, pipe clamps and restraints
• valves
• structural steel
• reinforced precast concrete
• construction materials
EPA may waive the AIS requirement under certain circumstances.
Furthermore, if the original financial assistance agreement for the planning and/or design of
a project closed prior to January 17, 2014, then the AIS provision would not apply to the
construction phase of the same project. TWDB guidance is available at
http://www.twdb.texas.gov/financial/instructions/doc/TWDB-1106.docx.
3. Environmental Reviews
Environmental review requirements are specified in Texas Administrative Code, Title 31,
Part 10, Chapter 371.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 55
4. Generally Accepted Accounting Principles
Assistance recipients must maintain project accounts according to Generally Accepted
Accounting Principles as issued by the Governmental Accounting Standards Board,
including standards relating to the reporting of infrastructure assets.
5. Compliance with Cross-cutting Authorities
There are a number of federal laws, executive orders, and federal policies that apply to
projects and activities receiving federal financial assistance, regardless of whether the
federal laws authorizing the assistance make them applicable. These federal authorities are
referred to as cross-cutting authorities or cross-cutters. All cross-cutters apply to
Equivalency projects and only federal anti-discrimination laws, also known as the super
cross-cutters, apply to Non-Equivalency projects.
The cross-cutters can be divided into three groups: environmental; social policies; and,
economic and miscellaneous authorities.
• Environmental cross-cutters include federal laws and executive orders that relate to
preservation of historical and archaeological sites, endangered species, wetlands,
agricultural land, etc. This cross-cutter requirement includes a National Environmental
Policy Act(NEPA) compliant environmental review. When conducting the NEPA-like
review the TWDB will inform EPA when consultation or coordination by EPA with other
federal agencies is necessary to resolve issues regarding compliance with applicable
federal authorities.
• Social policy cross-cutters include requirements such as minority and women's business
enterprise participation goals, equal opportunity employment goals, and
nondiscrimination laws. This cross-cutter requirement includes compliance with the
EPA's Disadvantaged Business Enterprise program administered by TWDB.
• Economic cross-cutters directly regulate the expenditure of federal funds such as the
prohibition against entering into contracts with debarred or suspended firms.
The Equivalency projects that are considered federal are those entered into the Federal
Funding Accountability and Transparency Act Subaward Reporting System.
6. Financial, Managerial, and Technical (FMT) Capacity
Prior to receiving or closing a commitment, the TCEQ will conduct a review of each
applicant's FMT capacity. All applicants must receive FMT approval before closing on
financial assistance funding.
7. Additional Subsidization
In accordance with the Consolidated Appropriations Act, 2021 (Public Law 116-260), and 42
U.S.C. 300j-12(d)(2) the TWDB is required to provide 20 percent of the capitalization grant
of$86,202,000, or$17,240,400, in Additional Subsidization. In addition, of the $813,000 of
reallotted funds from FFY 2019, the TWDB will provide additional subsidization of$211,380
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 56
and another$235,770 of additional subsidization may be used for a total of$447,150. The
TWDB has allocated Additional Subsidization for SFY 2022 as follows:
Funding Option Additional Subsidy
Allocation
Disadvantaged Community $16,000,000
Disadvantaged Community-Small/Rural only $2,000,000
Subsidized Green (incl. Water Conservation) $2,000,000
Very Small Systems $2,000,000
Very Small Systems - "Securing Safe Water" $1,000,000
Initiative
Emergency Preparedness—Severe Weather $3,000,000
Urgent Need - "Securing Safe Water" Initiative/ $2,000,000
Contaminants
Urgent Need—Other(Disaster Recovery, etc.) $2,000,000
Total $30,000,000
Of the total Additional Subsidization being made available for SFY 2022, an amount equal to
$12,068,280 may only be used where such funds would be for initial financing for an eligible
recipient or to buy, refinance, or restructure the debt obligations of eligible recipients where
such debt was incurred on or after December 27, 2020. A total of$162,600 of FFY 2019
additional subsidization may only be used where such funds would be for initial financing for
an eligible recipient or to buy, refinance, or restructure the debt obligations of eligible
recipients where such debt was incurred on or after February 15, 2019. The TWDB may
increase the allocations to provide the full eligible amount to a project. The TWDB may
allocate up to the maximum of$42,686,130 as principal forgiveness in accordance with the
SDWA and the FFY 2019 and FFY 2021 capitalization grant appropriations as applicable.
TWDB may consider projects receiving principal forgiveness under the Urgent Need,
Emergency Preparedness, Very Small Systems, and Green that qualify as Disadvantaged
Communities as part of the additional subsidization authorized for Disadvantaged
Communities under the SDWA.
8. Green Project Reserve
The capitalization grant for FFY 2021 states that at the discretion of each State, the
capitalization grant may be used for projects to address green infrastructure, water or
energy efficiency improvements, or other environmentally innovative activities. The TWDB
is establishing a goal to allocate an equivalent of 10 percent of the capitalization grant to
approved green project costs. The discretionary allocation is known as the Green Project
Reserve (GPR).
To encourage green infrastructure projects, a portion of the additional subsidy will be made
available for projects that include green infrastructure. In order to be eligible to receive
green subsidy, projects must have approved green project elements with costs that exceed
30 percent of the total project costs.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 57
Green components include green infrastructure, water or energy efficiency improvements, or
other environmentally innovative activities. Eligibility for all green projects will be determined
by the TWDB.
Appendix L, "Initial Invited Green Projects", lists invited green projects with project
descriptions that detail the green category associated with the project and how much of the
project's total cost is applicable to the GPR.
TWDB information on green project eligibility may be found online at
http://www.twdb.texas.gov/financial/instructions/doc/TWDB-0163.docm.
9. Competency Statements
The following competency statements are provided to satisfy the EPA's policy entitled
"Policy to Assure Competency of Organizations Generating Environmental Measurement
Data under Agency Funded Assistance Agreements."
A. TWDB Competency Statement
TWDB ascertains that competency can be demonstrated by the following:
1. The "TWDB Quality Management Plan," was approved by EPA Region 6 on
September 17, 2020. The plan demonstrates competency by providing a
description of the quality policies including all requirements described in EPA
QA/R-2.
B. TCEQ Competency Statement
TCEQ ascertains that competency can be demonstrated by the following:
1. EPA approval of the "Quality Assurance Project Plan for the Public Water Supply
Supervision Program Relating to the Safe Drinking Water Act of the Texas
Commission on Environmental Quality", Revision 13 (QTRAK#20-054),
approved by EPA on November 4, 2019, which is approved through November 4,
2022
2. The "TCEQ Quality Management Plan, Revision 26 (2021)" (QTRAK#21-088)
approved on December 18, 2020 by EPA Region 6 which demonstrates
competency by providing a description of the quality policies including all
requirements described in EPA QA/R-2.
10. Compliance with Capacity Development Authority, Capacity Development Strategy
and Operator Certification Program
A. Capacity development authority. The State of Texas, through the TCEQ, has the legal
authority to ensure that all new community water systems, and new nontransient,
noncommunity water systems that commence operations have demonstrated FMT
capacity with respect to national primary drinking water regulations. If DWSRF financial
assistance is being provided to the new system, TCEQ conducts and provides to TWDB
the results of its FMT assessment prior to closing on the financial assistance.
B. Capacity development strategy. The State of Texas, through the use of DWSRF set-
asides provided to TCEQ, implements a strategy to assist public water systems in
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 58
acquiring and maintaining financial, managerial, and technical capacity. The TWDB has
set aside funds from the FFY 2021 grant and set aside funds from the FFY 2019
reallotment funds for TCEQ to implement a capacity development strategy. TCEQ will
use funds from the State Program Management, Small Systems Technical Assistance,
and Local Assistance and Other State Programs set-asides to conduct the capacity
development activities. The TCEQ demonstrates compliance with the Capacity
Development Strategy requirement of the SDWA by annually submitting the Capacity
Development Report to EPA. The most recent report was provided to EPA on
November 13, 2020. The TCEQ submitted the TCEQ Triennial Progress Report to the
Governor on the Public Water Supply Capacity Development Program on September 30,
2020 as required by SDWA Section 1420(c)(3).
C. Operator certification program. The State of Texas, through the TCEQ, has a program
for certifying operators of community and nontransient, noncommunity public water
systems. The TCEQ demonstrates compliance with the Operator Certification Program
Provisions by annually submitting an Operator Certifications Program Report to EPA.
The most recent report was provided to EPA on September 10, 2020.
11. Signage
DWSRF projects must comply with the EPA signage requirements implemented to enhance
public awareness of the program. The entity may select from the following options to meet
EPA's signage requirement:
• Standard signage
• Posters or wall signage in a public building or location •
• Newspaper or periodical advertisement for project construction, groundbreaking
ceremony, or operation of the new or improved facility
• Online signage placed on community website or social media outlet
• Press release
According to EPA's policy, to increase public awareness of projects serving communities
where English is not the predominant language, entities are encouraged to translate the
language used (excluding the EPA logo or seal) into the appropriate non-English language.
TWDB guidance is available at http://www.twdb.texas.gov/financial/instructions/doc/TWDB-
1109.pdf.
12. Reserves Established from Available Funds
The following reserved amounts may be applied to the funding options.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 59
Fundin• Reserves
Reserve Amount
Green Projects (10% of capitalization grant) $8,620,200
Small Communities (15% of available funds) $22,500,000
Extended Terms (75% of available funds) $112,500,000
Urgent Need / Emergency Preparedness $3,500,000 (principal
Disadvantaged/ Small/Rural (50% of principal forgiveness) and
forgiveness and 20% of loans with an interest $800,000 (0% loans)
rate of zero percent)
13. Transfers—Amount Available
Calculation of amounts available to transfer between the DWSRF and CWSRF based on
FFY 2008 through FFY 2021 (additional authority is available from prior years):
Federal Fiscal Grant Award
Year Number Grant Amount 33% of Grant
FFY 2008 FS-99679512 $67,112,000 $22,146,960
FFY 2009 FS-99679513 $67,112,000 $22,146,960
FFY 2010 FS-99679514 $86,254,000 $28,463,820
FFY 2011 FS-99679515 $59,854,000 $19,751,820
FFY 2012 FS-99679516 $57,041,000 $18,823,530
FFY 2013 FS-99679517 $53,517,000 $17,660,610
FFY 2014 FS-99679518 $63,953,000 $21,104,490
FFY 2015 FS-99679519 $63,532,000 $20,965,560
FFY 2016 FS-99679520 $60,104,000 $19,834,320
FFY 2017 FS-99679521 $59,590,000 $19,664,700
FFY 2018 FS-99679522 $87,040,000 $28,723,200
FFY 2019 FS-99679523 $86,225,000 $28,454,250
FFY 2020 FS-99679524 $86,280,000 $28,472,400
FFY 2021 FS-99679525 $87,015,000 $28,714,950
TOTAL $984,084,290 $324,927,570
Available from FFY 2008 to FFY 2021 grants plus reallotted FFY 2019
grant funds in FS-99679525 $324,927,570
Ongoing cash flow transfer $200,000,000
Remaining Transfer Authority $124,927,570
B. Assurances
Entry into the Federal Reporting Systems
The TWDB will enter information into EPA's DWSRF Reporting System, the DWSRF
National Information Management System, and the Federal Funding Accountability and
Transparency Act Sub-Award Reporting System as required.
Drinking Water State Revolving Fund / SPY 2022 Intended Use Plan 60
Appendix F. Bypass Procedures
The Executive Administrator may decide to bypass, or skip, higher ranked projects in favor of
lower ranked projects to ensure that funds available are utilized in a timely manner and that
statutory and capitalization grant requirements are met. If an entity is offered funding for any
project that has an interrelated project ranked lower on the list, the TWDB Executive
Administrator will have discretion to also offer funding for the interrelated project.
Reasons for bypassing projects are listed below, but are not limited to:
1. Fulfill the Minimum Additional Subsidization Requirement
A project on the PPL or IIPL may be bypassed to fulfill the federal minimum additional
subsidization requirement.
2. Intent to Apply and Application Submission Deadlines
A project may be bypassed if the applicant did not submit any intent to apply form or
information by a specified deadline or the application is not received by the TWDB-
established submission deadline and it is not administratively complete by the
established deadline.
3. Projects Previously Funded
To fund the construction phase of a project that previously received funding for planning,
acquisition and/or design.
4. Disadvantaged Community/Disadvantaged Community-Small / Rural only
In the event that there are not enough projects with completed applications eligible to
receive Disadvantaged Community funding, the Executive Administrator may bypass
other projects to invite additional projects that are eligible for additional subsidization.
5. Green Project Reserve
In the event that there are not enough projects with completed applications eligible to
meet the Green Project Reserve goal, the Executive Administrator may bypass other
projects to invite additional projects that are eligible for review of their green components
and possible funding.
6. Very Small Systems
In the event that there are not enough projects with completed applications eligible to
receive Very Small Systems funding, the Executive Administrator may bypass other
projects to invite additional projects that are eligible for Additional Subsidization.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 61
7. Urgent Need
The Executive Administrator may bypass projects to provide Urgent Need funding to
replace or rehabilitate essential public water facilities that pose an imminent peril to the
public health, safety, environment, or welfare with a threat of failure in response to an
urgent condition. Projects will be rated by the TCEQ and added to the PPL as an Urgent
Need project.
8. Small Communities
A minimum of 15 percent of the capitalization grant will be made available to systems
serving populations not more than 10,000. In the event that small community projects
with completed applications do not equal 15 percent of the capitalization grant, the
Executive Administrator may bypass other projects to include additional small
community projects.
9. Readiness to Proceed
The Executive Administrator may bypass projects to include those deemed ready to
proceed to construction.
10. Past Project Performance
If the applicant has failed to close a commitment or complete a project in a timely
manner under a prior IUP, and it is determined that such failure to perform could
jeopardize the timely use of funds for a project under this IUP, the Executive
Administrator may bypass the project.
11. Financial Capacity
A project may be bypassed if the Executive Administrator determines that the applicant
will be unable to repay the SRF financial assistance for the project.
Drinking Water State Revolving Fund / SFY 2022 Intended Use Plan 62
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
• Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIE#'s
Public Water System
99 13 14100 Abilene M TX2210001 121,994 This project involves the replacement of existing water lines, PADC $89,500,000.00 13437
the installation of new water lines,the construction and/or
rehabilitation of pump stations,and storage tanks.
60 21 14129 Agua SUD D TX1080022 69,095 The Agua SUD is requesting funding from the Texas Water C $182,500.00 50%Yes-BC $25,000.00
Development Board in order to Rehabilitate the FM 492
Water Treatment Plant Rapid Mix.
•
125 10 14131 Agua SUD D TX1080022 69,095 The Agua SUD is requesting funding from the Texas Water PDC $1,087,682.00 50%Yes-BC $330,000.00
Development Board in order to replace deteriorating
infrastructure and improve efficiency to the Abram Water
Treatment Plant Recovery and Waste Process.
31 43 14133 Alamo M TX1080001 20,178 Water Treatment Plant Rehabilitation&Expansion PDC $7,500,000.00 30%
52 23 14064 Albany M TX2090001 2,034 The proposed project includes improvements at the Water PDC $3,034,000.00 30%Yes-BC $400,000.00
Treatment Plant to address aging infrastructure including
replacement of existing membrane system trains,chemical
system improvements,high service pump station
improvements,electrical,SCADA,and Instrumentation and
controls improvements.
89 13 14033 Alto M TX0370001 1,280 Remove and replace existing aged and deteriorated PDC $1,872,000.00 50%
waterlines within the distribution system as well as rehabilitate
existing deteriorated Ground Storage Tanks and Elevated
Storage Tank.
3 195 14024 Angelina 8 Neches RA D TX0030030 1,043 The proposed project involves the design and construction of PADC $23,895,045.00 50%
a regional water system to serve first time water customers,to
consolidate and supply drinking water to several Public Water
Systems(PWSs)east of the City of Zavalla along Highway
147 in southern Angelina County and the City of Zavalla.
These PWS's primary source of drinking water supply is
groundwater,which has historically had water quality and
quantity issues.The proposed regional water system will
decommission each of the PWS's water production facilities
and supply drinking water for existing customers and
projected residential and commercial growth.
•
21 58 14018 Anthony M TX0710001 3,500 The Town of Anthony will need to construct a 250,000 gallon ADC $9,520,963.00 50% 13494
elevated water tank,rehabilitate existing water wells,replace
booster stations,address leaking water lines,install a
chlorination control system,replace meters and build arsenic
treatment plant in order to provide enough adequate water to
the residents.
63
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIE# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type
Phase(s) % Type PIF#'s
Public Water System
23 52 14165 Avmak WSC W TX1330135 108 The Arimak Water Supply Corporation(WSC)is the recipient PDC 51.314.000 00
of an Administrative Order from the United States
Environmental Protection Agency(EPA)for non-compliance
of the Safe Drinking Water Act(SDWA)as it pertains to
radionuclides levels in drinking water.The WSC is addressing
this matter through the implementation of a groundwater
treatment project.Also,the ground storage tanks(GSTs)
have reached the end of their useful life and are in need of
replacement.The project will include development of an asset
management plan.
40 30 14093 Athens M TX1070005 12,777 Installation of back-up generator for the Lake Athens Water C $557.390.00 30%
Treatment Plant
69 20 14007 Athens M TX1070005 12,777 S19 waterline replacement from College Street to Ben Belt PDC $1,329,972.00 30% 13485
Drive and Edmonson waterline improvements from N Prairie
Street to Cream Level Road.
108 11 14148 Athens M TX1070005 12,777 The City of Athens needs to implement an asset management PDC $828,000.00 30% $578,000.00
plan.Also included in this project is the design and installation
of a SCADA system for the City's utility system.
92 13 14068 Balmorhea M TX1950002 610 Installation of control and remote monitoring equipment in key PDC $300,000.00
locations along the drinking water transmission and
distribution lines.
6 150 14154 Barksdale WSC W TX0690011 210 New Well Exploration to find an aquifer PADC $660,000.00 50%
47 23 14001 Baytown M TX1010003 76,635 Replace of 16-inch asbestos-cement water line,which is C $3,072,300.00
experiencing high failure rate.
90 13 14137 Baytown M TX1010003 76,635 Replacement of 16-inch asbestors-cement water line C $6.721,000.00
85 14 14108 Becker-Jibe WSC W TX1290011 3,547 300,000 gallon Single Pedestal Elevated Water Storage Tank PDC $2,567,000.00
for extra storage and waterline extension.
29 44 14114 Bistone Municipal WSD D TX1470006 23,555 Bistone's transmission lines to its various wholesale PDC $12,121,000.00
customers is aged and has issues with leaks.The project will
replace the portion of the transmission system known as the
1967 14"steel cylinder concrete pipe.Bistone has also been
advised by TCEQ that a pressure sustaining tank(pressure
tank or elevated tank)is needed for the periods when the
Surface Water and Groundwater Treatment Plants are
providing water.Blending is isolated from the two sources
when the Surface Plant operates but this requires pumps to
provide needed pressure.The elevated tank will resolve this
issue and comply with the TCEQ Blending Exception.
64
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
140 3 14096 Bluegrove WSC W TX0390014 70 This project involves the construction of a new pump station PDC $300,000.00 13415
and the replacement of water distribution line to help with
water loss.
135 4 14040 Blum M TX1090007 434 The purpose of this project is to replace/upsize undersized PDC $300,000.00
water mains and replace non-working isolation valves.
36 32 14046 Breckenridge M TX2150001 5,800 The City desires to install improvements/upgrades at the WTP PDC $4.743,000.00 30%Yes-BC $2,922,000.00 13438
and raw water intake structure. In addition,the City is
planning to rehabilitate various portions of the distribution
system in order to reduce the number of water line
leaks/breaks that have resulted in numerous boil water
notices.
148 3 14029 Brenham M TX2390001 17,123 The proposed project includes testing of an existing well that P 6287,100.00
is currently not being used to see if it is able to be reinstated.
It also includes analyzing the addition of up to four well sites
to have as an emergency groundwater supply.
73 19 14119 Bridge City M TX1810001 7,961 This project will provide for the construction of a new water PDC $7,136,905.00
well located on Roberts Avenue and also provide for the
relocation of an existing 65,000 gallon ground storage tank.
87 13 13999 Carl's Corner M TX1090070 199 The city's water well only produces 10 gallon per minute to DC $1,016,900.00
serve 76 connections.This amount is woefully short of the
TCEO requirement of 0.6 gpm per connection.The city
desires to increase its water supply by constructing a new
water well,or if necessary to obtain other adequate water
supply or emergency interconnection.
16 67 14060 Carthage M TX1830001 16,251 The City of Carthage's water treatment plant contains aged DC $6,000,000.00
equipment performing critical treatment methods within the
plant's treatment process.Age of equipment has become
noticeable as the performance of equipment has decreased
from it's intended purpose.The City of Carthage's elevated
storage tanks are in need of rehabilitation as inspection
reports have revealed significant corrosion and compromised
the structural integrity of parts of the elevated storage tanks.
93 13 14039 Colorado Co WCID#2 D TX0450014 615 100,000 gallon elevated storage tank,new chlorination C $1,150,000.00 30%
facilities,and upgraded well pumps and controls.
79 15 14004 Covington M TX1090021 570 The purpose of this project is to replace/upsize undersized PDC $300,000.00
water mains to improve water flow/pressure.Covington is
experiencing between 25-35%water loss in any given month.
157 1 14031 Crescent Heights WSC W TX1070016 1,935 A new public water supply well and elevated storage tank PADC $2,705,000.00 13414
65
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
'Public Water System
55 23 14144 Crockett M TX1130001 6,616 Rehabilitation of existing water lines along SH7 and SH21 PDC $4,365,300,00 30% 13490
between the downtown are and the east loop.Existing lines
are failing due to age causing numerous leaks.Leaking water
lines contribute to overall water loss and pavement repairs to
TxDOT maintained roadways.
117 10 14102 Cross Plains M TX0300003 1,035 The City of Cross Plains proposes to replace undersized lines PDC $1,200,000.00 30% 13464
and loop dead end areas in their system.
37 31 14020 Daingerleld M TX1720001 4,047 Install a new elevated storage lank chemical dosing,and PDC $3,351,000.00 30% 13399
pressure maintenance facility. Upgrade linework and valves.
27 45 14153 Daisetta M TX1460004 938 Water Well PADC $2,157,380.90 30%
43 24 14037 Dawson M TX1750003 767 The purpose of this project is to replace/upsize undersized PDC $300,000.00 50%
water mains that are causing issues within the system.
Replacement of ex.valves and installation of new valves are
also needed throughout for better operation and maintenance
of the overall system.
38 30 13996 De Kalb M TX0190001 1,593 Groundwater Supply and Water Distribution Improvements PADC $7,174,000.00 50%Yes-BC $4,720,000.00
107 11 14021 Dean WSC W TX2120009 5,847 Construction of a new elevated storage tank at an existing PDC $2,858,500.00
pump station.
74 18 14012 Denton M TX0610002 131,712 Ray Roberts Water Treatment Plant Rerate,Performance, C $27,176,000.00
and Regulatory Improvements and Regulatory Improvements
project provides for improvements to improve the operational
performance,process reliability,and redundancy for the
facilities.
152 2 14157 Dish M 426 Investigate the feasibility of establishing a PWS and acquiring P $400,000.00
aldual certified CCN area.
75 17 14027 Dog Ridge WSC W TX0140044 776 Upsize existing water mains in the Sherwood Shores area. PADC $1,313,000.00 30%Yes-BC $120,000.00 13405
83 14 14028 Dog Ridge WSC W TX0140044 4,830 Installation of SCADA system,meter replacement,and PDC $3,483,000.00 30%Yes-BC $320,000.00 13404
mapping software with a GPS system.The WSC also plans to
rehabilitate two elevated water storage tanks.
34 35 14161 Donna M TX1080002 15,798 The proposed project consists of a 12"waterline to serve as PADC $1,463,738.42 30% 13849
an interconnect connected from the City of Weslaco's water
tower to the City of Donna's pipeline.
106 11 14030 East Texas MUD of Smith D TX2120005 2,661 Water Planning and System Improvements PDC $2,697,225.00 13436
County
66
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
56 23 14074 Eastland Co WSD D TX0670019 10,100 Re-clear the pipeline ROW and replace the existing raw water PDC $4.303,000.00 50% Yes-BC $4,303,000.00
transmission pipeline with a new fusion-welded,high-density
polyethylene(HDPE)pipeline.
84 14 14049 Eden M TX0480001 2,766 The City desires to install improvements at the water supply PDC $2,340,000.00 50% 13439
well sites and to install a redundant cooling tower for
operational flexibility.
58 22 14065 Et Paso Co WCID#4 D TX0710018 5,736 The existing water distribution system piping on Elam PDC $1,996,669.00 50%Yes-BC $1,996,669.00
Subdivision has ruptured several times in the past and is
prone to leaks.The system also has physical deficiencies
such as non-functional valves and a lack of additional
isolation valves and curb stops.
Under this project,the Fabens Water District(EPCWCID#4)
proposes to abandon the existing distribution system in place
and furnish and install approximately 6,100 LF of new 6-inch
PVC C900 piping,including all related appurtenances and
2,000 LF of 6-inch PVC C900 pipe for the loop system
adjacent to railroad tracks including all related work and
appurtenances.
59 22 14070 El Paso Co WCID#4 D TX0710018 5,736 Per TCEQ requirements,the minimum pressure throughout a PDC $174,896.00 50%
system during a transient event(power outage)must be
greater than 20 psi.
A surge evaluation of the existing 1-10 booster station
indicated that the system's pressure dropped below the
minimum TCEQ required pressure of 20 psi during a power
failure event.
Per TCEQ requirements,the El Paso County Water
Improvements District#4(EPCWCID#4)requires an elevated
storage capacity of 100 gallons per connection or a pressure
tank capacity of 20 gallons per connection to meet this
requirement.
Under this project,the EPCWCID#4 proposes installing a
new 120-gallon bladder tank to meet the pressure
requirements in the event of a power failure event specified
by ICED.
67
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
76 17 14066 El Paso Co WCID#4 D TX0710018 5,736 The existing Cypress Well has been drilled but is currently not PC 8780.829 00 50%
equipped.When in service,the Cypress Well will have a 900
GPM capacity.Under this project,the Fabens Water District
(EPCWCID#4)proposes to fully equip Cypress Well#6,
including furnishing and installing a new well pump and motor,
a Well building and canopy,discharge piping,valves,flow
meter,electrical and instrumentation systems,generator with
ATS,site grading,and a new access roadway and driveway.
100 12 14067 El Paso Co WCID#4 D TX0710018 5,736 The existing meters at the El Paso County Water PDC $869,671.00 50%Yes-BC 5869.671 00
Improvements District#4(EPCWCID#4)are manual and rely
largely on manpower for water usage reading collection.
Some of the existing meters are also malfunctioning.
Under this project,the EPCWCID#4 proposes replacing the
existing metering and billing system and furnishing and
installing 1,932 new digital meters,electronic equipment for
meter reading,and software for billing throughout the water
distribution system.The meter replacement project seeks to
provide benefits that result in water loss reduction and allow
for a more accurate and efficient water usage data collection
and,ultimately,better customer service.
101 12 14069 El Paso Co WCID#4 D TX0710018 5,736 The existing 1-10 Ground Storage Reservoir controls the raw PDC $895,280.00 50%
water feed quality to the existing Fe/Mn filters and Reverse
Osmosis facility and provides storage if the Wells become
non-operational.The reservoir is currently not in use due to
tank structural defects.Under this project,the Fabens Water
District(EPCWCID#4)proposes to demolish the existing 0.5
MG steel reservoir,including foundation and piping,and
replace it with a new 0.25 MG steel reservoir,including
foundation,piping,cathodic protection system,fencing,and
site grading.
13 73 14118 Ellinger Sewer 8 Water W TX0750014 392 Construct new filter system for Arsenic,including new PDC $1,448,500.00 30% 13479
SC building,piping and electrical.Additionally,construct new
yard piping,chlorination system,booster pumps,electrical,
generator,fencing and Bluebonnet Electrical Service.Also,
move existing pressure tank from existing plant to new plant
location including blast/coat pressure tank.
159 1 14077 Ennis M TX0700001 21,203 Design and Construct a new Elevated Storage Tank with PDC $3,700,220.00
associated piping for the City of Ennis
68
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phases) % Type PIF Ws
Public Water System
160 1 14078 Ennis M TX0700001 21,780 Remove and replace existing old.undersized,and PDC $2,987,600.00
deteriorating waterlines with a new larger diameter waterline.
66 20 13989 Ericksdahl WSC W TX1270005 274 Ericksdahl WSC has a history of high of TTHM levels and PADC $1.420,000.00 50%Yes-BC $140.000.00
water loss.The proposed project will include tank mixing,
disinfection improvements,water line replacement,and
automatic meter reading system to reduce TTHMs and water
loss.
78 15 14045 Evadale WCID#1 D TX1210011 963 Evadale WCID#1 has recently lost part of its production wells PDC $959,999.90 12993
due to mechanical failure and their water lines are
deteriorating and undersized.This project will provide
additional production capacity and replace deteriorated
distribution lines.
26 46 14112 Fort Davis WSC W TX1220001 1,029 Groundwater Treatment System to address Radionuclide in PADC $2,750,000.00
excess of the MCL for Gross Alpha,additional groundwater
well,and prepare an asset management plan
165 0 14082 Freer WCID D TX0660002 2,686 This project consists of constructing one(1)composite PDC $3,856,524.00
elevated tank,removing once(1)standpipe,rehabilitation one
(1)ground storage tank,acquiring 1,000 water meters,and
upgrading SCADA system.
133 5 14002 Fulshear M TX0790133 16,311 A new 4.0 MGD supply and 5.75 MGD pumping station with C $25,381,210.00
3.0 MG ground storage.
158 1 14036 Futshear M TX0790133 16,311 This project includes the construction of a new 1.0 MG C $3,364,725.00
elevated storage tank to serve growth in the City of Fulshear
water system.
50 23 14016 Gordon M TX1820007 744 Water treatment plant improvements including clarifier PDC $2,135,000.00 50%Yes-BC $625,000.00
replacement,plant piping,SCADA,and distribution line
replacements.
150-
2 14132 Graford M TX1820003 830 Replace existing water lines,install a SCADA System and PDC $750.000.00 Yes-BC $750,000.00 13474
radio read meters
63 21 14025 Grand Saline M TX2340003 3,115 Rehabilitate existing elevated storage tank and upgrade the PDC $1,277,250.00 30%
existing water distribution system.Hydraulic Water Modeling.
119 10 14000 Grandview M TX1260004 1,841 This project consists of installing two new water wells, PADC $2,930,000.00 30%Yes-BC $1,100,000.00
replacing deteriorated distribution lines and installing a new
backup generator at the elevated storage tank site.
69
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF 8 Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF is
I Public Water System
62 21 14026 Granger M TX2460002 1.119 The project Includes the rehabilitation of the City's pump PDC $4,298,801,00 30% 13401
station,south well,elevated storage tank supply pipe and
overflow drain pipe,Hwy.95 and UP railroad steel
encasement by bore,replacement of water lines,valves and
fire hydrants.A new filtration system will be installed for the
removal of iron and manganese from the groundwater.
Generators will be installed at the water plant.An asset
management plan will be prepared according to TWDB and
TCEQ requirements.
118 10 14125 Grapeland M 1,489 New industry developments in the City require additional PDC $3,221,000.00 50% 13394
TX1130002 supply and storage.
71 20 14110 Greater Texoma UA D TX0910006 41,567 GTUA/City of Sherman Water System Improvements PDC $8,403,500.00
104 11 14151 Green Acres Mobile P TX0710066 300 Green Acres/Riverview project to install Isolation Valves and C $92,500.00
Home Park Flush Hydrants to allow better management of water and
prevent full loss of system water during repairs.
91 13 14122 Green Creek WSC W TX0720028 460 The WSC proposes to install a pump station with disinfection PADC $750,000.00 70%Yes-BC $750,000.00 13423
facilities.The WSC received a violation from the ICED for
failure to provide a maximum hourly purchase rate of at least
2.0 gallons per minute(gpm)per connection.The WSC
currently purchases treated wholesale water from the City of
Dublin who also provides direct pressure to the WSC's water
system.The WSC proposes to install a pump station and
storage facility in order to provide a capacity of 0.6 gpm per
connection.
88 13 13993 Groveton M TX2280001 1,094 System Study and Water Distribution Line Replacements PDC $2,165,000.00 30%
77 16 14164 Haciendas Del Norte WID D TX0710091 1,148 Replacement of 14,900 linear feet of 12-inch diameter PDC $2,533,191.00
waterline along Desert Willow Drive and vital isolation valves
within Haciendas del Norte Units 1 and 2,El Paso County,
Texas and preparation of asset management plan.
64 21 13990 Hamilton M 7X0970001 3,200 Replacement of water lines that are in poor condition PDC $2,173,063.00 30%
throughout the city.
162 0 14090 Harrold WSC W TX2440002 141 Install a new supply line and repair the existing elevated PDC $300,000.00 13426
storage tank
39 30 14145 Hidalgo M TX1080021 12,200 Proposed Construction of 5.0 MGD Surface Water Treatment PADC $13,300,000.00 30%
Plant
123 10 14170 Hidalgo M TX1080021 12,200 0.5 MG Elevated Tank Replacement Project PDC $4,477,000.00 30%
70
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIE#'s
Public Water System
86 14 14013 Hidalgo Co MUD#1 D TX1080088 8,200 The district requires a 500,000 gal elevated storage tank to PADC $2.150,000.00 30%
meet state requirements
120 10 14109 Holiday Beach WSC W TX0040015 1,852 Water Line Improvements PDC $1,400,000.00 30%
53 23 14085 Hudspeth Co WCID#1 D TX1150007 2,141 Improvements on the existing transmission line and the PADC $6,150,000.00 50% 13424
creation of a new well field,including a booster pump station,
ground storage tank,chlorination system,and appurtenances
to be tied into the existing transmission line.
94 13 14053 Jackson Co WCID#1 D TX1200003 819 New Water Well,Ground Storage Tank,8 Booster Pumps DC $788,200.00
97 13 14121 Keene M TX1260008 6,266 Replace approximately 16,000 linear feet of 2-inch through 8- PDC $3,100,000.00 Yes-BC $3,100,000.00 13472
inch water line.Install a new well and pump station facilities.
30 43 14044 Kenedy M TX1280002 3,410 The City has a history of water supply outages and marginal PDC $24,000,000.00 70%
supply including boil notices to it's community during each of
the most recent natural disasters.The existing complicated,
electricity-dependent reverse-osmosis system based on a
poor water-quality supply is a major contributor to the
problem.This project includes a new,more dependable water
source and supply pipeline.
114 10 14023 Knollwood M TX0910146 590 This project will include replacing/improving undersized water PDC $300,000.00
mains in the City and installing new isolation valves to
improve operation and maintenance.
8 99 14003 La Joya M TX1080213 4,253 The project includes expansion of the Water Treatment Plant, PADC $7,179,200.00 30%
installing two 1,350 gpm pumps,installation of 16,415 LF.of
12-inch pvc pipe and construction of an elevated storage tank.
11 77 14010 La Joya M TX1080213 4,253 Construct new 0.5 MG elevated storage tank and 20,000 LF. PADC $7,055,000.00 30%
of 12 inch transmission line.
57 22 14140 La Villa M TX1080023 2,781 Proposed project is intended to help meet water demand for PADC $10,185,000.00 70%
future upcoming development.
71
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIFls
Public Water System
41 30 13987 Laguna Madre WD D TX0310005 15,022 Water Treatment Plant No.1(WTP No.1)is currently out of PDC $24.434,459.00
service due to lower quality effluent production with water
demands provided for solely by Water Treatment Plant No.2
(WTP No.2),which cannot meet present day maximum water
demands during the summer with existing firm capacity.The
District has identified improvements to WTP No.1 that are
necessary to increase treatment capacity from 2,9 MGD to 5.0
MGD,upgrade treatment units to match water quality from
WTP No.2 and replace equipment past the end of their
service life,and provide system resiliency should one of the
treatment plants need to be taken offline,or should a water
main break occur.
Additionally.project includes the decommissioning of two(2)
existing elevated storage tanks(ESTs)in poor condition and
installation of a single new 0.60 MG EST.
70 20 14103 Laguna Madre WD D TX0310005 19,908 The proposed project consists of improvements to Long PDC $6,649,606.50 30
Island Village(LIV)Water Distribution system located within
Laguna Madre Water District(LMWD)service area.
137 4 14076 Lake Palo Pinto Area W TX1820069 1,932 This project is targeted mainly at making distribution system PDC $5.803,000.00 Yes-BC $5,763,000.00 13444
WSC improvements to bring the system in compliance with TCEO
minimum line size requirements(30 TAC 7290.44(c)). It also
includes pump station improvements to eliminate an existing
inline booster pump station.and replace old infrastructure,
provide better pressure maintenance for areas of the existing
system,and provide operational flexibility through SCADA
improvements and piping insulation at the Water Treatment
Plant
42 25 14062 Leonard M TX0740005 2,481 improvements to the existing water system,piping,pumps, PADC $8,479.050.00 50%
tanks
116 10 14124 Lone Oak M TX1160006 786 The City of Lone Oak is experiencing issues with various PDC $500,000.00 Yes-BC $500,000.00 13430
water lines in their system due to undersized lines and dead-
ends
115 10 14075 Loraine M TX1680002 602 Replacement of various portions of the City's potable water PDC $2,177,000.00
distribution pipeline and valves.
126 10 14146 Lower Valley WD 0 TX0710154 93,061 This area is currently being served by an undersized and PDC $1,853 491.00
dilapidated water system. In addition,LVWD is proposing to
upgrade the size of the main distribution system to improve
pressure.
72
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Dteadv Green OPR Related
Type Phase(s) % Type PIF#'s
Public Water System
127 10 14149 Lower Valley WD D TX0710154 93,061 This area is currently being served by an undersized and PDC $2,346,725.00
dilapidated wafer system.In addition,LVWD proposes to
upgrade the size of the main distribution system to improve
pressure and bring dependable water source to Mesa Del
Norte,Lourdes Estates and El Conquistador colonies(416
households/1,539 residents).
128 10 14150 Lower Valley WD D TX0710154 93,061 This area is currently not served by the District's water PDC $17,331,795.00
system. LVWD propose to install a 12"or larger pipe to the
main distribution system to expand services to unserved
areas and improve pressure.
129 10 14152 Lower Valley WD D TX0710154 93,061 This project's focus is to provide first-time water services to PDC $10,412,000.00
areas that are not being served.Also,this project will help
extend and expand water services by adding water lines and
will help the District's water system by creating redundancy by
eliminating dead ends in the system which will help the
District from flushing this water out of the system.
9 94 13986 M 8 M WSC W TX0030026 3,189 Disinfection system upgrades and new tank mixers PDC $1,019,000.00 30%
130 7 14038 Mabank M TX1290005 12,975 The demands of the City's water service area are taxing the PDC $15,806,700.00
capacity of the PWS.Upgrades to the WTP,transmission
lines,and added storage capacity are proposed to keep the
City in compliance and to meet the needs of the occurring
growth in the City.
146 3 14142 Magnolia M TX1700020 2,688 Water System Improvements PADC $12,000,000.00 13380
136 4 14139 Marsha WSC W TX2270040 680 Marsha WSC is experiencing major and consistent water loss PADC $5,571,400.10 Yes-BC $1,166,970.00
in the distribution system.In order to prevent these losses,
the PWS will need to replace water lines and replace meters.
The system also needs to replace lines to accommodate fire
flow.
169 0 14032 Marshall M TX1020002 23,449 Replace Existing Raw Water Main PDC $8,579,000.00 13413
80 14 14107 McAllen M TX1080006 143,258 This Project consists of facility improvements at the Northwest C $22,500,000.00
Water Treatment Plant such as to increase Capacity by a
minimum of 10 MGD.The current plan is to install a parallel
treatment train that will essentially double capacity of the
North Water Treatment Plant.
73
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF Vs
Public Water System
134 5 14115 McAllen M TX1080006 143.258 McAllen Public Utility proposes to install large diameter C $6,750,000.00
transmission lines such as to improve efficiency of water
delivery throughout the service area. This loan will also be
used to fund the construction of a new elevated water storage
tower.
149 3 14116 McAllen M TX1080006 143,258 This Project consists of improvements to existing Back-up C $2,812,500.00
Power facilities at both our South and Northwest Water
Treatment Facilities.
32 36 14166 Medina Highlands P TX0100041 120 Medina Highlands very small water system has one well. C $215.000.00
Well production had been in decline,and unable to meet peak
usage. Customers are operating under conservation
measures. The winter weather event of February 2021
caused water outages,after returning to production the sole
well later lost production in March 2021. Medina Highlands
seeks emergency funding for a replacement well to provide
adequate long term supply for the small public water system.
An asset management plan will be developed and adopted.
121 10 14073 Meeker MWD D TX1230004 3,550 Proposed groundwater well;production facilities including PADC $6,504,000.00 13412
high service pumps,ground storage tanks,chemical feed
systems,electrical facilities etc.,and water line extensions
necessary to connect new well to existing system.
109 10 13988 Melvin M TX1540003 184 This project involves the installation of an AMR meter system, PDC $400.000.00 50%Yes-BC $65.000.00 13388
the recoating and repair of an existing ground storage tank
and the installation of new waterlines.
4 160 14111 Menard M TX1640001 1.562 Major rehabilitation,additions and modifications to the surface DC $4,565,000.00 30% 13450
water treatment plant and raw water wells to address
groundwater under the influence.
74
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) Y. Type PIF Ws
Public Water System
49 23 14050 Mertzon M TX1180002 700 As a result of the recent historic ongoing drought,the City s PDC $3.808,000.00 50%Yes-BC $3.224.000.00 13440
water supply is still depleted.The City currently has five(5)
functional groundwater wells(of the original eight),caused by
continual pumping during the ongoing drought,and is in the
process of obtaining approval for a new sixth well.The City
has observed a steady decrease in production from its wells
over the past several years,to the point that three of the
original eight wells are essentially"dry"at this time.As the
water supply has dwindled,the quality of the water no longer
meets secondary drinking water quality standards. In order to
support current water supply needs with water that meets
current drinking water quality standards,the City of Mertzon is
pursuing implementation of a major project to install a
treatment system to address the City's groundwater quality
issues.
10 85 14051 Miles M TX2000002 870 The City of Miles(City)proposes to pursue development of P $200,000.00 Yes-BC $200,000.00 13431
an alternative source of water supply to complement its
current wholesale water supply.The City needs to identify and
evaluate alternative water supply options including
development of additional surface water or groundwater
supplies as well as potential treatment of its existing
groundwater to reduce nitrate and dissolved solids levels to
within compliance.
1 495 14126 Millersview-Doole WSC W TX0480015 3,579 Treating well water at the source and blending with surface PDC $2,300.000.00 70% 13427
water.The project includes additional water system
improvements
164 0 14009 Montgomery Co FWSD# D TX1700142 373 Improvements to the Montgomery County Fresh Water DC $1,211.348.00
6 Supply District No 6(MCFWSD6 or the"District")water plant
and distribution system to meet minimum TCEQ and City of
Conroe design standards for existing and future demands.
139 3 13994 Montgomery Co UD#4 D TX1700286 3,804 New water well,transfer line,and booster pumps to serve DC $2,835.000.00
Montgomery County Utility District 4(UD4 or the"District")to
meet minimum TCEQ and City of Conroe design standards
for separation from Montgomery County Utility District 3
(UD3).
141 3 14175 Mooreville WSC W TX0730015 142 Mooreville WSC Pump Station&Water Distribution System PADC $2,625,580.00 13367
Improvements
111 10 14015 Moran M TX2090002 355 Water Line Replacement PDC $340,000.00 70%Yes-BC $300,000.00 13422
75
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF it Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
61 21 14084 Mount Cairn M TX1090005 331 The existing elevated is out of plumb and needs to be PDC $700,000.00 50%
corrected.The tank is currently out of service.
17 66 13997 Mullin ISO D TX1670013 130 Planning and design fora new well,treatment and distribution PADC $25,839,530.00
system to supply municipal and school needs
155 1 13992 New Fairview M 1,347 The City does not currently own public water infrastructure PADC $58,765,000.00
nor provide water to anyone.At present,small water supply
corporations provide water to residences and businesses that
do not have private groundwater wells within the city.
However,these small co-ops are unable to meet the
demands of growth occurring within the City.Therefore,the
City wishes to obtain a CCN and construct infrastructure for
providing public water to meet the needs of the City moving
forward.
12 74 14022 New Summerfield M TX0370028 1,350 Water System Improvements PDC $2,000,000.00
153 2 14071 Nolanville M 5,496 Replace water lines with code compliant PDC $2,196,000.00
67 20 14042 North Alamo WSC W TX1080029 963 Transmission System Improvements for Hargill C $827,000.00 30%
44 24 14155 Oak Grove WSC W TX0190014 921 Riverbend Regional Water System ADC $1,420,000.00 Yes-BC $497.000.00
72 20 14006 Odessa M TX0680002 169,416 The proposed project elements include replacement of the C $100,000,000.00 13810
plant 1 flocculation and sedimentation basins,rehabilitation
and upgrade of disinfection facilities,new chemical feed and
storage facilities,rehabilitation of all filters along with SCADA
and electrical improvements.
105 11 14005 Old Tamina WSC W TX1700110 507 Upgrades to existing water meters and master water meter; PADC $195,030.00 50% 13478
replacement of hydrotanks and rehabilitation of ground
storage tank;installation of new isolation valves and
replacement of existing flush valves
167 0 14014 Olney M TX2520003 3,200 Rehabilitation or new construction of the existing water PADC $10,330,000.00 13505
treatment plant.
54 23 14143 Orangefied WSC W TX1810186 6,531 The proposed project water system improvement will PADC $9,300,000.00
eliminate the use of private drinking water wells and address
the human health needs by eliminating potential risks to
public health and safety caused by the unsatisfactory water
quality.
24 51 14099 Paint Rock M TX0480012 223 This project involves the replacement of old water lines with PDC $300,000.00 13418
new water lines and the installation of new water lines to
reduce Ohms.
76
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Dlsadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
95 13 14167 Palm Valley M TX0310027 1.706 Palm Valley Water Distribution System Improvement projects DC $12,111,005.00
151 2 14123 Parker WSC W TX1260021 3,000 The WSC wants to improve their water distribution system to PDC $3,300,000.00 Yes-BC $3,300,000.00 13428
better service customers with sufficient pressure and
disinfectant residuals.
20 60 14017 Pfiugerville M TX2270014 56,558 Since July of 2018 the City of Pfiugerville Water Treatment C $66,945,000.00
Plant has received numerous TCEQ violations related to the
Long Term 2 Enhanced Surface Water Treatment Rule
(LT2ESWTR)violations. The WTP expansion is to address
these violations.
45 24 14054 Port Arthur M TX1230009 54,864 Water Line Improvements DC $16,500,520.00 30% 13416
131 7 14091 Reno M TX1840049 2,900 Design and construction of a new 0.5MG elevated storage PADC $3,550,000.00 Yes-BC $2,000,000.00
tank and onsite well to fill the tank.SCADA will be included to
monitor the hydraulics and fill rates.A master plan which
includes an asset management plan will be developed to
prioritize the system needs.
166 0 14095 Reno M TX1840049 2,900 Water system analysis with a masterplan to identify and PDC $7,750,000.00 Yes-BC $6,150,000.00
prioritize the system needs. Design and construction of
waterlines and other facilities will be included in this project.
18 63 14098 Rhome M TX2490007 10,277 This project will allow the City to serve current and future PADC $26,545,000.00
development and meet their long term water supply needs.
156 1 14089 Rhome M TX2490007 1,813 Ground storage tank improvements,Water well and SCADA PDC $1,945,650.00
improvements,FM 3433 disinfection booster system,and
Well No.6 radium treatment
48 23 14052 Richland Springs M TX2060002 350 replacement and upgrade of 25 miles of pipeline PDC $3,824,200.00 70% 13458
15 68 14063 Riverside SUD D TX2360010 5,760 Riverside SUD Waterwell Replacement PDC $1,500,000.00
143 3 14087 Rochelle WSC W TX1540004 372 This project involves the rehabilitation of existing ground PDC $300,000.00 Yes-BC $75,000.00 13419
storage tanks,the replacement of old waterlines and the
replacement of existing meters with an AMR meter system.
112 10 14086 Rochester M TX1040002 464 This project involves the drilling of a new water well,the PDC $500,000.00 70%Yes-BC $75,000.00 13467
installation of an AMR meter system and the installation of
water line and the replacement of old water line.
77
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
98 13 14094 Roma M TX2140007 19,123 The City is addressing the need for Phase I(6 MGD)of a new PDC $6,000,000.00 50%Yes-BC $6,000,000.00 13446
water treatment plant(WTP)to serve City of Roma residents
and fully comply with all water treatment regulations.The
City's existing WTP was partially rehabilitated in the late
1990s and has reached the end of its useful life and requires
replacement.
19 63 14057 Rowena WSC W TX2000004 480 This project will reduce TTHM levels to gain compliance with PDC $4,261,000.00 70%Yes-BC $4,261,000.00 13442
the Stage 2 DBP Rule.
113 10 14097 Rule M TX1040003 540 This project involves the replacement of old cast iron lines PDC $400,000.00 50%Yes-BC $110,000.00 13470
with new lines and the installation of an AMR meter system.
170 0 13998 San Antonio Water M TX0150018 1,857,779 This project,Phase 9 in the multi-year pump station C $20,139,290.00
System improvements program,will evaluate and replace high service
pumps,well pumps,and electrical and SCADA equipment at
the Marbach pump station.
171 0 14092 San Antonio Water M TX0150018 1,857,779 Replace high service pumps,electrical gears,instrumentation C $22,918,170.00
System and and controls,SCADA,valves,motors,disinfection and
fluoride system,cathodic protection,and other miscellaneous
improvements.
124 10 14156 San Benito M TX0310007 24,371 City of San Benito Proposed Water System Improvements PDC $2,941,264.00 30%
122 10 14117 San Diego MUD#1 D TX0660003 4,753 Rehabilitation of the existing elevated and ground storage for PADC $2,290,000.00 50%
the San Diego MUD facilities.
5 154 14130 Sandbranch W Pending 190 Install a water system to an existing development ADC $587,500.00 70%Yes-BC $587,500.00 12486
Development 8 WSC
68 20 14136 Santa Anna M TX0420002 1,099 Replacement of various portions of the City's potable water PDC $1,093,000.00 30% 13386
distribution pipeline and valves.
82 14 14079 Santo SUO D TX1820010 2,775 The proposed project includes improvements to various PDC $9,866,000.00 Yes-BC $9,866,000.00
portions of the water system to bring the system into
compliance with TCEQ requirements and provide capacity for
future growth.An asset management plan will be prepared as
part of this project.
46 23 14141 Shamrock M TX2420001 2,430 Shamrock desires to replace the transmission pipeline that PADC $16,955,200.00 50%Yes-BC $11,835,000.00 13498
carries water from the North Well Field to the distribution
system,replace ground storage tanks in both the West and
North Well Fields,replace a portion of the existing distribution
system and construct a new elevated storage tank.
78
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
35 33 13991 Sharyland WSC W TX1080033 87.274 SWSC seeks funding from the Texas Water Development DC $23,500,000.00 30%
Boards Drinking Water State Revolving Fund in order to be
able to better serve their customers and improve the overall
performance,reliability,and redundancy of their water
distribution system.Proposed projects include,but are not
limited to:pressure zone expansions to address identified low
pressure zones throughout the system and improve the level
of service for customers;infrastructure relocation projects;
capacity and performance improvements projects to
treatment facilities and the distribution system;and looping
and gridding throughout the system to improve redundancy,
reliability,and resiliency.
102 12 14058 Slaton M TX1520004 6,077 The City of Slaton is proposing the installation of an AMI PDC $4,604.000.00 30%Yes-BC $4,604,000.00 13441
system throughout their distribution system as well as the
installation of a new elevated storage tank.
147 3 14043 South Newton WSC W TX1760022 3,800 This project will provide improvements to South Newton's PDC $2,462,209.00
water plants to improve operation of the distribution system,
add backup power,and an additional elevated storage tank at
water plant for pressure stabilization.
51 23 14080 Spur M TX0630012 1,100 Replacement of various portions of the City's potable water PDC $2,321,000.00 50%Yes-BC $2,321,000.00
distribution pipeline system,valves,and fire hydrants.
96 13 14135 Stephens Regional SUD D TX2150007 3,173 SRSUD is proposing water system improvements to address PDC $1,093,000.00 30%Yes-BC $1,093,000.00
growth in the distribution system by expanding the distribution
system to areas which are currently unserved.
2 275 14041 Strawn M TX1820005 487 The project includes replacing the existing multi-media fitters PDC $1,627,000.00 70%
with new microfi8ers.
132 6 14035 Stryker Lake WSC W TX0370033 908 New water plant with ground storage tank,high service pump PDC $1,427,900.00 13391
station and treatment. Replace aging water line.
110 10 14088 Study Butte WSC W TX0220035 196 This project involves the replacement of an existing ground PDC $500.000.00 70% 13393
storage tank and the replacement of existing water lines and
valves.
145 3 14019 Toga M TX0910007 1,366 The project involves constructing a new high service pump PADC $8,459,053.00
station. 500,000-gallon elevated storage tank,250,000-
gallon ground storage tank,a 400 gpm water well,and line
extensions to connect the elevated storage tank into the
distribution system.
79
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
14 70 14138 Toyah M TX1950004 113 Installation of Raw Water Chlorination,Chlorine Residual PDC $300,000.00 13406
Monitoring.Ammonia Facilities,and Raw Water piping
improvements to convert the disinfection system to
Chloramines to address DPB.
163 0 14101 Trent M TX2210009 269 This project involves the replacement of old existing water PDC $300,000.00 13500
lines that are prone to breaking and leaking with new pvc
water line.
161 0 14120 Tri-Try WSC W TX2170004 88 This project includes the construction of a new pump station PDC $300,000.00 13510
for the WSC.
142 3 14105 Umbarger Community W TX1910024 180 Water System Improvements This project involves the PADC $500,000.00 13382
WSC installation of a new water well and supply line as well as the
treatment for the new water supply.
144 3 14163 Upton Co WCID#1 D TX2310027 744 Upton County Water District,Rankin Well Well Field,required DC $4.455.000.00
Rankin additional water wells to meet primary drinking water
standards.
22 55 14127 Venus M TX1260006 3,488 Water Distribution System Improvements PADC $10,175,840.00
33 35 14034 Vernon M TX2440001 10,874 Install a new 8.5 mile 24'PVC pipeline. PADC $11,881,000.00 50%Yes-BC $11,881,000.00 13402
28 44 14081 Webb County C TX2400022 750 Webb County desires to install improvements/upgrades at the C $2,192,000.00 Yes-BC $2,192,000.00
existing RO WTP.The County is currently hauling water to
this area to serve the residents.
7 111 14106 Welch WSC W TX0580013 315 Welch Water Rehabilitation PADC $1,650,000.00
103 11 13995 Wellbom SUD D TX0210016 22,000 The District plans to add two water supply wells for additional PADC $43,304,491.00
water supply
capacity with water transmission lines,ground storage and
pump station,and distribution lines to
increase distribution system capacity.
81 14 14083 Westbound WSC W TX0670027 2,748 Westbound WSC has substantial head loss through smaller PDC $3,685,000.00
diameter water lines,a lack of production water in certain
pressure planes,limited capability to control and monitor the
distribution system remotely,two pump stations that are old
and hydraulically undersized,in addition to very limited
emergency back up power.After the proposed improvements
have been constructed,the above mentioned issues should
be resolved.
80
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix G.Project Priority List-Alphabetical
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
138 3 14011 Westhaven WSC W TX0460050 185 Repairs and upgrades to Well#1 which is 60 years old shut- PDC $606.727.00 Yes-BC $60,000.00
off valves at the ends of streets replace all water meters with
AMI meters to reduce water loss figures.Develop an asset
management plan to include asset management training.
154 1 14008 Willow Park M TX1840027 6,323 The project consists of a water transmission line,water PADC $6.350,000.00 Yes-BC $650,000.00 13407
distribution line replacement,two new elevated tanks,
elevated tank recoating,and appurtenances.
168 0 14128 Willow Park M TX1840027 6,323 The project consists of the installation of 18"and 16"water C $7,287,080.00
supply lines along IH20 and pump station and storage
improvements. The current request is for funding of cost
overruns.
65 21 14061 Wills Point M TX2340005 3,889 The City of Wills Point has a 12 inch raw water supply line PDC $5,585,000.00 50% 13398
which supplies water from the intake on Lake Tawakoni to the
City's Water Treatment Plant. The raw water transmission
line,the raw water intake pump station,and the in-line
booster pump station are in need of repairs,upgrades,and
replacements. The purpose of this project is to replace
38.400 linear feel of 12 inch raw water transmission line from
the Lake Tawakoni Intake to the City of Wills Point Water
Treatment Plant,make upgrades to the raw water intake
pump station,and make upgrades to the in-line booster pump
station in order to provide reliable raw water to the City's
Water Treatment Plant.
25 51 14072 Winnsboro M TX2500004 3,360 Blast and paint interior and exterior of existing 350,000 PDC $7,963,176.70
gallon elevated storage tank,500,000 gallon ground storage
tank,and 1,000,000 gallon ground storage tank.Replace
aged cast iron distribution lines.
Public Water 171 $1,192,938,220.52 77 42 $101,825,810.00
System Total
Total 171 $1,192,938,220.52 77 42 $101,825.810.00
Phase(s).P-Planning;A-Acquisition;0-Design;C-Construction
Green Type-.BC-Business Case,CE-Categorically Eligible;Comb-Project consists of both CE and BC components
81
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix H.Alphabetical List of Ineligible Projects
None.
82
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix I.Projects Ineligible for Disadvantaged Funding
Projects Listed are not eligible for Disadvantaged Community Funding but are eligible for low-interest financing.
PIF# Entity Project Cost Reason for Ineligibility
1 14165 Arimak WSC $1,314,000 Disadvantaged Ineligible-AMHI
2 14001 Baytown $3,072,300 Disadvantaged Ineligible-HCF
3 14040 Blum $300,000 Disadvantaged Ineligible-AMHI
4 13999 Carl's Corner $1,016,900 Disadvantaged Ineligible-AMHI
5 14004 Covington $300,000 Disadvantaged Ineligible-AMHI
6 14157 Dish $400,000 Disadvantaged Ineligible-AMHI
7 14132 Graford $750,000 Disadvantaged Ineligible-AMHI
8 14151 Green Acres Mobile Home Park $92,500 Disadvantaged Ineligible-HCF
9 14023 Knollwood $300,000 Disadvantaged Ineligible-AMHI
10 14124 Lone Oak $500,000 Disadvantaged Ineligible-AMHI
11 14146 Lower Valley WD $1,853,491 Disadvantaged Ineligible-HCF
12 14149 Lower Valley WD $2,346,725 Disadvantaged Ineligible-HCF
13 14150 Lower Valley WD $17,331,790 Disadvantaged Ineligible-HCF
14 14152 Lower Valley WD $10,412,000 Disadvantaged Ineligible-HCF
15 14051 Miles $200,000 Disadvantaged Ineligible-AMHI
16 13997 Mullin ISD $25,839,530 Disadvantaged Ineligible-DNS
17 14071 Nolanville $2,196,000 Disadvantaged Ineligible-AMHI
18 14143 Orangefield WSC $9,300,000 Disadvantaged Ineligible-AMHI
19 14167 Palm Valley $12,111,000 Disadvantaged Ineligible-AMHI
20 14123 Parker WSC $3,300,000 Disadvantaged Ineligible-AMHI
21 14063 Riverside SUD $1,500,000 Disadvantaged Ineligible-AMHI
22 14035 Stryker Lake WSC $1,427,900 Disadvantaged Ineligible-AMHI
23 14081 Webb County $2,192,000 Disadvantaged Ineligible-AMHI
24 14106 Welch WSC $1,650,000 Disadvantaged Ineligible-AMHI
25 14083 Westbound WSC $3,685,000 Disadvantaged Ineligible-AMHI
Total $103,391,136
AMHI=Annual Median Household Income was greater than 75%of the State AMHI.
DNS=Did not submit updated project information form survey data
HCF=Did not meet the Household Cost Factor
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix J.Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS 1D Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF We
Public Water System
1 495 14126 Millersview-Doole WSC W TX0480015 3,579 Treating well water at the source and blending with surface PDC $2,300.000.00 70% 13427
water.The project includes additional water system
improvements
2 275 14041 Strawn M TX1820005 487 The project includes replacing the existing multi-media filters PDC $1,627.000.00 70%
with new microfilters.
3 195 14024 Angelina&Neches RA D TX0030030 1.043 The proposed project involves the design and construction of PADC $23,895,045.00 50%
a regional water system to serve first time water customers,to
consolidate and supply drinking water to several Public Water
Systems(PWSs)east of the City of Zavalla along Highway
147 in southem Angelina County and the City of Zavalla.
These PWS's primary source of drinking water supply is
groundwater,which has historically had water quality and
quantity issues.The proposed regional water system will
decommission each of the PWS's water production facilities
and supply drinking water for existing customers and
projected residential and commercial growth.
4 160 14111 Menard M TX1640001 1.562 Major rehabilitation,additions and modifications to the surface DC $4.565,000.00 30% 13450
water treatment plant and raw water wells to address
groundwater under the influence.
5 154 14130 Sandbranch W Pending 190 Install a water system to an existing development ADC $587,500.00 70%Yes-BC $587,500.00 12486
Development 8 WSC
6 150 14154 Barksdale WSC W TX0690011 210 New Well Exploration to find an aquifer PADC $660,000,00 50%
7 111 14106 Welch WSC W TX0580013 315 Welch Water Rehabilitation PADC $1,650,000.00
8 99 14003 La Joya M TX1080213 4,253 The project includes expansion of the Water Treatment Plant, PADC $7,179,200.00 30%
installing two 1,350 gpm pumps,installation of 16,415 LF.of
12-inch pvc pipe and construction of an elevated storage tank.
9 94 13986 M 8 M WSC W TX0030026 3,189 Disinfection system upgrades and new tank mixers PDC $1,019,000.00 30%
10 85 14051 Miles M TX2000002 870 The City of Miles(City)proposes to pursue development of P $200,000.00 Yes-BC $200,000,00 13431
an alternative source of water supply to complement its
current wholesale water supply.The City needs to identify and
evaluate altemative water supply options including
development of additional surface water or groundwater
supplies as well as potential treatment of its existing
groundwater to reduce nitrate and dissolved solids levels to
within compliance.
84
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix I.Project Priority List-By Rank
Rank Points PIF S Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(sj A Type PIF#'s
Public Water System
11 77 14010 La Joya M TX1080213 4,253 Construct new 0.5 MG elevated storage tank and 20,000 LF. PADC 57,055,000.00 30%
of 12 inch transmission line.
12 74 14022 New Summerfetd M TX0370028 1,350 Water System Improvements PDC $2,000,000.00
13 73 14118 Ellinger Sewer&Water W TX0750014 392 Construct new filter system for Arsenic,including new PDC $1,448,500.00 30% 13479
SC building,piping and electrical.Additionally,construct new
yard piping,chlorination system,booster pumps,electrical,
generator,fencing and Bluebonnet Electrical Service.Also,
move existing pressure tank from existing plant to new plant
location including blast/coat pressure tank.
14 70 14138 Toyah M TX1950004 113 Installation of Raw Water Chlorination,Chlorine Residual PDC $300,000.00 13406
Monitoring,Ammonia Facilities,and Raw Water piping
improvements to convert the disinfection system to
Chloramines to address DPB.
15 68 14063 Riverside SUD D TX2360010 5,760 Riverside SUD Waterwell Replacement PDC $1,500,000.00
16 67 14060 Carthage M TX1830001 16,251 The City of Carthage's water treatment plant contains aged DC $6,000,000.00
equipment performing critical treatment methods within the
plant's treatment process.Age of equipment has become
noticeable as the performance of equipment has decreased
from it's intended purpose.The City of Carthage's elevated
storage tanks are in need of rehabilitation as inspection
reports have revealed significant corrosion and compromised
the structural integrity of parts of the elevated storage tanks.
17 66 13997 Mullin ISD D TX1670013 130 Planning and design for a new well,treatment and distribution PADC $25.839,530.00
system to supply municipal and school needs
18 63 14098 Rhome M TX2490007 10,277 This project will allow the City to serve current and future PADC $26,545,000.00
development and meet their long term water supply needs.
19 63 14057 Rowena WSC W TX2000004 480 This project will reduce TTHM levels to gain compliance with PDC $4,261,000.00 70%Yes-BC $4.261.000 00 13442
the Stage 2 DBP Rule.
20 60 14017 Pfiugerville M TX2270014 56,558 Since July of 2018 the City of Pflugerville Water Treatment C $66,945,000.00
Plant has received numerous TCEQ violations related to the
Long Term 2 Enhanced Surface Water Treatment Rule
(LT2ESWTR)violations.The WTP expansion is to address
these violations.
85
Texas Water Development Board
SFy 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix J.Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
21 58 14018 Anthony M TX0710001 3.500 The Town of Anthony will need to construct a 250,000 gallon ADC $9,520.963.00 50% 13494
elevated water tank,rehabilitate existing water wells,replace
booster stations,address leaking water lines,install a
chlorination control system,replace meters and build arsenic
treatment plant in order to provide enough adequate water to
the residents.
22 55 14127 Venus M TX1260006 3,488 Water Distribution System Improvements PADC $10,175,840.00
23 52 14165 Arimak WSC W TX1330135 108 The Arimak Water Supply Corporation(WSC)is the recipient PDC $1,314,000.00
of an Administrative Order from the United States
Environmental Protection Agency(EPA)for non-compliance
of the Safe Drinking Water Act(SDWA)as it pertains to
radionuclides levels in drinking water.The WSC is addressing
this matter through the implementation of a groundwater
treatment project.Also,the ground storage tanks(GSTs)
have reached the end of their useful life and are in need of
replacement.The project will include development of an asset
management plan.
24 51 14099 Paint Rock M TX0480012 223 This project involves the replacement of old water lines with PDC $300,000.00 13418
new water lines and the installation of new water lines to
reduce tthms.
25 51 14072 Winnsboro M TX2500004 3,360 Blast and paint interior and exterior of existing 350,000 PDC $7,963,176.70
gallon elevated storage tank,500,000 gallon ground storage
tank,and 1,000,000 gallon ground storage tank.Replace
aged cast iron distribution lines.
26 46 14112 Fort Davis WSC W TX1220001 1,029 Groundwater Treatment System to address Radionuclide in PADC $2,750,000.00
excess of the MCL for Gross Alpha,additional groundwater
well,and prepare an asset management plan
27 45 14153 Daisetta M TX1460004 938 Water Well PADC $2,157,380.90 30%
28 44 14081 Webb County C TX2400022 750 Webb County desires to install improvements/upgrades at the C $2,192,000.00 Yes-BC $2,192,000.00
existing RO WTP.The County is currently hauling water to
this area to serve the residents.
86
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix].Project Priority List-By Rank
Rank Points PIF ff Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF We
Public Water System
29 44 14114 Bistone Municipal WSD D TX1470006 23,555 Bistone's transmission lines to its various wholesale PDC $12,121 000 00
customers is aged and has issues with leaks.The project will
replace the portion of the transmission system known as the
t967 14"steel cylinder concrete pipe.Bistone has also been
advised by ICED that a pressure sustaining tank(pressure
tank or elevated tank)is needed for the periods when the
Surface Water and Groundwater Treatment Plants are
providing water.Blending is isolated from the two sources
when the Surface Plant operates but this requires pumps to
provide needed pressure.The elevated tank will resolve this
issue and comply with the TCECI Blending Exception.
30 43 14044 Kenedy M TX1280002 3,410 The City has a history of water supply outages and marginal PDC $24,000,000.00 70%
supply including boil notices to it's community during each of
the most recent natural disasters.The existing complicated,
electricity-dependent reverse-osmosis system based on a
poor water-quality supply is a major contributor to the
problem.This project includes a new,more dependable water
source and supply pipeline.
31 43 14133 Alamo M TX1080001 20,178 Water Treatment Plant Rehabilitation 8 Expansion PDC $7,500,000.60 30%
32 36 14166 Medina Highlands P TX0100041 120 Medina Highlands very small water system has one well. C $215,000.00
Well production had been in decline,and unable to meet peak
usage. Customers are operating under conservation
measures. The winter weather event of February 2021
caused water outages,after returning to production the sole
well later lost production in March 2021. Medina Highlands
seeks emergency funding for a replacement well to provide
adequate long term supply for the small public water system.
An asset management plan will be developed and adopted.
33 35 14034 Vernon M TX2440001 10,874 Install a new 8.5 mile 24"PVC pipeline. PADC $11,881,000.00 50%Yes-BC $11,881,000.00 13402
34 35 14161 Donna M TX1080002 15,798 The proposed project consists of a 12"waterline to serve as PADC $1,463,738.42 30% 13849
an interconnect connected from the City of Weslaco's water
tower to the City of Donna's pipeline.
87
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix J.Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
35 33 13991 Sharyland WSC W TX1080033 87,274 SWSC seeks funding from the Texas Water Development DC $23.500.000 00 30%
Board's Drinking Water State Revolving Fund in order to be
able to better serve their customers and improve the overall
performance,reliability,and redundancy of their water
distribution system.Proposed projects include,but are not
limited to:pressure zone expansions to address identified low
pressure zones throughout the system and improve the level
of service for customers;infrastructure relocation projects;
capacity and performance improvements projects to
treatment facilities and the distribution system;and looping
and gridding throughout the system to improve redundancy,
reliability,and resiliency.
36 32 14046 Breckenridge M TX2150001 5,800 The City desires to install improvements/upgrades at the WTP PDC $4,743,000.00 30%Yes-BC $2,922,000.00 13438
and raw water intake structure. In addition,the City is
planning to rehabilitate various portions of the distribution
system in order to reduce the number of water line
leaks/breaks that have resulted in numerous boil water
notices.
37 31 14020 Daingerfield M TX1720001 4,047 Install a new elevated storage tank chemical dosing,and PDC $3,351,000.00 30% 13399
pressure maintenance facility. Upgrade linework and valves.
38 30 13996 De Kalb M TX0190001 1,593 Groundwater Supply and Water Distribution Improvements PADC $7,174,000.00 50%Yes-BC $4,720,000.00
39 30 14145 Hidalgo M TX1080021 12,200 Proposed Construction of 5.0 MOD Surface Water Treatment PADC $13,300,000.00 30%
Plant
40 30 14093 Athens M TX1070005 12,777 Installation of back-up generator for the Lake Athens Water C $557,390.00 30%
Treatment Plant
88
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix J.Project Priority List-By Rank
Rank Points PIE# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) o Type PIF#'s
Public Water System
41 30 13987 Laguna Madre WD D TX0310005 15,022 Water Treatment Plant No.1(WTP No.1)is currently out of PDC 524.434.459 00
service due to lower quality effluent production with water
demands provided for solely by Water Treatment Plant No.2
(WTP No.2),which cannot meet present day maximum water
demands during the summer with existing firm capacity.The
District has identified improvements to WTP No.1 that are
necessary to increase treatment capacity from 2.9 MGD to 5.0
MGD,upgrade treatment units to match water quality from
WTP No.2 and replace equipment past the end of their
service life,and provide system resiliency should one of the
treatment plants need to be taken offline,or should a water
main break occur.
Additionally,project includes the decommissioning of two(2)
existing elevated storage tanks(ESTs)in poor condition and
installation of a single new 0.60 MG EST.
42 25 14062 Leonard M TX0740005 2,481 improvements to the existing water system,piping,pumps, PADC $8,479,050.00 50%
tanks
43 24 14037 Dawson M TX1750003 767 The purpose of this project is to replace/upsize undersized PDC $300,000.00 50%
water mains that are causing issues within the system.
Replacement of ex.valves and installation of new valves are
also needed throughout for better operation and maintenance
of the overall system.
44 24 14155 Oak Grove WSC W TX0190014 921 Riverbend Regional Water System ADC 51,420,000.00 Yes-BC $497,000.00
45 24 14054 Port Arthur M TX1230009 54,864 Water Line Improvements DC $16,500,520.00 30% 13416
46 23 14141 Shamrock M TX2420001 2,430 Shamrock desires to replace the transmission pipeline that PADC $16,955,200.00 50%Yes-BC $11,835,000.00 13498
carries water from the North Well Field to the distribution
system,replace ground storage tanks in both the West and
North Well Fields,replace a portion of the existing distribution
system and construct a new elevated storage tank.
47 23 14001 Baytown M TX1010003 76,635 Replace of 16-inch asbestos-cement water line,which is C $3,072,300.00
experiencing high failure rate.
48 23 14052 Richland Springs M TX2060002 350 replacement and upgrade of 25 miles of pipeline PDC $3,824,200.00 70% 13458
89
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix 3.Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIP#'s
Public Water System
49 23 14050 Mertzon M TX1180002 700 As a result of the recent historic ongoing drought,the City's PDC $3.808,000.00 50%Yes-BC $3,224,000.00 13440
water supply is still depleted.The City currently has five(5)
functional groundwater wells(of the original eight),caused by
continual pumping during the ongoing drought,and is in the
process of obtaining approval for a new sixth well.The City
has observed a steady decrease in production from its wells
over the past several years,to the point that three of the
original eight wells are essentially-dry"at this time.As the
water supply has dwindled,the quality of the water no longer
meets secondary drinking water quality standards. In order to
support current water supply needs with water that meets
current drinking water quality standards,the City of Mertzon is
pursuing implementation of a major project to install a
treatment system to address the City's groundwater quality
issues.
50 23 14016 Gordon M TX1820007 744 Water treatment plant improvements including clarifier PDC $2,135,000.00 50%Yes-BC $625,000.00
replacement,plant piping,SCADA,and distribution line
replacements.
51 23 14080 Spur M TX0630012 1,100 Replacement of various portions of the City's potable water PDC $2,321,000.00 50%Yes-BC $2,321,000.00
distribution pipeline system,valves,and fire hydrants.
52 23 14064 Albany M TX2090001 2,034 The proposed project includes improvements at the Water PDC $3.034.000.00 30%Yes-BC $400,000.00
Treatment Plant to address aging infrastructure including
replacement of existing membrane system trains,chemical
system improvements,high service pump station
improvements,electrical,SCADA,and Instrumentation and
controls improvements.
53 23 14085 Hudspeth Co WCID#1 D TX1150007 2,141 Improvements on the existing transmission line and the PADC $6,150,000.00 50% 13424
creation of a new well field,including a booster pump station,
ground storage tank,chlorination system,and appurtenances
to be tied into the existing transmission line.
54 23 14143 Orangefield WSC W TX1810186 6,531 The proposed project water system improvement will PADC $9,300,000.00
eliminate the use of private drinking water wells and address
the human health needs by eliminating potential risks to
public health and safety caused by the unsatisfactory water
quality.
90
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix J.Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
55 23 14144 Crockett M TX1130001 6,616 Rehabilitation of existing water lines along SH7 and SH21 PDC $4,365,300,00 30% 13490
between the downtown are and the east loop.Existing lines
are failing due to age causing numerous leaks.Leaking water
lines contribute to overall water loss and pavement repairs to
TxDOT maintained roadways.
56 23 14074 Eastland Co WSD D TX0670019 10,100 Re-clear the pipeline ROW and replace the existing raw water PDC $4,303,000.00 50%Yes-BC $4,303,000.00
transmission pipeline with a new fusion-welled,high-density
polyethylene(HOPE)pipeline.
57 22 14140 La Villa M TX1080023 2,781 Proposed project is intended to help meet water demand for PADC $10,185,000.00 70%
future upcoming development.
58 22 14065 El Paso Co WCID#4 D TX0710018 5,736 The existing water distribution system piping on Elam PDC $1,996,669.00 50%Yes-BC $1,996,669.00
Subdivision has ruptured several times in the past and is
prone to leaks.The system also has physical deficiencies
such as non-functional valves and a lack of additional
isolation valves and curb stops.
Under this project,the Fabens Water District(EPCWCID#4)
proposes to abandon the existing distribution system in place
and furnish and install approximately 6,100 LF of new 6-inch
PVC C900 piping,including all related appurtenances and
2,000 LF of 6-inch PVC C900 pipe for the loop system
adjacent to railroad tracks including all related work and
appurtenances.
59 22 14070 El Paso Co WCID#4 D TX0710018 5,736 Per TCEQ requirements,the minimum pressure throughout a PDC $174.896.00 50%
system during a transient event(power outage)must be
greater than 20 psi.
A surge evaluation of the existing 1-10 booster station
indicated that the system's pressure dropped below the
minimum TCEQ required pressure of 20 psi during a power
failure event.
Per TCEQ requirements,the El Paso County Water
Improvements District#4(EPCWCID#4)requires an elevated
storage capacity of 100 gallons per connection or a pressure
tank capacity of 20 gallons per connection to meet this
requirement.
Under this project,the EPCWCID#4 proposes installing a
new 120-gallon bladder tank to meet the pressure
requirements in the event of a power failure event specified
by TCEQ.
91
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix J.Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
60 21 14129 Agua SUD D TXt 080022 69,095 The Agua SUD is requesting funding from the Texas Water C $182,500.00 50%Yes-BC $25.000.00
Development Board in order to Rehabilitate the FM 492
Water Treatment Plant Rapid Mix.
61 21 14084 Mount Calm M TXI 090005 331 The existing elevated is out of plumb and needs to be PDC $700,000.00 50%
corrected. The tank is currently out of service.
62 21 14026 Granger M TX2460002 1,119 The project includes the rehabilitation of the City's pump PDC $4,298,801.00 30% 13401
station,south well,elevated storage tank supply pipe and
overflow drain pipe,Hwy.95 and UP railroad steel
encasement by bore,replacement of water lines,valves and
fire hydrants.A new filtration system will be installed for the
removal of iron and manganese from the groundwater.
Generators will be installed at the water plant.An asset
management plan will be prepared according to TWDB and
TCEQ requirements.
63 21 14025 Grand Saline M TX2340003 3,115 Rehabilitate existing elevated storage tank and upgrade the PDC $1,277,250.00 30%
existing water distribution system. Hydraulic Water Modeling.
64 21 13990 Hamilton M TX0970001 3,200 Replacement of water lines that are in poor condition PDC $2,173,063.00 30%
throughout the city.
65 21 14061 Wills Point M TX2340005 3,889 The City of Wills Point has a 12 inch raw water supply line PDC $5,585,000.00 50% 13398
which supplies water from the intake on Lake Tawakoni to the
City's Water Treatment Plant.The raw water transmission
line,the raw water intake pump station,and the in-line
booster pump station are in need of repairs,upgrades,and
replacements. The purpose of this project is to replace
38,400 linear feet of 12 inch raw water transmission line from
the Lake Tawakoni Intake to the City of Wills Point Water
Treatment Plant,make upgrades to the raw water intake
pump station,and make upgrades to the in-line booster pump
station in order to provide reliable raw water to the City's
• Water Treatment Plant.
66 20 13989 Ericksdahl WSC W TX1270005 274 Ericksdahl WSC has a history of high of TTHM levels and PADC $1,420,000.00 50%Yes-BC $140,000.00
water loss.The proposed project will include tank mixing,
disinfection improvements,water line replacement,and
automatic meter reading system to reduce TTHMs and water
loss.
67 20 14042 North Alamo WSC W TX1080029 963 Transmission System Improvements for Hargill C $827,000.00 30%
92
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix J.Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
68 20 14136 Santa Anna M TX0420002 1,099 Replacement of various portions of the City's potable water PDC $1,093,000.00 30% 13386
distribution pipeline and valves.
69 20 14007 Athens M TX1070005 12,777 S19 waterline replacement from College Street to Ben Belt PDC $1,329,972.00 30% 13485
Drive and Edmonson waterline improvements from N Prairie
Street to Cream Level Road.
70 20 14103 Laguna Madre WD D TX0310005 19,908 The proposed project consists of improvements to Long PDC $6,649,606.50 30%
Island Village(LIV)Water Distribution system located within
Laguna Madre Water District(LMWD)service area.
71 20 14110 Greater Texoma UA D TX0910006 41,567 GTUA/City of Sherman Water System Improvements PDC $8,403,500.00
72 20 14006 Odessa M TX0680002 169,416 The proposed project elements include replacement of the C $100,000,000.00 13810
plant 1 flocculation and sedimentation basins,rehabilitation
and upgrade of disinfection facilities,new chemical feed and
storage facilities,rehabilitation of all fitters along with SCADA
and electrical improvements.
73 19 14119 Bridge City M TX1810001 7,961 This project will provide for the construction of a new water PDC $7,136,905.00
well located on Roberts Avenue and also provide for the
relocation of an existing 65,000 gallon ground storage tank.
74 18 14012 Denton M TX0610002 131,712 Ray Roberts Water Treatment Plant Rerate,Performance, C $27,176,000.00
and Regulatory Improvements and Regulatory Improvements
project provides for improvements to improve the operational
performance,process reliability,and redundancy for the
facilities.
75 17 14027 Dog Ridge WSC W TX0140044 776 Upsize existing water mains in the Sherwood Shores area. PADC $1,313,000.00 30%Yes-BC $120,000.00 13405
76 17 14066 El Paso Co WCID#4 D TX0710018 5,736 The existing Cypress Well has been drilled but is currently not PC $780,829.00 50%
equipped.When in service,the Cypress Well will have a 900
GPM capacity.Under this project,the Fabens Water District
(EPCWCID#4)proposes to fully equip Cypress Well#6,
including furnishing and installing a new well pump and motor,
a Well building and canopy,discharge piping,valves,flow
meter,electrical and instrumentation systems,generator with
ATS,site grading,and a new access roadway and driveway.
77 16 14164 Haciendas Del Norte WID D TX0710091 1,148 Replacement of 14,900 linear feet of 12-inch diameter PDC $2,533,191.00
waterline along Desert Willow Drive and vital isolation valves
within Haciendas del Norte Units 1 and 2,El Paso County,
Texas and preparation of asset management plan.
93
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix J.Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
78 15 14045 Evadale WCID#1 D TX1210011 963 Evadale WCID#1 has recently lost part of its production wells PDC $959,999.90 12993
due to mechanical failure and their water lines are
deteriorating and undersized.This project will provide
additional production capacity and replace deteriorated
distribution lines.
79 15 14004 Covington M TX1090021 570 The purpose of this project is to replace/upsize undersized PDC $300,000.00
water mains to improve water flow/pressure.Covington is
experiencing between 25-35%water loss in any given month.
80 14 14107 McAllen M TX1080006 143,258 This Project consists of facility improvements at the Northwest C $22,500,000.00
Water Treatment Plant such as to increase Capacity by a
minimum of 10 MGD.The current plan is to install a parallel
treatment train that will essentially double capacity of the
North Water Treatment Plant.
81 14 14083 Westbound WSC W TX0670027 2,748 Westbound WSC has substantial head loss through smaller PDC $3,685,000.00
diameter water lines,a lack of production water in certain
pressure planes,limited capability to control and monitor the
distribution system remotely,two pump stations that are old
and hydraulically undersized,in addition to very limited
emergency back up power.After the proposed improvements
have been constructed,the above mentioned issues should
be resolved.
82 14 14079 Santo SUD D TX1820010 2,775 The proposed project includes improvements to various PDC $9,866,000.00 Yes-BC $9,866,000.00
portions of the water system to bring the system into
compliance with TCEQ requirements and provide capacity for
future growth.An asset management plan will be prepared as
part of this project.
83 14 14028 Dog Ridge WSC W TX0140044 4,830 Installation of SCADA system,meter replacement,and PDC $3,483,000.00 30%Yes-BC $320,000.00 13404
mapping software with a GPS system.The WSC also plans to
rehabilitate two elevated water storage tanks.
84 14 14049 Eden M TX0480001 2,766 The City desires to install improvements at the water supply PDC $2,340,000.00 50% 13439
well sites and to install a redundant cooling tower for
operational Flexibility.
85 14 14108 Becker-Jibe WSC W TX1290011 3,547 300.000 gallon Single Pedestal Elevated Water Storage Tank PDC $2,567,000.00
for extra storage and waterline extension.
86 14 14013 Hidalgo Co MUD#1 D TX1080088 8,200 The district requires a 500,000 gal elevated storage tank to PADC $2,150,000.00 30%
meet state requirements
94
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix].Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
87 13 13999 Carl's Corner M TX1090070 199 The city's water well only produces 10 gallon per minute to DC $1,016.900.00
serve 76 connections. This amount is woefully short of the
TCEQ requirement of 0.6 gpm per connection. The city
desires to increase its water supply by constructing a new
water well,or if necessary to obtain other adequate water
supply or emergency interconnection.
88 13 13993 Groveton M TX2280001 1.094 System Study and Water Distribution Line Replacements PDC $2,165.000.00 30%
89 13 14033 Alto M TX0370001 1.280 Remove and replace existing aged and deteriorated PDC $1,872.000.00' 50%
waterlines within the distribution system as well as rehabilitate
existing deteriorated Ground Storage Tanks and Elevated
Storage Tank.
iG 90 13 14137 Baytown M TX1010003 76.635 Replacement of 16-inch asbestors-cement water line C $6,721,000.00
91 13 14122 Green Creek WSC W TX0720028 460 The WSC proposes to install a pump station with disinfection PADC $750,000.00 70%Yes-BC $750,000.00 13423
facilities.The WSC received a violation from the TCEQ for
failure to provide a maximum hourly purchase rate of at least
2.0 gallons per minute(gpm)per connection.The WSC
currently purchases treated wholesale water from the City of
Dublin who also provides direct pressure to the WSC's water
system.The WSC proposes to install a pump station and
storage facility in order to provide a capacity of 0.6 gpm per
connection.
92 13 14068 Balmorhea M TXt950002 610 Installation of control and remote monitoring equipment in key PDC $300,000.00
locations along the drinking water transmission and
distribution lines.
93 13 14039 Colorado Co WCID#2 0 TX0450014 615 100,000 gallon elevated storage tank,new chlorination C $1,150.000.00 30%
facilities.and upgraded well pumps and controls.
94 13 14053 Jackson Co WCID#1 D TX1200003 819 New Water Well.Ground Storage Tank.&Booster Pumps DC $788,200.00
95 13 14167 Palm Valley M TX0310027 1,706 Palm Valley Water Distribution System Improvement projects DC $12,111,005.06
96 13 14135 Stephens Regional SUD D TX2150007 3,173 SRSUD is proposing water system improvements to address PDC $1.093.000.00 30%Yes-BC $1,093,000.00
growth in the distribution system by expanding the distribution
system to areas which are currently unserved.•
97 13 14121 Keene M TX1260008 6,266 Replace approximately 16,000 linear feet of 2-inch through 8- PDC $3,100,000 00 Yes-BC $3.100,000.00 13472
•
inch water line.Install a new well and pump station facilities.
•
• 95
Texas Water Development Board
SFy 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix].Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
98 13 14094 Roma M TX2140007 19.123 The City is addressing the need for Phase I(6 MGD)of a new PDC $6,000,000.00 50%Yes-BC $6,000,000.00 13446
wafer treatment plant(WTP)to serve City of Roma residents
and fully comply with all water treatment regulations.The
City's existing WTP was partially rehabilitated in the late
1990s and has reached the end of its useful life and requires
replacement.
99 13 14100 Abilene M TX2210001 121,994 This project involves the replacement of existing water lines, PADC 589,500,000.00 13437
the installation of new water lines,the construction and/or
rehabilitation of pump stations,and storage tanks.
100 12 14067 El Paso Co WCID#4 D TX0710018 5.736 The existing meters at the El Paso County Water PDC $869,671.00 50%Yes-BC $869,671.00
Improvements District#4(EPCWCID#4)are manual and rely
largely on manpower for water usage reading collection.
Some of the existing meters are also malfunctioning.
Under this project.the EPCWCID#4 proposes replacing the
existing metering and billing system and furnishing and
installing 1,932 new digital meters,electronic equipment for
meter reading,and software for billing throughout the water
distribution system.The meter replacement project seeks to
provide benefits that result in water loss reduction and allow
for a more accurate and efficient water usage data collection
and.ultimately,better customer service.
101 12 14069 El Paso Co WCID#4 D TX0710018 5,736 The existing I-10 Ground Storage Reservoir controls the raw PDC $895,280.00 50%
water feed quality to the existing Fe/Mn filters and Reverse
Osmosis facility and provides storage if the Wells become
non-operational.The reservoir is currently not in use due to
tank structural defects.Under this project,the Fabens Water
District(EPCWCID#4)proposes to demolish the existing 0.5
MG steel reservoir,including foundation and piping,and
replace it with a new 0.25 MG steel reservoir,including
foundation,piping,cathodic protection system,fencing,and
site grading.
102 12 14058 Slaton M TX1520004 6,077 The City of Slalon is proposing the installation of an AMI PDC $4,604.000.00 30%Yes-BC $4,604,000.00 13441
system throughout their distribution system as well as the
installation of a new elevated storage tank.
103 11 13995 Wellborn SUD D TX0210016 22,000 The District plans to add two water supply wells for additional PADC $43,304,491.00
water supply
capacity with water transmission lines,ground storage and
pump station,and distribution lines to
increase distribution system capacity.
96
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix J.Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
104 11 14151 Green Acres Mobile P TX0710066 300 Green Acres/Riverview project to install Isolation Valves and C $92,500.00
Home Park Flush Hydrants to allow better management of water and
prevent full loss of system water during repairs.
105 11 14005 Old Tamina WSC W TX1700110 507 Upgrades to existing water meters and master water meter; PADC $195,030.00 50% 13478
replacement of hydrotanks and rehabilitation of ground
storage tank;installation of new isolation valves and
replacement of existing flush valves
106 11 14030 East Texas MUD of Smith D TX2120005 2,661 Water Planning and System Improvements PDC $2,697,225.00 13436
County
107 11 14021 Dean WSC W TX2120009 5,847 Construction of a new elevated storage tank at an existing PDC $2,858,500.00
pump station.
108 11 14148 Athens M TX1070005 12,777 The City of Athens needs to implement an asset management PDC $828,000.00 30% $578,000.00
plan.Also included in this project is the design and installation
of a SCADA system for the City's utility system.
109 10 13988 Melvin M TX1540003 184 This project involves the installation of an AMR meter system, PDC $400,000.00 50%Yes-BC $65,000.00 13388
the recoating and repair of an existing ground storage tank
and the installation of new waterlines.
110 10 14088 Study Butte WSC W TX0220035 196 This project involves the replacement of an existing ground PDC $500,000.00 70% 13393
storage lank and the replacement of existing water lines and
valves.
111 10 14015 Moran M TX2090002 355 Water Line Replacement PDC $340,000.00 70%Yes-BC $300,000.00 13422
112 10 14086 Rochester M TX1040002 464 This project involves the drilling of a new water well,the PDC $500,000.00 70%Yes-BC $75,000.00 13467
installation of an AMR meter system and the installation of
water line and the replacement of old water line.
113 10 14097 Rule M TX1040003 540 This project involves the replacement of old cast iron lines PDC $400,000.00 50%Yes-BC $110,000.00 13470
with new lines and the installation of an AMR meter system.
114 10 14023 Knollwood M TX0910146 590 This project will include replacing/improving undersized water PDC $300,000.00
mains in the City and installing new isolation valves to
improve operation and maintenance.
115 10 14075 Loraine M TX1680002 602 Replacement of various portions of the City's potable water PDC $2,177,000.00
distribution pipeline and valves.
116 10 14124 Lone Oak M TX1160006 786 The City of Lone Oak is experiencing issues with various PDC $500,000.00 Yes-BC $500,000.00 13430
water lines in their system due to undersized lines and dead-
ends.
117 10 14102 Cross Plains M TX0300003 1,035 The City of Cross Plains proposes to replace undersized lines PDC $1,200,000.00 30% 13464
and loop dead end areas in their system.
97
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix I.Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
!Public Water System
118 10 14125 Grapeland M 1,489 New industry developments in the City require additional PDC $3,221,000.00 50% 13394
TX1130002 supply and storage.
119 10 14000 Grandview M TX1260004 1,841 This project consists of installing two new water wells, PADC $2,930,000.00 30%Yes-BC $1,100,000.00
replacing deteriorated distribution lines and installing a new
backup generator at the elevated storage tank site.
120 10 14109 Holiday Beach WSC W TX0040015 1,852 Water Line Improvements PDC $1,400,000.00 30%
121 10 14073 Meeker MWD D TX1230004 3,550 Proposed groundwater well;production facilities including PADC $6,504,000.00 13412
high service pumps,ground storage tanks,chemical feed
systems,electrical facilities etc.,and water line extensions
necessary to connect new well to existing system.
122 10 14117 San Diego MUD#1 D TX0660003 4,753 Rehabilitation of the existing elevated and ground storage for PADC $2,290,000.00 50%
the San Diego MUD facilities.
123 10 14170 Hidalgo M TX1080021 12,200 0.5 MG Elevated Tank Replacement Project PDC 84,477,000.00 30%
124 10 14156 San Benito M TX0310007 24,371 City of San Benito Proposed Water System Improvements PDC $2,941,264.00 30%
125 10 14131 Agua SUD D TX1080022 69,095 The Agua SUD is requesting funding from the Texas Water PDC $1,087,682.00 50%Yes-BC $330,000.00
Development Board in order to replace deteriorating
infrastructure and improve efficiency to the Abram Water
Treatment Plant Recovery and Waste Process.
126 10 14146 Lower Valley WD D TX0710154 93,061 This area is currently being served by an undersized and PDC $1,853,491.00
dilapidated water system. In addition,LVWD is proposing to
upgrade the size of the main distribution system to improve
pressure.
127 10 14149 Lower Valley WO D TX0710154 93,061 This area is currently being served by an undersized and PDC $2,346,725.00
dilapidated water system.In addition,LVWD proposes to
upgrade the size of the main distribution system to improve
pressure and bring dependable water source to Mesa Del
Norte,Lourdes Estates and El Conquistador colonies(416
households/1,539 residents).
128 10 14150 Lower Valley WD D TX0710154 93,061 This area is currently not served by the District's water PDC S17,331,795.00
system. LVWD propose to install a 12"or larger pipe to the
main distribution system to expand services to unserved
areas and improve pressure.
98
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix].Project Priority List-By Rank
Rank Points PIF 8 Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF S'e
Public Water System
129 10 14152 Lower Valley WD D TX0710154 93,061 This project's focus is to provide first-time water services to PDC $10,412,000.00
areas that are not being served.Also,this project will help
extend and expand water services by adding water lines and
will help the District's water system by creating redundancy by
eliminating dead ends in the system which will help the
District from flushing this water out of the system.
130 7 14038 Mabank M TX1290005 12,975 The demands of the City's water service area are taxing the PDC $15,806,700.00
capacity of the PWS.Upgrades to the WTP,transmission
lines,and added storage capacity are proposed to keep the
City in compliance and to meet the needs of the occurring
growth in the City.
131 7 14091 Reno M TX1840049 2,900 Design and construction of a new 0.5MG elevated storage PADC $3,550,000.00 Yes-BC $2,000,000.00
tank and onsite well to fill the tank.SCADA will be included to
monitor the hydraulics and fill rates.A master plan which
includes an asset management plan will be developed to
prioritize the system needs.
132 6 14035 Stryker Lake WSC W TX0370033 908 New water plant with ground storage tank,high service pump PDC $1,427,900.00 13391
station and treatment. Replace aging water line.
133 5 14002 Fulshear M TX0790133 16,311 A new 4.0 MGD supply and 5.75 MGD pumping station with C $25,381,210.00
3,0 MG ground storage.
134 5 14115 McAllen M TX1080006 143.258 McAllen Public Utility proposes to install large diameter C $6,750.000.00
transmission lines such as to improve efficiency of water
delivery throughout the service area.This loan will also be
used to fund the construction of a new elevated water storage
tower.
135 4 14040 Blum M TX1090007 434 The purpose of this project is to replace/upsize undersized PDC $300,000.00
water mains and replace non-working isolation valves.
136 4 14139 Marsha WSC W TX2270040 680 Marsha WSC is experiencing major and consistent water loss PADC $5,571,400.10 Yes-BC $1,166,970.00
in the distribution system.In order to prevent these losses,
the PWS will need to replace water lines and replace meters.
The system also needs to replace lines to accommodate fire
flow.
99
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix J.Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF*fa
Public Water System
137 4 14076 Lake Palo Pinto Area W TX1820069 1.932 This project is targeted mainly at making distribution system PDC $5.803.000 00 Yes-BC $5.763.000.00 13444
WSC improvements to bring the system in compliance with TCEQ
minimum line size requirements(30 TAC?290.44(c)). It also
includes pump station improvements to eliminate an existing
inline booster pump station,and replace old infrastructure,
provide better pressure maintenance for areas of the existing
system,and provide operational flexibility through SCADA
improvements and piping insulation at the Water Treatment
Plant.
138 3 14011 Westhaven WSC W TX0460050 185 Repairs and upgrades to Well#1 which is 60 years old;shut- PDC $606,727.00 Yes-BC $60.000.00
off valves at the ends of streets;replace all water meters with
AMI meters to reduce water loss figures.Develop an asset
management plan to include asset management training.
139 3 13994 Montgomery Co UD#4 D TX1700286 3,804 New water well,transfer line,and booster pumps to serve DC $2835.000.00
Montgomery County Utility District 4(UD4 or the"District")to
meet minimum TCEQ and City of Conroe design standards
for separation from Montgomery County Utility District 3
(UO3).
140 3 14096 Bluegmve WSC W TX0390014 70 This project involves the construction of a new pump station PDC $300,000.00 13415
and the replacement of water distribution line to help with
water loss.
141 3 14175 Mooreville WSC W TX0730015 142 Mooreville WSC Pump Station 8 Water Distribution System PADC $2,625,580.00 13367
Improvements
142 3 14105 Umbarger Community W TX1910024 180 Water System Improvements This project involves the PADC $500,000.00 13382
WSC installation of a new water well and supply line as well as the
treatment for the new water supply.
143 3 14087 Rochelle WSC W TX1540004 372 This project involves the rehabilitation of existing ground PDC $300,000.00 Yes-BC $75,000.00 13419
storage tanks,the replacement of old waterlines and the
replacement of existing meters with an AMR meter system.
144 3 14163 Upton Co WCID#1 D TX2310027 744 Upton County Water District,Rankin Well Well Field,required DC $4,455,000.00
Rankin additional water wells to meet primary drinking water
standards.
145 3 14019 Tioga M TX0910007 1,366 The project involves constructing a new high service pump PADC $8,459,053.00
station,500,000-gallon elevated storage tank,250,000-
gallon ground storage tank,a 400 gpm water well,and line
extensions to connect the elevated storage tank into the
distribution system.
146 3 14142 Magnolia M TX1700020 2,688 Water System Improvements PADC $12,000,000.00 13380
100
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix].Project Priority List-By Rank
Rank Points PIF if Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
!Public Water System
147 3 14043 South Newton WSC W TX1760022 3 800 This project will provide Improvements to South Newton's PDC $2,462.209.00
water plants to improve operation of the distribution system,
add backup power,and an additional elevated storage tank at
water plant for pressure stabilization.
148 3 14029 Brenham M TX2390001 17,123 The proposed project includes testing of an existing well that P $287.100.00
is currently not being used to see if it is able to be reinstated.
It also includes analyzing the addition of up to tour well sites
to have as an emergency groundwater supply.
149 3 14116 McAllen M TX1080006 143,258 This Project consists of improvements to existing Back-up C $2,812,500.00
Power facilities at both our South and Northwest Water
Treatment Facilities.
150 2 14132 Graford M TX1820003 830 Replace existing water lines,install a SCADA System and PDC $750,000.00 Yes-BC $750,000.00 13474
radio read meters
151 2 14123 Parker WSC W TX1260021 3,000 The WSC wants to improve their water distribution system to PDC $3,300,000.00 Yes-BC $3,300,000.00 13428
better service customers with sufficient pressure and
disinfectant residuals.
152 2 14157 Dish M 426 Investigate the feasibility of establishing a PWS and acquiring P $400,000.00
a/dual certified CCN area.
153 2 14071 Nolanville M 5,496 Replace water lines with code compliant PDC $2,196,000.00
154 1 14008 Willow Park M TX1840027 6,323 The project consists of a water transmission line,water PADC $6,350,000.00 Yes-BC $650,000.00 13407
distribution line replacement,two new elevated tanks,
elevated tank recoating,and appurtenances.
155 1 13992 New Fairview M 1,347 The City does not currently own public water infrastructure PADC $58,765,000.00
nor provide water to anyone.At present,small water supply
corporations provide water to residences and businesses that
do not have private groundwater wells within the city.
However,these small co-ops are unable to meet the
demands of growth occurring within the City.Therefore,the
City wishes to obtain a CCN and construct infrastructure for
providing public water to meet the needs of the City moving
forward.
156 1 14089 Rhome M TX2490007 1,813 Ground storage tank improvements,Water well and SCADA PDC $1,945,650.00
improvements,FM 3433 disinfection booster system,and
Well No.6 radium treatment
157 1 14031 Crescent Heights WSC W TX1070016 1,935 A new public water supply well and elevated storage tank PADC $2,705,000.00 13414
101
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix].Project Priority List-By Rank
Rank Points PIF# Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF#'s
Public Water System
158 1 14036 Fulshear M TX0790133 16.311 This project includes the construction of a new 1.0 MG C $3,364.725.00
elevated storage tank to serve growth in the City of Fulshear
water system.
159 1 14077 Ennis M TX0700001 21,203 Design and Construct a new Elevated Storage Tank with PDC $3.700.220.00
associated piping for the City of Ennis
160 1 14078 Ennis M TX0700001 21,780 Remove and replace existing old,undersized,and PDC $2,987,600.00
deteriorating waterlines with a new larger diameter waterline.
161 0 14120 Tri-Try WSC W TX2170004 88 This project includes the construction of a new pump station PDC $300,000.00 13510
for the WSC.
162 0 14090 Harrold WSC W TX2440002 141 Install a new supply line and repair the existing elevated PDC $300,000.00 13426
storage tank
163 0 14101 Trent M TX2210009 269 This project involves the replacement of old existing water PDC $300,000.00 13500
lines that are prone to breaking and leaking with new pvc
water line.
164 0 14009 Montgomery Co FWSD# D TX1700142 373 Improvements to the Montgomery County Fresh Water DC $1,211,348.00
6 Supply District No 6(MCFWSD6 or the'District")water plant
and distribution system to meet minimum TCEO and City of
Conroe design standards for existing and future demands.
165 0 14082 Freer WCID D TX0660002 2,686 This project consists of constructing one(1)composite PDC $3,856,524.00
elevated tank,removing once(1)standpipe,rehabilitation one
(1)ground storage tank,acquiring 1,000 water meters,and
upgrading SCADA system.
166 0 14095 Reno M TX1840049 2,900 Water system analysis with a masterplan to identify and PDC $7,750,000.00 Yes-BC $6,150,000.00
prioritize the system needs. Design and construction of
waterlines and other facilities will be included in this project.
167 0 14014 Olney M TX2520003 3,200 Rehabilitation or new construction of the existing water PADC $10,330,000.00 13505
treatment plant.
102
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix 3.Project Priority List-By Rank
Rank Points PIF S Entity Owner PWS ID Population Project Description Requested Total Project Cost Disadv Green GPR Related
Type Phase(s) % Type PIF Vs
Public Water System
168 0 14128 Willow Park M TX1840027 6,323 The project consists of the installation of 18"and 16"water C $7.287.080,00
supply lines along IH20 and pump station and storage
improvements. The current request is for funding of cost
overruns.
169 0 14032 Marshall M TX1020002 23,449 Replace Existing Raw Water Main PDC $8,579,000.00 13413
170 0 13998 San Antonio Water M TX0150018 1,857,779 This project,Phase 9 in the multi-year pump station C $20,139,290.00
System improvements program,will evaluate and replace high service
pumps,well pumps,and electrical and SCADA equipment at
the Marbach pump station.
171 0 14092 San Antonio Water M TX0150018 1,857,779 Replace high service pumps,electrical gears,instrumentation C $22,918,170.00
System and and controls,SCADA,valves,motors,disinfection and
fluoride system,cathodic protection,and other miscellaneous
improvements.
Public Water 171 61,192,938,220.52 77 42 $101,825,810.00
System Total
Total 171 $1.192.938,220.52 77 42 $101,825.810.00
Phase(s):P-Planning;A-Acquisition;D-Design;C-Construction
Green Type.BC-Business Case;CE-Categoncally Eligible;Comb-Project consists of both CE and BC components
103
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix K.Initial Invited Projects List
Rank Points PIES Entity PWS ID Population Project Description Eligible Project Cost Disadv Green GPR Related
Phase(s) % Type PIF e's
Public Water System
1 495 14126 Millersview-Doole WSC TX0480015 3,579 Treating well water at the source and blending with surface water. PDC $2,300,000.00 70% 13427
The project includes additional water system improvements
2 275 14041 Strawn TX1820005 487 The project includes replacing the existing multi-media filters with PDC $1,627,000.00 70%
new microfilters.
3 195 14024 Angelina&Neches RA TX0030030 1,043 The proposed project involves the design and construction of a PADC $23,895,045.00 50%
regional water system to serve first time water customers,to
consolidate and supply drinking water to several Public Water
Systems(PWSs)east of the City of Zavalla along Highway 147 in
southern Angelina County and the City of Zavalla.These PWS's
primary source of drinking water supply is groundwater,which has
historically had water quality and quantity issues.The proposed
regional water system will decommission each of the PWS's water
production facilities and supply drinking water for existing
customers and projected residential and commercial growth.
4 160 14111 Menard TX1640001 1,562 Major rehabilitation,additions and modifications to the surface DC $4,565,000.00 30% 13450
water treatment plant and raw water wells to address groundwater
under the influence.
5 154 14130 Sandbranch Pending 190 Install a water system to an existing development ADC $587,500.00 70%Yes-BC $587,500.00 12486
Development&WSC
6 150 14154 Barksdale WSC TX0690011 210 New Well Exploration to find an aquifer PADC $660,000.00 50%
7 111 14106 Welch WSC TX0580013 315 Welch Water Rehabilitation PADC $1,650,000.00
8 99 14003 La Joya TX1080213 4,253 The project includes expansion of the Water Treatment Plant, PADC $7,179,200.00 30%
installing two 1,350 gpm pumps,installation of 16,415 LF.of 12-inch
pvc pipe and construction of an elevated storage tank.
9 94 13986 M&M WSC TX0030026 3,189 Disinfection system upgrades and new tank mixers PDC $1,019,000.00 30%
10 85 14051 Miles TX2000002 870 The City of Miles(City)proposes to pursue development of an P $200,000.00 Yes-BC $200,000.00 13431
altemative source of water supply to complement its current
wholesale water supply.The City needs to identify and evaluate
alternative water supply options including development of additional
surface water or groundwater supplies as well as potential
treatment of its existing groundwater to reduce nitrate and
dissolved solids levels to within compliance.
11 77 14010 La Joya TX1080213 4,253 Construct new 0.5 MG elevated storage tank and 20,000 LF.of 12 PADC $7,055,000.00 30%
inch transmission line.
12 74 14022 New Summerfield TX0370028 1,350 Water System Improvements PDC $2,000,000.00
104
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix K.Initial Invited Projects List
Rank Points PIF# Entity PWS ID Population Project Description Eligible Project Cost Disadv Green GPR Related
Phase(s) % Type PIF#'s
Public Water System
, 13 73 14118 Ellinger Sewer F.Water TX0750014 392 Construct new filter system for Arsenic,including new building, PDC $1,448,500.00 30% 13479
SC piping and electrical. Additionally,construct new yard piping,
chlorination system,booster pumps,electrical,generator,fencing
and Bluebonnet Electrical Service.Also,move existing pressure
•
tank from existing plant to new plant location including blast/coat
pressure tank.
14 70 14138 Toyah TX1950004 113 Installation of Raw Water Chlorination,Chlorine Residual PDC $300,000.00 13406
Monitoring,Ammonia Facilities,and Raw Water piping
improvements to convert the disinfection system to Chloramines to
address DPB.
15 68 14063 Riverside SUD TX2360010 5,760 Riverside SUD Waterwell Replacement PDC $1,500,000.00
16 67 14060 Carthage TX1830001 16,251 The City of Carthage's water treatment plant contains aged DC $6,000,000.00
equipment performing critical treatment methods within the plant's
treatment process.Age of equipment has become noticeable as the
performance of equipment has decreased from it's intended
purpose.The City of Carthage's elevated storage tanks are in need
of rehabilitation as inspection reports have revealed significant
corrosion and compromised the structural integrity of parts of the
•
elevated storage tanks.
• 17 66 13997 Mullin ISD TX1670013 130 Planning and design for a new well,treatment and distribution PADC $25,839,530.00
system to supply municipal and school needs
18 63 14098 Rhome TX2490007 10,277 This project will allow the City to serve current and future PADC $26,545,000.00
_ development and meet their long term water supply needs.
19' 63 14057 Rowena WSC TX2000004 480 This project will reduce TTHM levels to gain compliance with the PDC $4,261,000.00 70%Yes-BC $4,261,000.00 13442
Stage 2 DBP Rule.
105
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix K.Initial Invited Projects List
Rank Points PIF# Entity PWS ID Population Project Description Eligible Project Cost DIsadv Green GPR Related
Phase(s) % Type PIF#'s
Public Water System
20 60 14017 Pnugerville TX2270014 56,558 Since July of 2018 the City of Ptlugerville Water Treatment Plant C $66,945.000.00
has received numerous TCEQ violations related to the Long Term 2
Enhanced Surface Water Treatment Rule(LT2ESWTR)violations.
The WTP expansion is to address these violations.
21 58 14018 Anthony TX0710001 3,500 The Town of Anthony will need to construct a 250,000 gallon ADC $9,520,963.00 50% 13494
elevated water tank,rehabilitate existing water wells,replace
booster stations,address leaking water lines,install a chlorination
control system,replace meters and build arsenic treatment plant in
order to provide enough adequate water to the residents.
Public Water 21 $195,097,738.00 11 3 $5,048,500.00
System Total
Total 21 $195,097,738.00 11 3 $5,048,500.00
Phase(s).P-Planning;A-Acquisition;D-Design;C-Construction
Green Typo BC-Business Case;CE-Categorically Eligible;Comb-Project consists of both CE and BC components
106
Texas Water Development Board
SFY 2022 Drinking Water State Revolving Fund
Intended Use Plan
Appendix L.Initial Invited Green Projects
Rank Points PIF# Entity PWS ID Green Description Eligible Project Cost Disadv Green GPR Subsidized
Phase(s) % Type Green
[Public Water System
5 154 14130 Sandbranch Development&WSC Pending Provide drinking water to an area without any reliable sources in the ADC $587.500.00 70% Yes-BC $587,500.00 X
most efficient way possible.
10 85 14051 Miles TX2000002 The proposed study will also evaluate the City's current water loss P 5200.000 00 Yes-BC $200,000.00 X
to identify areas of water conservation and areas of reuse potential
to reduce daily potable water demands.
19 63 14057 Rowena WSC TX2000004 The proposed treatment system for reducing TTHM5 will result in a PDC $4.261,000.00 70% Yes-BC $4,261,000.00 X
reduction of water loss due to extensive flushing.
Public Water 3 $5,048,500.00 2 3 $5,048,500.00
System Total
Total 3 $5.048,500.00 2 3 $5,048,500.00
Phase(s).P-Planning;A-Acquisition;D-Design;C-Construction
Green Type.BC-Business Case,CE-Categorically Eligible;Comb-Project consists of both CE and BC components
107
EXHIBIT C
Texas Water
Development Board
OLA ID 1450477
PIF No. Not Assigned Yet
Entity Name: Port Arthur
Project Name: Water Line Replacement
Project
TABLE OF CONTENTS
General Information
Contact Information
Service Area
Document - ServiceAreaMap
Previous PIF
Project Description
Rating Criteria for PWS Projects
Document - PWSDistPressLessTwentyPsi
Document - PWSDistPressLessThirtyFivePsi
Document - PWSDistLossGreaterTwentyFive
Rating Criteria for All Projects - Effective Management
Document - WaterConservation
Green Project Information
Refinancing.
Readiness to Proceed to Construction
Estimated Costs
Document - AnticipatedCommitments
Document - EstimatedCostsSignature
Disadvantaged Community
Document - HouseHoldConnectionsMap
Submittal
General Information
Project Information
Funding Type DWSRF
Project Category PWS
Contact Information
County Jefferson
PWS ID No. TX1230009
CCN No. 10979
Entity Contact Information Engineering Firm Contact Information
Name of Entity Port Arthur Name of New Entity
Prefix Mr. Prefix Mr.
First Name Donald First Name Joe
Last Name Stanton Last Name Wilson
Addr 1 444 4th Street Addr 1 3120 Central Mall Drive
Addr 2 Addr 2
City Port Arthur City Port Arthur
State TX State TX
Zip 77640-6450 Zip 77642-8039
Phone (409) 983-8180 Phone (409) 724-7888
Fax Fax
Suffix Suffix Jr.
OroName OrgName
DeptName DeptName
Title Interim Director of Utilities Title President
Email donald.stanton@portarthurtx.gov Email joe.wilsontawceng.com
Firm Name Arceneaux Wilson & Cole, LLC
Make Changes Y Make Changes Y
No Entity TxWISE Id No Engineering TxWISE Id
Service Area
Population Served 54,864
Total Household Connections 21,370
o
N
$—
PORT
NECHES
,;.. NEDERLAND
d G
0 6.000 1Y,000
ilittGROVES
! _ 4
,,. ' ' SABINE LAKE
ti
CITY OF
SABINE PASS
CITY OF
PORT ARTHUR
a t
EXHIBIT SHOWING THE
BOUNDARY OF THE
CITY OF PORT ARTHUR, TX ,
1
CIVIIC _________________ _ . _ . ...._________—
ARCENEAUX WILSON&COLE
Previous PIF
Previous PIF N
Project Description
Project Name Water Line Replacement Project
Project Short Desc Water Line Improvements
Project Long Desc Improve the City's distribution system by replacing deteriorated water lines with
adequately sized pipes, and replacement of cast iron lines or other outdated materials with new
PVC material will increase pressure and reduce the number of leaks throughout the distribution
system.
What is the need for the proposed project? Please describe any current Health and Compliance
Factor and/or MCL Violations and physical deficiencies. No current health and complainant factors
or MCL violations.
DW Cost Category TRANSMISSION
Is the proposed project Urgent Need? N
Rating Criteria for PWS Projects
Total Storage Capacity (in gallons) 17950000.00
Total Production Capacity (MGD)40.00
A. Has the entity's system experienced documented instances of water contaminants exceeding
the primary or secondary maximum contaminant level (MCL)? N
B. Has the entity's system experienced documented outages in the water distribution system? N
C. Is the system's documented water production capability less than 85% of the minimum required
by TCEQ? N
D. Is the system's documented treated water storage capacity less than 85% of the minimum
required by TCEQ (including total storage, elevated storage, and/or pressure tank)? N
E. Has the system experienced distribution system disinfection residuals of less than 0.2 mg/I free
chlorine or 0.5 mg/I chloramines as applicable? N
F. Has the system experienced documented instances of water distribution pressures:
1. less than 20 PSI? Y
2. less than 35 PSI? Y
G. Is the system experiencing documented water distribution losses of greater than 25%? Y
H. Will the proposed project benefit any other public water systems (i.e., one the entity is currently
serving or proposes to serve)? N
During main waterline breaks the City of Port Arthur has experienced water
distribution pressures less than 20 PSI in isolated areas plus incidents that occur
within our City Limit.
During main waterline breaks the City of Port Arthur has experienced water
distribution pressures less than 35 PSI in isolated areas plus incidents that occur
within our City Limit.
tar
"AN ARCENEAUX WILSON&COLE
e�iyrt,eenr�g surveywy L)Ofl'It,y
City of Port Arthur
Drinking Water State Revolving Fund (DWSRF) SFY 21
Project Information Form (PIF)
Below is the data for the last four years regarding Total Water Loss throughout
the City's Water Distribution System. These were related to the amount of water
leakage and not attributed to an event where the system went down. Again, the
purpose of the project would be to repair a lot of the problematic lines that
require the most repairs or have the most leaks.The data is below for each year:
2015
Total Input Volume: 5,465,785,102 gallons
Total Water Loss Volume:3,170,941,768 gallons
Water Loss: 58.01%
2016
Total Input Volume: 5,308,278,265 gallons
Total Water Loss volume:1,043,799,617 gallons
Water Loss:19.66%
2017
Total Input Volume:6,167,052,143 gallons
Total Water Loss Volume:1,832,611,129 gallons
Water Loss:33.09%
2018
Total Input Volume:6,456,349,789 gallons
Total Water Loss Volume:3,371,890,779 gallons
Water Loss: 52.23%
409.724.7888
2901 Turtle Creek Dr,Suite 320
Port Arthur,TX 77642 Engineering Surveying
awceng.com F-16194 10194049
Rating Criteria for All Projects - Effective
Management
A. Asset Management
1 a. In the past 5 years, has an asset management plan been adopted by the entity's governing
body that incorporates an inventory of all assets, an assessment of the criticality and condition of
the assets, a prioritization of capital projects needed, and a budget? Note: A Capital Improvement
Plan (CIP) alone does not constitute an asset management plan. N
b. If"No," is the entity planning to prepare an asset management plan as part of the proposed
project? If so, include language in the Project Description that states this. N
2. Has asset management training been administered to the entity's governing body and
employees? N
B. Water Conservation
Does the proposed project address specific targets, goals, or measures in a water conservation or
drought contingency plan that has been adopted by the entity's governing body within the past five
years? Y
If"Yes," 1) list the targets, goals, or measures to be supported; 2) describe how they will be
addressed by the proposed project; Increase pressure and prevent leaking deteriorated lines
throughout the distribution system. By removing/replacing the existing deteriorated lines the
amount of gallons lost throughout the distribution system will decrease and will increase the
system's overall pressure.
C. Reclaimed Water
Does the proposed project involve the use of reclaimed water? N
D. Energy Efficiency
Does the proposed project address a specific goal(s) in a system-wide or plant-wide energy
assessment, audit, or optimization study that has been conducted within the past three years? N
E. Implementation of Water Plans
Does the proposed project implement elements contained in a state or regional water plan,
watershed protection plan, integrated water resource management plan, regional facility plan,
regionalization or consolidation plan, finalized Economically Distressed Areas Program (EDAP)
facility plan, or a total maximum daily loads (TMDL) implementation plan? N
3 8 y, < d S] 7 a n a a n 3 n 7 3 m c 3 v n T Cry cn z ^ o 5- a m` 3 cPD 3 *. 0 0 3 n c , z- a, 0, c
m m c m 7 O • O mX O C `< m
0 7 d_ o v -0 a aa' `.a v' a cr .7, n p^ o_ 7 a v - o q F m '^ q N (D n o D- $ `< ."+ T m ro °-' <' r<o c d a (D
m 5 3 `' co a 2 = a ? rD a- L2, °o o T 0°0, .0 v, N Q < m m Q rp a r m CD `.c a N' N < 0 0 * 3 a a `' A ,-+D
a c 5.
o f r� s ° a , c ° `C'oa o ,3D m ao "' m 7 --, A `., x N w v .mN. co o m 0,cm oa a a°, m Q 1, A m
3 - ^ m `< a O pS ° O N j 7 7 !D n (D C N m n 7 -. , 7 ° A ° 7 •Q Co m ° T ° m ° m a 7 0 a a a ° m
3 < a c o m 4 3 0g F (a D 0 — 7 m a 3' a v. 3 °° O a -c ,7" o 7 ?on m — _ ro 7a. A. a D-
o' c 3 c n o a :-A A v. ° v3, a T 5 d, > 3 d m a a a g- d s d " a m 3 x o mo n a o70 7 S^, a p a - (D
7 o c c o -▪ -0 7 = -., 0 oa 7 00 7' H 0 _, a- 7 - c m m 0 o c a a o -' f m 0 c n < 7 C�
o a, » m a m n 3 c a3D •" m o D c . a on a '< ^ C ' o . 3 -a _. n p ro a £ m v
c ? o a• Cu . a 3 o-12 ? - 0- a a.a = rao v m m c = _ A r f a 3 0 o f ° 0 3 c 3 0 ^ a A A m a .a
< 3 < `� c 0 9, c Q m 3 0- m o 7 g 00m a 7 a. a o a D < - 7 _. N m `< m n °c c n m `< a 3 w
co 0 ,- a S, 0 5, 0 oa O a a a 0, =3 3 7 7 = n OR p z OQ 7 rT 7 p 3 ;^ o S. rD pa O a 0 1-• 'p °�Q
` c o a m ? 7 m „,c ° D a 3 < ° - or' a(D .. c w 3' 'n f < A C v 0
0 ,0 c c -, ,y v 3 as , m 3 7' a a - o o' a c <' 1 a- A ' d a o' a •m a m a f D a d o o 3 vi (D
3 � (cra dv°NAv ,m<o �� Aa. aTa3' 03 f mo ., 7 .< '^ x, 30 7taa3v0+ '-, cmmm cdc •va
o � oa _+ v �y :. 3 � a7o3 wa "D a. 3 ° avo' °� °—' � c � c o `87m °: p3f <' � a .z4o
• ,.� m A m 7 C m A ? (� . a> w - n -C 7 m . S 0 d
�o v a 3 Tc a ,3, -. m (7, n m m a n = a .7 ° o c M 0 3 a so = vf 2. < _c`.'_- „ 3. rm m
at C 7 /p .,< 1n o' 3• 7 a- N 3 a of a O f c rN. c A ? 0 7- ? o • A N N a- ° 04 (p 7 m a 7
N o 7 �� c ° 7• 7 `< n c m 0 0, 7 7. O 7 a 0a 0 a p 0 O p a 3 7 ' m m �' N (D? E. D70 m m 3 m Cr a
fps °c .0�° H ca c - c rnD < -• nz-d 0a . sc 3o7- a3 , : A ..) 0--0 a um, oa .7, r. c0oaam
a s a,a, < C a •.a. b m• Fr; 7 , a a O, m j•-• S c S p ▪ m e fD d a m 7 0 r 7 A
x m ,o `" < `m Q 3, a, 3 ,o = m 0 c a o ., m c - 7
m m m F m o o 'D m a ,. D, n on c o c•
a
m3. 0 Oa
0o m 3 o n ,� s a 3 n c -c a 3 a o v d ; H 0r . a V, ° r: ° o CO v -3. Cr * -i g f v -- c n v Cn
o = o ° -o .a. a a ° & o m n 7 v, i, in 0 s a• n n .n•. vm' d ° n n A a 9 rp O a m a a n .a. 3 c to 8 0 ° c
O ;, a n N <K .- a a V C d 0 c m- n a . Fi a < .c-. m 0 : 7 3 CL fn M m n 0 m a N •T 01 Ci 0 Q
a(. 7' m 3 - v d 7 c •`< a A c ^ a (?1 .7 Ini, A 7- Oi n =' a O 0- A -`" CI^ C ." 7yD', 7 _ ' N ° 3_ c ram,
O, n ° 3 0' -0`< umi 7 3' p o a 0", a12' m m co o; a N . V'• 0- 1n Oa .O Oa y' y' m T. F o A m 3 . n 0- O a 7 m ,, D
N n O N m 0 0 0 m 7 7 3 c •n a m c J c e' m a = m 0 7 C m 0 a a N r,
-4 T 3 y 0 cr vc' 0 cD a a c 7 .. n a o c m w 3 n o A. 3 a -, 3' m• S d w' < vi m a, o A Q a 7 a 0 co ,ate, (D
Lc, m a, c„ m m N a 7 ./ ? ? 7 a :" 7' D: a N d m m n f .,, 0- 0 m 7 N c , r,
c S `, 0 3 5 3 •;., f % d o .m. vc, N m a ° a n'0% 3 °' n a v o a s 3 o a Y' to n g c m a'^.8- 3 2 7 °:"0 —I
m o N 3. N A 7 0= g n d 7 0, Q a,d•
o, 7 c n 7 S N a <j• N d m 0' O `" Ec,.atCD ' m N m N .` ,O ?• a N ,- ,-
D .c. m ° 8 0 G.. a b 3 K a a c 0 V 0 0 a c 3 d - m N m N rlf CM Oa ,p 0 =a `� `". 3 v '5 `-.
" n n 3 .. p 3 7 7 a aa, . o a :" 3 ". rn, 3• a m 3, 3 n 7 (. n a N 7 a o* •0 7 7 0 . H n
'' 3 ^. m o ..ac oo a d a n• , 7 c d q, o', - 0 y K o d a 3 °c n 7 0 a,, a ro o`"i -
• co O a 7 v o a O 7 < 7 a a •'_, m ao fD
0 3 a^.. a °a c0D .0 c v ° °n o lSD Q 0. 7 n G .00 v3' ;, m 3 1,t' ... m 3 a 3rt; v a o Q.
s o co
• a _ ° °c odd o um a 3 a 3 ° ° c ^ f c o 3a 0 o < v . 0 `< d ? (D
- n y
7 3 Q Cu n /3 a n s.in m A. 3.a »`a< 3• ID ° S O aaa 3- r,"D ya, ' Sa NO NPiA o c 3 j 5.
C 7 cQ 7 ° On .. a n n o p 5 �< a r. a 0 . 1( N mD 3 o S c _• c ,
a a 7 R c m n m o 7 7• O 3 07a n i0 1,"ii m N f". S x V' m j o f ai n r7.. 7
m N p ^ y 7• j 7 ^ 0a 3 a O N C a �'fli a. C ° ¢ O 9 0- S n 7 a O C ,-
= o 0 0 F d 0 A N �. 3 0 `D G' 0 3 v c 3 7 7 w m• n (D
a -., Co o m m T d Cr -, m m In ,
•- °^ m H oo - a o .a. m L" cu c a 3 a 3 a 0 a, m 3 # o,, 3' m 0 d 0 a
-7D' 0, fD O m d 7 A O' 3 7�' O7 a,o7v c aj °- 01 V.. 2 W 0 "0 7 - '. 7 D
a 0 O O 7' 0 0O c 7 i,• 0. 7 4, 7. �" n W j
.. a < ? AV a S, a - _ • u
-• c�}} 7
n' m m . • OAC54 2 O r C VN `2. r+ C n , d _F', N n H
m x n v ,S• �. " :_-n 0 p v j �. Alt T- i t 7 a m
(D -f �• -4•� QQ X m 0 =' 92 0a - D' f._._n as-N- "7_�
O ,,, i- 1 ° a c rD a p k 3
A d c D o p:w- a 7 n C i , ; v' j O O d o
n n z a ..<
0 3 s 'o in m - 3' ° (D
w n m e; A c 3 0_ o o v G a- ,1 o 3
6, - O A• -., n a S C 0 7 V'*i a " a '^ C (') C c n a 7-cm D (D 0 (D � 7 c.)
- 7' 7 a < a o a S to 0 , 00) c m -p n ri
V, 3 '-D, ° M r* m a d m m c N < N m 7' -o 0 ,< o
• mc n a < ov acc m Q �nn o a 0 00 p o O
7 fiS 3 ,r g m a 3 . v ° a COn 7 3 7 ^ n "
o n f o a 7 0 0 v_, m 0' 3 a aDL. as T,o a a N 3 N m
7 3 a m 7a PO to c o �0- o a ,'^. m7 c m a `< 'n' ro 0 „ 7
w• m "'� - `< 3 N in d 7• " o O" , ° c7n a 'i 9� c 0- C a 7 ,Ci, `c 00
K < m O r 0 a 0. N 6, 0 " V, m m O' '<
3 N N S Dm R 7 ^ 0 r o an° O d 4 3 `vo `< S rD OS n A
n A.< m 0 << ,yer, N 'Tt ,< ip n0.
C N 3' 7
.. p p a ,-, a c O x K . p n ,m, O N go ON"
n S ,. S.7C m 3 a �, 7 Cu 7 C _. 0.O.m Oa C ? 01 ° <
7
.B c o ; n 7 �, n a n N• . _.o7v
a m LA
H-.
m m ^. a, c m 3a m a
Green Project Information
A. Does the proposed project contain, either partially or completely, green elements as defined by
the Green Project Information Worksheets? N
Refinancing.
Will DWSRF funds be used to refinance existing debt related to this project and received from a
source other than the TWDB? N
Readiness to Proceed to Construction
A. Permitting
Have all applicable permitting aspects of the project, including acquisition of water rights and/or
Certificate of Convenience and Necessity (CCN), or TCEQ approval and completion of piloting
been achieved? N
* If"No," identify in the space below each federal, state or local permit, license or other
authorizations needed for the project and the status of each. We have a TxDOT and Drainage
District crossing that will need to be reviewed for the permitted crossing.
B. Land Acquisition
Have all land acquisitions and easements necessary to complete the project been obtained?
1. Have you completed the design process including full development of plans and specifications?
(If"No," proceed to Question 2. If"Yes," proceed to Question 4.) Y
2. Has design work progressed beyond preliminary design? Y
If so, please provide the anticipated completion date:
C. Design
3. Will design work be initiated after the TWDB releases design funds for this project? Y
4. For membrane plants, SWTP, water wells, treatment changes, or intake structures, has TCEQ
approved plans and specs?
D. Environmental Review
1. Have you received a Finding of No Significant Impact (FNSI), Categorical Exclusion (CE), a
Record of Decision (ROD), or an environmental determination prepared by another entity in
compliance with the National Environmental Policy Act (NEPA) for this project? For projects that
may qualify for a FNSI, please review 31 TAC §371.43; or that require a CE, review 31 TAC
§371.42; or that require a ROD, review 31 TAC §371.46; or that have a determination by another
entity, review 31 TAC §371.50. N
2. If an environmental finding has not been issued, does your project meet the criteria to receive
Categorical Exclusion as defined at 31 TAC §371.42? Y
3. Can you submit an environmental report with the completed loan application that documents
coordination with agencies has proceeded sufficiently to determine that no major issues remain? N
4. Will the environmental review be initiated after the TWDB releases planning funds for this
project? N
E. Construction Phase
Start Date (mm/dd/yyyy) 06-01-2022
Completion Date (mm/dd/yyyy) 01-01-2025
F. Project Bidding and Contracts
Will the proposed project be ready to advertise for construction bids immediately following a
funding commitment for construction costs? Y
If you are seeking reimbursement for eligible planning and/or design costs, was the work
performed in compliance with applicable state law and federal crosscutters, including procurement
following Disadvantaged Business Enterprise (DBE) requirements? Please visit the TWDB's DBE
web page for more information. Y
How many months will it take to close the loan after receiving a funding commitment? Projects
deemed ready to proceed to construction must be able to expend funds quickly after receiving a
funding commitment. 6
Estimated Costs
Seeking planning funding N
Seeking acquisition funding N
Seeking design funding Y
Seeking construction funding Y
Cost Category (a) Planning (b) Acquisition (c) Design (d) (e) Total
Construction (a)+(b)+(c)+(d)
Treatment $0 $0 $0 $0 $0
Transmission $0 $0 $0 $16,000,525 $16,000,525
and
Distribution
Source $0 $0 $0 $0 $0
Storage $0 $0 $0 $0 $0
Purchase of $0 $0 $0 $0 $0
System
Restructuring $0 $0 $0 $0 $0
Land $0 $0 $0 $0 $0
Acquisition
Source Water $0 $0 $0 $0 $0
Protection
Engineering $0 $0 $50,000 $450,000 $500,000
General, Legal, $0 $0 $0 $0 $0
Financial
Contigency $0 $0 $0 $0 $0
Other $0 $0 $0 $0 $0
(Describe
Cost)
Subtotal (Add $0 $0 $50,000 $16,450,525 $16,500,525
all rows above)
Financing from $0 $0 $0 $0 $0
Local Funds
Financing from $0 $0 $0 $0 $0
Other Funds
Subtotal, SRF- $0 $0 $50,000 $16,450,525 $16,500,525
Funded
Amount
Green component costs as a percentage of"Subtotal, SRF-Funded Amount" 0%
Anticipated Commitment(s) MULTIYEAR
Attachment to SFY DWSRF IUP
Disadvantaged Communities Worksheet(SRF-008)
City of Port Arthur
991099
Amortization Schedule
Loan Amount to be Amortized: $ 20,000,000
Interest Rate 2.400%
Annual Payments $ 1,042,000.00
Number of years 20
Year Payment Interest Principal Balance
$20,000,000.00
1 $ 1,024,000.00 $ 734,906.25 $ 289,093.75 19,710,906.25
2 1,024,000.00 712,385.55 $ 311,614.45 19,399,291.80
3 1,024,000.00 688,766.97 $ 335,233.03 19,064,058.77
4 1,024,000.00 663,996.98 $ 360,003.02 18,704,055.75
5 1,024,000.00 638,019.45 $ 385,980.55 18,318,075.20
6 1,024,000.00 610,775.52 $ 413,224.48 17,904,850.72
7 1,024,000.00 582,203.45 $ 441,796.55 17,463,054.17
8 1,024,000.00 552,238.49 $ 471,761.51 16,991,292.66
9 1,024,000.00 520,812.73 $ 503,187.27 16,488,105.39
10 1,024,000.00 487,854.97 $ 536,145.03 15,951,960.36
11 1,024,000.00 453,290.52 $ 570,709.48 15,381,250.88
12 1,024,000.00 417,041.06 $ 606,958.94 14,774,29I.94
13 1,024,000.00 379,024.43 $ 644,975.57 14,129,316.37
14 1,024,000.00 339,154.49 $ 684,845.51 13,444,470.86
15 1,024,000.00 297,340.89 $ 726,659.11 12,717,811.75
16 1,024,000.00 253,488.88 $ 770,511.12 11,947,300.63
17 1,024,000.00 207,499.09 $ 816,500.91 11,130,799.72
18 1,024,000.00 159,267.29 $ 864,732.71 10,266,067.01
19 1,024,000.00 108,684.19 $ 915,315.81 9,350,751.20
20 1,024,000.00 55,635.20 $9,350,751.20 0.00
P I F Estimated Costs - #1450477
Entity Name: Port Arthur
New Entity Name: null
Project Name: Water Line Replacement Project
Report generated by: PRODOLA2$, Thu Feb 25 07:47:02 CST 2021
Please review the estimated costs below, then sign and upload. P�� OF TF+%1
(:::-
Signature /*� •*ivN �
0 JOE M.WILSON,JR.
Seeking planning funding N �/j�o.. 92067 ,.41,0
11'�l�"4'cENst��'%`'V
Seeking acquisition funding N �%��;;""���
Seeking design funding Y
Seeking construction funding Y February 25, 2021
Cost Category (a) Planning (b)Acquisition (c) Design r (d) (e) Total
Construction (a)+(b)+(c)+(d)
Treatment $0 $0 $0 $0 $0 _
Transmission $0 $0 $0 $16,000,525 $16,000,525
and
Distribution
Source $0 $0 $0 $0 $0
Storage $0 $0 .$0 $0 $0
Purchase of $0 $0 $0 $0 $0
System
Restructuring $0 $0 $0 $0 $0
Land $0 $0 $0 $0 $0
Acquisition
Source Water $0 $0 $0 $0 $0
Protection
Engineering $0 $0 $50,000 $374,400 $424,400
General, Legal, $0 $0 $0 $0 $0
Financial
Contiqency $0 $0 $0 $0 $0
Other $0 $0 $0 $0 $0
(Describe
Cost)
Subtotal (Add $0 $0 $50,000 $16,374,925 $16,424,925
all rows above)
Financing from $0 $0 $0 $0 $0
Local Funds .
Financing from $0 $0 $0 $0 $0
Other Funds
Subtotal, SRF- $0 $0 $50,000 $16,374,925 $16,424,925
Funded
Amount
Disadvantaged Community
1. Will the community pursue disadvantaged eligibility? Y
2. Is the Entity pursuing disadvantaged status for either the entire service area or a portion of the
service area? ENTIRE
3. Identify the sources for the socioeconomic data to be used for disadvantaged status CENSUS
4. Standard Census Boundary or Incongruous Census? STANDARD
Boundary Designations
Boundary AMHI Average Current 2010 Unemployme Total
Household Population Population nt Rate Household
Size Connections
Port Arthur $36,557 2.72 54,864 55,109 7.2900% 21,370
city, Texas
5. AMHI $36,557
6. Average household size 2.72
7. Current population 54,864
8. Previous population 55,109
9. Unemployment rate 7.29%
12. Average Monthly Gallons per user 2,325
13. Average Household Size 2.72
14. Average monthly water flow per household 6,324
15. Monthly Water Rate Schedule
From (gallons) To (gallons) Rate Type Per
0 10,000 $5.06 Variable 1000
10,001 .50,000 $5.31 Variable 1000
50,001 100,000 $5.58 Variable 1000
16. Total of all other monthly water charges $7.5
17. Average annual water bill $473.99
18. Average Monthly Gallons per user 1,279
19. Average Household Size 2.72
20. Average monthly sewer flow per household 3,478.88
21. Monthly Sewer Rate Schedule
From (gallons) To (gallons) Rate Type Per
0 10,000 $4.65 Variable 1000
10,001 50,000 $4.88 Variable 1000
50,001 100,000 $5.12 Variable 1000
22. Total of all other monthly sewer charges $7.5
23. Average annual sewer bill $284.12
Note: This section must be submitted to be considered for Disadvantaged Community funding.
Information that is not submitted as requested will not be considered. Eligibility will be determined
based on information provided, and subject to final review by TWDB staff.
The Estimated Eligible Principal Forgiveness % is not a final determination; disadvantaged
information is subject to TWDB staff review. Actual prinicpal forgiveness amounts will depend
upon a project's Disadvantaged determination, ranking, and the availability of funding.
Annual Loan Cost Per Customer$49.58
Unemployment Adjustment 0.75%
Population Adjustment 0.03%
Household Cost Factor 3%
Household Cost Factor Difference 0.99%
Estimated Principal Forgiveness 30%
Z./K.
VC),'Clj'''''®:-:".41____._:®'.
01
4 __,..
----, -,-,_- _ ,
.1 I'L.--7.1.7.. _
_ _ ,
_.7 - ,
_ .
m
__
_ ..
(;) _ _,:._ .
1 ____
. . .. __ _ _---- _ _ ,..,_
,:. t.e: ' _
. _.,_ (4":--s Ei ....„------,,,_
. . _ .
Q t s
Q:
•
— a o.o
_ 8 i --
U
CC a1a
G
t i
-3 ,11110
> :91.74. i i i i \
9ADp< «�4ni q
p Z-n`TI 3 _m
- I Y m m O r L ;m0 2 m0 2
"ni3zmp x i i
NC�1, .'O _N _3 1Y' F
O ~3 0 m= IV N �a05^ i
Of mm ;C o'° 3-0=E4
O: Z O s p7 CD F N p
H a m .
Submittal
I, Derek Graffagnino, Graduate Engineer, as the designated authorized representative of the Port
Arthur, hereby approve and authorize the submission of this project information form to the Texas
Water Development Board. I certify that all information contained herein is true and correct to the
best of my knowledge. I understand the failure to submit a complete project information form by
the stated deadlines may result in the withdrawal of the form without review.
Submitted by Derek Graffagnino, Graduate Engineer
Telephone Number (409) 724-7888
Submitted date 2020-03-02 09:30:06.257
L y
4
ZW N UJ C T C
�a co M co M _M
o o o o 0
0 0 0 0 0
oo oo R 0 0
a o 0 o Cl) Lai
a C 00 n
c9
M N cr5 ea ea
—
fH ea 69
m a
co co m m
0.
d T 0 N N N N
f�~ >- >- >- >- }
> o 0 0
N e O O O
✓ O O O O O O O O O O 0
CO O 0 0 0 O O O O O O O O
O U) O O O O O O O O O O O
U 0 O O N O O 0 U) O O O 0
CI O 0 0 O O 0 (O N O O O
O 0 U) O O O Cl) U) .cr.' O O O
a) _ O •R O co U) V V N O O 0
f — 0-, O Lc) U) N- Cl) O CO U) COU)
N C') CO CO M CDCOEA EA
d 69 fA O69 H 6969 fA N fA69 fA EA
2
O
H
a)= U 0
U d ddddd❑ d d❑ d ct
da
re
C U y o 2
LL a+ °) E El E o)°�' ° vi ❑� -oE o
d
Ol a y E° y-o m� cri a o'o ,_ d U c y y a) c
12 C f6 T fa N N o U E N a) c d C Cl) O T Y
L IC j Z C N C co C 3 a T O W T E O'O a) _.6
O O a o f �m�;� ma �� � � , 0 mT m co foa) au)
m O Q ° a N 0 c E _o a 3 a c� u 3 m y E d.S_c
C C i+ a N N .0 a) N a)<N O 2 O U N Y Y a x o 2 3 a)—
O N a E � a a�f0 c ❑ cps c � > > � a' o a °�mQ 3�m
G� E. aE) Z o a) �Ua 3 g c Q) E �-0 uc) ac) c� m e a)
OLA y�j +' y >.2 a)�ma o mui cco °1 rnn aZ)� v;o Ha) E °Or a) EO
N +- fj �U�H 3 c °�n m-L-5= N rn a u E t1 .a 5•§ o y o
a) N a)N 4) 2 C 2 ,n f0 n
4) .44 d : E. .L..L �O N a) o C'' y= a) a)❑ fn 2 a)C N N a) QC) N .� ,.)'''E. N.
G31a ? ?3 2,H �aEN ty.� U'0 o"c o _ 2Ea) ,2_> E
d Ol G) 0) • ai UEV a> ac) o'` f0ca) 3aim �- Ec'"8 m °� ymrn rEc)o
.0 C p c p E E vi a, U,o E .0° 6' m e 'y c 3 a°)) x M a) m aa)) fn m'E N aai
3Y 51 I- O a oy °oamm > 2a) E °E maE ) ° E c� a a > a) X >Q
N V a 9. m 12 V y 0.>c.4 en a a y-0 N w co N O f9 N LL j c a O t„ N C
ea W,w c O 2 N a)W_C E O r T co N y U — E. CA a)'O a) ❑ C O C O 12
K D V N _U., O a)N O U a o c O E O C 3 0 0 , 0 ' Y . `O 0
G7 N K Od a U l m > EH c �c ct m= y� N a o a m n a m c m
HN � o c°if > d E E d od
O 0 V > (n N a) L H Cn > J C C 63 o y N V N C 0 0 0 > O N 'O O O O O;�C
N Q) a) E N C a) C O a W� N O O Y C 7~ O~ a) cn a Q) 7 z a) ` a m a) wa«p a)
'. a O` m a, to C m C F °) a) a, C 0 U O Cp O E > O a a) a > E o a E y al
LL Q a d Ha`o ini1JJ- 3 ❑ E.E a n3 H-0 C9 E� d E H w E H.=_ 3
LA C CO O CO V 0 O N CO O O N V
O O O U) CO 0 0 I . 0 CO f` CO
N- 0 U) CO C) 0) N CO M N M V
jd M (0 V N N O H U)
U) U)
a
0
0-
N. v- V C) C) C) N N N 0 7 N
O O O O O O O O O O O O O
O C., O O O O CD O O O 0
_
CO t0 f- CO O. V O) CO 0 CD O. Tt
CO N
X NX C CO N V cr
XX O CO U)XX O
a X X X X
H H H H H H I-- H H H H H
E) a
0
Co
> 0 N .s n cn
W :Z C O N a) a V) 3 �)
> a) < c c E E rn a) a a)
E s o CC
!r a- a m L vp
To a `a a > o
T Q-. a' a
C
W
N. M N- U) co C) N CO N- 0
ItE co N 0o) 0) Cr) CO LC) CD CO m
a> 0 0 0 0 0 0 0 0 0 0
W > ,- ,- ,- *- ,- a
F. T
N N CO N 0 7 N O M .- M co CO0
m 0 N 0N O
C N
a
.0 •2u
U) O U) 0 CO CD CO � CO CV
C .Q a) — N V CO (0 U)
a- a.
Texas Water
Development Board
P.O.Box 13231, 1700 N.Congress Ave.
Austin,TX 78711-3231,www.twdb.texas.gov
Phone(512)463-7847,Fax(512)475-2053
March 2, 2022
Mr. Calvin Matthews
Director of Water Utilities
City of Port Arthur
P.O. Box 1089
Port Arthur, TX 77641
Re: City of Port Arthur
Water Line Project
TWDB DWSRF Project No.62633
Engineering Feasibility Report Approval
Dear Mr. Matthews:
The Texas Water Development Board (TWDB) has reviewed and is approving the final
engineering feasibility report (EFR) for The City of Port Arthur (City) 2014 Drinking Water
State Revolving Fund (DWSRF) project, identified as Project No. 62633.The final EFR was
received by the TWDB on July 8, 2019.The final EFR was sealed and signed on July 8, 2019,
by Joe M.Wilson,Jr., P.E.with Arceneaux Wilson& Cole, LLC. of Port Arthur, Texas.
The EFR is a basic document that describes the following proposed project to be completed
under the 2014 DWSRF funding commitment.The City is proposing to replace existing
water lines with new water lines of similar size.Approximately 114,186 linear feet (LF) of
deteriorated waterlines throughout the City have been identified for replacement. The
water line project will be prioritized based on water loss, low pressure, and a system
analysis. In addition, the project includes approximately 13,583 LF of minor extensions of
the water lines.Along with the water line replacement, the project may require isolation
valves, fire hydrants, fittings, and all necessary appurtenances, including pavement repairs.
The approval of the EFR document by the TWDB does not replace any approvals that may
be required by other local, state, or federal agencies for the work proposed within this
project.
Please be aware that any changes to the proposed project that might have environmental
impacts must be presented to Gayla Duaine,TWDB Environmental Reviewer, prior to
implementing the changes. Ms. Duaine can be reached at (512) 475-1521 or via email at
gayla.duaine@twdb.texas.gov.
Our Mission Board Members
Leading the state's efforts in ensuring a Brooke T.Paup,Chairwoman I Kathleen Jackson,Board Member
secure water future for Texas and its citizens
Jeff Walker,Executive Administrator
Mr. Calvin Matthews
March 2, 2022
Page 2
Should you have any general project concerns or questions,you may contact Cody
Cockayne, Project Reviewer, at (512) 475-1524 or via email at
cody.cockayne@twdb.texas.gov.You may also contact Jeff Taylor, Team Manager, at
(512) 463-5850.
Regards,
Digitally signed by Bill
Bill Blaik, P.E. Date:2022.03.02
16:50:14-06'00'
Bill Blaik, P.E.
Senior Engineer, Team 7
Water Supply and Infrastructure
BB/CC/ep
Enclosure: Approved Engineering Feasibility Report