Loading...
HomeMy WebLinkAboutPR 24349: SABINE PASS SEWER PIPE BURSTING PHASE IV CLOSEOUT City of ort rthur�� Tt,;, INTEROFFICE MEMORANDUM Date: August 22, 2025 To: The Honorable Mayor and City Council Through: Ronald Burton, C.P.M., City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR 24349—Sabine Pass Sewer Pipe Bursting Phase IV Closeout Introduction: The intent of this Agenda Item is to seek the City Council's approval to accept the closeout documents for the completion of the Sabine Pass Sewer Pipe Bursting Phase IV Project and further authorize the City Manager to release the retainage amount of$22,644.40. Background: The wastewater collection system in Sabine Pass requires ongoing rehabilitation under the sanitary sewer overflow initiative mandated by the TCEQ order,which calls for the replacement of 2,000 linear feet(L.F.) of sanitary sewer pipe and five manholes annually, along with related appurtenances. Per Resolution 24-515, the Sabine Pass Sewer Pipe Bursting Phase IV project was awarded to Global Drilling, Inc. of Winnie, Texas, with a projected budgetary impact amount of $452,888.00. As part of the ongoing sewer rehabilitation program to maintain compliance with the TCEQ order, Phase IV included the replacement of approximately 2,142 L.F. of 8-inch sewer lines and 829 L.F. of 10-inch sewer lines along Tremont Street,crossing Broadway Street,and continuing through Greenwich Street. The Phase IV project is now completed. Global Drilling, Inc. has submitted all required closeout documents, which City staff have reviewed and confirmed. All the closeout project documents required are attached. Budget Impact: Funds for the retainage invoice are available in Retainage Account No. 169-00-000-2050-00- 00-000. "Remember,we are here to serve the Citizens of Port Arthur" Miff' City of l itiil .h art rthur Recommendation: It is recommended that City Council adopt Proposed Resolution No.24349,authorizing the City Manager to accept the project completion and further authorize the release the retainage in the amount of$22,644.40 "Remember,we are here to serve the Citizens of Port Arthur" PR No. 24349 7/14/25 cm Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT THE PROJECT COMPLETION DOCUMENTS FOR THE SABINE PASS PIPE BURSTING PHASE IV PROJECT WITH GLOBAL DRILLING, INC. OF WINNIE, TEXAS, AND AUTHORIZE THE RELEASE OF RETAINAGE IN THE TOTAL AMOUNT OF $22,640.40; FUNDING IS AVAILABLE IN RETAINAGE ACCOUNT NO. 169-00-000-2050-00-00-000. WHEREAS, pursuant to Resolution No. 25-515, the Sabine Pass Sewer Pipe Bursting Phase IV Project was awarded to Global Drilling, Inc. of Winnie, Texas with a total projected budgetary amount of$452,888.00; and, WHEREAS, as part of the ongoing sewer rehabilitation program to maintain compliance with the TCEQ order, Phase IV included the replacement of approximately 2,142 L.F. of 8-inch sewer lines and 829 L.F. of 10-inch sewer lines along Tremont Street, crossing Broadway Street, and continuing through Greenwich Street, which is now complete; and WHEREAS, Global Drilling,LLC has submitted the required closeout documents,which have been verified by Water Utilities Staff, stating that to the best of their knowledge,the Sabine Pass Sewer Pipe Bursting Phase IV Project has been completed in general accordance with the City standards, which includes the Engineer's Certificate of Completion (Exhibit "A"), Contractor's Affidavit (Exhibit"B"), Contractor's Certificate of Substantial Completion (Exhibit "C"),Contractor's Certificate of Warranty(Exhibit"D"),and Contractor's Certificate and Release (Exhibit"E"); and, WHEREAS,the retainage for this project is due, as the work is completed and billed, and the release of retainage to Global Drilling, Inc. of Winnie, Texas for $22,644.40 (Exhibit"F") is recommended. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: PR No. 24349 7/14/25 cm Page 2 of 3 THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Manager is hereby authorized to accept the closeout documents for the Sabine Pass Sewer Pipe Bursting Phase IV Project, which includes the Engineer's Certificate of Completion (Exhibit "A"), Contractor's Affidavit (Exhibit "B"), Contractor's Certificate of Substantial Completion (Exhibit "C"), Contractor's Certificate of Warranty (Exhibit "D"), and Contractor's Certificate and Release (Exhibit E"); and, THAT, the City Manager is further authorized to execute on behalf of the City of Port Arthur a Certificate of Acceptance(Exhibit"G")for the completion of the Sabine Pass Sewer Pipe Bursting Phase IV Project; and, THAT,the Release of Retainage be paid to Global Drilling, Inc. of Winnie, Texas, in the amount of$22,644.40(Exhibit"F")is available in Account No. 169-00-000-2050-00-00-000;and THAT, a copy of the caption of this Resolution be spread upon the minutes of the City Council. READ,ADOPTED,AND APPROVED THIS day of , 2025 at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor: Councilmembers: NOES: Charlotte M. Moses Mayor ATTEST: Sherri Bellard City Secretary PR No. 24349 7/14/25 cm Page 3 of 3 APPROVED AS TO FORM: Roxann Pais Cotroneo City Attorney APPROVED ADMINISTRATION: it\ Ronald Bu7r, C' r City Manage Calvin Matthews, . Water Utilities Director APPROVED AS TO FUND AVAILABILITY: .100 ,&,,ir C4 Lyn e . (Lyn) Boswe , MA, ICMA-CM Finance Director („j t ;Ytim, Clifto , E. Williams Jr., CPPB Purchasing Manager EXHIBIT A (Engineer's Certificate of Completion) ENGINEER'S CERTIFICATE OF COMPLETION Project: Sabine Pass Sewer Pipe Bursting Phase IV Project Date of Issuance: Owner(s): City of Port Arthur Owner's Project Number: 24-515 Engineer: Dr. Hani J. Tohme, P.E. /Golden Triangle Consulting En ineers Contractor: Global Drilling, Inc. This Engineer's Certificate of Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To: City of Port Arthur (OWNER) And To: Dr. Hani J. Tohme, P.E. /Golden Triangle Consulting En ineers (ENGINEER) The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor and Engineer, and that Work is hereby declared to be complete in accordance with the Contract Documents on Jul 10 2025 DATE OF COMPLETION Executed by Engineer > � �-� on Cjit/14, �� EXHIBIT B (Contractor's Affidavit) r CONTRACTOR'S AFFIDAVIT OF ALL BILLS PAID Project: Sabine Pass Sewer Pipe BurstingPhase IV Project (Contract No. : 24-515) Location: Sabine Pass Port Arthur. Texas Owner: City of Port Arthur County of Jefferson , State of Texas The undersigned hereby certifies that. except as listed below, all pre\ious prod*ress payments received on account of the Work, have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Pa}meni. t -. Exceptions: NONE ---- Signature: Print: Mr. BAKER MOHAMMAD Date: AUGUST 14, 2C25 Sworn to and subscribed to nee, a ilh- Notary Public, this i`t day of ' 44�l9..1— . 202‘ Q414,..tic. cAb.oluitVt (Notary Publ. "���"", JAMIE C. DOHERTY My Commission Ex r�'o'�r"`q r, T� Notary Public,State of Texas 'iN" Comm.Expires 08-2e 2028 ',Y Notary ID 3154721 ii EXHIBIT C (Contractor's Certificate of Substantial Completion) CERTIFICATE OF SUBSTANTIAL CO7IPLETION Purchase Order No.: 24-515 Project Name: Sabine Pass Sewer Pipe Bursting Phase IV Project Contractor: Global Drilling, Inc. Description of Work: Rehabilitation of Sanitary Sewer Pipes, Manholes and Service Connections The work performed under this contract has been reviewed and found to be substantially complete. The date of substantial completion is hereby established as JULY 10, 2025 . KNOW ALL MEN BY THESE PRESENTS: 1.) The stage of construction where. in the opinion of the City of Port Arthur, all items of the w'ork necessary to enable the assets to be utilized without restrictions for the purpose far ,vhich the asset was constructed have been completed;and 2.) All pay items are complete and all necessary testing as required bt the and euulation;and or Contract Documents have all been completed. Punch List All list of items to be completed or corrected, prepared by the C h TR-IC Tt ,R and ‘erified and amended L-., the ENGINEER, is attached hereto. The failure to include any items on such list does not alter the of the CONTRACTOR to complete all crk in accordance with the contract documents. The CONTRA( T t P. shall complete or correct the work on the k t ems attached hereto within in 60 days tam the above date of substantial completion. The responsi . I ies shall be as set out in the Contract Documents or on the attached hereto. If not specified in and an attachment or in the Contract Documents the F.ON t tR. is responsible. for maintenance, utilities and insurance. _<__ - GLOBAL DRILLING, INC v= -- ---- AUGUST 14. 2025 CONTRACTOR NAME SIGNATURE. . DATE. RECOMMENDED FOR ACCEPT ANCE ENGINEER NAME SIC-NATLRE D' `F The City of Port Arthur accepts the .\ark as Substantially Complete. Ciio of Port Arthur . Department of Puhlic Works. PROJECT MANAGER SIGNATURE DATE CITY ENGINEER Stt jNATURE DATE PUBLIC WORKS DIRECTOR SiGNATI_RE • I?.iTE EXHIBIT D (Contractor's Certificate of Warranty) CONTRACTOR'S CERTIFICATE OF WARRANTY FROM: GLOBAL DRILLING, INC TO: CITY OF PORT ARTHUR REFERENCE CONTRACT NO.: 24-515 CONTRACT ENTERED INTO TH is 17th DAY t F December. 2025 BETWEEN T i l E CITY OF PORT ARTHURAND GLOBAL DRILLING, INC OF WINNIE, TEXAS FOR THE PROJECT Sabine Pass Sewer Pipe Bursting Phase IV Project KNOW ALL MEN BY THESE PRESENTS: I.) GLOBAL DRILLING, INC does hereby eeuttrantee all of the work done under the Name of Contractor) above referenced contract to be free from faulty materials in ever} particular. and tree from improper workmanship, and against injw from proper and usual wear; and;,_roes to replace or re-execute \,rithout cost to the Owner and Ope: , such work as may he found to be improper or imperfect. and to make good all damage caused to, ncr work or materials due to such required replacement or re-e\ecui 2.) This guarantee shall cover mod of one I I ; ear from the dale of acceptance of all ork under this contract by Owner, as evidenced b, the Contractors C'ertiticaic of Completaon. 3.) This Certificate is given in connection with the final p,iement under the contract between the Owner and GLOBAL DRILLING. INC amid .pith the knotek-ice that it will be relied upon in (\'ame of Contractor) Making such payment and that such payment would not be made e\eept upon the truth of the matter contained in this affidavit. IN WITNESS WHEREOF, the undersigned has si_ned and sealed this instrument this 14th de of August 2025 GLOBAL DRILLING, INC sEAt.; (contractor) — — oOP� DRltt/NG, / _--- w GL08 AL" tr BAKER MOHA AMAD r PPF ct IT rF'rA S U•`' BAKER MOHAMMAD ,6,tc, it,a +1111 �,,urn on ,al.t. ucuu,t;;Ind ='fir;(. that. . t tlk: t.,ltianti PRESIDENT of GLOBAL DRILLING INC (Title) r,1',uttc of(I,;up:;n,I Second,that heishe has read the for <-,inactttiiicate II,, him`htr :ubscribeo it, PRESI!DEN T I.tt' of GLOBAL DRILLING, II\ (Name of Compuinv - - Aftiant further states that the matte; . i • ,•:v. Subscribed and sworn to before me ihi� 1 ,t,=, 1\1y commission ex.Tres .` •,.�f,, JAMIE C. C:;cir • e. 'c ry Public. ' „xea ` ?,,,,,. . :e° ...-. _..fires OE262028 �%-�� �,:. Notary ID " 47: ":,.Y;":, JAMIE C. DOHERTY ;r° 1n:Notary Public,State of Tex ?.44 ,,s_ Comm.Expires 08-26-2026 ,,,,,,, %`` Notary ID 3154721 ?_tit:trrantN CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: GLOBAL DRILLING, INC TO: CITY OF PORT ARTHUR FOR: Sabine Pass Sewer Pipe Bursting Phase IV Project REFERENCE CONTRACT NO. 24-515 ENTERED INTO THE 17th DAY OF December , 2024,BETWEEN THE CITY OF PORT ARTHUR AND GLOBAL DRILLING, INC {CONTRACTOR} OF WINNIE, TEXAS (CrFV!STATE) FOR: Sabine Pass Sewer Pipe Bursting Phase IV Project (PROJECT) KNOW ALL MEN BY THESE PRESENTS: 1 GLOBAL DRILLING, INC does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular, and free improper workmanship, and against injury from proper and usual wear; and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials, due to such require replacement or re-execution. 2. This guarantee shall cover a period of one GI) year from the date of acceptance of all work under this Contract, as evidenced by the Engineer's Certificate of Completion. IN WITNESS THEREOF, 11 .I ides si,ned has signed and scaled this instrument this the 14th day of Aug'-:` -)!i)s. GLOBAL DRILLING, INC —— ,,OmP-.N". '.v.It-, i{n,Nr--R.s,<,:.�..ti_ RI l u ll.) Mr. BAKER fV1OHAMMAD SUBSCRIBED AND SWOT' , a , =`,i t`Y F 20 � 47,,.o, JAMIE C. DOHERTY `4 __r; __Notary Public,State of Texas My commission expires k� Comm.Expires 08-26.2026 .,,,a;-„ e` Notary ID 3154721 t. '..°611/4141;C:r TARYIPIJRI li_i -- EXHIBIT E (Contractor's Certificate and Release) CONTRACTOR'S CERTIFICATE AND RELEASE FROM: GLOBAL DRILLING, INC (Name of Contractor) TO: CITY OF PORT ARTHUR (Owner) REFERENCE CONTRACT NO.: 24-515 CONTRACT ENTERED INTO THE 17th DAY OF December, 2024 BETWEEN THE CITY OF PORT ARTHURAND GLOBAL DRILLING, INC OF WINNIE, TEXAS FOR THE PROJECT Sabine Pass Sewer Pipe Bursting Phase IV Project KNOW ALL MEN BY THESE PRESENTS: 1.) The undersigned hereby certifies that there is due from, and payable by,the Owner to the Contractor under the contract and duly approve Change Orders and modification the balance of $ 22,644.40 2.) The undersigned further certifies that in addition to the amount set forth in Paragraph 1,there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: a. b. c. d. (Itemize claims and amounts due,if none,so state) 3.) The undersigned further certifies that all work required under this contract,including work required under Change Order(s)numbered ,has been performed in accordance with the terms thereof,and that there are no unpaid claims for materials,supplies,or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract,and that the wage rates paid by the contractor were in conformity with the contract provisions relating to said wage rates. 4.) Except for the amounts stated under Paragraphs 1 and 2 hereof,the undersigned has received from the Owner all sums of money payable to the undersigned under,or pursuant to,the above-mentioned contract or any modifications or changes thereof. 5.) That in consideration of the payment of the amount stated in Paragraph 1 hereof, the undersigned does hereby release the Owner and Operator from any all claims arising under or by virtue of this contract, except the amount listed in Paragraph 2 hereof due from the owner,provided however,that if any reason the Owner does not pay the full amount stated in Paragraph 1 hereof,said deduction shall not affect the validity of this release,but the amount so deducted shall be automatically included under Paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof. The Contractor further certifies that upon the payment of the amount listed in Paragraph 2 hereof,and of an amount which may be deducted from Paragraph 1 hereof,he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of paid contract modification thereof,and will execute such further releases or assurances of the Owner and Operator may request. 1 IN WITNESS WHEREOF, the under,igncd has signed and scaIed thistn,irunicni this 14th {;_ ,.,t August . _'015 GLOBAL DRILLING, INC ;sEAL4 L( r ntractor) ��DRiLcttic , 4.. GLOBAL E31 `r = ;. ' (Si:gn'atm-c) TF'�AS V S P Mr. BAKER IV1OHAMMAD / PRESIDENT (Prime:( \4rme Title'nt t)111,1 r•/ BAKER MOHAMMAD _ ft atii. dc!W m.', Anti -;ZI'S i-II,t. :hai. ht.:',h,_ .' tit'.: H. t i/nt) PRESIDENT )1 GLOBAL DRILL IN. : NNC ride) Second,that he/she has read the foret�-iIi e rtificate by Inin'hcr,uhscrincd a PRESIDENT tTir/cl t i GLOBAL DRILLING, INC (Name of Company) Aftiiant further states that the matters and things stated herein are true. .0 I fiimr,t Subscribed and sworn to before me II, , l My commission expires _ O zO FFyP::,'%, JAMIE C. DOHERTY rl—C9-- 0-- h4...t.A.. -.:71c1 =+° n=Notary Public,Stet.of TAX43 i°�'.t• 'P= Comm.Expires 08-26-2028 $;, s� Notary ID 3154721 EXHIBIT F (Retainage Invoice) r C) > z o o A U., IV m p 3 p, 7 7 o v al d 3 v v im L. N 3 0 m L. ko ko m ch N 3 rD, m o m °Q m m o H fDww c ° aw a O o '" c ° m aw a v mw a 0 �' Z °1 XG) �, m �+ �, °: c m In o to v ': w c d - £. m m i �+, v j 7 A N A 7 7 3 V N N j 7 O S C n O CI ' 5 c 9 on w w 1.. 'I' H 3 w i S v o. o. D cn A °7 * tn' O O..c,' g O O.D co `n o V m a p D p N C N fDD vI fDD O N ,.. D VI -, 13 3 a :: o n 7 o < n V o D - 0 ,L,Z - m :'y�I S' D 3 a m IELL„r; D . A v F v o C .D • g D •V y N 3 m n v 7 n v 9 a 0 °. -I ti n O L y ^ ° m N d 10 m Z Ar 1I ° °. o - aI a 7, T• ° C s3 n CD n ° 3 D. n ° D D ' 2 z 3 a 3- f f , m m w p D y , o' m Q ' °. G M 7 m cn n S V j 5• 7 V rat n W O' m m EL • c fD N ' N n rat m 5 a m -• a n w v w 5 a3 r T T T G z 25 Z 532,.. p J o 01 m 0 00 -, A No 0 NJA N r N., , Z n 3 ° —1- C ? m co Z a o o y O pc,z z 3 a 0 rn 2 8 m mO O O O --I n D w p 8 p p n3 CD Cp� ...IDJO O A f+ O 1 3 rn wcm g O O 8 o 8 O N N b A ~ N D n 1 77 O C c m Co �" o Z m fD g p o g n Z 8 8 8 0 'a_ °3 0 ° m m -0 T > Z v C a ~ p 1 m D C 0 S r 1" o �' is-, M • O g O D .�+ N N \TJ 8 C 8o 0' G o 7 N rn A O C m A D z x In Z N I-. O 1.0 0o V 01 I u• Q m T 01 m m n :p N N n -N T 01 y W m n Q T of m n S m d m V g2 9 A C O c n x x 0 m O d m C 7 3 n x 0 0 c n X 0 0 C n N x m '' C ^. m o4i c 3, o :, o w 3 3 m (0 O v 3 a 0 22 3 . E 3, o oo 3 x c 3, o O^ .N. an d c ? fi — A o S W w' .01. °*. N .1. - obi j S m N a m ',. m m N 7 y ': m m m O- la+ » 00 a n 0- m o N m rno > > ? ' = o• N = a E• o+ o m > T. 0 0 n m > j o v 0. m P c' m <. w N' a ° w F. 3 m a a 3 a °: a f. d v ° > > f. m y . N f. N •m a o -o o °; T g o n' 3 ^ m o o_s ° c 5 a H T n o v E s ; Cu o v d < T g v . p a -a m v 3 r. N c •• = m L: m '. o0 O' r. 7 O — S h O ... f d ro ^ v m — • W S - ' 3 V — S = • 3 '°O — S 00 N = y w 7 m rp 1 N .. O g x O D m ,, m O A m n m O A m y N ti O o- 2 a o' rmo o °' a o c N d o.. too g moo, g' 3 o d rcc a p c orni d m o: o a y y a c _a S o "! » 7 d W % rp f d - O C ; Y R ? n 00 0 . WI j rn0 04 O 7 01 j m �'W. 'n O m f W .S. m O. °- a �'Z .-'. a, n °- 7 7 a N -ti X W < °- rC V X W '� °- 00 co J rn Ln m m A ^ d g N ' N O N N N rn N N 13 N N d n N t1 on ^ ocm vm ° o m » mm n ' '3 v m v o m v mO. > >o 3 3 _ ^ m c m m ,x-N„• m w 'm .^. 2 w £ E, a °° w f A m W - it. 2o w o N v ,2 o o' K o ..c. o S d 3 3 o w' ° n in ^n ' '). g a g.v `moo °• a � a m gt ,1 0° E m Z o m T ° a, n p N m =' m 5 a 0. d. W d o 5 o m m - . '< p m m - . ? o m f ° . rD c. v ° 3 d ». o o a ?: m• m e ut 0. m m re 0. m m A a 1D 'm^. o w o 0 3 3 N n a w Nv w o a v sr. N f ° 3 rail m w m.. m m > > .mN. m m A 3 o x- N n _. d n m ry = a ro n co = a ro n O P. eo o = S 3' 3 ^. ^ m s N S m f £• = o0 3 0 on 3 m in o n co 0- ro n •l a'o 'o ° a - a 0 3 CD �• d d m 2 Ft o m m ro m o i c 3 0 ° ° m v ^. d m m `" .°. 3 m o o ,.°. 2 c w .°. z m 3 In d T v d v N — P. C oo 01 7 N Wv. n y IA 5- y N . n 0 m V 3a r,' a 3 O 4. u00i I — y S N i �. p N ; N. 'O R .. m umi m C5. ° _ N a m O O a C T > > > -n > > - Z 1 N A ON V V N V F+ F+ N F+ CI — C C m Z_ Z o q -i A yn CO 03 W ,., . n to in u, . x, 0 ti N Q S P w o o c m -I `", o S S S S S o 0 .+ � :D 01 W W IV0W N S V1 00 pV� O O O ° o O S O 01 O O O O O O rz) O p 8 $ O O 0 !. A C F-• V N v F+ V NJ 1-+ - t1 C C C U, V1 0p0 0p0 pW pN F' Z 1- NJO O O O 9 O S O S S O S S c f1 m m — m 0 -10 m co w in in a, 0 0 o g $ c 0 o D0O S c S o 0 m 3 D x rn Q7, - En ) 2 ] NJ § ( CO § k » a 2 m ' # �� 73 2 0 % Al IIt \ \ I } g �� ) k k k ( = / \ { IV ( ■ ■ _ i 2 § £ E . § \ § . \ m 0 / 0 ; ° Co ■ m - f •- / 1- e 9 § § 2 ` \ a k / k k •• _ 3 la • } § > � § -1 : 3 , '1 - § (\ I 0 ) \ an f \ ; , ° } \ f \ cn C _, , c\ ; §} ; ;t _I � --- \ \ k w / . _ / z ( \ B / § — - - --- 0 0 Q c § ) • \ � � i ro / % _ L. / \ � \ / \ m -1 % • § .... : : : . . B / i � a 8 / @ , \ 1 8 0 \ , _ § 1 o 71 II . . : . o oo o ` ` ) 0 $ . . . ( 2 § 9 p § o \ 0 0 0 8 ; § I to ao o 7 VI un B 8 o k B . 1 2 ! 1 EXHIBIT G (City of Port Arthur Certificate of Acceptance) CERTIFICATE OF ACCEPTANCE FOR SABINE PASS SEWER PIPE BURSTING PHASE IV PROJECT FOR THE CITY OF PORT ARTHUR To: Global Drilling, Inc. of Winnie, Texas This document is to certify that the City of Port Arthur, Texas accepts the completion of the Sabine Pass Sewer Pipe Bursting Phase IV Project, based on the Contractor's Affidavit of Bills Paid, the Contractor's Certificate and Release, and Contractor's Certificate of Warranty from Global Drilling, Inc. of Winnie, Texas. Ronald Burton, CPM City Manager ATTEST: Sherri Bellard City Secretary