HomeMy WebLinkAboutPR 24515: RICE FARM ROAD DRAINAGE IMPROVEMENT PROJECT-PHASE I, SETX CONSTRUCTION CORP. City of nrt rthu�� Texas www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: September 8, 2025 To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: Pamela D. Langford, CPM; Assistant City Manager-Operations/Director of Development Services RE: PR No. 24515: Rice Farm Road Drainage Improvement Project-Phase I- Change Order No. 1: Installation of 12" Insta-Valve on 12" water line submitted by SETEX Construction Corp. of Beaumont, Texas. Project No. DRIP10.CON. Introduction: The intent of this Agenda Item is to seek the Port Arthur City Council's approval for the City Manager to ratify Change Order No. 1 with SETEX Construction Corp., (SETEX) of Beaumont, Texas for the installation of a 12" Insta-Valve on an existing 12" water line for the amount of$33,162.55. Project No. DR1P10.CON. Background: Recent developments in the Rice Farm Road Drainage Basin have increased flows into the unimproved Drainage District 7 (DD7) Ditch B2-A, located along the Interurban Right-of-Way (ROW). Pursuant to Resolution No. 24-318, approved by the Port Arthur City Council,the City Manager was authorized to enter into an interlocal agreement with Jefferson County Drainage District No. 7 (DD7) for the construction of a concrete lined channel at the Entergy Interurban Right-of-Way (ROW) along Rice Farm Road. DD7 has agreed to furnish labor and equipment subject to the requirements of the Texas Government Code, Sec. 791. DD7 has the knowledge, experience, staff and equipment to construct the channel within the B2-A ditch, with the City furnishing the design, engineering, materials, and oversight. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 Pursuant to Resolution No. 23-476, approved by Port Arthur's City Council, Soutex Surveyors & Engineers (Soutex) of Port Arthur, Texas,was selected to provide design, plans, and bid phase services for the Rice Farm Road Drainage Improvement Project: Phase 1. The Purchasing Department advertised for competitive qualified bidders on March 22, 2025 and March 29, 2025 under Bid Number P25-039. Bids were opened on Wednesday, April 16, 2025 with five contractors responding. Eastex Utility Construction, LLC, of Beaumont, Texas; Brystar Contracting, Inc. of Beaumont, Texas; SETEX Construction Corp. of Beaumont, Texas; MK Constructors of Vidor, Texas; and APEX Alliance, LLC, of Port Neches, Texas. After review by the Engineering Division, Soutex, and staff,it was determined that SETEX Construction Corp. of Beaumont,Texas, provided the lowest responsible bid for the amount of$745,752.00. Pursuant to Resolution No. 25-196, the City Manager was authorized to enter into an agreement with SETEX Construction Corp. (SETEX) of Beaumont, Texas, for the construction within the B2-A ditch that includes lining with concrete, replacing culverts, waterline tie-ins, demolition, lane striping, installation of a 6"curb in place, and paving to match existing. SETEX, along with City forces, was tasked with locating a 12" AC Water Main valve in order to shut off a portion of the pressurized water line so that work could be completed. Shutting off the area proved problematic as there were no valves in the immediate area. The City, Soutex and SETEX determined that the best course of action was to install an Insta-Valve at an alternate location that would shut off a smaller portion of the pressurized water line so that a large area of the surrounding community would not be without water for a significant and unknown amount of time. Subsequently,Field Change Order No. 1 was issued by Soutex to keep the project moving and maintain water to the adjacent community. This order was reviewed, approved, and signed by the City Manager with the understanding that this change to the original scope of work would be presented to the Port Arthur City Council, in the form of Change Order No. 1, as soon as practicable. SETEX has submitted Change Order No. 1 for the installation of a 12" Insta-Valve installed on the existing 12"water line with the work subcontracted by JZ Southern Boyz Services,LLC,for the amount of$33,162.55. Additionally, Change Order No. 1 modifies the original contract price of$745,752.00 to the new contract price of$778,914.55; no additional calendar days were requested. Budget Impact: Funds are available from Capital Improvement Account No. 307-21-053-8517-00-10-000; Project No. DR1P10.CON. Recommendation: It is recommended that the City of Port Arthur's City Council approve PR No. 24515 authorizing the City Manager to execute Change Order No. 1 with SETEX Construction Corp.,(SETEX)of Beaumont, Texas for the installation of a 12"Insta-Valve on an existing 12"water line for the amount of$33,162.55 and modifying the original contract price of$745,752.00 to the new contract price of$778,914.55 with no additional calendar days being requested. Project No. DIUP10.CON. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 PR No. 24515 9/4/2025 mje Page 1 of 6 RESOLUTION NO. A RESOLUTION RATIFYING THE CITY MANAGER'S EMERGENCY EXECUTION OF CHANGE ORDER NO. 1 FOR THE RICE FARM ROAD DRAINAGE IMPROVEMENT PROJECT-PHASE I FROM SETEX CONSTRUCTION CORP. OF BEAUMONT, TEXAS, FOR THE INSTALLATION OF A 12" INSTA-VALVE ON A MAIN WATER LINE FOR THE AMOUNT OF $33, 162.55. FUNDS ARE AVAILABLE IN THE CAPITAL IMPROVEMENT ACCOUNT NO. 307-21-053-8517-00-10- 000. PROJECT NO. DR1P10. WHEREAS, recent developments in the Rice Farm Road Drainage Basin have increased flows into the unimproved Jefferson County Drainage District 7 (DD7) Ditch B2- A, located along the Entergy Interurban Right-of-Way (ROW); and, WHEREAS, the City of Port Arthur, in cooperation with DD7, has identified essential drainage ditch improvements to the area along Rice Farm Road and DD7 ditch B2-A; and, WHEREAS, pursuant to Resolution No. 24-318, approved by the Port Arthur City Council, the City entered into an Interlocal Agreement in which DD7 will construct a concrete lined channel along the Entergy Interurban ROW; and, WHEREAS, DD7 has the knowledge, experience, staff and equipment to construct the channel with the City furnishing the design, engineering, materials, and oversight; and, WHEREAS, pursuant to Resolution No. 23-476, approved by Port Arthur's City Council, Soutex Surveyors & Engineers of Port Arthur, Texas, was selected to provide design, plans, and bid phase services for the Rice Farm Road Drainage Improvement Project: Phase 1; and, S:Engineering`PUBLIC WORKS\PW-ENGINEERING`C.1.P.PROJECTS\Year 2023\RICE FARM RD DRAINAGE`Change Orders\Change Order 1\PR 24515 RICE CO 1.docx PR No.24515 9/4/2025 mje Page 2 of 6 WHEREAS, the Purchasing Department advertised for competitive qualified bidders on March 22, 2025 and March 29, 2025 under Bid Number P25-039; and, WHEREAS, bids were opened on Wednesday, April 16, 2025 with five contractors responding — Eastex Utility Construction, LLC, of Beaumont, Texas; Brystar Contracting, Inc. of Beaumont, Texas; SETEX Construction Corp. (SETEX) of Beaumont, Texas; MK Constructors of Vidor, Texas; and APEX Alliance, LLC, of Port Neches, Texas; and, WHEREAS, after review by the Engineering Division, Soutex and Staff, it was determined that SETEX Construction Corp. of Beaumont, Texas, provided the lowest responsible bid for the amount of $745,752.00; and, WHEREAS, pursuant to Resolution No. 25-196, the City Manager was authorized to enter into an agreement with SETEX Construction Corp. (SETEX) of Beaumont, Texas, for the construction within the B2-A ditch; and, WHEREAS, SETEX will construct a portion of the DD7 Ditch B2A that includes lining with concrete, replacing culverts, waterline tie-ins, demolition, lane striping, installation of 6" curb in place, and paving to match existing; and, WHEREAS, during construction, the unknown location of the existing 12-inch AC water main valve created an unforeseen condition requiring immediate remediation to avoid service disruption and potential hazards to the public health and safety of the citizens of Port Arthur; and WHEREAS, pursuant to Section 252.022(a)(2) of the Texas Local Government Code, a procurement necessary to preserve or protect the public health or safety of the municipality's residents is exempt from the requirements of competitive bidding; and PR No.24515 9/4/2025 mje Page 3 of 6 WHEREAS, the City, Soutex and SETEX determined that the best course of action was to install an Insta-Valve at an alternate location that would shut off a smaller portion of the pressurized water line so that a large area of the surrounding community would not be without water for a significant and unknown amount of time; and, WHEREAS, a Field Change Order No. 1 was issued by Soutex to keep the project moving that was reviewed, approved, and signed by the City Manager with the understanding that this change to the original scope of work would be presented to the Port Arthur City Council, in the form of Change Order No. 1, as soon as practicable, see Exhibit A; and, WHEREAS, SETEX has submitted Change Order No. 1 for the installation of a 12" Insta-Valve installed on the existing 12" water line with the work subcontracted by JZ Southern Boyz Services, LLC, for the amount of$33,162.55, modifying the original contract price of$745,752.00 to the new contract price of $778,914.55 with no additional calendar days being requested, see Exhibit B; and, WHEREAS, approval of PR No. 24515 for the Port Arthur City Council to authorize the City Manager to accept Change Order No. 1 submitted by SETEX Construction Corp., of Beaumont, Texas, for the Rice Farm Road Drainage Improvement Project, is hereby deemed an appropriate action; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: THAT, the facts and opinions in the preamble are true and correct; and, PR No.24515 9/4/2025 mje Page 4 of 6 THAT, the City Council of the City of Port Arthur hereby authorizes the City Manager to ratify Change Order No. 1 from SETEX Construction Corp., of Beaumont, Texas, for the amount of $33,162.55, in substantially the same form as attached hereto as Exhibit B; and, THAT, Change Order No. 1 modifies the original contract price of $745,752.00 by $33,162.55 to the new contract price of $778,914.55 with no additional calendar days being requested; and, THAT, funding is available in the Capital Improvement Account 307-21-053-8517- 00-10-000; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of A.D., 2025, at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Charlotte M. Moses Mayor ATTEST: PR No. 24515 9/4/2025 mje APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: CO" Roxann Pais Cotroneo, Esquire Ronald B on, CPM City Attorney CityManager APPROVED AS FOR AVAILABILITY OF FUNDS: &Jag-0.7 P/4- Lyn a "Lyn" Boswell, M.A., ICNi -CM Director of Finance Suhail Kanwar, PE Director of Public Services/City Engineer (.vz� Clifton Williams, CPPB Purchasing Manager EXHIBIT A TBPE Firm No.F-5755 *I.9 ®_, OIJTEXT: ort Arthur,Texas 77642 SURVEYORS&ENGINEERS Office (409)983.2004 Fax(409)983.2005 July 29, 2025 City of Port Arthur 444 4th Street Port Arthur,Texas 77640 Re: Rice Farm Road Drainage Improvement Project: Phase 1—Field Change Order No. 1 Please see the attached letter from SETEX Construction.The price is $33,162.55 for(1) 12" Insta- Valve installed on the existing 12" water line. The Insta-Valve will be subcontracted to JZ Southern Boyz Services, LLC. Background: City forces were requested to assist in shutting down a portion of a 12"water line so that work could be completed related to this project.When City forces tried to turn off the line they ran to issues and it has been determined that to isolate the area that needs to be worked on will shut off water to a large area.This Insta-Valve is required to keep the project moving along and maintain water to the surrounding area. If you have any questions, please contact our office. Respectfully submitted, N Je Mitc ll P.E., RPLS jejL— Approved by-✓ Hani Tohme City of P. Arth r Approved by: ' !A�� Ronald :• -•�P-,�, City Manag- 5ETEx OWN IN CONSTA1/CJ , "Strength in Construction" Proposal Letter LA License#70090 Mailing Address: 7/25/2025 Rev-1 P.O. Box 20678 Beaumont, Texas 77720-0678 City of Port Arthur Engineering Department. 4444 40 Street Port Arthur, TX 77641 0 (409)842-8181 (409)842-2274 Project: Rice Farm Road Drainage Improvements ® setex@serexconstruct,on cornScope: Install 12"lnsta Valve to AC pipe 6 setexconstruction.corn City of Port Arthur Engineering, General Contracting July 7th SETEX attempted to locate the valve required to proceed with the project along with Construction Management the assistance of the City of Port Arthur.After multiple excavations and probing the group was unable to locate the Valve. Design-Build Due to the unknown shut-off valve location for the existing 12"AC Water Main, per the City's request Setex is providing a proposal to excavate, prepare for installation of a 12" lnsta Job Order Contracting Valve, and subcontract JZ Southern Bovz Services, LLC to supply& install (1) 12" Insta Valve, on pressurized water main to enable installation of original scope work including Facilities Maintenance reduction Tee and Cap. This proposal includes Labor, Materials, and Equipment for a total Commercial proposed price of$33.162.55 Please Note: This item has a (4)day lead time to delivery, after pipe OD is determined.Approval required to authorize JZ Southern Boyz Services, LLC to proceed with Material Procurement Industrial `This proposal excludes any expedited delivery of the forementioned/nsta Valve. Government 'This Proposal excludes Asbestos Abatement. if unable to bury in place, any Asbestos containing material is to be disposed of as property of the City of Port Arthur. Healthcare Please advise if this proposal requires any additional scope. Infrastructure Kind Regards, Corporate yet Derick Robinson Education Project Manager Performing Arts Historical Beaumont Nacogdoches Port Arthur Established 1990 EXHIBIT B CITY OF PORT ARTHUR Public Works Engineering DATE: SEPTEMBER 4,2025 PROJECT: RICE FARM ROAD DRAINAGE IMPROVEMENT PROJECT-PHA'. OWNER: CITY OF PORT ARTHUR CONTRACTOR: SETEX CONSTRUCTION CORP OF BEAUMONT,TEXAS CHANGE ORDER NO.: 1 THE FOLLOWING CHANGES IN THE PLANS AND/OR SPECIFICATIONS ARE HEREBY MADE: Adjust the Estimated Quantities to reflect the Actual Quantities used in the completion of the project: Original Item Description Unit Unit Price Original Amount Total Added New Amount Quantity 1 12"AC WATER MAIN 12"Insta-Valve installation EA $ 33,162.55 1 $ 33,162.55 Labor,Materials,Equipment included NO FUNDS ARE IMPACTED TOTAL CHANGE ORDER $ 33,162.55 PREVIOUS CONTRACT AMOUNT NEW CONTRACT $ 745,752.00 AMOUNT $ 778,914.55 ORIGINAL CONTRACT AMOUNT:I$ 745,752.00 I TOTAL AMOUNT OF CHANGE ORDER NO.1: $ 33,162.55 TOTAL PERCENT OF CHANGE ORDER NO.1: 0.04% NEW CONTRACT AMOUNT: $ 778,914.55 NO CALENDAR DAYS HAVE BEEN ADDED TO CHANGE ORDER NO.1 PAREPARED BY: APPROVED BY: M.Jennifer Edwards,BAAS,MPA;CIP Manager Jeremy Mitchell,PE,RPLS APPROVED BY: APPROVED BY: Derek Robinson,Project Manager,SETEX Clifton Williams,CPPB,Purchasing Manager APPROVED BY: APPROVED BY: Dr.Hani Tohme,PE,Consultant Ron Burton,City Manager S:\Engineering\PUBLIC WORKS\PW-ENGINEERING\CI.P.PROJECTS\Year 2023\RICE FARM RD DRAINAGE\Change Orders\Change Order 1\RICE Co 1