HomeMy WebLinkAboutPR 24495: ELITE CONTRACTORS & EQUIPMENT, RECONSTRUCTIO PROJECT ACCEPTANCE OF CLOSE OUT DOCUMENTS AND RELEASE OF RETAINAGE City of cart rthu�� Taro, www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: September 8, 2025 To: The Honorable Mayor and City Council Through: Ronald Burton, City Manager From: Pamela D. Langford, CPM, Assistant City Manager-Operations/Director of Development Services RE: PR No. 24495: Mechanic Street and S. 1st Avenue Roadway Reconstruction Project — Acceptance of Close Out Documents and Release of Retainage in the amount of$136,274.25 to Elite Contractors & Equipment of Kirbyville, Texas. Project No. ST1P9O.CON. Introduction: The intent of this agenda item is to authorize the City Manager to accept Close Out Documents and release retainage in the amount of$136,274.25 to Elite Contractors& Equipment of Kirbyville,Texas for the Mechanic Street and S. lst Avenue Roadway Reconstruction Project. Project No. ST1P9O.CON. Background: The City of Port Arthur received an infrastructure grant from the Texas Department of Transportation's (TxDOT) Rider 37 Grant Program from its Maritime Division to improve access and drainage to the Port of Sabine Pass. Mechanic Street from South 1st Avenue to Dowling Road (State Highway 87) and S. 1st Avenue from Broadway Street to Granger Street was selected by the Texas Legislature for funding since it provides access to the Port of Sabine Pass. Pursuant to Resolution No. 22-286, the City of Port Arthur entered into an Advanced Funding Agreement (AFA) with the Texas Department of Transportation (TxDOT) for the Texas Mobility Grant Fund (TMF) to reconstruct Mechanic Street. Pursuant to Resolution 22-246, approved by Port Arthur's City Council, Fittz and Shipman, Inc., (F&S) of Port Arthur, Texas, entered into a professional services agreement to provide design, surveying, and preliminary engineering services for the Mechanic Street and S. 1st Avenue Roadway Reconstruction Project for the amount of$417,000.00. Pursuant to Resolution 23-515, approved by Port Arthur's City Council,Fittz and Shipman, Inc., (F&S) of Port Arthur, Texas, entered into a professional services agreement to provide construction phase services for the Mechanic Street and S. 15t Avenue Roadway Reconstruction Project for the amount of$131,935.00. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 Pursuant to Resolution No. 23-421, approved by Port Arthur's City Council, the City Manager was authorized to enter into an agreement with Elite Contractors & Equipment, LTD, (Elite) of Kirbyville, Texas, for the reconstruction of Mechanic Street and S. 1st Avenue for the amount of$2,565,230.00. Pursuant to Resolution No. 24-243, approved by Port Arthur's City Council, Elite Contractors and Equipment, LTD, of Kirbyville,Texas, submitted Change Order No. 1 for the removal of seven(7) concrete driveways and replace them with flex base driveways decreasing the contract by$23,171.00 from the original contract amount of$2,565,230.00, amending it to the new contract amount of$2,542,059.00. On May 29, 2024, the Mechanic Street and S. 1st Avenue Roadway Reconstruction Project was halted due to the discovery of an unknown petroleum substance while installing drainage structures. As a result,a Stop Work Order (SWO) was issued on June 25, 2024 by TXDOT's Maritime Division until a plan of action was determined. Under the guidance and direction of the Texas Commission on Environmental Quality, (TCEQ), the City of Port Arthur remediated the site. TCEQ inspected the site and was satisfied that the City's clean-up efforts had met all the necessary requirements for remediation. TXDOT was notified of TCEQ's approval and the Stop Work Order was lifted on February 4, 2025. TXDOT's Maritime Division requested that the City officially remobilize the project. Pursuant to Resolution 25-042,approved by Port Arthur's City Council,Elite Contractors and Equipment,LTD, of Kirbyville, Texas, submitted Change Order No. 2 for the remobilization of the project, extra dirt, and the installation of guard rails for the amount of $201,570.00 increasing the previous contract amount of $2,542,059.00 to the new contact amount of$2,743,629.00. Additionally, Change Order No. 2 requested that one hundred twenty(120)calendar days be added to the project with a new contract completion date established once the date of remobilization is determined. The Notice to Proceed for the remobilization of the project was March 25, 2025. The Engineering Division has received Close Out Documents from Elite Contractors & Equipment, LTD, of Kirbyville, Texas, that includes the Certificate of Substantial Completion establishing substantial completion as of July 1, 2025, the Engineer's Certificate of Completion, the Contractor's Certificate and Release, the Contractor's Certificate of Warranty, the Contractor's Certificate of Guarantee, and the Contractor's Affidavit of All Debts Paid. Additionally, Elite Contractors & Equipment, LTD, of Kirbyville, Texas, is asking for release of retainage in the amount of$136,274.25. Budget Impact: Funding is available is the Street Account 307-00-000-2050-00-00-000; Project No. ST1P9O-CON. Recommendation: It is recommended that the City of Port Arthur City Council approve PR No. 24495 authorizing the City Manager to accept the Close Out Documents and release the retainage in the amount of$136,274.25 for Elite Contractors and Equipment, LTD, of Kirbyville, Texas, for the Mechanic Street and S. 1st Avenue Roadway Reconstruction Project . Project No. ST1P9O.CON. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 PR No. 24495 9/8/2025 mje Page 1 of 6 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT CLOSE OUT DOCUMENTS SUBMITTED BY ELITE CONTRACTORS& EQUIPMENT, LTD, OF KIRBYVILLE,TEXAS, AND APPROVE THE RELEASE OF RETAINAGE IN THE AMOUNT OF $136,274.25 FOR THE SABINE PASS MECHANIC STREET AND S. 1ST AVENUE ROADWAY RECONSTRUCTION PROJECT. FUNDING IS AVAILABLE IN THE STREET ACCOUNT NO. 307-00-000-2050-00-00-000. PROJECT NO. ST1P9O.CON. WHEREAS, the City of Port Arthur received an infrastructure grant from the Texas Department of Transportation (TxDOT) from its Maritime Division in the Rider 37 Grant Program; and, WHEREAS, Mechanic Street from S. 1st Avenue to Dowling Road (State Highway 87) and S. 1st Avenue from Broadway Street to Granger Street was selected for reconstruction to improve access and drainage to the Port of Sabine Pass; and, WHEREAS, pursuant to Resolution No. 22-286, the City of Port Arthur entered into an Advanced Funding Agreement (AFA) with the Texas Department of Transportation (TxDOT) for a Texas Mobility Grant Fund (TMF) to reconstruct Mechanic Street; and, WHEREAS, pursuant to Resolution No. 22-246, Fitt and Shipman, Inc., (F&S) of Port Arthur, Texas, entered into a professional services agreement to provide the design, plans, and bid phase services for the Sabine Pass Mechanic Street and S. 1st Avenue Roadway Reconstruction Project for the amount of $417,000.00; and, WHEREAS, pursuant to Resolution 23-515, approved by Port Arthur's City Council, Fittz and Shipman, Inc., (F&S) of Port Arthur, Texas, entered into a professional services agreement 9 C 1° PR No.24495 9/8/2025 mje Page 2 of 6 to provide construction phase services for the Mechanic Street and S. 1st Avenue Roadway Reconstruction Project for the amount of $131,935.00. WHEREAS, pursuant to Resolution No. 23-421, approved by Port Arthur's City Council, the City Manager was authorized to enter into an agreement with Elite Contractors & Equipment, LTD, (Elite) of Kirbyville, Texas, for the reconstruction of the Sabine Pass Mechanic Street and S. 1st Avenue Roadway Reconstruction Project for the amount of $2,565,230.00; and, WHEREAS, pursuant to Resolution No. 24-243, approved by Port Arthur's City Council, Elite Contractors and Equipment, LTD, of Kirbyville, Texas, submitted Change Order No. 1 for the removal of seven (7) concrete driveways and replaced them with flex base driveways decreasing the contract by $23,171.00 from the original contract amount of $2,565,230.00, amending it to the new contract amount of $2,542,059.00; and, EliteWHEREAS, on May 29, 2024, during construction, encountered an unknown petroleum based substance while installing drainage structures; and, WHEREAS, F&S, along with City forces and the Texas Department of Transportation (TxDOT) determined that the area was contaminated, and collectively notified the Texas Commission on Environmental Quality (TCEQ) and sought its assistance with developing a remediation plan before continuing construction activities; and, WHEREAS, TxDOT issued a Stop Work Order (SWO) on June 24, 2024, in order to facilitate clean up, remediation, and disposal of materials generated; and, WHEREAS, TCEQ inspected the site and was satisfied that the City's clean-up efforts had met all the necessary requirements for remediation; and, PR No.24495 9/8/2025 mje Page 3 of 6 WHEREAS, TXDOT was notified of TCEQ's approval and the Stop Work Order was lifted on February 4, 2025 with TXDOT's Maritime Division requesting that the City officially remobilize the project; and, WHEREAS, pursuant to Resolution No. 25-042, approved by Port Arthur's City Council, Elite submitted Change Order No. 2 for the remobilization of the project, extra dirt, and the installation of guard rails for the amount of$201,570.00 increasing the previous contract amount of $2,542,059.00 to the new contact amount of $2,743,629.00; and. WHEREAS, Change Order No. 2 also requested that one hundred twenty (120) calendar days be added to the project with a new contract completion date established once the date of re-mobilization is determined; and, WHEREAS, the Engineering Staff, F&S, and Elite determined that the Notice to Proceed for the re-mobilization of the project would be March 25, 2025; and, WHEREAS, Elite Contractors & Equipment, LTD, of Kirbyville, Texas, has submitted the Certificate of Substantial Completion dated July 1, 2025 and the work to which the Certificate applies has been inspected, authorized, and declared to be complete in accordance with the contract documents and made a part hereof as Exhibit A; together with the Engineer's Certificate of Completion (Exhibit B); Contractor's Certificate and Release (Exhibit C), the Contractor's Certificate of Warranty (Exhibit D), the Contractor's Certificate of Guarantee (Exhibit E); and the Contractor's Affidavit of Bills Paid (Exhibit F); and, WHEREAS, the retainage for the project is 5% of the work completed and billed, the Release of Retainage has been submitted by Elite Contractors & Equipment, LTD, of Kirbyville, Texas, for the amount of $136,274.25, see Exhibit G; and, PR No.24495 9/8/2025 mje Page 4 of 6 WHEREAS, Elite Contractors & Equipment, LTD, of Kirbyville, Texas, has completed the contracted project to the satisfaction of the Public Works Director and the City Engineering staff, see Exhibit H; and, WHEREAS, acceptance of the Close Out Documents and Release of Retainage is herein deemed an appropriate action; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Council hereby authorizes the City Manager to hereby accept the Certificate of Substantial Completion dated July 1, 2025 and the work to which the Certificate applies has been inspected, authorized, and declared to be complete in accordance with the contract documents and made a part hereof as Exhibit A; together with the Engineer's Certificate of Completion (Exhibit B); Contractor's Certificate and Release (Exhibit C), the Contractor's Certificate of Warranty (Exhibit D), the Contractor's Certificate of Guarantee (Exhibit E); and the Contractor's Affidavit of Bills Paid (Exhibit F); and, THAT, Elite Contractors & Equipment, LTD, of Kirbyville, Texas, has completed the contracted project to the satisfaction of the Public Works Director and the City Engineering staff, see Exhibit H; and, THAT, the City Manager of the City of Port Arthur is hereby authorized to accept, on behalf of the City of Port Arthur, a Certificate of Acceptance (Exhibit I) for the completion of the Sabine Pass Mechanic Street and S. 1st Avenue Roadway Reconstruction Project; and, THAT, the Release of Retainage be paid to Elite Contractors & Equipment, LTD, of Kirbyville, Texas, for the amount of $136,274.25; and, PR No. 24495 9/8/2025 mje Page 5 of 6 THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of , A.D. 2025, at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Councilmembers: Noes: Charlotte M. Moses Mayor ATTEST: Sherri Bellard City Secretary APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: Roxann Pais Cotroneo, Esquire Ron Burto P City Attorney City Manager PR No.24495 9/8/2025 mje Page 6 of 6 APPROVED AS FOR AVAILABILITY OF FUNDS: Lyn "Lyn" Boswell, MA, ICMA-CM Director of Finance Clifton Williams, CPPB Purchasing Manager Suhail Kanwar, PE Director of Public Services/City Engineer EXHIBIT A i CERTIFICATE OF SUBSTANTIAL COMPLETION • Contract No.: P23-057 Project Name:_Sabine Pass Mechanic Street&South IS`Avenue Roadway Reconstruction Project Contractor: Elite Contractors&Equipment,LTD Description of Work: Reconstruct Mechanic Street from South 15`Ave to Dowling Rd and South IS'Avenue from Broadway Street to Granger Street The work performed under this contract has been reviewed and found to be substantially complete.The date of substantial completion is hereby established as July 1,2025 . KNOW ALL MEN BY THESE PRESENTS: l.) The stage of construction where, in the opinion of the City of Port Arthur,all items of the work necessary to enable the assets to be utilized without restrictions for the purpose for which the asset was constructed have been completed;and 2.) All pay items are complete and all necessary testing as required by the Laws and Regulations and/or Contract Documents have all been completed. Punch List All list of items to be completed or corrected,prepared by the CONTRACTOR and verified and amended by the ENGINEER, is attached hereto.The failure to include any items on such list does not alter the responsibility of the CONTRACTOR to complete all work in accordance with the contract documents.The CONTRACTOR shall complete or correct the work on the list of items attached hereto within in 60 days from the above date of substantial completion.The responsibilities shall be as set out in the Contract Documents or on the attached hereto. If not specified in and an attachment or in the Contract Documents the CONTRACTOR is responsible for maintenance, utilities and insurance. til) d CONTRACTOR NAME SIGNAT E DATE RECOMMENDED FOR ACCEPTANCE Daniel Dotson S ENGINEER NAME l� DATE The City of Port Arthur accepts the work as Substantially Complete. City of Port Arthur, Department of Public Works. 40a5 PROJECT MANAGER SI NATURE DATE ,SOHA-IL KANO4k KicimAAhog T/8/z5 CITY ENGINEER SIGNATURE DATE PUBLIC WORKS DIRECTOR SIGNATURE DATE EXHIBIT B ENGINEER'S CERTIFICATE OF COMPLETION Project:_Sabine Pass Mechanic Street&South ls`Avenue Roadway Reconstruction Project Date of Issuance: August 8,2025 Owner(s): City of Port Arthur Owner's Project Number: P23-057 Engineer: Fittz&Shipman,Inc. Contractor: _Elite Contractors &Equipment,LTD This Engineer's Certificate of Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To: City of Port Arthur (OWNER) And To: Fittz&Shipman, Inc. (ENGINEER) The Work to which this Certificate applies has been inspected by authorized representatives of Owner,Contractor and Engineer, and that Work is hereby declared to be complete in accordance with the Contract Documents on 08-01-2025 DATE OF COMPLETION % Executed by Engineer on 8-7-2025 r* %\ •• *tt1 DANIEL A. DOTSON r jf A.:.. •109833Q ti•..4 0 t � CENSER,,.••'��Nw ttt 1 t8IQN 6�� EXHIBIT C CONTRACTOR'S CERTIFICATE AND RELEASE FROM: Elite Contractors&Equipment,LTD (Name of Contractor) TO: City of Port Arthur (Owner) REFERENCE CONTRACT NO.: P23-057 CONTRACT ENTERED INTO THE 6th DAY OF November 2023_ BETWEEN THE CITY OF PORT ARTHUR AND Elite Contractors&Equipment,LTD OF Kirbyville,Texas FOR THE PROJECT Sabine Pass Mechanic Street&South 1"Avenue Roadway Reconstruction Project KNOW ALL MEN BY THESE PRESENTS: 1.) The undersigned hereby certifies that there is due from,and payable by,the Owner to the Contractor under the contract and duly approve Change Orders and modification the balance of 2.) The undersigned further certifies that in addition to the amount set forth in Paragraph 1,there are outstanding and unsettled the following items which he claims are just and due and owing by the Owner to the Contractor: a. None b. c. d. (Itemize claims and amounts due,if none,so state) 3.) The undersigned further certifies that all work required under this contract, including work required under Change Order(s)numbered 1 and 2 ,has been performed in accordance with the terms thereof,and that there are no unpaid claims for materials,supplies,or equipment and no claims of laborers or mechanics for unpaid wages arising out of the performance of this contract,and that the wage rates paid by the contractor were in conformity with the contract provisions relating to said wage rates. 4.) Except for the amounts stated under Paragraphs 1 and 2 hereof,the undersigned has received from the Owner all sums of money payable to the undersigned under,or pursuant to,the above-mentioned contract or any modifications or changes thereof. 5.) That in consideration of the payment of the amount stated in Paragraph 1 hereof,the undersigned does hereby release the Owner and Operator from any all claims arising under or by virtue of this contract, except the amount listed in Paragraph 2 hereof due from the owner,provided however,that if any reason the Owner does not pay the full amount stated in Paragraph 1 hereof,said deduction shall not affect the validity of this release, but the amount so deducted shall be automatically included under Paragraph 2 as an amount which the Contractor has not released but will release upon payment thereof.The Contractor further certifies that upon the payment of the amount listed in Paragraph 2 hereof,and of an amount which may be deducted from Paragraph I hereof,he will release the Owner and Operator from any and all claims of any nature whatsoever arising out of paid contract modification thereof, and will execute such further releases or assurances of the Owner and Operator may request. 1 IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this 'r- day of to �,� k ,2025. Eli (b, -rca:/3 Jt Lc-la/Po- ,- l,To (SEAL} (Contractor) BY: (Signature) C Ok I I' s PCC‘;eeI Mano9r( (Printed Name/Title of Officer) • 'reek , being first duly sworn on oath,deposes and says,First,that,he/she is the (Aff ant) C\.3N r of tit- CO(4-r,d1-4r iP� , (Title) (Name of Company) Second,that he/she has read the foregoing certificate by him/her subscribed as p{<'. e(3 iAXIItkeit'C- (Title of 0:It- C0.n4-17,/17.-5 A t tp,p, of (Name of Company) Affiant further states that the matters and things stated herein are true. ( rant) Subscribed and sworn to before me this 8 day of F1UUusf ,2025. My commission expires I D).11 ao as kaniu.a. Monica Ann Kelley 1 - My Commission Expires t NOTARY + 10121tary 25 1334042J0 Notaryy ID ...7P; 2 EXHIBIT D CONTRACTOR'S CERTIFICATE OF WARRANTY FROM: Elite Contractors&Equipment,LTD (Name of Contractor) TO: City of Port Arthur (Oivner) REFERENCE CONTRACT NO.: P23-05 7 CONTRACT ENTERED INTO THE 6th DAY OF_November 2023 BETWEEN THE CITY OF PORT ARTHUR AND Elite Contractors&Equipment,LTD OF Kirbyville,TX FOR THE PROJECT_Sabine Pass Mechanic Street&South 1st Avenue Roadway Reconstruction Project_ KNOW ALL MEN BY THESE PRESENTS: 1.) - Elite Contractors&Equipment,LTD_ does hereby guarantee all of the work done under the (Name of Contractor) above referenced contract to be free from faulty materials in every particular,and free from improper workmanship,and against injury from proper and usual wear;and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect,and to make good all damage caused to other work or materials due to such required replacement or re-execution. 2.) This guarantee shall cover a period of one(1)year from the date of acceptance of all work under this contract by Owner,as evidenced by the Contractor's Certificate of Completion. 3.) This Certificate is given in connection with the final payment under the contract between the Owner and Elite Contractors&Equipment,LTD,and with the knowledge that it will be relied upon in (Name of Contractor) Making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this e day of ile.)1" ,2025. 1 e CoN\ A Fr IPvie LTQ {SEAL} (Contractor) BY: tz,§r9— • (S na welt Coc)\,1 Eli, s Pro',e c tv\r 9e r (Printed Name/Title of Officer) 1-Warranty l2(e.C. . 51-2LAj , being first duly sworn on oath, deposes and says, First,that,he/she is the (Affiant) QW1ler of CI e Pviek-4 tT() (Title) (Name of Company) Second,that he/she has read the foregoing certificate by him/her subscribed as P(c>)e— tito,'t C (— (Title) of Cl LrO (Name of Company) Affiant further states that the matters and things stated herein are true. ( ant) Subscribed and sworn to before me this 0 day of A U St ,2025. My commission expires 1O1DI I aoa5 .114,151a gAter ► --- - - ----- - - 4 NOTARY Monica Ann Kelley I 1 • My Commission Expires 1 10/21/2025 Notary ID 133405420 2-Warranty EXHIBIT E CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: Elite Contractors &Equipment, LTD TO: City of Port Arthur FOR: Sabine Pass Mechanic Street& South 1st Avenue Roadway Reconstruction Project REFERENCE CONTRACT NO. P23-057 ENTERED INTO THE 6th DAY OF November , 2025, BETWEEN THE CITY OF PORT ARTHUR AND Elite Contractors &Equipment,LTD (CONTRACTOR) OF Kirbyville, Texas (CITY/STATE) FOR: _Sabine Pass Mechanic Street& South 1st Avenue Roadway Reconstruction Project_ (PROJECT) KNOW ALL MEN BY THESE PRESENTS: 1. Elite Contractors & Equipment, LTD does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular,and free improper workmanship, and against injury from proper and usual wear; and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials, due to such require replacement or re-execution. 2. This guarantee shall cover a period of one(1)year from the date of acceptance of all work under this Contract,as evidenced by the Engineer's Certificate of Completion. IN WITNESS THEREOF, the undersigned has signed and sealed this instrument this the t' day of Au.y4,Sk , 2025. COMPANY SEAL. Elite Contractors & Equipment,LTD_ (COMPANY NAME) '7":1WNER,SIGNATURETTITLE) 3-d le c, � .Shi l s (PRINT) SUBSCRIBED AND SWORN to before me this $ day of Auic List . 2025. My commission expires f a .1 a035 (DATE) jrV XYYN-A:,C. - 0Monica Ann Kelley l (NOTARY PUBLIC) My Commission Expires I No?ery20Ds I 133405420 I EXHIBIT F CONTRACTOR'S AFFIDAVIT OF ALL BILLS PAID Project: Sabine Pass Mechanic St. & South 1st Ave. Reconstruction Project Location: Sabine Pass, Port Arthur, Texas Owner: City of Port Arthur County of Jefferson State of Texas The undersigned hereby certifies that, except as listed below, all previous progress payments received on account of the Work, have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. Exceptions: NONE Signature: 1,1‘"4- Print: Lud`1 611 5 Date: '5 l Sworn to and subscribed to me, a Notary Public, this 3 day of Atlq U S`� , 2025. (Notary Public) t Monica Ann Kelley * * My CoNotmmixpires r�y2 ssion p5 E My Commission Expires: 10 I aft j _045 1334a054 20 EXHIBIT G 08888888 888888888888888888888888888888888 8 888 ry e� ,Vnrv.. rv.. ,�..a�,-..mry "m. 4 N N s oc - 88888888888888888888888.8888888m 8 8888888888 ;5 - < m Pm ry „'' m< m 33m's$ _ E G .1 d . c E p a = - - 6 A da 32! = Da o' z U n 8888888888888888888888888888888888888888888 8 ;* 88m�r88 §M M88 0$88888o85g S oo ry m a o n m ry m m ti m . � 8888888888888888888888888888888388888888888m 9 °. 3m$>> 8 " N "' N ' m a S g f �� 80 a E E E Lt. E o a 3 5 3 0 11 n'1 o 5 `88 0 0 8 8 a� \ 8 �oo 11 a ~N N U e.E E o` a V u°s o „ 8 o C _ 111:: a66 G -A' '" mA ,o ;e`g`e� W fa o`oz w8888E88888888888888888888888888888888888 8 = g egg F. os� ErQa000§� §oamo �'� t Ery v rvn .... u ,_.. ,n..a�n rv.ym r, ,nmm..g 2" u.... 7 it G O e 88808888888888888888888888888888888884i8888 d a 8 `_ v§o N2, 44�� ^8t2h�eBsN&m 888§0�� �§ z o N _ d a ° ., 8880888888888888888888888888888m88888888, r oi> m mm ^p7nIE 5d '$m m m 8m88 ya o m ry m t2t_ - Fl n i n a a n 6-m N H r m 25 m ±.t t t t t w¢w J t t±,,a w n t 2 E i Y E E n E - 3�.3 'i 3 `z n� i s E m o 3 9 ; E E E E E E 3 n 3 E 3 `o r. - - - -v§ - E 3 i 11 l 44'111i_ G r2,0$ w _ - - - - - - - - - - gt, u ;LL c o C 4 c 3 3 3 i N E C? -8 Is o N- A - c c°c_°c c c c z i E o - - i f n a d i E w v a.m..m - 1 1&O�o n = E E E E E E E E _ Go'x"_ _ 0 ,t o ,� s a °N o o o - _ a 3 W i c _ _ _ c _ d a w t ..ry“..a“ry m .._....,...4 4:-. ..,,. 4 ry ,V m m m m m m m m m m e e a e m F-5.- E V Q H w Fittz & Shipman INC. Consulting Engineers and Land Surveyors Ronald D.Fittz,P.E.,R.P.L.S.(1948-1987) Terry G.Shipman,P.E.,Senior Consultant Daniel A.Dotson,P.E.,President Bernardino D.Tristan,P.E.,Chief Executive Officer Donald R.King,P.E.,Vice President September 8, 2025 Dr. Hani Thome, PhD, P.E City of Port Arthur 444 4th Street Port Arthur, Texas 77640 RE: Sabine Pass Mechanic Street&South 15t Ave Roadway Reconstruction Project F&S Project No. 22099.0000 Retainage Dear Dr. Thome, Attached is the Retainage Request for the above referenced project. The total value of work completed and materials installed to date amounts to $2,725,485.00 with previous payments of$2,589,210.75. The remaining 5% retainage, in the amount of$136,274.25 is now due. The final walkthrough was conducted on August 1, 2025 with representatives from both the City of Port Arthur and TXDOT. The project was accepted and approved by both parties. Based on this acceptance, we are recommending the release of the retainage in the amount of$136,274.25 as final payment for the project. Should you have any questions regarding this retainage request or any other matter, please feel free to contact me. Sincerely, Fittz &Shipman, Inc. V uto- Alberto C. Elefano, PE For the Firm 1405 Cornerstone Court•Beaumont,Texas 77706•(409)832-7238•Fax(409)832-7303 Texas Board of Professional Engineers Firm No. 7760•Texas Board of Professional Land Surveyors Firm No. 100186 EXHIBIT H City of ort rthu � 7exus www.PortArthurTx.gov CERTIFICATE OF COMPLETION Project: THE SABINE PASS MECHANIC STREET AND S. 1sT AVENUE ROADWAY IMPROVEMENT PROJECT Project No. ST1P90.CON To: All Concerned I HEREBY CERTIFY THAT this project was completed on July 1, 2025 and that the work was under periodic inspection during construction by the City Engineer. That, to the best of my knowledge, the project was constructed substantially in accordance with the plans and specifications, and that record documents were received and are on file in the Engineering Division. Submitted by: Ka tivJar 4 — g-Zo Zs Suhail Kanwar, PE Date Director of Public Services/City Engineer "Remember,we are here to serve the Citizens of Port Arthur" P.O. Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 r EXHIBIT I CITY OF PORT ARTHUR, TEXAS ENGINEERING DIVISION CERTIFICATE OF ACCEPTANCE FOR... THE SABINE PASS MECHANIC STREET AND S. 1ST AVENUE ROADWAY IMPROVEMENT PROJECT To: Elite Contractors and Equipment, LTD, of Kirbyville, Texas This document is to certify that the City of Port Arthur, Texas accepts the completion of the Sabine Pass Mechanic Street and S. Pt Avenue Roadway Improvement Project on the basis of the recommendation of the City of Port Arthur's Engineering Division and receipt of the Certificate of Completion,the Engineer's Certificate of Completion,the Contractor's Certificate and Release, the Contractor's Certificate of Warranty, the Contractor's Certificate of Guarantee, and the Contractor's Affidavit of All Bills Paid. Ron Burton, CPM Date City Manager Sherri Bellard Date City Secretary ;1