HomeMy WebLinkAboutPR 24506: CHANGE ORDER NO. 1 WITH MIKE BARNETT CONSTRUCTION, REPAIRS AT THE WEST SIDE DEVELOPMENT CENTER P.R. No. 24506 09/11/2025 AJS Memorandum City of Port Arthur, Texas Robert A. "Bob"Bowers Civic Center To: The Honorable Mayor and City Council Through: Ron Burton, City Manager From: Adam J Saunders, Civic Center Dir RE: Proposed Resolution No. 24506 In May 2025, the City Council approved Resolution No. 25-204 for Roof Replacement at the West Side Development Center. During the removal of the roof, unforeseen concealed circumstances were discovered. In order to comply with warranty guidelines, the manufacturer's warranty inspector requires these changes. The current thru-wall flashing must be removed and replaced. To accomplish this, 10" of EFIS wall substrate must be removed at the parapet base. This EFIS must be replaced after installation, new rake supports must be mounted, and a textured finish must be applied to seal off the flashing. This work will be Change Order No. 1. The cost of Change Order No. 1 is $11,790.00. The original cost for this work was $64,895.00. With the addition of this change order, the total amount for this work increases to $76,685.00. Funding for this proposed change order will be added to account number 307-21-049-8512-00-10-000, Project No. BU0023. Mike Barnett Construction of Port Neches, Texas, has agreed to do the work for $11,790.00 out of Account No. 307-21-049-8512-00-10-000-, Project No. BU0023. ANALYSIS/CONSIDERATION: West Side Development Center needs additional work on the Roof Replacement due to unforeseen circumstances. Change Order No. 1 will address this additional work. BUDGETARY AND FISCAL EFFECT Funds are available in Account No. 307-21-049-8512-00-10-000, Project No.#BU0023. STAFFING EFFECT None RECOMMENDATION It is recommended that the City Council approve the City Manager to execute Change Order No. 1 to the contract with Mike Barnett Construction of Port Neches, Texas, for additional repairs at the West Side Development Center, in the amount of$11,790.00. P.R. No. 24506 09/11/2025 AJS RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT WITH MIKE BARNETT CONSTRUCTION OF PORT NECHES, TEXAS, FOR ADDITIONAL REPAIRS AT THE WEST SIDE DEVELOPMENT CENTER IN THE AMOUNT OF $11,790.00 TO A NEW TOTAL OF $76,685.00. FUNDS WILL BE ADDED TO ACCOUNT NO. 307-21-049-8512-00-10-000, AND PROJECT NO. BU0023 WHEREAS, the City Council approved Resolution No. 25-204 in May 2025, authorizing an agreement with Mike Barnett Construction of Port Neches, Texas, for Roof Replacement at the West Side Development Center in the amount of$64,895.00; and, WHEREAS, it has been determined that additional repairs are needed due to unforeseen circumstances revealed after the demolition of the area in preparation to install a new roof; and, WHEREAS, to comply with warranty guidelines, the manufacturer's warranty inspector requires changes: and, WHEREAS, the necessary changes involve removing and replacing the current through-wall flashing. To accomplish this, 10" of EFIS wall substrate must be removed at the parapet base. This EFIS must be replaced after installation, new rake supports must be mounted, and a textured finish must be applied to seal off the flashing.; and, WHEREAS, Mike Barnett Construction of Port Neches, Texas, has submitted Change Order No. 1 for this additional work in the amount of$11,790.00, with an additional five days added to the work schedule, attached hereto as Exhibit"A"; and, WHEREAS, the balance of$11,790.00 will be added to the total cost of this project, increasing the total amount of this work to $76,685.00. Funding for this proposed change order will be added to account number 307-21-049-8512-00-10-000, Project No. BU0023; and, WHEREAS, approval of Change Order No. 01 is deemed an appropriate action. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT,the facts and opinions in the preamble are true and correct. THAT,the City Council hereby authorizes the City Manager to execute Change Order No. 1 to the contract with Mike Barnett Construction of Port Neches, Texas, for additional repairs at the West Side Development Center, in substantially the same form as attached here to Exhibit"A". THAT the funding for Change Order No. 1 is $11,790.00,bringing the new total to $76,685.00, available in Account No. 307-21-049-8512-00-10-000-, Project No. BU0023. THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED, AND APPROVED,this day of 2025 AD, at a P.R. No. 24506 09/11/2025 AJS Regular Meeting of the City Council of the City of Port Arthur,Texas,by the following Vote: AYES: Mayor: Councilmembers: NOES: Charlotte M. Moses, Mayor ATTEST: Sherri Bellard, City Secretary APPROVE M: Roxann Pais Cotroneo City Attorney APPROVED ! ' ADMINISTRATION: Ronald Burton, ,‘- City Manager APPROVED AS TO FUND AVAILABILITY: 's7s Lynda :oswell, M.A., CMA-CM Director of Finance Clifton Williams, CPPB Purchasing Manager P.R. No. 24506 09/11/2025 AJS EXHIBIT "A" MIKE BARNETT CONSTRUCTION Change order Proposal-CPR 1.0 City of Port Arthur 08/29/25 221 Houston Ave Port Arthur, Texas 77642 Attn: Adam Saunders Re: Westside Development Clinic We at Mike Barnett Construction are providing you with this change order proposal for the following scope of work. We are submitting this change order proposal due to unforeseen concealed circumstances discovered once the removal of the roof commenced. The mfg. warranty inspector is requiring these changes to comply with warranty guidelines. All the work in this scope of work are additional items that the owner commissioned GC to perform. All items in this proposal are additional to the original contract amount. Scope of work: • To remove 10" EFIS wall substrate at parapet base. • Remove existing thru-wall flashing. • To furnish and install New through wall flashing. • To furnish and install New Rake supports. • To furnish and install EFIS wall substrate with matching texture finish to seal off the flashing. Pricing: We are providing this change order with all labor,materials,and equipment for the total amount of: Eleven thousand seven hundred ninety dollars and .00 cents: $11,790.00 plus all applicable taxes Labor= $7.075.00 materials =$4,715.00 Mike Barnett Construction: SETX REGION 5 COOP# 20250202/# 20250301 If you accept our proposal please sign below and return via email to rbourgeoismbc(a@gmail.com /or lanceusal 1(ct,gmail.com. Accepted By: Date: Sincerely, Russell Bourgeois- Commercial Const. Mgr. Mike Bamett Construction,Inc., 1701 Port Neches Ave., Port Neches,TX 77651 Phone(409)727-5673 Fax(409)727-2905 MIKE BARNETT CONSTRUCTION CPR # 1 • 0 Serving The Golden Triangle Since 1965 1701 Port Neches Ave PROJECT: City of Port Arthur Port Neches,Texas 77651 Westside Development (409)727-5673 25-204 Center. Roof project. CHANGE PROPOSAL REQUEST TO: City of Port Arthur FROM: Mike Barnett Construction 221 Houston Ave. 1701 Port Neches Ave. Port Arthur,Texas 77642 Port Neches,Texas 77651 Attn: Adam Sanders Russell Bourgeois CHANGE PROPOSAL#: CPR#1.0 DATE: 09/08/25 REFERENCE:Warranty requirement-Extras SCHEDULE IMPACT: 5 days DESCRIPTION OF CHANGE: To remove 10" EFIS wall substrate at the parapet base. To remove the existing thru-wall flashing. To furnish and install New thru-wall flashing. To furnish and install new rate supports. To furnish and install EFIS wall substrate with matching texture finish to seal off the flashing. DESCRIPTION UNIT QTY UNIT $ TYPE TOTALS 1 To remove and replace EFIS as needed. $11,790.00 2. To remove and replace new rake supports. 3. To remove and replace thru wall flashing SUBTOTAL: $ 11,790.00 SUBTOTAL: $ 11,790.00 SALES TAX: $ CHANGE PROPOSAL GRAND TOTAL: $ 11,790.00