HomeMy WebLinkAboutPR 24567: ATLANTA WATER LINE IMPROVEMENT PROJECT CHANGE ORDER NO. 4 Cul,of n t I't It U�_ Te.vas INTEROFFICE MEMORANDUM Date: October 6, 2025 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR No. 24567—Atlanta Water Line Improvement Project Change Order No. 4 Introduction: This Agenda Item is to seek the City Council's approval for Change Order No. 4 for the Atlanta Water Line Improvement Project with Global Drilling Inc. of Winnie, Texas. Background: The 16"Atlanta water line from 19th Street to 4th Street is the main water supply line for the downtown area of Port Arthur. Based on the work orders and the residents' concerns, the water line condition urgently needs rehabilitation. Arceneaux Wilson& Cole Engineer firm(AWC) provided professional services to design and construct a 20" water line replacement for the project. Resolution No. 24-021 awarded the project to Global Drilling Inc. of Winnie, Texas, for $2,377,477.00, and Arceneaux Wilson & Cole Engineer firm (AWC) of Port Arthur, Texas, is the project engineer and construction manager. Resolution No. 24-471 approved Change Order No. 1 to utilize directional drilling trenchless technology to install remaining portions of the new 20-inch water line to better accommodate construction plans. This change order increased the contract amount by $234,163.00 to a new contract amount of$2,611,640.00 and also extended the contract time by 90 days to a new total contract time of 270 days. Resolution No. 25-198 approved Change Order No. 2 to repair a major leak on the 16-inch waterline along Atlanta Avenue, repair a leaking 8-inch sanitary sewer line with bypass pumping, and install tie-ins to address previously unidentified underground utilities, increasing the contract amount by $109,900.00 to a new contract amount of$2,721,540.00 and extending the contract time by 90 days to the new total contract time of 360 days. "Remember,we are here to serve the Citizens of Port Arthur" Resolution No. 25-328 approved Change Order No. 3 to address the increased installation requirements of six (6)proposed alleyway crossing tie-ins and for the field orders to repair water leaks on existing 2-inch and 6-inch waterlines, which increased the contract amount by $79,510.00 to the new total contract amount of$2,801,050.00. This Change Order also extended the contract time by 45 days for the installation requirements and repairs which prevented the mass water shutoff in the downtown area during the tie-ins installation. AWC engineer, along with City Staff, is proposing Change Order No. 4 for additional tie-in installations to the new line. Change Order No. 3 addressed six (6)tie-in installations, however, during installation it was found that many existing water valves were inoperable due to aging infrastructure. These valves are needed for the installation to prevent water shutdown in major portions of the city. As such, the remaining tie-in installations will require the need for line stops and insertion valves increasing the contract amount by $166,500.00 to a new contract amount of$2,967,550.00 and extending the contract time by 75 days for the installations. Budget Impact: The initial contract amount was $2,377,477.00 Change Order No. 1 increased the contract amount by $234,163.00 to the new contract amount of$2,611,640.00, increasing the change order percentage allowed by 9.8%. Change Order No. 2 increased the contract amount by $109,900.00 to the new contract amount of$2,721,540.00, increasing the change order percentage allowed by 4.6%to a total 14.4%. Change Order No. 3 increased the contract amount by$79,510.00 to the new contract amount of $2,801,050.00, increasing the change order percentage allowed by 3.3%to a total 17.8%. Proposed Change Order No. 4 will increase the contract amount by $166,500.00 to the new contract amount of$2,967,550.00, increasing the change order percentage allowed by 7% to a total 24.8%. Funding is available in Capital Improvement Projects Account No. 405-40-000-8516-00-00- 000, Project No. WS0019-CON. Recommendation: It is recommended that City Council approve Proposed Resolution No.24567 to approve Change Order No.4 for the Atlanta Water Line Improvement project as discussed and/or outlined above. "Remember, we are here to serve the Citizens of Port Arthur" PR No. 24567 10/6/25 cm Page 1 of 4 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 4 TO THE ATLANTA WATERLINE IMPROVEMENT PROJECT WITH GLOBAL DRILLING INC. OF WINNIE, TEXAS, INCREASING THE CONTRACT AMOUNT BY $166,500.00 TO THE NEW TOTAL CONTRACT AMOUNT OF $2,967,550.00 WITH EXTENDED CONTRACT TIME OF 75 DAYS TO A NEW TOTAL CONTRACT TIME OF 480 DAYS; FUNDS ARE AVAILABLE IN CAPITAL IMPROVEMENT PROJECTS ACCOUNT NO. 405-40-000-8516-00- 00-000,PROJECT NO. WS-0019 CON. WHEREAS, pursuant to Resolution No. 24-021, the Atlanta Water Line Improvement Project was awarded to Global Drilling Inc. of Winnie, Texas, with a total projected budgetary amount of$2,377,477.00; and, WHEREAS, pursuant to Resolution No. 23-464, Arceneaux Wilson & Cole Engineering Firm (AWC) of Port Arthur, Texas, was hired as Design and Construction Engineer to oversee the project; and, WHEREAS, pursuant to Resolution No. 24-471, Change Order No. 1 was approved to utilize directional drilling trenchless technology to install remaining portions of the new 20-inch water line to better accommodate construction plans increasing the contract amount by $234,163.00 to a new contract amount of$2,611,640.00 and extending the contract time by 90 days to a new contract time of 270 days; and, WHEREAS, pursuant to Resolution No. 25-198, Change Order No. 2 was approved to repair a major leak on the 16-inch waterline along Atlanta Avenue, repair a leaking 8-inch sanitary sewer line with bypass pumping, and install tie-ins to address previously unidentified underground utilities, increasing the contract amount by $109,900.00 to the new total contract amount of$2,721,540.00 with extended contract time of 90 days to the new total contract time of 360 days; and, PR No. 24567 10/6/25 cm Page 2 of 4 WHEREAS, pursuant to Resolution No. 25-328, Change Order No. 3 was approved for the increased requirements for the installation of six (6) proposed alleyway crossing tie-ins that were affected by the further discovery of existing and abandoned underground utilities lines during construction, and additionally, for field orders to repair water leaks on existing 2-inch and 6-inch waterlines, which increased the contract amount by $79.510.00 to a new total contract amount of$2,801,050.00 with extended contract time of 45 days to the new total contract time of 405 days; and, WHEREAS, AWC is proposing Change Order No. 4 (EXHIBIT "A") for further tie-in installations to the new line due to inoperable water valves needed to prevent water shutdown in the area, and as such will require the need for line stops and insertion valves to be installed at the tie-ins increasing the contract amount by $166,500.00 to a new contract amount of $2,967,550.00; and, WHEREAS, Change Order No. 4 also proposes a time extension of 75 days to address the aforementioned installations which increases the total contract completion time to 480 days; and, WHEREAS, the total increased amount in the Change Orders, including the proposed Change Order No. 4, are within the maximum allowed 25% of the original contract amount (Exhibit"B"), as per the Texas Local Government Code Section 252.048(d). NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: THAT,the facts and opinions in the preamble are true and correct; and, PR No. 24567 10/6/25 cm Page 3 of 4 THAT, the City Council hereby approves Change Order No. 4 (EXHIBIT "A") further tie-in installations to the new line, increasing the amount by $166,500.00 to the new total contract amount of$2,967,550.00; and, THAT, the City Council further approves Change Order No. 4 for a time extension of 75 days to the new total contract completion time of 480 days, due to the aforementioned installation requirements and repairs; and, THAT, the funding is available in Capital Improvement Projects Account No. 405-40- 000-8516-00-00-000, Project No. WS-0019.CON; and, THAT, a copy of the caption of this resolution be spread upon the minutes of the City Council. READ, ADOPTED, AND APPROVED, this day of , 2025, AD, at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following Vote: AYES: Mayor: Councilmembers: • NOES: Charlotte M. Moses Mayor ATTEST: Sherri Bellard City Secretary PR No. 24567 10/6/25 cm Page 4 of 4 APPROVED AS TO FORM: Roxann Pais Cotroneo City Attorney APPROVED FOR ADMINISTRATION: Ronald Burto Phi City Mana'•r .. +Cuvcre Suhail Kanwar, P.E. Director of Public Services Calvin Matthews, P.E. Water Utilities Director APPROVED AS TO FUND AVAILABILITY: 11 Lyn (Lyn Boswell, A, ICMA-CM Finance Director Clifton,E. Williams Jr., CPPB Purchasing Manager EXHIBIT "A" (CHANGE ORDER NO. 4) AllElk • avx ARCENEAUX WILSON&CODE engineering I surveyirg!plonnrng October 02, 2025 Mr. Calvin Matthews, P.E. City of Port Arthur Director of Water Utilities 444 4th Street Port Arthur, Texas 77640 RE.. Proposal For Change Order No. 04 for A TLANTA WATER LINE IMPROVEMENTS AWC Job No. CPA-1160 Mr. Matthews: Attached is Change Order No.4 for the Atlanta Water Line Improvements project. This change order is to increase the contract amount by $166,500.00 and extend the contract time by 75 calendar days. While attempting to locate and operate the existing valves within the immediate project area on the City's existing potable water distribution system, the Contractor and City staff found that many existing valves were inoperable due to the age of the infrastructure. These valves surpass 50-years of service life. These valves are necessary for completing final tie-ins of the lateral lines located in the alleyways and also minimizing the effect of water outage on the surrounding area. In foresight of experiencing this once in construction,the original design included multiple sizes of line stops and insertion valves as supplemental bid items in the contract. This would allow the City to have established pricing for these items if the existing valves were found to be inoperable during construction. The City and Engineer have reviewed the proposed changes and agree they are within the budget and scope as requested. 409.724.7888 3120 Central Mall Drive Port Arthur,TX 77642 Engineering Surveying awceng.com F-16194 10194049 A.AW TALI � awn s This change order will extend the original contract time by 75 calendar days and increase the original contract amount by $166,500.00. We recommend that the City of Port Arthur authorize this change order to the contract as submitted. We have attached Change Order No. 4 which modifies the contract to reflect this change for your consideration and action. Should you have any questions or require additional information, please contact our office. ARCENEAUX WILSON&COLE LLC TEXAS REGISTERED ENGINEERING FIRM F-16194 Keith Zotzky, P.E., C Vice President of Engineering Services Attached Change Order#04 • aw ARCENEAUX WILSON&COLE CHANGE ORDER NO. 4 DATE: October 2, 2025 JOB NO.: CPA-1160 AGREEMENT DATE: May 20, 2024 NAME OF PROJECT: Atlanta Water Line Improvements OWNER: CITY of PORT ARTHUR CONTRACTOR: GLOBAL DRILLING The following changes are hereby made to the CONTRACT DOCUMENTS: SUPPLEMENTAL BID ITEMS 1. Add One (1) 12" Line Stop at $22,500/EA. ($22,500.00) 2. Add Eight (8) 6" Line Stop at $10,000/EA. ($80,000.00) 3. Add Four (4) 6" Insertion Valve at$16,000/EA. ($64,000.00) TOTAL $166,500.00 CHANGE TO CONTRACT PRICE: ORIGINAL CONTRACT PRICE: $2,377,477.00 CURRENT CONTRACT PRICE adjusted by previous CHANGE ORDER(S): $2,801,050.00 The CONTRACT PRICE due to this CHANGE ORDER will be [increased] by: $166,500.00 The new CONTRACT PRICE, including this CHANGE ORDER, will be $2,967,550.00 1 of 2 M_ CHANGE ORDER NO. 4 ♦_♦' CnApe October 2, 2025 ♦" Job No. CPA-1160 ARCENEAUX WILSON&COLE cnglnecring!surveying dunning CHANGE TO CONTRACT TIME: ORIGINAL CONTRACT TIME: 180 Calendar Days CURRENT CONTRACT TIME adjusted by previous CHANGE ORDER: 360 Calendar Days ORIGINAL DATE OF COMPLETION: November 17, 2024 ADJUSTED DATE OF COMPLETION: September 21, 2025 CONTRACT TIME due to this CHANGE ORDER will be increased by 75 Calendar Days The New DATE OF COMPLETION: December 5, 2025 No other Terms and Conditions of the Contract are changed as a result of this Change Order. Contractor's acceptance of Change Order relieves OWNER of any liability for additional costs incurred by Contractor in his performance of the work covered by the Change Order. RECOMMENDED0BY ENGINEER: ACCEPTED BY: *e--.9tiS2:k7 ARCENEAUXWtt-SON & COLE LLC (CONTRACTOR, OFFICER OR OWNER) GLOBAL DRILLING ACCEPTED BY: CITY of PORT ARTHUR 2 of 2 Contract Current Status Contract Name: Atlanta Waterline Improvement Contractor: Global Drilling Contract#: 24-021 Original Contract Amount: $ 2,377,477.00 Statutory Range: 25%Pursuant to 252.048(d)(+/-) $ 594,369.25 Amount Percentage of Percentage Original Contract to Date Original Contract $ 2,377,477.00 Change Order 1 $ 234,163.00 9.8% 9.8% Change Order 2 $ 109,900.00 4.6% 14.5% Change Order 3 $ 79,510.00 3.3% 17.8% Change Order 4(Proposed) $ 166,500.00 7.0% 24.8% Total Change Orders to Date $ 590,073.00 24.8% New Contract Amount $ 2,967,550.00