Loading...
HomeMy WebLinkAbout(P3) Streetlight Overview in Port Arthur (2)Home October 21, 2025 About Project Contact Streetlight Overview in Port Arthur Home Page02 About Project Contact •Effective Date: August 1, 2014 •Term: 25 years⚬Tree trimming and removal for power line maintenance purposes⚬Provide pole space for City-owned equipment⚬Provides franchise fee payment for operating within City limits⚬Permanent relocation of Entergy facilities for road closures, widening, opening, relocation Franchise Agreement Coordination with Entergy •Call 1-800-ENTERGY(1-800-368-3749)to report the unused/damaged pole •Providethe closest addressto the damaged pole •Mark the damaged pole with orange or yellow tape •Entergy’sengineering department will determine if the request is warranted Home Page03 About Project Contact Removing Unused and Damaged Poles *AT&T and/ or Spectrum may still have lines and equipment on Ente rg y’s poles Home Page04 About Project Contact Outage Requests •Use the app to report an outage or •Contact 1-800-ENTERGY (1-800-368-3749) Streetlight Replacement Home Page05 About Project Contact HPS: High Pressure Sodium MV: Mercury Vapor 100W HPS-A Light 100W MV-L Light 175W MV-LP Light 250W HPS-A Light Existing Lighting within the City 400W HPS-A Lig h t 400W Lamp Home Page06 About Project Contact •Performed quarterly by the Traffic Division •Information is compiled and presented to Entergy for replacement •Last survey:September 4,2025 •No.of lights out of service:524 Streetlight Survey Home Page07 About Project Contact Energy Efficiency & Conservation Block Grant Purpose To assist states,local governments and Tribes in efforts to reduce energy use,reduce fossil fuel emissions,and improve energy efficiency Award •Toincrease energy efficiency by replacing older streetlights with LEDs •Awarded $118,760by the Department of Energy(Res.24 -190) •100%funded with no cash match •Design began:April 2025 •Construction began:October 2025 •Deadline for completion:December 31,2026 (Res.25-294 ) (EECBG) Replacements Remaining 2024 Facility Type Replacements Remaining 2025 Difference 2371 100W HPS -A Light *2057 314 662 100W MV -L Light 559 103 471 175W MV-LP Light 385 86 849 250W HPS -A Light *724 125 13 400W HPS -A Light *12 1 11 400W Lamp *8 3 Home Page08 About Project Contact Existing Streetlights Replaced EECBG Progress *Thereis a $25 charge per light for replacement Existing Lighting Replacement Lighting 100W HPS -A Light 100W LED Cobra Head 100W MV -L Light 100W LED Cobra Head 175W MV -LP Light 150W LED Cobra Head 250W HPS -A Light 250W LED Cobra Head 400W HPS -A Light 400W LED Cobra Head 400W Lamp 400W LED Cobra Head Home Page09 About Project Contact Existing Streetlights Replaced EECBG Progress Home Page10 About Project Contact LED: Light Emitting Diode 100W LED Cobra Head 734 $8.88/light/month 150W LED Cobra Head 274 $9.73/light/month Replacement Lighting within the City250W LED Cobra Head 403 $ 13 . 7 1/ lig h t / mo n t h 400W LED Cobra Head 18 $16.97/ light/ month Home Page11 Presented By : Flozelle C. Roberts About Project Contact Thank You