Loading...
HomeMy WebLinkAboutPR 24583: ACCEPTANCE OF CLOSE OUT DOCUMENTS AND RELEASE OF RETAINAGE ':1'4n>M'4[F'.vs:lc0�!FM1cvl\..!P.\P^'R!«aE'r. .Wrn\ne.mPum..W .i..• .... .. ;I. Kam._.. 1 1, City of ort rthur Ii 1r7S www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: October 14, 2025 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Flozelle C. Roberts,EIT, MEng,MBA, CPM, Director of Public Works Cg RE: PR 24583: Authorizing the City Manager to Accept Close-out Documents for the Operations Center's Renovation Project Located at 201 West H. O. Mills Boulevard Submitted by Daniels Building and Construction of Beaumont, Texas, and Approve the Release of Retainage Introduction: This agenda item proposes to authorize the City Manager to accept the close-out documents and release retainage of$57,826.45 for renovations at the Operations Center as submitted by Daniels Building and Construction, Inc. of Beaumont,Texas. Background: The Operations Center houses the Public Works Department's and the Parks and Recreation Department's staff. The building required numerous improvements to make the building more conducive for staff to work. The City Council, through Resolution 24-489, authorized a contract with Daniels Building and Construction, Inc. of Beaumont, Texas, for the renovation of the Operations Center for a contract amount of $1,434,548.00. The renovations included repairing the men's and women's restrooms, repairing the men's locker room, cleaning and repainting office walls and flooring, cosmetic repairs to the building's exterior, and the transfer of the unused generator from City Hall. Staff was able to locate a new, comparably sized generator at a lower cost, resulting in Resolution 25- 143, a deductive change order of$251,871.00 for the relocation of the unused generator from City Hall to the Operations Center, which reduced the contract amount to $1,182,677.00. The Public Works Department has received close-out documents from Daniels Building and Construction, Inc. of Beaumont, Texas, that include the Certificate of Substantial Completion establishing completion as July 17, 2025, the Contractor's Certificate and Release, the Contractor's Certificate of Debts Paid, and the Release of Retainage Pay Application for$57,826.45. Budget Impact: Funds for the not-to-exceed amount of$57,826.45 are available in the Accounts Payable Retainage Account, 307-00-000-2050-00-00-000, Operations Center Renovation project,BU0001-CON. Recommendation: It is recommended that the City of Port Arthur City Council approve PR 24583, authorizing the City Manager to accept the close-out documents from Daniels Building and Construction,Inc. of Beaumont, Texas, and release the retainage in the amount$57,826.45. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 id II. PR No.24583 10/14/2025 FCR Page 1 of 4 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT CLOSE-OUT DOCUMENTS FOR THE OPERATIONS CENTER'S RENOVATION PROJECT LOCATED AT 201 WEST H.O. MILLS BOULEVARD SUBMITTED BY DANIELS BUILDING AND CONSTRUCTION, INC. OF BEAUMONT, TEXAS, AND APPROVE THE RELEASE OF RETAINAGE IN THE AMOUNT OF$57,826.45.FUNDING IS AVAILABLE IN THE ACCOUNTS PAYABLE RETAINAGE ACCOUNT, ACCOUNT NUMBER 307-00-000-2050-00-00-000, PROJECT NO. BU0001- CON WHEREAS, the Operations Center houses the Public Works Department's and the Parks and Recreation Department's staff, and it required numerous improvements to make the building more conducive for staff to work; and, WHEREAS, pursuant to Resolution Number 24-489, the City Council authorized the execution of a contract with Daniels Building and Construction, Inc. (Daniels) of Beaumont, Texas, for the renovation of the Operations Center for a contract amount of$1,434,548.00; and, WHEREAS, pursuant to Resolution Number 25-143, the City Council authorized a deductive change order of$251,871.00 for the relocation of the unused generator from City Hall to the Operations Center,which reduced the total contract amount to $1,182,677.00; and, WHEREAS,Daniels has submitted the final invoice and the Certificate of Substantial Completion dated July 16, 2025 for the work to which the Certificate applies has been inspected, authorized, and declared to be complete in accordance with the Certificate of Substantial Completion(Exhibit A);together with the Contractor's Affidavit of Payment of Debts and Claims (Exhibit B), Contractor's Affidavit of Release of Liens (Exhibit C), Contractor's Request for Payment of Retainage (Exhibit D), Contractor's Certificate of Warranty (Exhibit E), Contractor's Certificate of Guarantee (Exhibit F), Certificate of Completion(Exhibit G), and Certificate of Acceptance(Exhibit H); and, PR No.24583 10/14/2025 FCR Page 2 of 4 WHEREAS, Daniels Building and Construction, Inc. of Beaumont, Texas, has submitted the Certificate of Substantial Completion dated July 17, 2025, and the work to which the Certificate applies has been inspected, authorized, and declared to be complete in accordance with the contract documents and made a part hereof as Exhibit A, together with the Contractor's Certificate and Release (Exhibit B), and the Contractor's Certificate of Debts Paid(Exhibit C); and, WHEREAS,the retainage for the project is 5% of the work completed and billed,the Release of Retainage has been submitted by Daniels Building and Construction, Inc. of Beaumont, Texas, for the amount of$57,826.45, as denoted in Exhibit D; and, WHEREAS, Daniels Building and Construction, Inc. of Beaumont, Texas, has completed the contracted project to the satisfaction of the Public Works staff, see Exhibit E; and, WHEREAS, approval of the acceptance of the Close Out Documents, and Release of Retainage is herein deemed an appropriate action. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT,the facts and opinions in the preamble are true and correct; and, THAT, the City Council hereby authorizes the City Manager to accept the Certificate of Substantial Completion(Exhibit A),the Contractor's Affidavit of Payment of Debts and Claims (Exhibit B),Contractor's Affidavit of Release of Liens(Exhibit C),Contractor's Request for Payment of Retainage (Exhibit D), Contractor's Certificate of Warranty (Exhibit E), Contractor's Certificate of Guarantee (Exhibit F),Certificate of Completion(Exhibit G),and execute the Certificate of Acceptance(Exhibit H); and, THAT,the City Manager of the City of Port Arthur is hereby authorized to execute on behalf of the City of Port Arthur a Certificate of Acceptance (Exhibit F) for the completion of the Operations Center's renovations; and, AP7 PR No.24583 10/14/2025 FCR Page 3 of 4 THAT,the Release of Retainage be paid to Daniels Building and Construction,Inc. of Beaumont, Texas, for $57,826.45 from the Accounts Payable Retainage Account, 307-00-000-2050-00-00-000, Operations Center Renovation project, BU0001-CON; and, THAT,a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ,ADOPTED AND APPROVED this the day of , A.D. 2025 at a meeting of the City of Port Arthur, Texas, by the following vote: Ayes: Mayor: Councilmembers: Noes: Charlotte M. Moses Mayor ATTEST: Sherri Bellard, TRMC City Secretary APPROVED AS TO FORM: Roxann Pais Cotroneo, Esq. City Attorney PR No. 24583 10/14/2025 FCR Page 4 of 4 APPROVED FOR ADMINISTRATION: 740#217 RonaldBurton CP City Manager ri../ A_ elle MI erts, EIT, Ming, MB' CPM Director 'ublic orks APPROVED AS FOR AVAILABILITY OF FUNDS: & eJfLyn a Lyn Boswell, ICMA-C , FOA Director of Finance // o4- LJ le Clifton . Williams, Jr., CiPB Purchasing Manager PR No. 24583 Exhibit (Certificate of Substantial Completion) ���ATADocument G704 2017 Certificate of Substantial Completion PROJECT:(name and address) CONTRACT INFORMATION: CERTIFICATE INFORMATION: Public Works Operations Center Level I Contract For:General Construction Certificate Number:001 Alterations 201 W.H.0.Mills Boulevard Date:6/6/2023 Dote:7/17/2025 Port Arthun Texas OWNER:(name cent/odrlress) ARCHITECT:(name and address) CONTRACTOR:(name and address) City of Port Arthur Long Architecture Daniels Building&Construction,Inc 444 4th Street 755 S. I Ith Street,Suite 255 P.O.Box 20117k Port Arthur,Texas 776,121 Beaumont,'Texas 77701 Beauutot.Texas 77720 the Work identified below has been reviewed and loom!,to the Architect's best knowledge,information,and belief,to be substantially complete.Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.The date or Substantial Completion of the Project or portion designated below is the date established by this Certificate. ((demi&the Work,or potion there%that is substantially complete.) Public Works building and rocket. Long Architecture j J i Code Spell, President Julz 17,2025 ARCHITECT(Firm A'anm) SIGNAT PRINTED NAME AND TITLE DATE OF SUBSTANTIAL COMPLETION WARRANTIES The date of Substantial Completion of the Project or portion designated above is also the date ofcommencement of applicable warranties required by the Contract Documents,except as stated below: (Identity warranties that do not commence oar the date of Subahnuiul Completion, !lane,and indicate their date of commencement) one(I)year Contractor Warranty or Standard Manufacturer Warranty. WORK TO BE COMPLETED OR CORRECTED A list of items to be completed or corrected is attached hereto,or transmitted as agreed upon by the pill cs,and identified as follows: (Menitfy the list of Work to be completed or corrected) See attached punchlist. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.Unless otherwise agreed to in writing,the date of commencement of warranties for items on the attached list will be the date or issuance or mu final Certificate ol'Payment or die date of final payment,whichever occurs first.The Contractor will complete or correct the Work on the list or items attached hereto within thirty(30)days front the above date of Substantial Completion. Cost estimate of Work to be completed or corrected: SN/A The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work,insurance,and other items identified below shall be as follows: (Note:Owner's and Contractor's legal and insurance a counsel should review insurance requirements and coverage.) Per Contract Documents. The Owner and Contractor hereby accept the responsibilities assigned to them in this Certificate of Substantial Completion: Daniels Building& Consoaction.Inc, Janet Daniels.President _July 28.2025 CONTRACTOR(Finn RINTED NAME AND TITLE DATE Name) •.elk C.Roberts Cit of Port Arthur Director of Public Work July 29,2025 OWNER(Finn Name) GN URE PRINTED NAME AND TITLE DATE AlA Document D704—2017.Copyright C .1978, 00 and 2017.NI lights reserved.'The American Institute of Architects,"-American Institute of Architects,"AIA,"the AlA Logo and^AIA Contract Documents'are trademarks of The American Institute of Architects.This document was produced at 13:45:55 ET on 07/24/2025 under Order No.4104247653 which expires on 08/26/2025.is not for resale,is licensed for one-lime use only,and may onty be used in accordance with the MA Contract Documents'Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA50) Public Works Operations Center Interior Renovation for the City of Port Arthur Architectural Punch List 7/17/2025 SUBJECT: Walk-Thru Inspection Punch List—A walk-film inspection was conducted by Cade Spell on 7/17/2025. The following items were found to be deficient and must be completed and/or corrected. Location Item Status Verified General Notes Clean areas around Contractor's dumpster,job trailer,and toilet trailer. Sweep paving and remove trash and debris. Ensure weatherstripping is installed at head and jambs of all office exterior doors per PR#18. Weatherstripping missing at tops of most doors,and some locations have none or damaged existing weatherstripping that needs to be replaced(such as at door to Conference Room 115). _-- ***Owner to check AC units serving rooms 108, 109, 111,and 113-118. AC may not be operating properly.*** Women's RR Add light fixture inside women's restroom entry Valve on left toilet is leaking Install grab bars at ADA toilet stall ADA toilet does not flush _ Custodial Cover opening in wall between closet and Men's Locker Room Closet Repair masonry under grille on NW wall. Seal around grille on NW wall(after masonry is repaired) — Men's Toilet Attach escutcheon plate on drain pipe under 2"d lavatory from the Room right Touch up paint at corners of painted CMU passageway into room Men's Shower Attach shower head escutcheon plates to wall at shower stalls 5&6 Room (in south corner/southeast end of room) Touch up paint on painted CMU where tile wall trim abuts painted CMU at passageway opening into shower room. Meeting Room Swap locations of the two Men's Locker Room door signs so that 102 the one.with the wheelchair symbol is next to the 36"wide door. Reduce water pressure at the two electric drinking fountain spouts Touch up paint on concrete deck/tee outside Office 103 Touch up paint on wall above Office 104 windows and remove paint from window frames Light fixture in narrow corridor outside office 106 is lopsided. Clean tops of all window frames -u Touch up paint on wall under windows in narrow corridor outside Office 106 Corridor 100 Touch up paint under fire alarm pull box near entry doors Light fixture appears to be wet. Inspect for damage and source of water infiltration. Repair/replace as required. Suspended ceiling grid is sagging within a few tiles from light fixture. Office 103 Light fixture appears to be wet. Inspect for damage and source of water infiltration. Repair/replace as required. Replace water damaged ceiling tiles. Install wall plate for coaxial cable on NE wall below ceiling, Page 1 of 2 Public Works Operations Center Interior Renovation for the City of Port Arthur Architectural Punch List 7/17/2025 Location Item Status Verified Office 104 Replace one ceiling tile on NE wall(right of marker board) Touch up paint 2 very small nicks on SW wall Repair bent ceiling grid and replace scratched ceiling tile(near light fixture) Office 105 Remove small mark/residue from wall between fire alarm pull box and exterior door,about 15"above floor). Office 106 Ceiling tiles along NE wall not sitting properly in grid 4 chairs are damaged. Were not damaged prior to being stored. Small hole in corner of ceiling tile near center of room. Replace tile. Remove paint/mud overspray from light fixture Infill and touch up paint at pinholes in wall at top right corner of passageway into Room 109. Office 107 Adjust duplex receptacle plate on SW wall and seal hole and/or touch up paint as required Ceiling tiles in center of room need to be adjusted Office 110 Lights are not turning on. Office Ill Lights are not turning on. Files/Storage Install door stop behind door to break room 109 Fix holes in caulking(see Owner for location, if not apparent) Break Room Touch up paint at corner near fire extinguisher. Contractor 108 discussed the possibility of installing a corner guard at this location. Swap the refrigerator and storage freezer Power outlet behind refrig.was operable before renovation Corridor 112 Fix caulk at furrdown(at SW entry to Classroom 118) Touch up paint and/or remove residue from painted concrete tee above furrdown to classroom 118. Fill hole and touch up paint where painted concrete tee(deck) meets NW wall Corridor 113 ***Light switch not working properly*** Office 116 Small nick on wall at bottom left of fire pull box Classroom 118 An approximately 2.5' x 4'area of the new floor appears to have a different color epoxy and does not match rest of floor. Touch up paint near wall stop on NW wall Exterior,SW Seal hole in wall where canopy meets brick side of building Exterior,NW Touch up paint on double doors(#001)around latch and at door side of building closer attachment Hallway btwn. Remove scuff marks from the north side of the walls Rms. 106& 107 The items listed above shall not be considered a final list of all deficient items.If any deficiencies are found during inspection for substantial completion,beneficial occupancy,or inspection for final acceptance,the Subcontractor/Vendor will correct all deficient items per the contract documents,prior to final inspection. Please contact me if you have any questions or need additional information. Page 2 of 2 PR No.24583 Exhibit (Contractor's Affidavit of Payment of Debts and Claims) tee/1 "p' A IA Document G706® - 1994 Contractor's Affidavit of Payment of Debts and Claims PROJECT:(Name and address) ARCHITECT'S PROJECT NUMBER: OWNER:❑ Public Works Operations Center ARCHITECT:0 Level 1 Alterations CONTRACTOR:0 111 Henry O.Mills Blvd. CONTRACT FOR:General Construction SURETY:❑ Port Arthur,Texas 77641 OTHER:❑ TO OWNER:(Name and address) CONTRACT DATED:January 24,2025 City of Port Arthur 444 4th Street Port Arthur,Texas 77641 STATE OF: Texas COUNTY OF: Jefferson The undersigned hereby certifies that,except as listed below,payment has been made in full and all obligations have otherwise been satisfied for all materials and equipment furnished,for all work,labor,and services performed,and for all known indebtedness and claims against the Contractor for damages arising in any manner in connection with the performance of the Contract referenced above for which the Owner or Owner's property might in any way be held responsible or encumbered. EXCEPTIONS: Contingent upon receipt of final payment SUPPORTING DOCUMENTS ATTACHED HERETO: CONTRACTOR: (Name and address) 1. Consent of Surety to Final Payment. Whenever Daniels Building&Construction,Inc. Surety is involved,Consent of Surety is P.O.Box 20878 required. AIA Document G707,Consent of Beaumont,Texas 77720 Surety,may be used for this purpose Indicate Attachment ® Yes ❑ No BY. The following supporting documents should be attached (J gn ire of authorized representative) hereto if required by the Owner: Janet Daniels,President 1. Contractor's Release or Waiver of Liens, (Printed name and title) conditional upon receipt of final payment. 2. Separate Releases or Waivers of Liens from Subscribed and sworn to before me on this date: 9/19/2025 Subcontractors and material and equipment suppliers,to the extent required by the Owner, accompanied by a list thereof. .(ttAtLtivv....tir Notary Public: 3. Contractor's Affidavit of Release of Liens(AIA My Commission E es:9/19/2 Document G706A). STEPHANIE L STAUDENMIER (t) Notary Public,State of Texas Cann.Expo 0919-2028 1 Nary VI 7569099 AIA Document G706—1994.Copyright®1970 and 1994.All rights reserved."The American Institute of Architects,""American Institute of Architects;"AIA,the AIA Logo,and"AIA Contract Documents'are trademarks of The American Institute of Architects.This document was produced at 11:15:02 ET on 09/19/2025 1 under Order No.500002997 which expires on 09/19/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (389ADA54) PR No.24583 Exhibit (Contractor's Affidavit of Release of Liens) ! AIA Document G706®A - 1994 Contractor's Affidavit of Release of Liens PROJECT:(Name and address) ARCHITECT'S PROJECT NUMBER: OWNER:❑ Public Works Operations Center ARCHITECT:❑ Level 1 Alterations 111 Henry O.Mills Blvd. CONTRACT FOR:General CONTRACTOR:El Port Arthur,Texas 77641 Construction SURETY:El TO OWNER: (Name and address) CONTRACT DATED:January 24,2025 City of Port Arthur OTHER:❑ 444 4th Street Port Arthur,Texas 77641 STATE OF: Texas COUNTY OF: Jefferson The undersigned hereby certifies that to the best of the undersigned's knowledge,information and belief,except as listed below,the Releases or Waivers of Lien attached hereto include the Contractor,all Subcontractors,all suppliers of materials and equipment,and all performers of Work,labor or services who have or may have liens or encumbrances or the right to assert liens or encumbrances against any property of the Owner arising in any manner out of the performance of the Contract referenced above. EXCEPTIONS: Contingent upon receipt of final payment SUPPORTING DOCUMENTS ATTACHED HERETO: CONTRACTOR: (Name and address) 1. Contractor's Release or Waiver of Liens, Daniels Building&Construction,Inc. conditional upon receipt of final payment. P.O.Box 20878 Beaumont,Texas 77720 2. Separate Releases or Waivers of Liens from BY: Subcontractors and material and equipment (Signatur of authorized suppliers,to the extent required by the Owner, represe tive) accompanied by a list thereof. Janet Daniels,President (Printed name and title) Subscribed and sworn to before me on this date: 9/19/2025 Notary Public: .%).146 My Commission R,res:9/19/202 '',`�' Notary I.STAtIOEIMrwER - Pubic,State of Texas 1 ',/, Comm.Expires 09"19.2028 1 a Notary ID*7569099 1 AIA Document G706A—1994.Copyright®1982 and 1994.All rights reserved. The American Institute of Architects,""American Institute of Architects,'"AIA'the AIA Logo,and'AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 11:26:15 ET on 09/19/2025 1 under Order No.500003000 which expires on 09/19/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documentso Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (3B9ADA42) PR No.24583 Exhibit D (Contractor's Request for Payment of Retainage) CD C) C)D C) C) CD O N o) w C) H Z H0 '0 C) C) H 0 V > r. 0 Z 0 m '< ° p 0 < o n0 ro m m O2, C C m D I z 0 W W , H -Z1 7 - O 7 O.CD 7 C7 r N m <Z Z mZ m a Drm � n DmawN � Qm > m0 Cm C) C i -1 m Z -I 3 3 a < f 5'0 C7 z g_ x 0 O-i C) mp 0N � g sr ?rn m H zm 0m D � ("nO Dp AC) OOm D _ w O. cc Z 7 w LP 7 j A �m m rnO N O 0 CD p { n> o nI •m A c CD > A o n1 D z a m ,0 -0 D E m 7 0 3 n O N > = Cn v 3 D n A 0 O W D d Z n d o m D N4 a' D z 05 Dm K N.ao -. 7 o . cn o m - m `� ..1 M 0 -< n W ry N (D a C O. p Z -C m U) -1 7 N 7 - (D t0 ,� 1. rim to w tD a m ° O O T. -coco y � � �� > O m = m m N 7 m ° O O n x c x m �� � � y C _ C 3 n `� O m y o m co _1m w .�i °� D a w , m 0 m 3 0�i 0 Z s3 Fp w y O C F fD 0 r Z v N N O N m D D z m a o ? p m co m n 4> c m x- in 3 94 7 2) mCO z 0 n ` o m m 0 0 m 0 0 -o - p CD D D n •c 3 7 O -i 0 Z 1-X m C m o o O m "� Z mZ0 < C) C �1�1 D 0 _ Hm 1„ 0Dm = Z 0 'ray i Z m ' = 2 .N .N N c0n m V, -+ 0 m n CO CO °i - 0 c M C)-1 m C) 0 0 i, o' O C) w r m x 0 O - co o _ -z 0 0 0o O C m c m = 0 0 0 0 c cn 0 cn �" m m i off° H 0 D 0m 0 -i Z c m CO J o 0) A W No �'1 '^z Z Qz'H m 7� hou, Cn OH n D > r -1 2) -i C) Z 0 -i > 'D D n C) (') Z 0 D m O 0 0 n = m �� A m 0 0 0 Z O ° -1 (n D T. D - a O r 0 -i Z m m v r- z ' m z m an d 0 n 0m z < o CO Za m m > 0 0 m > 0 o m -i CD) > > m o > 0 z -o 0 K 0 O z rn 0 0 C D co H -3 a -< p C m r C 0 Z w 9. w O 0 > Z O O 3 c a m 3 c m d U' 0 m D A m n 0v = m m m 7 O -1 mm co o a c 0 0 n = o r" mm 7 O o D OCD m ;0 N N .Z1 Z > 0 0) c N G) U C ' C) 0r = < x * m m N Z rn 0 -+ a c w-c m pD 7 O i D '�. D H m fD K g t 3 Z ZrTi m Z m= O �wr' o v_ m z O N co' o o D OO to N C1 Z l7 OD > I. o 474- A m p Da N r.) 0 r IQm 0 rn H I c 0 7 I .� r • fin 0D o G)7 G) 0 1 91 Z 1 Z m U1 -i _ O� C Woo °0 Fri-, 00 0 m N 0 -, c 00 O 0m y I�►`. m w 3. z O� U m zm �,' N ? � -zix D � z o a � H 0 O 69 m (� ce3 ��cc ..., y p 0 c O U1 z m c 7 m? K CO� V p `•err Z ti _ m N co = � < m -40 z CD N m 0 O o G) N CD Z �' ry o CD ..P. j • N Z �01 • R�� 3, m T` �t v w «,C mn n 0 Iii > 0 � - za° o N a Z .p..Z Z J m 0, o1 O) O) A O O Oo -.! (n n O1 O r,N O N N N RI O) N (C 0 (C (D (0 0) N1 t... A N 0 0 0 0 0 O U cn 1 CO (U O O 0 0 0 0 {j) pOj 1 c)1)...., D �� co w ec t` 0rnt a N—Ic1 am" ` CO IN) 1 ..-_ W N N) N) N) N N N) N) j N -� -+ -. . -+ --� -' Z O co CO V CS) CT A CO N O CO Co V 0) CT A CO N -., O O O V O A W N D O rl g _ CD 0 0 0 m < c o 0 -° o m m , _ a, w CD m c 0 C 0 0 0 0 0 0 v o m y o m o O O `Z c. j. n -, 0 (n > a, m w v m j. 3 o) a3 Zii o D n m o m m � Z cn D - o c 1 o v m D3 y d' 5 Z/' QO CO o cot — 3 0 0 .. O d co y' 0, Cn 0 > -1 m m o WG7 m Z_ noc 3 ) o IX) n ' v s o m CD o z ' o N o �. m a O -I� <o CD � n; T y x 0 y 0 m (1) y o6 D Z 4o CD O at o - 90 () '< m 1 m U) o Q, o co Z +(7 a ' [D = 'n m O= a O n) 0 v n y m D_ u, 'n o a o o 3 D m m a com Pc o = N m o °' m D (, '� 90 '` -a m y `° N m r oc m ' np CD7 cp D N - co It . w n& a A C C y cov 3D 0 N CD xi 0 CD D c r n C - < m m O) _ _ C) C 0 0 V00)) j COO A N CT co 0)) ,ONo O � co CO N) A C-O CO V W V COT A CD C1 CD CO 0 W A _ m C 'T7 Cr -CO N N O) V O V V CT -+ O O A O co A O A CO N W O A --� CA 0) -+ -co m N V O N CT CO V O CO W CO CT A CT -i N CO CT O W A CO CD CT 0 A 0 A 0 0) CO - 0 CO 0 CO O 0 N A -+ CO O CO CO O O) N O) CO N N CT V co A ) CD -+ CT m O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 73 0 0 0 0 CD O o 0 0 0 0 0 0 0 0 0 0 o O o o O o 0 0 0 0 0 0 o D 3l D a 13 -1m a h) _ m 0-1 CT Co C..) -,, a CO V N V CO W N A W- CA N -+ co A W V -� V CO 0 < 0) -+ CO A N co 0) Co CA O co W W A O CO V 0) V CT - i O CT CO W co W A > *2 -♦ C71 O N N O) V CT V V cn -co O A O O A O A CO N W O A O o) -, O m 0 m N V co N.) CO V O O O) CO O) A CT -.AN.) CD 0) -, O W A CD CD CT O A 0 A -0 X K CO -• O 0) 0 O O O N A CO O CO CO O O N CT CO N N CT V co A W co co r X O O o O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 O O O CD CD 0 O O O 0 O O O CD O O O O O O O O O O O O CD O CD CD 0 0 -a -Ti r m o I m 0 F.i' o Z m D -I -13 0 0 o O o co 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 y 0 0 0 0 o 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o n o CD CD 0 o CD o 0 CD CD 0 CD CD 0 0 0 0 CD 0 0 0 0 0 CD 0 CD CD 0 CD CD -I K D co 0 -i m m O D m O CD 0 O O O O CD CD CD O CD 0 O CD CD O 0 CD O O O O O CD CD O CD O O r 0 o O O O O O O O O O O O O O O O O 0 0 0 O 0 0 0 0 O O CD CD O C!) O O O O O O co O O O co O CD CD CD CD CD O 0 O CD O 0 O O O O CD CD CD a O _s N O� Do O 01 CT Co cr..) -+ --rt. W V N) -4 CO Cs. N A Ca CD N -• CD A W -+ -+ V a -4 0) 0) -+ CD A NJ CD CD O) CO O - Co 0) 0) A CD Co V W V CT -.. -• CD Cr. CO 0) O W A 0 01 O N N (3) V CD V V cn Co o A 0 0 A 0 A cD -IV -Co (D A Co 0) -. CT n 0 N V CD IQ CT CO V 0 CO CD Co 0) A CT DoD CD-+ CO C.) ACr. CD CO CD CA CD A 73 I- CO -+ 0 W 0 O O O N A Co 0 Co CO O CD N m Co N N 01 V Co A Co CO 01 m 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O o O 0 0 O CD CD CD CD O 0 O CD 0 0 0 0 0 0 CD CD O O CD CD CD CD 0 CD O CD CD 0 CD O m r --11 m m o O O O O 0 0 0 CD CD 0 C) 0 0 0 0 0 0 CD 0 0 0 0 0 CD O CD CD CD CD 0 0 0 0 0 0 0 O O o 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 O 0 0 0 o O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 zg o a o 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 ,'g 0 0 co > () Z z 0 i m -1 O CD CD CD CD CD O CD CD O CD 0 0 0 CD O O CD O O O O O CD 0 O O CD O O 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O CD 0 CD O O CD CD O CD O O O O O O O 0 O 0 0 O CD O CD CD O CD CD 73 C,' v m CO V N co -+ - W W A V 0) 0) A N - CO W - C) CD CO CT A V O V O O A CT CT A CT I,. N 01 A co -• co V O Cn CT V CD -, CT O V o m N N CO O - W Co CO CO Co N 01 A U) V 0 A N CT V CO CD O) CD N 01 CO Co 0 CT N 0) W 0 -+ N CO W CT CO CD CO CO N N CD CD A CO CT O 0) -4 A CO N 0 V CT -4 O A CT O in "co Co O Co N O A O O CD O OD (T W c0 CA N O CD V A O iv O1 CT 0 CT CD CD 0 0 0 CD Cr. CD CD CD 01 CD O O CD O CD CD C.T. CT 0 CD CT 0 CT CT Ni A Ca) ND -� O (D CO --.10) Cn A CO N -+ > 0 0 OD -0 "0 U -0 -0 -0 -0 10 "0 '0 -0 -0 -0 O -0 C) A) ;U 7:7 7J 7J :0 :0 :U :0 73 :0 70 77 70 71 0 0 O * t * * * * * # # �t k 4t It �t Z m z D N.) N -+ (D V 0) 01 A W m (n 0 N 0 (D A CoCD 0) ( -+ , i i i 73 C) > -I CDO �J 7J W X 0 —I 0 7J D 7J -0 -0 a D m CD C m m L" --i C C O O -0a -0 ? -05Qaa70oa < an O o - D D �' o Z O —I r- X C v -1 0 0 0 �1 a m Sk 7) m 0 m = •• o 0 m 0 al z m 0 m (D w N _' g X m ° 0 7 m A 0 U) w o 5 aD o sp Z g 2 (o cp n m W 0 (D v o a m o ti m rn = a7 a . n ° C) ,. 00 (0.n (� -I ° 0 _.( Co r (D Q° D (D C) (D ', o (9 CD (D N 5 3 co u) * 7- 0 0 -� 3 CD K -0 m m CD .Z7 . 0 a D (n — I- 0 C < I m v , Co NJ C) 0 w W -, N N CO A A - Cr. N - W O) Co C C 0 .A W CD O W A N W N N A N CT -a m m m O N.) C) --I -4 Cn Co j CO - -A CO O A Ca) O O (D 0 Ca A CD O A CT N J CO OD A 0 (J) O O O O O O O O 0 O O 0 O 0 O 0 O m O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O D X o > _ m m CO C....) DJN.) CW A A �+ 0' N - 0.) C -+ A CO CO CO W A N (U j N A N 0l O N 0) -J --.1 01 COj CO -A CD 0 A Co -o0 m _a CO O 0.) A C) O A Cr. N V Co O7 A r A O O O O O O O O O O O O O O 0 0 U) O 00000000000000 0 1 -oO m m Fri 0 0 "' D Z m -I 0 0000000000000, 0 I- 77 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o D 0 00000000000000 C) H g D co -i 1 T 7D 0 m O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r- C O 0 0 0 O O O O 0 O O O O O 0 O 00000000000000 0 O D. -1 Co W - DO N Co A A -+ CT NJ --a co 0) m (n 0 A W (O -OD W A N 00 v cAD O A Co o - CO 0 W A (7) 0 -- A 0' N J CO C) A O O O O O O O O O O O O O O O 0 0 O O O O O 0 o O O O O O O O O 1 K 0 r- o m -I m _ m o 0 00000000000000 0 00000000000000 O 0 0 0 O O 0 0 O 0 O O O 0 0 O O O O O O O O O O O O O O O CO > I T n 2 2 c) 1 m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ° : 0 00000000000000 CD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 cD co C) : 0 N m 3 - o nl j. w -+ -+ -+ A NJ N - -, Co o c (p Cal j CS) A A -+ NJ -+ A CD J —0) N T N m C) C (D CT co co co v A CO A o W A 0 -J W O A O C) �I Co O 0 N �1 W Co A W �I C) 01 01 O U1 0 0 0 (I1 0 01 O (1 0 0 0 `G N.) j D 0 m CO -0 "0 0 13 0 j * * Z o O (-) w , m 0 > _i CD X 7:3-, 6 T C. z O 0 o o C C 0 o a) om -D D a m 7 C ° v z A o a 0 z O = D D a. N m m v 0 -I a) m = C 77 CD 3 < 0 > a 0 (D C D m m s - co r p O W O) O C C 0 .A v v A m r m 11 Co 0 -.1 o Cn o co 0 0 o m O 0 0 0 o m > 73 ; -I < m 0 co rn o > o --1 CO X Cn 0 o o 0 1 0 m m H H 0 = m o 0 m a Z v H 0 0 0 r- 7) 0 0 o > O 0 0 0 --I E m O T 73 23 5 m 0 0 0 r C cn O O O 0 O O -a O PO -1 O CO O) 0 CP 0 A N i v D co v -, M o O O o CO _ 0 0 0 r p m D -1 0 m -) m O O 0 O O 0 O 0 O 0 O 0 0 CO > = T n z z 0 G) S m C 0 CD 0 0 0 -- 0 0 0 0 0 0 7J 0 0 0 D 0 - o 0 v, - w o F. 0 co co co a) A 60 61 0 O n C.71 CD PR No. 24583 Exhibit (Contractor's Certificate of Warranty) CONTRACTOR'S CERTIFICATE OF WARRANTY FROM: Daniels Building&Construction, Inc. (Name of Contractor) TO: City of Port Arthur (Owner) REFERENCE CONTRACT NO.: 24-489 CONTRACT ENTERED INTO THE 24th DAY OF January 2025 BETWEEN THE CITY OF PORT ARTHUR AND Daniels Building&Construction, Inc. OF Beaumont,Texas FOR THE PROJECT Public Works Operations Center Interior Renovations KNOW ALL MEN BY THESE PRESENTS: 1.) Daniels Building&Construction,Inc. does hereby guarantee all of the work done under the (Name of Contractor) above referenced contract to be free from faulty materials in every particular,and free from improper workmanship, and against injury from proper and usual wear;and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect,and to make good all damage caused to other work or materials due to such required replacement or re-execution. 2.) This guarantee shall cover a period of one(1)year from the date of acceptance of all work under this contract by Owner,as evidenced by the Contractor's Certificate of Completion. 3.) This Certificate is given in connection with the final payment under the contract between the Owner and Daniels Building&Construction,Inc. , and with the knowledge that it will be relied upon in (Name of Contractor) Making such payment and that such payment would not be made except upon the truth of the matter contained in this affidavit. IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this 24`1' day of October ,2025. Daniels Building&Construction, Inc. (SEAL) (Contractor) BY: :gnat e) Janet Daniels, President (Printed Name/Title of Officer) 1-Warranty Janet Daniels , being first duly sworn on oath,deposes and says, First,that,he/she is the (Affiant) President of Daniels Building&Construction,Inc. (Title) (Name of Company) Second,that he/she has read the foregoing certificate by him/her subscribed as President (Title) of Daniels Building&Construction. Inc. (Name of Company) Affiant further states that the matters and things stated herein are true. rant anet Daniels,President Subscribed and sworn to before me this 24`1' day of October , 2025. My commission expires 9/19/2028 (62u,tAitimviv riv FEMME LSTAUDENMER NO A Y �%,I'- Win Pubic,Stale of Texas 1 b•f; COMM.Expires09.19•2O281 OF ' Noisy�7569099 2-Warranty PR No.24583 Exhibit (Contractor's Certificate of Guarantee) CONTRACTOR'S CERTIFICATE OF GUARANTEE FROM: Daniels Building & Construction, Inc. TO: City of Port Arthur FOR: Public Works Operations Center Interior Renovations REFERENCE CONTRACT NO. 24-489 ENTERED INTO THE 24th DAY OF January , 2025, BETWEEN THE CITY OF PORT ARTHUR AND Daniels Building & Construction. Inc. (CONTRACTOR) OF Beaumont. Texas (CITY/STATE) FOR: Public Works Operations Center Interior Renovations (PROJECT) KNOW ALL MEN BY THESE PRESENTS: 1. Daniels Building& Construction. Inc. does hereby guarantee all of the work done under the above referenced contract to be free from faulty materials in every particular, and free improper workmanship, and against injury from proper and usual wear; and agrees to replace or re-execute without cost to the Owner and Operator such work as may be found to be improper or imperfect, and to make good all damage caused to other work or materials, due to such require replacement or re-execution. 2. This guarantee shall cover a period of one (1)year from the date of acceptance of all work under this Contract, as evidenced by the Engineer's Certificate of Completion. IN WITNESS THEREOF,the undersigned has signed and sealed this instrument this the 24th day of October , 2025. Daniels Building & Construction, Inc. (COMPANY NAME) President WNER,SIGNATURE/TITLE) Janet Daniels (PRINT) SUBSCRIBED AND SWORN to before me this 24th day of October ,2025. My commission expires 9/19/2028 (DATE) r"Ik,* STER NE I.STAUOENMER • `= Notary Pubic,State of Texas 1 ! 1 Comm.E 08 i Nobly DP 7569099 OTAR PURL \()l MOSISI::\I. PR No.24583 ExhibitG (Contractor's Certificate of Completion) City of ort rthuur`�- 7exu.r www.PortArthurTx.gov CERTIFICATE OF COMPLETION Date: October 14, 2025 Project: Operations Center Renovations Project Close Out and Release of Retainage Contract 24-489 To: All Concerned I HEREBY CERTIFY THAT this project was completed on July 17,2025, and that the work was under periodic inspection during construction by Public Works staff and Long Architects. That, to the best of my knowledge,the project was constructed substantially in accordance with the plans and specifications, and that record documents were received and are on file in the Public Works and Engineering Departments. Submitted by: zelle . Robe s, EIT, MEng, MBA, CPM Direct r f Pub c orks "Remember,we are here to serve the Citizens of Port Arthur" P.O. Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 PR No. 24583 Exhibit! Olt H (Contractor's Certificate of Acceptance) CITY OF PORT ARTHUR, TEXAS DEPARTMENT OF PUBLIC WORKS CERTIFICATE OF ACCEPTANCE FOR OPERATIONS CENTER RENOVATIONS CONTRACT 24-489 To: Daniels Building and Construction, Inc. of Beaumont, Texas This document is to certify that the City of Port Arthur, Texas, accepts the completion of the Operations Center Renovations Project, on the basis of the recommendation of the City of Port Arthur's Public Works Department, architect, Long Architects, and receipt of the Certificate of Completion, Contractor's Affidavit of All Debts Paid, Contractor's Certificate of Release, Contractor's Certificate of Warranty executed by Daniels Building and Construction, Inc. of Beaumont,Texas. Ronald Burton, CPM City Manager Sherri Bellard, TRMC City Secretary