City of
ort rthur
Ii 1r7S
www.PortArthurTx.gov
INTEROFFICE MEMORANDUM
Date: October 14, 2025
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
From: Flozelle C. Roberts,EIT, MEng,MBA, CPM, Director of Public Works Cg
RE: PR 24583: Authorizing the City Manager to Accept Close-out Documents for the
Operations Center's Renovation Project Located at 201 West H. O. Mills Boulevard
Submitted by Daniels Building and Construction of Beaumont, Texas, and Approve the
Release of Retainage
Introduction:
This agenda item proposes to authorize the City Manager to accept the close-out documents and release
retainage of$57,826.45 for renovations at the Operations Center as submitted by Daniels Building and
Construction, Inc. of Beaumont,Texas.
Background:
The Operations Center houses the Public Works Department's and the Parks and Recreation
Department's staff. The building required numerous improvements to make the building more
conducive for staff to work.
The City Council, through Resolution 24-489, authorized a contract with Daniels Building and
Construction, Inc. of Beaumont, Texas, for the renovation of the Operations Center for a contract
amount of $1,434,548.00. The renovations included repairing the men's and women's restrooms,
repairing the men's locker room, cleaning and repainting office walls and flooring, cosmetic repairs to
the building's exterior, and the transfer of the unused generator from City Hall.
Staff was able to locate a new, comparably sized generator at a lower cost, resulting in Resolution 25-
143, a deductive change order of$251,871.00 for the relocation of the unused generator from City Hall
to the Operations Center, which reduced the contract amount to $1,182,677.00.
The Public Works Department has received close-out documents from Daniels Building and
Construction, Inc. of Beaumont, Texas, that include the Certificate of Substantial Completion
establishing completion as July 17, 2025, the Contractor's Certificate and Release, the Contractor's
Certificate of Debts Paid, and the Release of Retainage Pay Application for$57,826.45.
Budget Impact:
Funds for the not-to-exceed amount of$57,826.45 are available in the Accounts Payable Retainage
Account, 307-00-000-2050-00-00-000, Operations Center Renovation project,BU0001-CON.
Recommendation:
It is recommended that the City of Port Arthur City Council approve PR 24583, authorizing the City
Manager to accept the close-out documents from Daniels Building and Construction,Inc. of Beaumont,
Texas, and release the retainage in the amount$57,826.45.
"Remember,we are here to serve the Citizens of Port Arthur"
P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
id II.
PR No.24583
10/14/2025 FCR
Page 1 of 4
RESOLUTION NO.
A RESOLUTION AUTHORIZING THE CITY MANAGER TO ACCEPT
CLOSE-OUT DOCUMENTS FOR THE OPERATIONS CENTER'S
RENOVATION PROJECT LOCATED AT 201 WEST H.O. MILLS
BOULEVARD SUBMITTED BY DANIELS BUILDING AND
CONSTRUCTION, INC. OF BEAUMONT, TEXAS, AND APPROVE THE
RELEASE OF RETAINAGE IN THE AMOUNT OF$57,826.45.FUNDING IS
AVAILABLE IN THE ACCOUNTS PAYABLE RETAINAGE ACCOUNT,
ACCOUNT NUMBER 307-00-000-2050-00-00-000, PROJECT NO. BU0001-
CON
WHEREAS, the Operations Center houses the Public Works Department's and the Parks and
Recreation Department's staff, and it required numerous improvements to make the building more
conducive for staff to work; and,
WHEREAS, pursuant to Resolution Number 24-489, the City Council authorized the execution
of a contract with Daniels Building and Construction, Inc. (Daniels) of Beaumont, Texas, for the
renovation of the Operations Center for a contract amount of$1,434,548.00; and,
WHEREAS, pursuant to Resolution Number 25-143, the City Council authorized a deductive
change order of$251,871.00 for the relocation of the unused generator from City Hall to the Operations
Center,which reduced the total contract amount to $1,182,677.00; and,
WHEREAS,Daniels has submitted the final invoice and the Certificate of Substantial Completion
dated July 16, 2025 for the work to which the Certificate applies has been inspected, authorized, and
declared to be complete in accordance with the Certificate of Substantial Completion(Exhibit A);together
with the Contractor's Affidavit of Payment of Debts and Claims (Exhibit B), Contractor's Affidavit of
Release of Liens (Exhibit C), Contractor's Request for Payment of Retainage (Exhibit D), Contractor's
Certificate of Warranty (Exhibit E), Contractor's Certificate of Guarantee (Exhibit F), Certificate of
Completion(Exhibit G), and Certificate of Acceptance(Exhibit H); and,
PR No.24583
10/14/2025 FCR
Page 2 of 4
WHEREAS, Daniels Building and Construction, Inc. of Beaumont, Texas, has submitted the
Certificate of Substantial Completion dated July 17, 2025, and the work to which the Certificate applies
has been inspected, authorized, and declared to be complete in accordance with the contract documents
and made a part hereof as Exhibit A, together with the Contractor's Certificate and Release (Exhibit B),
and the Contractor's Certificate of Debts Paid(Exhibit C); and,
WHEREAS,the retainage for the project is 5% of the work completed and billed,the Release of
Retainage has been submitted by Daniels Building and Construction, Inc. of Beaumont, Texas, for the
amount of$57,826.45, as denoted in Exhibit D; and,
WHEREAS, Daniels Building and Construction, Inc. of Beaumont, Texas, has completed the
contracted project to the satisfaction of the Public Works staff, see Exhibit E; and,
WHEREAS, approval of the acceptance of the Close Out Documents, and Release of Retainage
is herein deemed an appropriate action.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
PORT ARTHUR,TEXAS:
THAT,the facts and opinions in the preamble are true and correct; and,
THAT, the City Council hereby authorizes the City Manager to accept the Certificate of
Substantial Completion(Exhibit A),the Contractor's Affidavit of Payment of Debts and Claims (Exhibit
B),Contractor's Affidavit of Release of Liens(Exhibit C),Contractor's Request for Payment of Retainage
(Exhibit D), Contractor's Certificate of Warranty (Exhibit E), Contractor's Certificate of Guarantee
(Exhibit F),Certificate of Completion(Exhibit G),and execute the Certificate of Acceptance(Exhibit H);
and,
THAT,the City Manager of the City of Port Arthur is hereby authorized to execute on behalf of
the City of Port Arthur a Certificate of Acceptance (Exhibit F) for the completion of the Operations
Center's renovations; and,
AP7
PR No.24583
10/14/2025 FCR
Page 3 of 4
THAT,the Release of Retainage be paid to Daniels Building and Construction,Inc. of Beaumont,
Texas, for $57,826.45 from the Accounts Payable Retainage Account, 307-00-000-2050-00-00-000,
Operations Center Renovation project, BU0001-CON; and,
THAT,a copy of the caption of this Resolution be spread upon the Minutes of the City Council.
READ,ADOPTED AND APPROVED this the day of , A.D.
2025 at a meeting of the City of Port Arthur, Texas, by the following vote:
Ayes: Mayor:
Councilmembers:
Noes:
Charlotte M. Moses
Mayor
ATTEST:
Sherri Bellard, TRMC
City Secretary
APPROVED AS TO FORM:
Roxann Pais Cotroneo, Esq.
City Attorney
PR No. 24583
10/14/2025 FCR
Page 4 of 4
APPROVED FOR ADMINISTRATION:
740#217
RonaldBurton CP
City Manager
ri../ A_
elle MI erts, EIT, Ming, MB' CPM
Director 'ublic orks
APPROVED AS FOR AVAILABILITY OF FUNDS:
& eJfLyn a Lyn Boswell, ICMA-C , FOA
Director of Finance
// o4- LJ le
Clifton . Williams, Jr., CiPB
Purchasing Manager
PR No. 24583
Exhibit
(Certificate of Substantial Completion)
���ATADocument G704 2017
Certificate of Substantial Completion
PROJECT:(name and address) CONTRACT INFORMATION: CERTIFICATE INFORMATION:
Public Works Operations Center Level I Contract For:General Construction Certificate Number:001
Alterations
201 W.H.0.Mills Boulevard Date:6/6/2023 Dote:7/17/2025
Port Arthun Texas
OWNER:(name cent/odrlress) ARCHITECT:(name and address) CONTRACTOR:(name and address)
City of Port Arthur Long Architecture Daniels Building&Construction,Inc
444 4th Street 755 S. I Ith Street,Suite 255 P.O.Box 20117k
Port Arthur,Texas 776,121 Beaumont,'Texas 77701 Beauutot.Texas 77720
the Work identified below has been reviewed and loom!,to the Architect's best knowledge,information,and belief,to be substantially
complete.Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in
accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.The date or Substantial
Completion of the Project or portion designated below is the date established by this Certificate.
((demi&the Work,or potion there%that is substantially complete.)
Public Works building and rocket.
Long Architecture j J i Code Spell, President Julz 17,2025
ARCHITECT(Firm A'anm) SIGNAT PRINTED NAME AND TITLE DATE OF SUBSTANTIAL COMPLETION
WARRANTIES
The date of Substantial Completion of the Project or portion designated above is also the date ofcommencement of applicable warranties
required by the Contract Documents,except as stated below:
(Identity warranties that do not commence oar the date of Subahnuiul Completion, !lane,and indicate their date of commencement)
one(I)year Contractor Warranty or Standard Manufacturer Warranty.
WORK TO BE COMPLETED OR CORRECTED
A list of items to be completed or corrected is attached hereto,or transmitted as agreed upon by the pill cs,and identified as follows:
(Menitfy the list of Work to be completed or corrected)
See attached punchlist.
The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the
Contract Documents.Unless otherwise agreed to in writing,the date of commencement of warranties for items on the attached list will be
the date or issuance or mu final Certificate ol'Payment or die date of final payment,whichever occurs first.The Contractor will complete or
correct the Work on the list or items attached hereto within thirty(30)days front the above date of Substantial Completion.
Cost estimate of Work to be completed or corrected: SN/A
The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work,insurance,and other items
identified below shall be as follows:
(Note:Owner's and Contractor's legal and insurance a counsel should review insurance requirements and coverage.)
Per Contract Documents.
The Owner and Contractor hereby accept the responsibilities assigned to them in this Certificate of Substantial Completion:
Daniels Building&
Consoaction.Inc, Janet Daniels.President _July 28.2025
CONTRACTOR(Finn RINTED NAME AND TITLE DATE
Name) •.elk C.Roberts
Cit of Port Arthur Director of Public Work July 29,2025
OWNER(Finn Name) GN URE PRINTED NAME AND TITLE DATE
AlA Document D704—2017.Copyright C .1978, 00 and 2017.NI lights reserved.'The American Institute of Architects,"-American Institute of
Architects,"AIA,"the AlA Logo and^AIA Contract Documents'are trademarks of The American Institute of Architects.This document was produced at 13:45:55
ET on 07/24/2025 under Order No.4104247653 which expires on 08/26/2025.is not for resale,is licensed for one-lime use only,and may onty be used in
accordance with the MA Contract Documents'Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA50)
Public Works Operations Center
Interior Renovation for the City of Port Arthur
Architectural Punch List
7/17/2025
SUBJECT: Walk-Thru Inspection Punch List—A walk-film inspection was conducted by Cade Spell on
7/17/2025. The following items were found to be deficient and must be completed and/or
corrected.
Location Item Status Verified
General Notes Clean areas around Contractor's dumpster,job trailer,and toilet
trailer. Sweep paving and remove trash and debris.
Ensure weatherstripping is installed at head and jambs of all office
exterior doors per PR#18. Weatherstripping missing at tops of
most doors,and some locations have none or damaged existing
weatherstripping that needs to be replaced(such as at door to
Conference Room 115). _--
***Owner to check AC units serving rooms 108, 109, 111,and
113-118. AC may not be operating properly.***
Women's RR Add light fixture inside women's restroom entry
Valve on left toilet is leaking
Install grab bars at ADA toilet stall
ADA toilet does not flush _
Custodial Cover opening in wall between closet and Men's Locker Room
Closet
Repair masonry under grille on NW wall.
Seal around grille on NW wall(after masonry is repaired) —
Men's Toilet Attach escutcheon plate on drain pipe under 2"d lavatory from the
Room right
Touch up paint at corners of painted CMU passageway into room
Men's Shower Attach shower head escutcheon plates to wall at shower stalls 5&6
Room (in south corner/southeast end of room)
Touch up paint on painted CMU where tile wall trim abuts painted
CMU at passageway opening into shower room.
Meeting Room Swap locations of the two Men's Locker Room door signs so that
102 the one.with the wheelchair symbol is next to the 36"wide door.
Reduce water pressure at the two electric drinking fountain spouts
Touch up paint on concrete deck/tee outside Office 103
Touch up paint on wall above Office 104 windows and remove
paint from window frames
Light fixture in narrow corridor outside office 106 is lopsided.
Clean tops of all window frames -u
Touch up paint on wall under windows in narrow corridor outside
Office 106
Corridor 100 Touch up paint under fire alarm pull box near entry doors
Light fixture appears to be wet. Inspect for damage and source of
water infiltration. Repair/replace as required.
Suspended ceiling grid is sagging within a few tiles from light
fixture.
Office 103 Light fixture appears to be wet. Inspect for damage and source of
water infiltration. Repair/replace as required.
Replace water damaged ceiling tiles.
Install wall plate for coaxial cable on NE wall below ceiling,
Page 1 of 2
Public Works Operations Center
Interior Renovation for the City of Port Arthur
Architectural Punch List
7/17/2025
Location Item Status Verified
Office 104 Replace one ceiling tile on NE wall(right of marker board)
Touch up paint 2 very small nicks on SW wall
Repair bent ceiling grid and replace scratched ceiling tile(near
light fixture)
Office 105 Remove small mark/residue from wall between fire alarm pull box
and exterior door,about 15"above floor).
Office 106 Ceiling tiles along NE wall not sitting properly in grid
4 chairs are damaged. Were not damaged prior to being stored.
Small hole in corner of ceiling tile near center of room. Replace
tile.
Remove paint/mud overspray from light fixture
Infill and touch up paint at pinholes in wall at top right corner of
passageway into Room 109.
Office 107 Adjust duplex receptacle plate on SW wall and seal hole and/or
touch up paint as required
Ceiling tiles in center of room need to be adjusted
Office 110 Lights are not turning on.
Office Ill Lights are not turning on.
Files/Storage Install door stop behind door to break room
109
Fix holes in caulking(see Owner for location, if not apparent)
Break Room Touch up paint at corner near fire extinguisher. Contractor
108 discussed the possibility of installing a corner guard at this
location.
Swap the refrigerator and storage freezer
Power outlet behind refrig.was operable before renovation
Corridor 112 Fix caulk at furrdown(at SW entry to Classroom 118)
Touch up paint and/or remove residue from painted concrete tee
above furrdown to classroom 118.
Fill hole and touch up paint where painted concrete tee(deck)
meets NW wall
Corridor 113 ***Light switch not working properly***
Office 116 Small nick on wall at bottom left of fire pull box
Classroom 118 An approximately 2.5' x 4'area of the new floor appears to have a
different color epoxy and does not match rest of floor.
Touch up paint near wall stop on NW wall
Exterior,SW Seal hole in wall where canopy meets brick
side of building
Exterior,NW Touch up paint on double doors(#001)around latch and at door
side of building closer attachment
Hallway btwn. Remove scuff marks from the north side of the walls
Rms. 106& 107
The items listed above shall not be considered a final list of all deficient items.If any deficiencies are found during inspection
for substantial completion,beneficial occupancy,or inspection for final acceptance,the Subcontractor/Vendor will correct
all deficient items per the contract documents,prior to final inspection. Please contact me if you have any questions or need
additional information.
Page 2 of 2
PR No.24583
Exhibit
(Contractor's Affidavit of Payment of Debts and Claims)
tee/1
"p' A
IA Document G706® - 1994
Contractor's Affidavit of Payment of Debts and Claims
PROJECT:(Name and address) ARCHITECT'S PROJECT NUMBER: OWNER:❑
Public Works Operations Center ARCHITECT:0
Level 1 Alterations CONTRACTOR:0
111 Henry O.Mills Blvd. CONTRACT FOR:General Construction SURETY:❑
Port Arthur,Texas 77641 OTHER:❑
TO OWNER:(Name and address) CONTRACT DATED:January 24,2025
City of Port Arthur
444 4th Street
Port Arthur,Texas 77641
STATE OF: Texas
COUNTY OF: Jefferson
The undersigned hereby certifies that,except as listed below,payment has been made in full and all obligations have otherwise
been satisfied for all materials and equipment furnished,for all work,labor,and services performed,and for all known
indebtedness and claims against the Contractor for damages arising in any manner in connection with the performance of the
Contract referenced above for which the Owner or Owner's property might in any way be held responsible or encumbered.
EXCEPTIONS:
Contingent upon receipt of final payment
SUPPORTING DOCUMENTS ATTACHED HERETO: CONTRACTOR: (Name and address)
1. Consent of Surety to Final Payment. Whenever Daniels Building&Construction,Inc.
Surety is involved,Consent of Surety is P.O.Box 20878
required. AIA Document G707,Consent of Beaumont,Texas 77720
Surety,may be used for this purpose
Indicate Attachment ® Yes ❑ No
BY.
The following supporting documents should be attached (J gn ire of authorized representative)
hereto if required by the Owner:
Janet Daniels,President
1. Contractor's Release or Waiver of Liens, (Printed name and title)
conditional upon receipt of final payment.
2. Separate Releases or Waivers of Liens from Subscribed and sworn to before me on this date: 9/19/2025
Subcontractors and material and equipment
suppliers,to the extent required by the Owner,
accompanied by a list thereof.
.(ttAtLtivv....tir
Notary Public:
3. Contractor's Affidavit of Release of Liens(AIA My Commission E es:9/19/2
Document G706A).
STEPHANIE L STAUDENMIER
(t)
Notary Public,State of Texas
Cann.Expo 0919-2028 1
Nary VI 7569099
AIA Document G706—1994.Copyright®1970 and 1994.All rights reserved."The American Institute of Architects,""American Institute of Architects;"AIA,the
AIA Logo,and"AIA Contract Documents'are trademarks of The American Institute of Architects.This document was produced at 11:15:02 ET on 09/19/2025 1
under Order No.500002997 which expires on 09/19/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA
Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com.
User Notes: (389ADA54)
PR No.24583
Exhibit
(Contractor's Affidavit of Release of Liens)
! AIA
Document G706®A - 1994
Contractor's Affidavit of Release of Liens
PROJECT:(Name and address) ARCHITECT'S PROJECT NUMBER: OWNER:❑
Public Works Operations Center
ARCHITECT:❑
Level 1 Alterations
111 Henry O.Mills Blvd. CONTRACT FOR:General CONTRACTOR:El
Port Arthur,Texas 77641 Construction SURETY:El
TO OWNER: (Name and address) CONTRACT DATED:January 24,2025
City of Port Arthur OTHER:❑
444 4th Street
Port Arthur,Texas 77641
STATE OF: Texas
COUNTY OF: Jefferson
The undersigned hereby certifies that to the best of the undersigned's knowledge,information and belief,except as listed
below,the Releases or Waivers of Lien attached hereto include the Contractor,all Subcontractors,all suppliers of materials
and equipment,and all performers of Work,labor or services who have or may have liens or encumbrances or the right to
assert liens or encumbrances against any property of the Owner arising in any manner out of the performance of the Contract
referenced above.
EXCEPTIONS:
Contingent upon receipt of final payment
SUPPORTING DOCUMENTS ATTACHED HERETO: CONTRACTOR: (Name and address)
1. Contractor's Release or Waiver of Liens, Daniels Building&Construction,Inc.
conditional upon receipt of final payment. P.O.Box 20878
Beaumont,Texas 77720
2. Separate Releases or Waivers of Liens from BY:
Subcontractors and material and equipment (Signatur of authorized
suppliers,to the extent required by the Owner, represe tive)
accompanied by a list thereof. Janet Daniels,President
(Printed name and title)
Subscribed and sworn to before me on this date: 9/19/2025
Notary Public: .%).146
My Commission R,res:9/19/202
'',`�' Notary I.STAtIOEIMrwER
-
Pubic,State of Texas
1 ',/, Comm.Expires 09"19.2028 1
a Notary ID*7569099 1
AIA Document G706A—1994.Copyright®1982 and 1994.All rights reserved. The American Institute of Architects,""American Institute of Architects,'"AIA'the
AIA Logo,and'AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 11:26:15 ET on 09/19/2025 1
under Order No.500003000 which expires on 09/19/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA
Contract Documentso Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com.
User Notes: (3B9ADA42)
PR No.24583
Exhibit D
(Contractor's Request for Payment of Retainage)
CD C) C)D C) C) CD O N o) w C) H Z H0 '0 C) C) H 0 V >
r. 0 Z 0 m '< ° p 0 < o n0 ro m m O2, C C m D I z 0 W
W , H -Z1 7 - O 7 O.CD 7 C7 r N m <Z Z mZ m
a Drm � n DmawN � Qm > m0 Cm C) C i
-1 m Z -I 3 3 a < f 5'0 C7 z g_ x 0
O-i C) mp 0N � g sr ?rn m H zm 0m D � ("nO Dp AC) OOm D
_ w O. cc Z 7 w LP 7 j A
�m m rnO N O 0 CD p { n> o nI •m A c CD > A o n1 D z
a m ,0 -0 D E m 7 0 3 n O N > = Cn v 3 D n A 0
O W D d Z n d o m D N4 a' D z 05 Dm K N.ao -. 7 o . cn o m - m
`� ..1 M 0 -< n W ry N (D a C O. p Z -C m U) -1 7 N 7 - (D t0 ,�
1. rim to w tD a m ° O O T. -coco y � � �� > O
m = m m N 7 m ° O O n x c x m
�� � � y C _ C 3 n `� O m y o m co _1m w .�i °� D
a w , m 0 m 3
0�i 0 Z s3 Fp w y O C F fD 0 r Z v N N O N m
D D z m a o ? p m co
m n 4> c m x- in 3 94 7 2)
mCO z 0 n ` o m m
0 0 m 0 0 -o - p CD
D
D n •c 3 7 O -i 0 Z
1-X m C m o o O m "� Z
mZ0 < C) C �1�1
D 0 _ Hm 1„
0Dm = Z 0 'ray
i Z m ' = 2 .N .N N c0n m V,
-+ 0 m n CO CO °i - 0 c M
C)-1 m C) 0 0 i, o' O C) w
r m x 0 O - co o _
-z 0 0 0o O C
m c m = 0 0 0 0
c cn 0 cn �"
m m
i off°
H 0 D
0m 0 -i Z
c m CO J o 0) A W No
�'1
'^z Z Qz'H
m 7�
hou,
Cn OH n
D >
r -1 2) -i C) Z 0 -i > 'D D n C) (')
Z 0 D m O 0 0 n = m �� A m 0 0 0 Z
O ° -1 (n D T. D - a O r
0 -i Z m m v r- z ' m z m an d 0 n
0m z < o CO Za m m > 0 0 m > 0 o m -i CD) > >
m o > 0 z -o 0 K 0 O z rn 0 0
C
D co H -3 a -< p C m r C 0 Z w 9. w O 0 >
Z O O 3 c a m 3 c m d U' 0 m D A m n
0v = m m m 7 O -1
mm co o a c 0 0 n = o r"
mm 7 O o D OCD m
;0 N N .Z1 Z > 0 0) c N G) U C ' C) 0r
= < x * m m N Z rn 0 -+ a c w-c m pD 7 O
i D '�. D H m fD K g t 3 Z ZrTi m Z
m= O �wr' o v_ m z O N co' o o D OO to N C1
Z
l7 OD > I.
o 474- A m p Da N r.) 0 r IQm 0
rn H I c 0 7 I .� r • fin 0D o G)7 G) 0
1 91 Z 1 Z m U1 -i _ O� C Woo °0
Fri-, 00 0 m N 0 -, c 00 O
0m y I�►`. m w 3. z O� U m
zm �,' N ? � -zix D
� z o a � H 0 O
69 m (� ce3 ��cc ...,
y p 0 c
O U1 z m c 7 m? K
CO� V p `•err Z ti _ m
N co = � < m -40 z
CD N m 0 O o G)
N
CD Z �' ry o
CD ..P. j • N
Z �01 •
R�� 3, m
T` �t v w
«,C mn n 0
Iii >
0 � - za° o N a Z
.p..Z
Z J m 0, o1 O) O) A O O
Oo -.! (n n O1 O r,N O N N N RI O) N (C 0 (C (D (0 0) N1 t... A N 0 0 0 0 0 O U
cn
1 CO (U O O 0 0 0 0 {j) pOj
1
c)1)....,
D �� co
w
ec
t` 0rnt
a N—Ic1
am" ` CO IN) 1
..-_
W N N) N) N) N N N) N) j N -� -+ -. . -+ --� -' Z
O co CO V CS) CT A CO N O CO Co V 0) CT A CO N -., O O O V O A W N D O rl
g
_ CD 0 0 0 m < c o 0 -° o m m , _ a, w CD m c 0 C 0 0 0 0 0 0
v o m y o m o O O
`Z c. j. n -, 0 (n > a, m w v m j. 3 o) a3 Zii o D n m o m m � Z
cn D - o c 1
o v m D3 y d' 5 Z/' QO CO o cot — 3 0 0 .. O d co y' 0, Cn 0 > -1
m m o WG7 m Z_ noc 3 ) o IX) n ' v s o
m CD o z ' o N o �. m a O -I� <o CD �
n; T y x 0 y 0 m (1) y o6 D Z 4o CD O
at o - 90 () '< m 1 m U) o Q, o co Z
+(7 a ' [D = 'n m O= a O n) 0 v n y
m D_ u, 'n o a o o 3 D m m a com Pc o =
N m o °' m D (, '� 90 '` -a m y `° N m
r oc m
' np CD7 cp
D N - co
It . w n& a A C C y cov 3D
0 N CD
xi 0
CD D
c r
n C
- < m m
O) _ _ C) C 0 0
V00)) j COO A N CT co 0)) ,ONo O � co CO N) A C-O CO V W V COT A CD C1 CD CO 0 W A
_ m C 'T7
Cr -CO N N O) V O V V CT -+ O O A O co A O A CO N W O A --� CA 0) -+ -co m
N V O N CT CO V O CO W CO CT A CT -i N CO CT O W A CO CD CT 0 A 0 A 0 0)
CO - 0 CO 0 CO O 0 N A -+ CO O CO CO O O) N O) CO N N CT V co A ) CD -+ CT m
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 73
0 0 0 0 CD O o 0 0 0 0 0 0 0 0 0 0 o O o o O o 0 0 0 0 0 0 o D
3l
D
a 13 -1m
a h) _ m
0-1 CT Co C..) -,, a CO V N V CO W N A W- CA N -+ co A W V -� V CO 0 <
0) -+ CO A N co 0) Co CA O co W W A O CO V 0) V CT - i O CT CO W co W A > *2 -♦
C71 O N N O) V CT V V cn -co O A O O A O A CO N W O A O o) -, O m 0 m
N V co N.) CO V O O O) CO O) A CT -.AN.) CD 0) -, O W A CD CD CT O A 0 A -0 X K
CO -• O 0) 0 O O O N A CO O CO CO O O N CT CO N N CT V co A W co co r X
O O o O O O O O O O O O O O O O O O O O O O O O O O O O O O 0
O O O CD CD 0 O O O 0 O O O CD O O O O O O O O O O O O CD O CD CD 0 0
-a -Ti
r
m o
I m 0
F.i' o Z
m D -I
-13
0 0 o O o co 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 y
0 0 0 0 o 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o n
o CD CD 0 o CD o 0 CD CD 0 CD CD 0 0 0 0 CD 0 0 0 0 0 CD 0 CD CD 0 CD CD -I
K
D co
0 -i
m m O
D m
O CD 0 O O O O CD CD CD O CD 0 O CD CD O 0 CD O O O O O CD CD O CD O O r 0
o O O O O O O O O O O O O O O O O 0 0 0 O 0 0 0 0 O O CD CD O C!)
O O O O O O co O O O co O CD CD CD CD CD O 0 O CD O 0 O O O O CD CD CD
a O
_s N O� Do O
01 CT Co cr..) -+ --rt. W V N) -4 CO Cs. N A Ca CD N -• CD A W -+ -+ V a -4 0)
0) -+ CD A NJ CD CD O) CO O - Co 0) 0) A CD Co V W V CT -.. -• CD Cr. CO 0) O W A 0
01 O N N (3) V CD V V cn Co o A 0 0 A 0 A cD -IV -Co (D A Co 0) -. CT n 0
N V CD IQ CT CO V 0 CO CD Co 0) A CT DoD CD-+ CO C.) ACr. CD CO CD CA CD A 73 I-
CO -+ 0 W 0 O O O N A Co 0 Co CO O CD N m Co N N 01 V Co A Co CO 01 m 0
O O O O O O O O O O O O O O O O O O O O O O O O O O O O o O 0 0
O CD CD CD CD O 0 O CD 0 0 0 0 0 0 CD CD O O CD CD CD CD 0 CD O CD CD 0 CD O m
r
--11 m
m o
O O O O 0 0 0 CD CD 0 C) 0 0 0 0 0 0 CD 0 0 0 0 0 CD O CD CD CD CD 0
0 0 0 0 0 0 O O o 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 O 0 0 0 o O
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 zg o a o 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 ,'g 0 0
co
>
() Z z
0 i m
-1
O CD CD CD CD CD O CD CD O CD 0 0 0 CD O O CD O O O O O CD 0 O O CD O O 0
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
O O CD 0 CD O O CD CD O CD O O O O O O O 0 O 0 0 O CD O CD CD O CD CD
73
C,' v m CO
V N co -+ - W W A V 0) 0) A N - CO W - C) CD
CO CT A V O V O O A CT CT A CT I,. N 01 A co -• co V O Cn CT V CD -, CT O V o m N
N CO O - W Co CO CO Co N 01 A U) V 0 A N CT V CO CD O) CD N 01 CO Co 0 CT N
0) W 0 -+ N CO W CT CO CD CO CO N N CD CD A CO CT O 0) -4 A CO N 0 V CT -4 O
A CT O in "co Co O Co N O A O O CD O OD (T W c0 CA N O CD V A O iv
O1 CT 0 CT CD CD 0 0 0 CD Cr. CD CD CD 01 CD O O CD O CD CD C.T. CT 0 CD CT 0 CT CT Ni
A Ca) ND -� O (D CO --.10) Cn A CO N -+ > 0 0
OD -0 "0 U -0 -0 -0 -0 10 "0 '0 -0 -0 -0 O -0 C)
A) ;U 7:7 7J 7J :0 :0 :U :0 73 :0 70 77 70 71 0 0 O
* t * * * * * # # �t k 4t It �t Z m z
D N.) N -+ (D V 0) 01 A W m (n
0 N 0 (D A CoCD 0) ( -+ , i i i 73 C) > -I
CDO �J 7J W X 0
—I 0 7J D 7J -0 -0 a D m CD C m m L" --i C C
O O -0a -0 ? -05Qaa70oa < an O o - D
D �' o Z O —I
r- X
C v -1
0 0 0 �1 a m Sk 7) m 0 m = •• o 0 m 0 al z
m 0 m (D w N _' g X m ° 0 7 m A 0 U)
w o 5 aD o sp Z g 2
(o cp n m W 0 (D v o a m o ti m
rn = a7 a . n ° C)
,. 00 (0.n (� -I ° 0 _.( Co r (D Q° D
(D C) (D ', o (9 CD (D
N 5 3 co u) * 7- 0 0 -�
3 CD K -0 m m CD .Z7
. 0
a D
(n — I-
0 C
< I m
v , Co NJ C) 0
w W -, N N CO A A - Cr. N - W O) Co C C 0
.A W CD O W A N W N N A N CT -a m m m
O N.) C) --I -4 Cn Co j CO - -A CO O A Ca) O
O (D 0 Ca A CD O A CT N J CO OD A 0 (J)
O O O O O O O O 0 O O 0 O 0 O 0 O m O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O
D
X
o >
_ m m
CO C....) DJN.) CW A A �+ 0' N - 0.) C
-+ A CO CO CO W A N (U j N A N 0l
O N 0) -J --.1 01 COj CO -A CD 0 A Co -o0 m
_a CO O 0.) A C) O A Cr. N V Co O7 A r A
O O O O O O O O O O O O O O 0 0 U)
O 00000000000000 0
1 -oO
m m
Fri 0 0
"' D Z
m -I
0 0000000000000, 0 I- 77
0 0 0 0 0 0 0 0 0 0 0 0 0 0 o D
0 00000000000000 C)
H
g
D co
-i 1
T 7D 0
m
O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r- C
O 0 0 0 O O O O 0 O O O O O 0
O 00000000000000
0
O D. -1
Co W - DO N Co A A -+ CT NJ --a co 0) m (n 0
A W (O -OD W A N 00 v cAD O A Co o
- CO 0 W A (7) 0 -- A 0' N J CO C) A
O O O O O O O O O O O O O O O 0 0
O O O O O 0 o O O O O O O O O 1 K
0 r-
o m
-I m
_ m o
0 00000000000000
0 00000000000000
O 0 0 0 O O 0 0 O 0 O O O 0 0
O O O O O O O O O O O O O O O
CO
>
I T
n 2 2
c) 1 m 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ° :
0 00000000000000 CD
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 cD
co
C)
: 0
N m 3
- o nl j.
w
-+ -+ -+ A NJ N - -, Co o c (p
Cal j CS) A A -+ NJ -+ A CD J —0) N T N m C) C (D
CT co co co v A CO A o W A 0 -J W
O A O C) �I Co O 0 N �1 W Co A W �I C)
01 01 O U1 0 0 0 (I1 0 01 O (1 0 0 0 `G
N.) j D 0 m
CO -0 "0 0 13 0
j * * Z o O
(-) w , m 0 > _i
CD X 7:3-, 6 T C.
z
O 0 o o C C
0 o
a) om -D D a
m 7 C ° v z
A o a 0 z O =
D D a. N m
m
v 0 -I
a) m =
C
77
CD
3 <
0 >
a
0 (D C
D m m
s - co r p
O W O) O C C 0
.A v v A m r m 11
Co 0 -.1 o Cn
o co 0 0 o m
O 0 0 0 o m
>
73
; -I
< m
0 co rn o > o --1
CO X
Cn
0 o o 0
1 0
m m
H H 0
= m
o 0
m a Z
v H
0 0 0 r- 7)
0 0 o >
O 0 0 0
--I
E
m O T
73 23
5 m
0 0 0 r C
cn
O O O
0 O O
-a O PO -1
O CO O) 0 CP 0
A N i v D
co v -, M o
O O o CO
_ 0 0
0 r
p m
D
-1 0 m
-) m O
O 0 O
O 0 O
0 O 0
O 0 0
CO
>
= T
n z z 0
G) S m C
0 CD
0 0 0 --
0 0 0
0 0 0 7J
0
0
0 D
0
- o 0
v, - w o F.
0 co co co a)
A 60 61 0
O n C.71 CD
PR No. 24583
Exhibit
(Contractor's Certificate of Warranty)
CONTRACTOR'S CERTIFICATE OF WARRANTY
FROM: Daniels Building&Construction, Inc.
(Name of Contractor)
TO: City of Port Arthur
(Owner)
REFERENCE CONTRACT NO.: 24-489
CONTRACT ENTERED INTO THE 24th DAY OF January 2025 BETWEEN THE
CITY OF PORT ARTHUR AND Daniels Building&Construction, Inc.
OF Beaumont,Texas
FOR THE PROJECT Public Works Operations Center Interior Renovations
KNOW ALL MEN BY THESE PRESENTS:
1.) Daniels Building&Construction,Inc. does hereby guarantee all of the work done under the
(Name of Contractor)
above referenced contract to be free from faulty materials in every particular,and free from improper
workmanship, and against injury from proper and usual wear;and agrees to replace or re-execute without
cost to the Owner and Operator such work as may be found to be improper or imperfect,and to make
good all damage caused to other work or materials due to such required replacement or re-execution.
2.) This guarantee shall cover a period of one(1)year from the date of acceptance of all work under this
contract by Owner,as evidenced by the Contractor's Certificate of Completion.
3.) This Certificate is given in connection with the final payment under the contract between the Owner and
Daniels Building&Construction,Inc. , and with the knowledge that it will be relied upon in
(Name of Contractor)
Making such payment and that such payment would not be made except upon the truth of the matter
contained in this affidavit.
IN WITNESS WHEREOF,the undersigned has signed and sealed this instrument this 24`1' day of
October ,2025.
Daniels Building&Construction, Inc.
(SEAL) (Contractor)
BY:
:gnat e)
Janet Daniels, President
(Printed Name/Title of Officer)
1-Warranty
Janet Daniels , being first duly sworn on oath,deposes and says, First,that,he/she is the
(Affiant)
President of Daniels Building&Construction,Inc.
(Title) (Name of Company)
Second,that he/she has read the foregoing certificate by him/her subscribed as President
(Title)
of Daniels Building&Construction. Inc.
(Name of Company)
Affiant further states that the matters and things stated herein are true.
rant anet Daniels,President
Subscribed and sworn to before me this 24`1' day of October , 2025.
My commission expires 9/19/2028
(62u,tAitimviv
riv FEMME LSTAUDENMER NO A Y
�%,I'- Win Pubic,Stale of Texas
1 b•f; COMM.Expires09.19•2O281
OF ' Noisy�7569099
2-Warranty
PR No.24583
Exhibit
(Contractor's Certificate of Guarantee)
CONTRACTOR'S CERTIFICATE OF GUARANTEE
FROM: Daniels Building & Construction, Inc.
TO: City of Port Arthur
FOR: Public Works Operations Center Interior Renovations
REFERENCE CONTRACT NO. 24-489 ENTERED INTO THE 24th
DAY OF January , 2025, BETWEEN THE CITY OF PORT ARTHUR
AND Daniels Building & Construction. Inc.
(CONTRACTOR)
OF Beaumont. Texas
(CITY/STATE)
FOR: Public Works Operations Center Interior Renovations
(PROJECT)
KNOW ALL MEN BY THESE PRESENTS:
1. Daniels Building& Construction. Inc. does hereby guarantee all of the work done under
the above referenced contract to be free from faulty materials in every particular, and free
improper workmanship, and against injury from proper and usual wear; and agrees to
replace or re-execute without cost to the Owner and Operator such work as may be found
to be improper or imperfect, and to make good all damage caused to other work or
materials, due to such require replacement or re-execution.
2. This guarantee shall cover a period of one (1)year from the date of acceptance of all work
under this Contract, as evidenced by the Engineer's Certificate of Completion.
IN WITNESS THEREOF,the undersigned has signed and sealed this instrument this the 24th
day of October , 2025.
Daniels Building & Construction, Inc.
(COMPANY NAME)
President
WNER,SIGNATURE/TITLE)
Janet Daniels
(PRINT)
SUBSCRIBED AND SWORN to before me this 24th day of October ,2025.
My commission expires 9/19/2028
(DATE)
r"Ik,* STER NE I.STAUOENMER •
`= Notary Pubic,State of Texas
1 ! 1 Comm.E 08 i
Nobly DP 7569099 OTAR PURL
\()l MOSISI::\I.
PR No.24583
ExhibitG
(Contractor's Certificate of Completion)
City of
ort rthuur`�-
7exu.r
www.PortArthurTx.gov
CERTIFICATE OF COMPLETION
Date: October 14, 2025
Project: Operations Center Renovations Project Close Out and Release of Retainage
Contract 24-489
To: All Concerned
I HEREBY CERTIFY THAT this project was completed on July 17,2025, and that the work was under
periodic inspection during construction by Public Works staff and Long Architects. That, to the best of
my knowledge,the project was constructed substantially in accordance with the plans and specifications,
and that record documents were received and are on file in the Public Works and Engineering
Departments.
Submitted by:
zelle . Robe s, EIT, MEng, MBA, CPM
Direct r f Pub c orks
"Remember,we are here to serve the Citizens of Port Arthur"
P.O. Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743
PR No. 24583
Exhibit! Olt H
(Contractor's Certificate of Acceptance)
CITY OF PORT ARTHUR, TEXAS
DEPARTMENT OF PUBLIC WORKS
CERTIFICATE OF ACCEPTANCE FOR
OPERATIONS CENTER RENOVATIONS
CONTRACT 24-489
To: Daniels Building and Construction, Inc. of Beaumont, Texas
This document is to certify that the City of Port Arthur, Texas, accepts the completion of the
Operations Center Renovations Project, on the basis of the recommendation of the City of Port
Arthur's Public Works Department, architect, Long Architects, and receipt of the Certificate of
Completion, Contractor's Affidavit of All Debts Paid, Contractor's Certificate of Release,
Contractor's Certificate of Warranty executed by Daniels Building and Construction, Inc. of
Beaumont,Texas.
Ronald Burton, CPM
City Manager
Sherri Bellard, TRMC
City Secretary