HomeMy WebLinkAboutPR 24581: CONTRACT EXTENSION WITH WOOLPERT, INC., FOR THE 25TH STREET BRIDGE REPAIRS ( . < j rr 1� ort rthu�7t www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: October 14, 2025 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Flozelle C. Roberts,EIT,MEng,MBA, CPM,Public Works Director RE: P.R. No. 24581: Authorizing the Contract Extension with Woolpert, Inc. of Houston, Texas, for the 25`h Street Bridge Repairs Introduction: The intent of this agenda item is to seek the City Council's authorization to extend the contract with Woolpert, Inc. of Houston,Texas,for the design of repairs to the 25th Street bridge. Background: The City of Port Arthur entered into a contract with Woolpert, Inc. of Houston,Texas,through Resolution 24-175 to provide professional engineering design and bid services for the improvements to the 9`h Avenue and 25th Street bridges. Woolpert sought direction from the City Council during its December 17, 2024 executive session meeting, but was unable to present its findings and receive direction.Therefore,on January 28,2025,the city council authorized Resolution 25-048, which authorized a contract extension for the repair designs for the two bridges until December 31, 2025. On August 13, 2025, the Texas Department of Transportation contacted the Public Works Department regarding the design status of the 25`h Street bridge. On August 14, 2025,the City Manager authorized the continuation of the 25th Street bridge design,as he deemed it in the best interest of the City to proceed with the design. The seven-month deliberative process has delayed the finalization of designs,resulting in the firm's request for a contract extension for the 25`h Street bridge repair designs to December 31, 2026. "Remember,we are here to serve the Citizens of Port Arthur" 444 4'h Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 Budget Impact: There is no funding impact for the contract extension. Recommendation: The City Council is recommended to approve PR 24581,authorizing the contract extension with Woolpert,Inc. of Houston,Texas,to complete the engineering design and bid services for the 25th Street bridge. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 PR 24581 10/14/2025 FCR Page 1 of 3 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CONTRACT EXTENSION FOR THE 25TH STREET BRIDGE REPAIR PROJECT WITH WOOLPERT, INC. OF HOUSTON, TEXAS. THERE IS NO FUNDING IMPACT FOR THE CONTRACT EXTENSION. WHEREAS,the City Council authorized a contract with Woolpert, Inc. (Woolpert) of Houston, Texas, through Resolution 24-175 to provide professional engineering design and bid services for the improvements of two bridges as noted in the Texas Department of Transportation's biannual report; and, WHEREAS, Woolpert sought direction from the City Council during its December 17, 2024 executive session meeting,but was unable to present its findings and receive direction; and, WHEREAS, on January 28, 2025, the city council authorized Resolution 25-048, which authorized a contract extension for the repair designs for the two bridges until December 31,2025; and, WHEREAS,on January 28,2025,Woolpert was directed to pause all design activities for the 25th Street bridge and continue its design of the 9th Avenue bridge; and, WHEREAS, on August 13, 2025, the Texas Department of Transportation contacted the Public Works Department regarding the design status of the 25th Street bridge; and, WHEREAS, on August 14, 2025,the City Manager authorized the continuation of the 25' Street bridge design, as he deemed it in the best interest of the City to proceed with the design; and, WHEREAS,pursuant to Resolution 25-377,the City Council approved Amendment Number 2 to increase Woolpert's contract by$37,765.00 for the 9th Avenue bridge design; and, WHEREAS, the seven-month deliberative process has delayed the finalization of designs as explained in Exhibit A,resulting in the firm's request for a contract extension for the 25th Street bridge repair designs to December 31,2026. ,ces27_ PR 24581 10/14/2025 FCR Page 2 of 3 NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT,the facts and opinions in the preamble are true and correct; and, THAT, the City Manager of the City of Port Arthur is hereby authorized and directed to execute, on behalf of the City of Port Arthur, a contract extension until December 31, 2026 (see Exhibit B) with Woolpert, Inc. of Houston, Texas, for the design of the 25th Street bridge for no additional cost; and, THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED, AND APPROVED this the day of A.D. 2025, at a meeting of the City of Port Arthur, Texas,by the following vote: Ayes: Mayor: Councilmembers: Noes: Charlotte M. Moses Mayor ATTEST: Sherri Bellard, TRMC City Secretary PR 24581 10/14/2025 FCR Page 3 of 3 APPROVED AS TO FORM: Roxann Cotroneo, Esq. City Attorney APPROVED FOR ADMINISTRATION: Ronald Burton, CPM 161/ City Manager •1i i.zelle ' Robert , E I , MEng, MBA, CPM Direct • ' Publi o' s APPROVED FOR AVAILABILITY OF FUNDS: IJ/ Lynda os ell, A, GFOA Director of Finance bi-b-„ i,,,,,te.,,, Clifton E. Williams, Jr., CPPB Purchasing Manager PR 24581 Exhibit A Al♦ WOOLPE RT ARCHITECTURE I ENGINEERING I GEOSPATIAL September 26, 2025 City of Port Arthur,TX Attn: Flozelle C. Roberts, EIT, MEng, MBA, CPM Director of Public Works P.O. Box 1089 Port Arthur,TX 77641 Subject: Request for Contract Time Extension- City of Port Arthur Bridge Repair Project-10020879.00 Dear Ms. Roberts, This letter formally requests a time extension to our current contract for the City of Port Arthur Bridge Repair Project(10020879.00).The City of Port Arthur is currently evaluating the best course of action for the 25'Street Bridge, considering both bridge replacement and repair alternatives. While we understand and support the City's due diligence in this important decision,the ongoing evaluation process has created a delay on the project.This delay significantly impacts on our ability to adhere to the original project schedule. In our recent discussions,you acknowledged the need for a contract extension.Therefore,we propose extending the current contract completion date to December 31,2026.This extension will provide adequate time to accommodate the City's decision-making process and allow us to proceed efficiently once a clear direction is established. We are committed to the successful completion of this project and look forward to continuing our work with the City of Port Arthur. Sincerely, John Brigham, PE,PTOE Sr. Project Manager Woolpert,Inc. cc: Sam Talge, PE,Vice President,Woolpert, Inc. David Zheng, PE, Project Manager,Woolpert, Inc. Suhail Kanwar, PE,City of Port Arthur Woolpert,Inc. 11750 Katy Fwy,Ste 1260,Houston,TX 77079 281.304.0200 I woolpert.com Flozelle C. Roberts From: Pamela Langford Sent: Thursday,August 14, 2025 10:40 AM To: Flozelle C. Roberts Cc: Ron Burton;Albert Thigpen; Suhail Kanwar Subject: RE: [NON-CoPA] FW: [NON-CoPA] RE: Follow-Up Bridge Actions @ 25th St over Drainage Ditch (20-124-0016-45-001) Good Morning, Ms. Roberts, Thank you for your message regarding TxDOT's request for an update on the 25th Street bridge. The City Manager has instructed that both the 25th Street bridge and the 9th Avenue bridge projects be submitted for inclusion in the FY2025-2026 Capital Projects. While previous discussions primarily focused on repairs to the 9th Avenue bridge, the City Manager—based on TxDOT's communications regarding the condition of both structures and the time lapse since the initial notifications—finds it in the best interest of the City to move forward with both projects concurrently. The City Council will ultimately make the final determination regarding funding for these repairs.This updated directive will allow you to confirm for TxDOT that both projects are being advanced for consideration in the upcoming fiscal year's capital program. Best regards, ,6:7 ine r =i111 f,r1/ Assistant City Manager - Operations/ Director of Development Services Department of Development Services Office:: (409) 983-8296 Fax:: (409) 983-8137 Pamela.Langford@portarthurtx.gov www.portarthurtx.gov PORT RRTHUR 125- •ANNIVERSARY• aaa Ica From: Flozelle C. Roberts<flozelle.roberts@portarthurtx.gov> Sent:Wednesday,August 13, 2025 5:32 PM 1 To: Ron Burton<ron.burton@portarthurtx.gov>; Pamela Langford <pamela.langford@portarthurtx.gov>;Albert Thigpen <a.thigpen@portarthurtx.gov>;Suhail Kanwar<suhail.kanwar@portarthurtx.gov> Subject: FW: [NON-CoPA] FW: [NON-CoPA] RE: Follow-Up Bridge Actions @ 25th St over Drainage Ditch (20-124-0016-45-001) Good Afternoon, Mr. Burton, I received the following email from TxDOT requesting an update on the 25th Street bridge's status. As you may recall,TxDOT surveys the local bridges every other year in the summer of the odd-numbered years. The agency advised John Cannatella in 2021 and John and me in 2023 of the condition of the 25th Street bridge,which required repair within six months of the 2023 notification. I obtained an engineering bridge consultant,Woolpert Engineers of Houston,to address the needed repairs for this and the 9th Avenue bridge. Upon the consultant's presentation of their findings and repair costs for both bridges during the executive session,the city council instructed Woolpert to proceed with their design for the 9th Avenue bridge only,while they determined the next steps for the 25th Street bridge. To my knowledge,the city council has not provided additional guidance on their path forward for the 25th Street bridge. Please confirm if the city council has determined its next steps for the 25th Street bridge,so I can relay this information to TxDOT. Thank you, Flozelle C. Roberts, EIT, MEng, MBA, CPM (she/her) { F.' Director of Public Works ,3:t rti4, - ©(409)983-8182 0 ftozelle.raberts@portartturtx.go 0 444 4th Street P.O.Box 1089 Port Arthur,Texas 77640 Communications to and from this email address are subject to the State of Texas Public Information Act. From:Alexander Eppes<Alexander.Eppes@txdot.gov> Sent:Wednesday,August 13, 2025 3:18 PM To: Flozelle C. Roberts<flozelle.roberts@portarthurtx.gov> Cc: Melissa McKague<Melissa.McKague@txdot.gov>; Ron Burton<ron.burton@portarthurtx.gov> Subject: [NON-CoPA] FW: [NON-CoPA] RE: Follow-Up Bridge Actions @ 25th St over Drainage Ditch (20-124-0016-45-001) Flozelle,Would you please provide an update on this FUA. Thank you, Alex Eppes, P.E. TxDOT I District Bridge Engineer Beaumont District 8350 Eastex Freeway Beaumont, TX 77708 2 Mobile: (409) 926-4957 Alexander.Eppes@txdot.gov From: Flozelle C. Roberts<flozelle.roberts@portarthurtx.gov> Sent:Wednesday, March 20, 2024 6:05 PM To:James Horne<James.Horne@txdot.gov> Cc: Melissa McKague<Melissa.McKague@txdot.gov>; Ron Burton <ron.burton@portarthurtx.gov>;Ashley DuBose <Ashley.DuBose@txdot.gov>; Flozelle C. Roberts<flozelle.roberts@portarthurtx.gov> Subject: RE: [NON-CoPA] RE: Follow-Up Bridge Actions @ 25th St over Drainage Ditch (20-124-0016-45-001) This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Afternoon, Mr. Horne, This matter is of utmost importance. We are engaging a consultant to assist with the repairs. Flozelle C. Roberts, EIT, MEng, MBA, CPM Director of Public Works ,,re r t h ri 0(409)983.8501 0 flozelle.robertapportmthuttx.gov 0 444 4th Street P.0.Box 1089 Port Arthur.Texas 77640 Communications to and from this email address are subject to the State of Texas Public Information Act. From:James Horne<James.Horne@txdot.gov> Sent:Tuesday, March 19, 2024 2:45 PM To: Flozelle C. Roberts<flozelle.roberts@portarthurtx.gov> Cc: Melissa McKague<Melissa.McKague@txdot.gov>; Ron Burton<ron.burton@portarthurtx.gov>;Ashley DuBose <Ashley.DuBose@txdot.gov> Subject: [NON-CoPA] RE: Follow-Up Bridge Actions @ 25th St over Drainage Ditch (20-124-0016-45-001) Flozelle,just wanting to follow on this email as I have not gotten a response from the city. We have not received any information regarding this FUA and are hoping to do so as the time frame for addressing this FUA has come and gone.This FUA is coded as a level 2 and should have been resolved within 6 months of the report. Please reach out with any questions and myself or staff will be happy to help. It is imperative that these FUAs be addressed as soon as possible to ensure there is no further deterioration at this location as well as the safety of the traveling public. -James From:James Horne Sent:Thursday, November 9, 2023 12:23 PM To: flozelle.roberts@portarthurtx.gov; john.cannatella@portarthurtx.gov 3 Cc: Melissa McKague<Melissa.McKague@txdot.gov> Subject: Follow-Up Bridge Actions @ 25th St over Drainage Ditch(20-124-0016-45-001) . Good morning,attached is the most current inspection report for an off-system structure on 25th St.These findings are recommended to be repaired within 6 months.The void under the approach slab is of significant concern and needs to be addressed soon. Please review these findings and offer up a time to discuss and proceed with any repairs. Thank you, James D. Horne, P.E. District Design Engineer TxDOT- BMT TP&D Office : (409) 898-5723 Cell : (409)617-2020 James.Horne@txdot.gov Air Texas Department of Transportation X This email and its attachments may be confidential and are intended solely for the use of the individual to whom it is addressed. Any views or opinions expressed are solely those of the author and do not necessarily represent those of the City of Port Arthur. If you are not the intended recipient of this email and its attachments, you must take no action based upon them, nor must you copy or show them to anyone. Please reply to the sender if you believe you have received this email in error. 1 SAFETY'S COOL FOR hiN BACK TO 1 400 SCHOOL DRIVE+TEXAN. # Kind. Courteous. Safe. 4 PR 24581 Exhibit B CONTRACT EXTENSION FOR THE 25TH STREET BRIDGE IMPROVEMENTS DESIGN AND BID SERVICES THIS AGREEMENT,made this day of , 2025, by and between the City of Port Arthur, a municipal corporation organized under the laws of the State of Texas,hereinafter called "OWNER" or "CITY" and Woolpert, Inc.hereinafter called "CONTRACTOR." WITNESSETH: That for and in consideration of the payment terms, conditions, and agreements set forth herein, OWNER and CONTRACTOR agree as follows: 1. The term of this Contract extension shall be for a period of 366 days from the date of the original contract expiration date of December 31, 2025. 2. The Contractor will perform work as stated in the Contract Documents. 3. During the term of this Contract,the Contractor will furnish at his own expense all of the materials, supplies, tools, equipment, labor and other services necessary to connection therewith, excepting those supplies specifically not required of Contractor in the Specifications. 4. The CONTRACTOR agrees to perform all the work described in the Specifications and Contract Documents and comply with the terms therein for the revised contract amount of$216,583.40. 5. The term "Contract Documents" means and includes the following: a) Agreement b) General rnf tio.. * c) Speci fc tions * d) Bid Extension Memo e) * * Attached when the contract was originally let. 6. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns. 7. IN WITNESS WHEREOF,the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in (2 copies) each of which shall be deemed an original on the date first above written. A- 1 CONTRACT EXTENSION FOR THE 25TH STREET BRIDGE IMPROVEMENTS DESIGN AND BID SERVICES Signed on the day of 2025 ATTEST CITY OF PORT ARTHUR BY CITY SECRETARY CITY MANAGER Signed on the day of 2025 ATTEST CONTRACTOR BY CITY SECRETARY Woolpert, Inc. Houston, Texas Print Name: Title: A- 2