INTEROFFICE MEMORANDUM
Date: November 3, 2025
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: PR No. 24625 —Ratification of Emergency Repair at Delmar and Lakeshore Lift
Station.
Introduction:
The intent of this Agenda Item is for the City Council to ratify the emergency repair of the
Delmar and Lakeshore Lift Station by Jet Aeration of Texas, LLC, of Vidor, Texas for a total
not to exceed amount of$50,199.49.
Background:
The influent pipe at the Delmar and Lakeshore Lift Station was severely deteriorated and broken,
causing sewage to leak and flood the dry well. To restore the lift station to normal operation,the
damaged pipe and all associated appurtenances had to be replaced. Jet Aeration visited the site
to provide a quote, and an emergency memo was issued on October 6, 2025, to authorize the
repairs. During the replacement, the lift station was temporarily bypassed to allow for the safe
removal and installation of the new pipe.
Budget Impact:
The total budgetary impact is $50,199.49 and funding is available in Account No. 410-40-220-
5313-00-00-000, Sewer System Maintenance.
Recommendation:
It is recommended that City Council approve PR No. 24625 ratifying the emergency repairs as
discussed/outlined above.
"Remember,we are here to serve the Citizens of Port Arthur"
PR No. 24625
10/31/25 cm
Page 1 of 3
RESOLUTION NO.
A RESOLUTION RATIFYING THE CITY MANAGER'S
DECISION TO AUTHORIZE THE EMERGENCY REPAIR
AT THE DELMAR AND LAKESHORE LIFT STATION BY
JET AERATION OF TEXAS, LLC OF VIDOR, TEXAS IN
THE TOTAL NOT TO EXCEED AMOUNT OF $50,199.49.
FUNDING IS AVAILABLE IN ACCOUNT NO. 410-40-220-
5313-00-00-000, SEWER SYSTEM MAINTENANCE.
WHEREAS, due to the failure of the influent pipe at Delmar and Lakeshore Lift Station,
sewage began to leak through flooding the drywell causing a public health and safety issue; and,
WHEREAS, to restore the lift station to standard operation, the lift station needed to be
bypassed to be able to replace the failed influent pipe, along with all related appurtenances; and,
WHEREAS, on October 6, 2025, the City Manager signed an emergency memo (Exhibit
"A"), authorizing the emergency lift station repair by Jet Aeration of Texas, LLC of Vidor, Texas;
and,
WHEREAS,pursuant to Section 252.022(a)(1)of the Texas Local Government Code,this
purchase is authorized because of a public calamity that requires the immediate appropriation of
money to relieve the necessity of the municipality's residents or to preserve the property of the
municipality; and,
WHEREAS, it is further authorized pursuant to Section 252.022(a)(2) of the Texas Local
Government Code to preserve or protect the public health or safety of the municipality's residents.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR, TEXAS:
THAT,the facts and opinions in the preamble are true and correct; and,
THAT, the City Council hereby ratifies the emergency repairs at the Delmar and
Lakeshore Lift Station, for the total not to exceed amount of$50,199.49 from Account 410-40-
220-5313-00-00-000, Sewer System Maintenance; and,
PR No. 24625
10/31/25 cm
Page 2 of 3
THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the
Meeting of the City Council.
READ, ADOPTED, AND APPROVED this day of , 2025
at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote:
AYES: Mayor
Councilmembers:
NOES:
Charlotte M. Moses
Mayor
ATTEST:
Sherri Bellard
City Secretary
PR No. 24625
10/31/25 cm
Page 3 of 3
APPROVED AS TO FORM:
�S.
Roxann Pais Cotroneo
City Attorney
APPROVED FOR ADMINISTRATION:
Ronald o , CPM
City, anager
Suhail Kanwar, P.E.
Director of Public Services
(7j61/
Calvin Matthews, P.E.
Water Utilities Director
APPROVED AS TO THE AVAILABILITY
OF FUNDS:
644—‘6/.
y (Lyn oswell, MA ICM�4-CM
Finance Director
/
Clifton E. Williams Jr. CPPB
Purchasing Manage
Exhibit "A"
(Emergency Memo)
City of 0 - '1
„,..12)
nrttva1
INTEROFFICE MEMORANDUM
Date: October 6,2024
To: Ronald Burton, C.P.M., City Manager
From: Calvin Matthews, P.E., Water Utilities Director
RE: Emergency Repair of Delmar and Lakeshore Lift Station
The suction pipe of the Delmar and Lakeshore Lift Station is worn out and broken, allowing
sewage to leak through a hole and flood the dry well. To restore the lift station to standard
operation, the pipe, along with all related appurtenances, must be replaced. The lift station will
have to be bypassed while the pipe is being replaced.
Jet Aeration of Vidor, Texas, has visited the site and is prepared to make the necessary repairs.
The preliminary estimate of the repairs is $62,000.00.
I, Ronald Burton.hereby approve the emergency repairs by Jet Aeration of Texas.
I '
"OW.--
R•• :urton, C.P.M.
City Manager
"Remember, we are here to serve the Citizens of Port Arthur"
111
AERATION OF TEXAS
P.O. Box 458
Vidor, 7X 77662
Phone:409-769-1500
Cell:409-658-4244
Fax: 409-769-3577
Email:sam.s@team jet.com
City of Port Arthur
4050 Lakeshore Dr.
Port Arthur Tx,
Attention: Calvin Matthews October 3,2025
RE: Lakeshore Dr Lift Station Bypass
We at Jet Aeration of Texas are pleased to have this opportunity to offer our Contract Cost for the above referenced
work.Jet Aeration of Texas is prepared to supply all necessary supervision,labor,tools,materials,consumables,
equipment to perform the work defined. If accepted, this proposal will form a part of any contract that may result
from this proposal,and as part of the contract documents,will take precedence over any contract language which
may differ from the intent and purpose of this proposal as identified by JET Aeration of Texas LLC.Our safety-
oriented professional staff is pleased to offer this proposal as set forth.
The Bypass pump rental& piping system
Budget Estimate Cost: $32,000.00
Piping repair in the lift station
Budget Estimate Cost: $30,000.00
Jet Aeration of Texas intends to maximize personal service and meet all your needs and expectations,starting with
this proposal and continuing throughout job completion.We will be available,at your convenience,to further
discuss our proposal and our plans to manage and execute this project.Thank you for your consideration of our
services. Should you have any additional questions or need further assistance,please do not hesitate to call.
Clarifications:
The followings items are included in the pricing and schedule.
Lakeshore Dr Lift Station Bypass.
1) Mobilization of all equipment and labor.
2) 811 locates will be called in by Jet Aeration of Texas. Work will not start until locates are verified.
3) Excavations necessary for the bypass tie in etc.
4) Cut existing 10"force main and install new 10"valve, install a section of 10"C900 with a tee reducing to
6"coming up out of the ground with a ninety, install 6"gate vale and converting to a camlock for bypass
hose connection.
5) Set up 6"diesel pump with 80'of suction hose and 2ea 50'rubber discharge hoses. We will place the
suction hose to pull out of the nearby manhole specified by city and tie the discharge into new bypass
connection.
6) Jet will supply the fittings for the bypass. The fittings not used will be put in stock at the Port Arthur
Warehouse.
7) Once the job is complete,we demobilize all equipment and material
NOTE:THIS QUOTE ALLOWS FOR 1-12 HOUR DAY ON THE BYPASS WORK.THIS COVERS FOR 1
MONTH RENTAL ON THE 6"DIESEL PUMP WITH HOSES BEGINNING FROM THE 9/29/25 RENTAL
DATE WHEN THE PUMP WAS SET UP.ANY OVERAGES IN TIME WILL BE BILLED ACCORDING
TO THE AGREED CONTRACT RATES ALREADY IN PLACE.
The Lift Station Piping Repair/Replacement will be done once the bypass has been installed
and the levels are under control.
I. We will repair/replace the piping in the lift station down in the drywell. The extent of repair will be
determined once we can access the drywell area where the pumps and piping are located.
2. Once we have a scope for repair that is acceptable to City,we will procure the material and perform the
repairs. It will be done on a time and material bases due to the inability to access and get a clear scope that
is needed.
3. City of Port Arthur will supply the materials
NOTE:THE SCOPE OF WORK FOR THE PIPE REPAIR/REPLACEMENT IS A BUDGET ESTIMATE
ONLY. IN THE EVENT WE GET DOWN IN THE DRY WELL AND THERE ARE MORE DAMAGED
PIPING OR EQUIPMENT THAN WE KNOW ABOUT,WE WILL HAVE TO REACCESS THE COST AT
THAT TIME.
Project/Payment Schedule
I. Mobilization,material procurement requires signing this contract
and issue PO
2. Payment net 30
General Clarifications:
The following clarifications and exceptions govern our proposal:
1. All work to be performed is based on establishing a mutually satisfactory agreement.
2. Jet Aeration of Texas proposal is valid for 30 days from submission.Any time after this period JET may
withdraw or modify this estimate in its entirety.
3. Jet Aeration of Texas will not be responsible for any damages to unknown underground utilities or obstacle
that the Owner/General contractor does not notify us about prior to construction.
4. Proposal excludes all cost associated with interruptions or delays that is not a direct result of Jet Aeration of
Texas
5. Prices submitted exclude sales and use tax.
6. Jet Aeration of Texas costs and schedule exclude any allowances for Force Majeure events.These events
include,but are not limited to,rain delays,tidal events,owner/engineer delays,acts of God.The occurrence
of any of these events,measured in whole hours,will be the basis for an adjustment in the contract price
and schedule.
7. Jet Aeration of Texas proposal is based on all permits being provided by others.
8. All materials are guaranteed to be as specified by the customer,and the above work to be performed in
accordance with the specifications.
9. In the event any part of the scope described in this proposal is changed due to unknown or unforeseen
obstacles or requested changes by owner will require a written change order signed and agreed by both
Contractor and Owner.
Additional company information such as policy and procedures,Drug testing policy,safety manuals or contract
items can be provided if needed.
Jet Aeration of Texas appreciates the opportunity to provide this proposal. Should you have any questions regarding
this proposal,please feel free to contact me by email or phone. Upon signing this document,you acknowledge and
agree to the terms set forth.
Sam Stroud
3760 Hwy 1131
Vidor,TX 77662
Cell:409-658-4244
Office:409-769-1500
Sam.s@team-jet.com Customer:
JET:
Exhibit "B"
(Invoice from Jet Aeration of Texas, LLC)
4111111111111111111111111111
INVOICE
ISE
INS
JET AERATION OF TEXAS,LLC Iisa.I@team-jet.com
t INS 1St
PO Box 458 +1 (409)769-1500 amom
Vidor,TX 77670-0458 = MI
mil JISSIrrr al/
AERATION OF TEXAS
Bill to
City of Port Arthur
P.O.Box 1089
Port Arthur,TX 77641
Invoice details
Invoice no.:17197
Terms:Net 30
Invoice date:10/27/2025
Due date:11/26/2025
Product or service Description Qty Rate Amount
1• Emergency Repair of Delmar&Lakeshore
Lift Station
2. Commercial Utilities Equipment&Labor 1 $25,579.68 $25,579.68
3. Commercial Utilities Material&Consumables 1 $24,619.81 $24,619.81
Total $50,199.49