HomeMy WebLinkAboutPR 24643: RICE FARM ROAD DRAINAGE IMPROVEMENT PROJECT-PHASE I - CHANGE ORDER NO. 2 City of i ort rthur Texas www.Po rtArth u rTx.gov INTEROFFICE MEMORANDUM Date: November 10, 2025 To: The Honorable Mayor and City Council Through: Ron Burton, CPM, City Manager From: Suhail Kanwar,P.E., M.S., CFM, ENV SP, Director of Public Services/City Engineer RE: PR No. 24643: Rice Farm Road Drainage Improvement Project-Phase I- Change Order No. 2: 12"Transite water line abatement by Sitek Omni Abatement and changes to ditch profile at DD7 tie-in, SETEX Construction Corp. of Beaumont, Texas. Project No. DR1P10.CON. Account No. 307-21-053-8517-00-10-000. Introduction: The intent of this Agenda Item is to seek the Port Arthur City Council's ratification of Change Order No. 2 with SETEX Construction Corp.,(SETEX) of Beaumont,Texas for the concrete lined ditch DD7 upgrades and abatement subcontractor remove and dispose of 400LF of 12" OD Transite pipe for the amount of$34,930.00, as authorized by the City Manager. Project No. DIUP10.CON. Account No. 307-21-053-8517-00-10-000. Background: Recent developments in the Rice Farm Road Drainage Basin have increased flows into the unimproved Drainage District 7 (DD7) Ditch B2-A, located along the Interurban Right-of-Way (ROW). Pursuant to Resolution No. 24-318, approved by the Port Arthur City Council,the City Manager was authorized to enter into an interlocal agreement with Jefferson County Drainage District No. 7 (DD7) for the construction of a concrete lined channel at the Entergy Interurban Right-of-Way (ROW) along Rice Farm Road. DD7 has agreed to furnish labor and equipment subject to the requirements of the Texas Government Code, Sec. 791. DD7 has the knowledge, experience, staff and equipment to construct the channel within the B2-A ditch, with the City furnishing the design, engineering, materials, and oversight. "Remember,we are here to serve the Citizens of Port Arthur" 444 4th Street X Port Arthur,Texas 77641-1089 X 409.983.8182 X FAX 409.983.8294 Pursuant to Resolution No. 23-476, approved by Port Arthur's City Council, Soutex Surveyors & Engineers(Soutex) of Port Arthur, Texas,was selected to provide design, plans, and bid phase services for the Rice Farm Road Drainage Improvement Project: Phase 1. The Purchasing Department advertised for competitive qualified bidders on March 22, 2025 and March 29, 2025 under Bid Number P25-039. Bids were opened on Wednesday, April 16, 2025 with five contractors responding. Eastex Utility Construction, LLC, of Beaumont, Texas; Brystar Contracting, Inc. of Beaumont, Texas; SETEX Construction Corp. of Beaumont, Texas; MK Constructors of Vidor, Texas; and APEX Alliance, LLC, of Port Neches, Texas. After review by the Engineering Division, Soutex, and staff, it was determined that SETEX Construction Corp. of Beaumont,Texas, provided the lowest responsible bid for the amount of$745,752.00. Pursuant to Resolution No. 25-196, the City Manager was authorized to enter into an agreement with SETEX Construction Corp. (SETEX) of Beaumont, Texas, for the construction within the B2-A ditch that includes lining with concrete, replacing culverts, waterline tie-ins, demolition, lane striping, installation of a 6" curb in place, and paving to match existing. SETEX, along with City forces, was tasked with locating a 12" AC Water Main valve in order to shut off a portion of the pressurized water line so that work could be completed. Shutting off the area proved problematic as there were no valves in the immediate area. The City, Soutex and SETEX determined that the best course of action was to install an Insta-Valve at an alternate location that would shut off a smaller portion of the pressurized water line so that a large area of the surrounding community would not be without water for a significant and unknown amount of time. Pursuant to Resolution No.25-406,the Port Arthur City Council and the City Manager approved Change Order No. 1 for the installation of a 12"Insta-Valve installed on the existing 12"water line by SETEX Construction Corp., with the work subcontracted by JZ Southern Boyz Services, LLC, for the amount of $33,162.55, modifying the original contract price of $745,752.00 to the new contract price of $778,914.55 with no additional calendar days being requested. Field Change Order No. 2 was issued by Soutex due to the hazardous nature of the asbestos,the original scope of work must be completed by a license Asbestos Abatement Contractor. The nature and scope of this abatement as explained in CO-07 proposal letter dated October 27, 2025 justifies the issuance of an emergency change order. Upon excavation of the 12" water line, it was discovered that the pipe is made of Transite material, which requires abatement by a licensed asbestos abatement contractor,which falls outside of the original scope of work. Based upon field observations by DD7, the drainage district instructed the contractor to turn the end of the concrete ditch at the tie-in location by 30 degrees and raise the elevation of the of the top of the ditch by one foot. Change Order No. 2 was submitted by SETEX, attached hereto; Change Order No. 2 increased the contract by$34,930.00 for a new total contract price of$813,844.55. Due to the additional work needed, 93 calendar days were requested as explained om CO-07 proposal letter dated October 27, 2025. Budget Impact: "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 Funds are available from Capital Improvement Account No. 307-21-053-8517-00-10-000;Project No. DR1 P 10.CON. Recommendation: It is recommended that the City of Port Arthur's City Council approve PR No. 24643 authorizing the City Manager to execute Change Order No. 2 with SETEX Construction Corp., (SETEX)of Beaumont, Texas for the excavation of the 12"water line,made of Transite material, which requires abatement by a licensed asbestos abatement contractor, which falls outside of the original scope of work; and per the DD7, for the contractor to turn the end of the concrete ditch at the tie-in location by 30 degrees and raise the elevation of the of the top of the ditch by one foot, line for the amount of$34,930.00 and modifying the original contract price of$778,914.55 to the new contract price of$813,844.55 with 93 additional calendar days being requested. Project No. DRIP10.CON. Capital Improvement Account No. 307-21- 053-8517-00-10-000. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 PR No. 24643 11/10/2025 RLD Page 1 of 6 RESOLUTION NO. A RESOLUTION RATIFYING THE CITY MANAGER'S EMERGENCY EXECUTION OF CHANGE ORDER NO. 2 FOR THE RICE FARM ROAD DRAINAGE IMPROVEMENT PROJECT-PHASE I FROM SETEX CONSTRUCTION CORP. OF BEAUMONT, TEXAS, FOR THE CONCRETE LINED DITCH DD7 UPGRADES AND ABATEMENT SUBCONTRACTOR REMOVE AND DISPOSE OF 400LF OF 12" OD TRANSITE PIPE FOR THE AMOUNT OF $34,930.00. FUNDS ARE AVAILABLE IN THE CAPITAL IMPROVEMENT ACCOUNT NO. 307- 21-053-8517-00-10-000. PROJECT NO. DR1P10. WHEREAS, recent developments in the Rice Farm Road Drainage Basin have increased flows into the unimproved Jefferson County Drainage District 7 (DD7) Ditch B2- A, located along the Entergy Interurban Right-of-Way (ROW); and, WHEREAS, the City of Port Arthur, in cooperation with DD7, has identified essential drainage ditch improvements to the area along Rice Farm Road and DD7 ditch B2-A; and, WHEREAS, pursuant to Resolution No. 24-318, approved by the Port Arthur City Council, the City entered into an Interlocal Agreement in which DD7 will construct a concrete lined channel along the Entergy Interurban ROW; and, WHEREAS, DD7 has the knowledge, experience, staff and equipment to construct the channel with the City furnishing the design, engineering, materials, and oversight; and, WHEREAS, pursuant to Resolution No. 23-476, approved by Port Arthur's City Council, Soutex Surveyors & Engineers of Port Arthur, Texas, was selected to provide design, plans, and bid phase services for the Rice Farm Road Drainage Improvement Project: Phase 1; and, S:\EngineeringPUBLIC WORKS\PW-ENGINEERING C.I.P.PROJECTS\Year 2023\RICE FARM RD DRAINAGE\Change Orders\Change Order 2\PR 24643 RICE CO 2.docx PR No. 24643 11/10/2025 RLD Page 2 of 6 WHEREAS, the Purchasing Department advertised for competitive qualified bidders on March 22, 2025 and March 29, 2025 under Bid Number P25-039; and, WHEREAS, bids were opened on Wednesday, April 16, 2025 with five contractors responding — Eastex Utility Construction, LLC, of Beaumont, Texas; Brystar Contracting, Inc. of Beaumont, Texas; SETEX Construction Corp. (SETEX) of Beaumont, Texas; MK Constructors of Vidor, Texas; and APEX Alliance, LLC, of Port Neches, Texas; and, WHEREAS, after review by the Engineering Division, Soutex and Staff, it was determined that SETEX Construction Corp. of Beaumont, Texas, provided the lowest responsible bid for the amount of $745,752.00; and, WHEREAS, pursuant to Resolution No. 25-196, the City Manager was authorized to enter into an agreement with SETEX Construction Corp. (SETEX) of Beaumont, Texas, for the construction within the B2-A ditch; and, WHEREAS, SETEX will construct a portion of the DD7 Ditch B2A that includes lining with concrete, replacing culverts, waterline tie-ins, demolition, lane striping, installation of 6" curb in place, and paving to match existing; and, WHEREAS, during construction, the unknown location of the existing 12-inch AC water main valve created an unforeseen condition requiring immediate remediation to avoid service disruption and potential hazards to the public health and safety of the citizens of Port Arthur; and WHEREAS, pursuant to Section 252.022(a)(2) of the Texas Local Government Code, a procurement necessary to preserve or protect the public health or safety of the municipality's residents is exempt from the requirements of competitive bidding; and PR No. 24643 11/10/2025 RLD Page 3 of 6 WHEREAS, the City, Soutex and SETEX determined that the best course of action was to install an Insta-Valve at an alternate location that would shut off a smaller portion of the pressurized water line so that a large area of the surrounding community would not be without water for a significant and unknown amount of time; and, WHEREAS, a Field Change Order No. 1 was issued by Soutex to keep the project moving that was reviewed, approved, and signed by the City Manager with the understanding that this change to the original scope of work would be presented to the Port Arthur City Council, in the form of Change Order No. 1; and, WHEREAS, pursuant to Resolution No. 25-406, the Port Arthur City Council and the City Manager approved Change Order No. 1 for the installation of a 12" Insta-Valve installed on the existing 12" water line by SETEX Construction Corp., with the work subcontracted by JZ Southern Boyz Services, LLC, for the amount of $33,162.55, modifying the original contract price of $745,752.00 to the new contract price of $778,914.55 with no additional calendar days being requested; and, WHEREAS, a Field Change Order No. 2 was issued by Soutex due to the hazardous nature of the asbestos, the original scope of must be completed by a license Asbestos Abatement Contractor, see Exhibit A; and, WHEREAS, upon excavation of the 12" water line, it was discovered that the pipe is made of Transite material, which requires abatement by a licensed asbestos abatement contractor, which falls outside of the original scope of work. Based upon field observations by DD7, the drainage district instructed the contractor to turn the end of the concrete PR No. 24643 11/10/2025 RLD Page 4 of 6 ditch at the tie-in location by 30 degrees and raise the elevation of the of the top of the ditch by one foot. Change Order No. 2 was submitted by SETEX, which increased the contract by $34,930.00 for a new total contract price of $813,844.55. Due to the additional work needed, 93 calendar days were requested as explained in CO-07 proposal letter dated October 27, 2025, see Exhibit B; and, WHEREAS, approval of PR No. 24643 for the Port Arthur City Council to authorize the City Manager to ratify Change Order No. 2 submitted by SETEX Construction Corp., of Beaumont, Texas, for the Rice Farm Road Drainage Improvement Project, is hereby deemed an appropriate action; now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: THAT, the facts and opinions in the preamble are true and correct; and, THAT, the City Council of the City of Port Arthur hereby authorizes the City Manager to ratify Change Order No. 2 from SETEX Construction Corp., of Beaumont, Texas, for the amount of $34,930.00, in substantially the same form as attached hereto as Exhibit A; and, THAT, Change Order No. 2 modifies the original contract price of $778,914.55 by $34,930.00 to the new contract price of $813,844.55 with 93 additional calendar days being requested as explained in CO-07 proposal letter dated October 27, 2025 in substantially the same form as attached hereto as Exhibit B; and, THAT, funding is available in the Capital Improvement Account 307-21-053-8517- I 00-10-000; and, PR No. 24643 11/10/2025 RLD Page 5 of 6 THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of A.D., 2025, at a meeting of the City of Port Arthur, Texas by the following vote: Ayes: Mayor: Council members: Noes: Charlotte M. Moses Mayor ATTEST: Sherri Bellard City Secretary PR No. 24643 11/10/2025 RLD Page 6 of 6 APPROVED AS TO FORM: APPROVED FOR ADMINISTRATION: 1t4 _ttot Roxann Pais Cotroneo, Esquire Ronald Burto► CPM City Attorney City Man.!-r APPROVED AS FOR AVAILABILITY OF FUND • L n "Lyn" Boswe , M.A., ICMA-CM Director of Finance Kewpet.)-#.4., Suhail Kanwar, PE Director of Public Services/City Engineer NP„, (.02k Clifton Williams, CPPB Purchasing Manager EXHIBIT A CITY OF PORT ARTHUR Public Works Engineering DATE: November 10,2025 PROJECT: RICE FARM ROAD DRAINAGE IMPROVEMENT PROJECT-PHA OWNER: CITY OF PORT ARTHUR CONTRACTOR: SETEX CONSTRUCTION CORP OF BEAUMONT,TEXAS CHANGE ORDER NO.: 2 THE FOLLOWING CHANGES IN THE PLANS AND/OR SPECIFICATIONS ARE HEREBY MADE: Adjust the Estimated Quantities to reflect the Actual Quantities used in the completion of the project: Item Description Unit Original Unit Price Original Amount Total Added New Amount Quantity 1 Abatement Subcontractor Remove and dispose of 400LF of 12"OD Transite pipe EA $27,269.00 1 $ 27,269.00 by Sitek Omni Abatement through Honesty Environmental Services 1 Changes to Ditch profile at DD7 tie-in Concrete lined Ditch(DD7)upgrades to original scope EA $ 7,661.00 1 $ 7,661.00 NO FUNDS ARE IMPACTED TOTAL CHANGE ORDER $ 34,930.60 PREVIOUS CONTRACT AMOUNT NEW CONTRACT $ 778,914.55 AMOUNT $ 813,844.55 ORIGINAL CONTRACT AMOUNT:I$ 745,752.00 I TOTAL AMOUNT OF CHANGE ORDER NO.1: $ 33,162.55 TOTAL AMOUNT OF CHANGE ORDER NO.2: $ 34,930.00 TOTAL PERCENT OF CHANGE ORDER NO.2: 4.29% NEW CONTRACT AMOUNT: $ 813.844.59 93 CALENDAR DAYS HAVE BEEN ADDED TO CHANGE ORDER NO.2 PREPARED BY. APPROVED BY: Roeisha Diaz,Engineering Admin. Jeremy Mitchell,PE,RPLS APPROVED BY: APPROVED BY: Paul Young,Project Manager,SETEX Clifton Williams,CPPB,Purchasing Manager APPROVED BY: APPROVED BY: Suhail Kanwar,PE,Director of Public Services,City Engineer Ron Burton,CPM,City Manager O\Engineering\PUBLIC WORKS\PW-ENGINEERING\C.I.P.PROJECTS\Year 2023\RICE FARM RO DRAINAGE\Change Orders\Change Order 2\RICE CO 2 TBPE Firm No.F-5755 ouTExT:::; -R+ Texas 77642 SURVEYORS&ENGINEERS Office(409)983.2004 Fax(409)983.2005 October 2, 2025 City of Port Arthur 444 4th Street Port Arthur,Texas 77640 Re: Rice Farm Road Drainage Improvement Project: Phase 1—Field Change Order No. 2 1. 12"Transite water line abatement by Sitek Omni Abatement through Honesty Environmental Services: $27,269.00 2. Changes to ditch profile at DD7 tie-in:$7,661.00 Total Price Increase:$34,930.00 New Contract Price: $813,844.55 Background: 1. Upon excavation of the 12"water line it was discovered that the pipe is made of Transite material,which requires abatement by a licensed asbestos abatement contractor,which falls outside of the scope of the original project. 2. Based upon field observations by DD7,the drainage district instructed the contactor to make a few minor changes to the concrete ditch liner:turn the end of the ditch at the tie in location by 30 degrees and raise the elevation of the top of the ditch by 1 foot. If you have any questions, please contact our office. ‘.5-R Respectfully submitted, `NN,... Jeremy Mitchel, P.E., RPLS 1 ii\s____:. Wk____________,_ Approved by: S; Hani Tohme City of 'o +rth I Approved by: W . . Ronald Burt. City M- ager 5EAFEX 006111 IN COMSTpptior O / 93J "Strength in Construction" CO-02 Proposal Letter LA License#70090 Abatement Subcontractor Cost Mailing Address P O. Box 20678 10/06/2025 Beaumont, Texas 77720-0678 City of Port Arthur Engineering Department. O (409)842-8181 4444 4th Street Port Arthur, TX 77641 t (409)842-2274 ® setex@setexconstruction.com Project: Rice Farm Road Drainage Improvements setexconstruction com Scope: Abatement Subcontractor Remove and dispose of 400 LF of 12"OD Transite pipe General Contracting City of Port Arthur Engineering, Construction Management During excavation activities for the demolition and removal of the existing 12"water line it was discovered that the pipe is asbestos-containing (Transite) material. Due to the hazardous nature of the asbestos, the original scope of work to cut, cap, and remove the 12"waterline Design-Build pipe must be complete by a licensed Asbestos Abatement Contractor. The City of Port Arthur provided contact information for Honesty Environmental Services, a licensed contractor qualified to perform the required abatement. Upon review, the scope of abatement work Job Order Contracting includes the demolition and removal of approximately 400 linear feet of Transite(asbestos) pipe and the performance of two cuts on the 12"waterline. Facilities Maintenance Project Plan: • Abatement work can only be performed when the 12"waterline is fully isolated by the Commercial Port Arthur Water Department. • When Water is isolated Sitek Omni Abatement will perform two cuts to allow Setex to Industrial install (2) 12" isolation caps to isolate 4001f of water line to be demolished by Abatement Contractors. Government • SETEX will be responsible for the excavation and exposure of the existing asbestos pipe to allow access for the abatement team. Healthcare • Sitek Omni Abatement, under the supervision of a consultant from Honesty Environmental Services, will perform the asbestos abatement and pipe cutting Infrastructure operations. Sitek will remove and dispose of approximately 400 LF of 12' OD transite pipe from the excavated trench. Pipe will be cut into manageable sections Corporate using NESHAP wet methods or disjointed. Pipe will be properly wrapped and labeled all asbestos debris generated, be removed from work area, and transported and disposed of as per federal, state and local regulations to an EPA approved landfill Education and transport to a licensed landfill as manifested asbestos waste. Performing Arts • The estimated duration for abatement and removal activities is 10 calendar days, once the line is isolated. Histoncal Beaumont Nacogdoches Port Arthur Established 1990 5 E TEX oN6w%IN CONSTRUCTION ESIO �1991 "Strength in Construction" Proposal Total: LA License#70090 This proposal includes only the additional subcontractor costs associated with the asbestos abatement work that falls outside of the original scope of Bid Item#13. The cost for labor, Mailing Address equipment, and pipe removal (by subcontractor) are all captured in Bid Item #13. P 0. Box 20678 Beaumont, Texas 77720-0678 Total Proposed Cost: $27,269.00 O (409)842-8181 `Water from on-site Fire Hydrant will be utilized forAbatement Operations and Waterline Purge • (409)842-2274 activities after Cuts are made to isolate 12"Water line. • setex@setexconstruction.com Kind Regards, ,A. setexconstruction corn General Contracting Construction Management Paul Young Project Manager Design-Build Job Order Contracting Facilities Maintenance Commercial Industrial Government Healthcare Infrastructure Corporate Education Performing Arts Historical Beaumont Nacogdoches Port Arthur Established 1990 _.. ..,...„ ri. --- iii.,5 I1644 owl{Th IN CONS1RUC ON "Strength in Construction" CO-05 Proposal Letter LA License#70090 Setex Labor & Equipment Only Mailing Address: P.O. Box 20678 10/6/2025 Beaumont, Texas 77720-0678 City of Port Arthur Engineering Department. IS (409)842-8181 4444 4th Street Port Arthur, TX 77641 ill (409)842-2274 ® setex@setexconstruction.corn Project: Rice Farm Road Drainage Improvements setexconstruction.com Scope: Concrete Lined Ditch DD7 Upgrades to Original Scope To: City of Port Arthur Engineering Department General Contracting Subject: Proposal for Scope Improvements to Bid Items#2&#3 Construction Management Additional Scope of Work: • Concrete Wall Lip Footer: Add 18"thick concrete wall lip footer on each side of the concrete-lined ditch (22 SY). Design-Build • Stabilized Sand Subgrade: Add 4"of 2-sack stabilized sand subgrade within the concrete-lined ditch due to poor existing subgrade conditions and erosion prior to form-up(60 Tons). Job Order Contracting • North Wall Extension: Add 2 linear feet of top wall to make the north wall 10'wide from the ditch bottom, Facilities Maintenance maintaining a 2:1 slope on the ditch (14 SY). • Delay and Additional Labor Due to Profile Revision: Account for 5 calendar days of delay due to ditch bottom profile change after the Commercial original planned slope was revised. This revision required removal and re-forming prior to the bottom pour(40 man-hours). Industrial Total Cost:$7,661.00 Government Please review the above proposed additions for approval and inclusion in the project scope. We are available to discuss any details or provide further documentation as required. Healthcare Thank you for your time and consideration. Infrastructure Kind Regards, Corporate Education Paul Young Project Manager Performing Arts Historical Beaumont Nacogdoches Port Arthur Established 1990 lit— . , . .....—.. ..—... .".." * -",44---•-• , 10-*----- ! .......4-; •4,4.7 --:;,,--------;.--;•.* , ,--- i ..- .." . -‘'- , -sa -.."-^. A" COO '`ENrRAL LINER DETAIL '-'5E1 * mt,C.,' ItEr.0057' r' I,scr....., '-'• ....-..'" . 6. , • ... ,...:147714°A.14. ,, 4.n.^-4.0 w• a, .._ e Is- oc pvtrunageo — \ 4p ,," 1 -i . ............”.. ,.. „......„„ . - . I ,i,i;. 1 0.1;o03 - dinkLk? D ' NOP . ..t I n zz a I I I coi v N 0 c- ( I a l I KINDER MORGAN TEXAS PIPELINE a30- -o N • OUtOa, r0 �' y SCALE: 1'=20' 4�oJ O x o 0 1 20 'Z > W 0 K K O p p 8'CMAINUNK FENCE 2 O 2 zJ a a o a—.1 =fit—���L_ ��L=_L- r o — 24:FLonuNE DEPRESSION ,C PROPOSED BROKEN x Z °< Y8 ;Le / CONCRETE/RIP-RAP—Y-- -, 2° ) < ° ., a L 15 LF± 12" THICK <1AAi, . —0+40 0 40` ° 8 .�1 11+00 I—..- - I < I �fr JEFFERSON COUNTY JJJ �� < °'V DRAINAGE DISTRICT N0. 7 OFF:0.00' °1 ° .1 g j N ✓STA:0+65.00 LATERAL B-2-A DITCH FL=-4.102 '1 I , AIp 0 7y OFF:0.00' 30' WIDE EASEMENT____A, } I FL=-4.06 DEMO. ABANDONED 2IPEL PR TECC111VE , PROPOSED CONCRETE-I v 15" FORCE MAIN RAILING PROPOSED CONCRETE LINED DITCH (FUTURE) PLUG ENDS W/CONC. I LINED DITCH PER DD7 TOP ELEV. = -3.04 DETAIL(2:1 SIDE SLOPE) COORDINATE NTH DD7 PRIOR TO CONSTRUCTION. LL GARRETT BOUDOIN I II 409-548-3802 I HARVEST TIME BIBLE CHURCH F.# 1999039941 O.P.R.J.C. i DITCH PROFILE E 4.00 1 4.00 8. 2.00 2.00 STAO+07.60 -E.' =0. STA0+65.00 \MATCH ELEV EXIST982.) ELEV=0.94 TOP OF DIT• i O.00 O.00 srno.4o.96 ELEV=-0.08 PROPOSED .RETE LIB DITCH 26= KINDER MORGAN PIPELINE 2.00 —2.00 - FUTURE CONCRETE `t' LINED DITC- E STA0.27.68 STA0+52.30 ST=-4E .0600 I FL=-4.00 FL=-4.08 FL .'��'TRANSITION FLOW IT TO MATCH EXIST. DITCH -4.00 a 1 h RIP-RAP 15 LF± 12" THICK a 22 STA:0.00.00 a.. ELEV=-4.100 - € (MATCH TOE OF I PROPOSED DITCH EXIST.DITCH) 1 FLOWUNE 0 0.05% DEMO EXIST. STA0+40.09 EXIST. DITCH FLOWLINE ABANDONED FL=-5.08 8 —6.00 FORCE MAIN - —6.00 1 n At —8.00 0 8 00 —0+40 —0+20 0+00 0+20 0+40 0+60 0+80 1+00 a a g 9"'rT""` DRAINAGE DISTRICT NO. 7 "' DITCH B-2—A TIE IN TO DITCH B-2 2320485 3737 Doctors DriveCHANGES TO ORIGINAL SCOPE 1" = 20' ®UTSDC Port Arthur,Texas 77642 PATETeL409.083.2004 10/2/25 PR0.ER ENA1N BY SURVEYORS&ENGINEERS Fax 409.083.2005 RICE FARM ROAD DRAINAGE IMPROVEMENT NJ .oute"aurveyora.com beam er r.6.P.E.FIRM/5765 JIMMY JOHNSON CULVERT REPLACEMENT JM 'DLLS FIRM/10123800 °Rags qg 0 CITY OF PORT ARTHUR, 77640 1 of 1 EXHIBIT B 5ETEX sit,„tiH ik CONSTRUCTION "Strength in Construction" CO-07 Proposal Letter LA License#70090 Mailing Address: 10/27/2025 P.O. Box 20678 Beaumont, Texas 77720-0678 City of Port Arthur Engineering Department. 4444 4rh Street Port Arthur, TX 77641 O (409) 842-8181 • (409) 842-2274 To: City of Port Arthur Engineering Department ?C setex@setexconstruction.com Subject: Project Time Extension Due to Waterline Isolation Delays Project: Rice Farm Road Drainage Improvements :. setexconstruction.coin Scope: Project Time Extension due to Waterline Isolation delays General Contracting Subject: Project Delay Due to 12"Waterline Isolation We are submitting this letter to provide an explanation of the project delays that have Construction Management accumulated to date on the Rice Farm Road Drainage Improvements. The summary below outlines the primary causes of the significant delays encountered throughout the course of this project. Design-Build Setex Construction was issued a Notice to Proceed on June 23, 2025, with an original contract duration of 120 calendar days. Upon commencement of the project, it was Job Order Contracting determined that the existing 12"waterline required additional isolation due to the unknown location of the isolation valves. Further Progress on the project was dependent upon timely isolation of the 12"waterline to allow for revisions and demolition beneath Willowood Lane. Facilities Maintenance The initial request for isolation of the 12"waterline was submitted to the City of Port Arthur Water Department on July 7, 2025. The Water Department was unable to locate the necessary valve to shut off the 12" line, which prevented commencement of critical work Commercial activities associated with the waterline revision. During this delay period, Setex maintained a field presence and continued performing non- industrial dependent work items, including tree removal and general site clearing. Coordination efforts with City personnel continued as multiple attempts to isolate the 12" line remained unsuccessful. The inability to achieve full isolation of the line caused a significant impact to Government the project's critical path and overall completion schedule. Full isolation of the 12"waterline was ultimately achieved on October 21, 2025, following installation of a new 6" isolation valve. This new valve provided the necessary control to Healthcare complete the waterline revision work and eliminated the need for future water outages to the surrounding apartment complexes. Infrastructure Setex respectfully requests that all delays associated with the 12"waterline isolation be recognized as non-compensable and non-contractor-related, and that the project completion date be extended accordingly. Corporate Summary of Delay and Justification Isolation of the 12"waterline was critical to the execution of several contract work items. Education While Setex advanced non-dependent tasks, major portions of the project—specifically the Willowood Lane Box Culvert installation and related work at Jimmy Johnson Boulevard— were directly dependent on successful isolation of the line. Performing Arts The Willowood Lane Box Culvert installation required operation of heavy equipment that could not be mobilized or used safely until the 12"waterline was fully isolated, capped, and Historical demolished. The project sequence was originally structured to begin with the waterline isolation and demolition, followed by installation of the Willowood Box Culvert and subsequent relocation of large equipment to Jimmy Johnson Boulevard to complete remaining work. Work items completed during this delay period included: Beaumont Nacogdoches Port Arthur Established 1990 rr u rV "Strength in Construction" • Removal of 16 trees LA License#70090 • Installation of 65 linear feet of concrete-lined ditch at the Kinder Morgan substation • Installation of 12" Inserta-valve Mailing Address. These activities were performed to maintain progress on available work while awaiting P.O. Box 20678 completion of the 12"waterline isolation. Beaumont. Texas 77720-0678 As a result of these circumstances, the project's critical path has experienced a cumulative delay. Setex Construction respectfully requests a time extension of ninety-three (93)calendar O (409)842-8181 days to account for delays related to the 12" waterline isolation, associated utility coo rdination • (409) 842-2274 efforts, and additional scope, including the time required for installation of the 12" insert valve. setex@setexconstruction corn setoxconstruction.com Total Extension Request: 93 Calendar Days The City of Port Arthur is a vital partner to Setex Construction, and we value the collaborative General Contracting relationship that ensures the delivery of high-quality work. Setex respectfully requests this time extension to enable the continuation of work in a manner that meets the exceptional Construction Management standards expected by the City of Port Arthur. Granting this extension will allow Setex to complete the project safely, efficiently, and to the level of quality that both the City and the public expect. Design-Build Please Note: Job Order Contracting * No additional costs are included in this request. Facilities Maintenance Kind Regards, Commercial Industrial --� Paul Young Project Manager Government Healthcare infrastructure Corporate Education Performing Arts Historical Beaumont Nacogdoches Port Arthur Established 1990