Loading...
HomeMy WebLinkAboutPR 24671: CALLING FOR A PUBLIC HEARING, PIPELINE PERMIT TO TRIDENT INTRASTATE PIPELINE, LLC 20" P.R.No.24671 Nov 18,2025 rib RESOLUTION NO. A RESOLUTION AUTHORIZING THE CALLING OF A PUBLIC HEARING TO CONSIDER WHETHER OR NOT TO ISSUE A MAJOR PIPELINE PERMIT TO TRIDENT INTRASTATE PIPELINE, LLC OF HOUSTON, TEXAS FOR THE INSTALLATION OF A TWENTY INCH (20") NATURAL GAS PIPELINE WITHIN THE CITY LIMITS OF PORT ARTHUR,TEXAS. WHEREAS, Trident Intrastate Pipeline, LLC of Houston, Texas has submitted an application for a major pipeline permit to install a twenty inch(20")natural gas pipeline to transport natural gas from facilities south of Highway 73, approximately 1.9 miles southwest of Port Arthur and continue in a northeasterly direction for approximately 3.3 miles before crossing Highway 73, within the City of Port Arthur. The line will continue 1.4 miles through lands adjacent to Highway 73 before crossing south, ultimately terminating at the Legend Power Plant. The project crosses approximately 3.2 miles of city limit jurisdictional area as shown on Exhibit "A" within the city limits of Port Arthur, Texas; and, WHEREAS, Trident Intrastate Pipeline, LLC has submitted all required documents and information for their major pipeline permit to be considered for approval; now therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: THAT, a Public Hearing before the City Council on the major pipeline permit requested by Trident Intrastate Pipeline,LLC will be held on Tuesday,December 16,2025 at 6:00 P.M. in the 5th Floor Council Chambers, City Hall,Port Arthur, Texas; and THAT,the City Secretary shall cause notice of the Public Hearing to be published in the official newspaper of the City of Port Arthur not less than ten(10)days prior to the date of the public hearing; and P.R. No. 24671 Page 2 THAT, a copy of the caption of this Resolution be spread upon the Minutes of the City Council. READ, ADOPTED AND APPROVED this the day of . A.D. 2025 at a meeting of the City Council of the City of Port Arthur,Texas by the following vote: AYES: Mayor: Councilmembers: NOES: Charlotte M. Moses Mayor Attest: Sherri Bellard City Secretary AP : Roxann Pais Cotroneo City Attorney APPROVED OR ADMINISTRATION: et0 Ronald Burto., M Ci : _er , Suhail Kanwar, P.E. et City Engineer EXHIBIT "A" /4 Trident Intrastate Pipeline LLC 7I a Kinder Morgan company September 24,2025 City of Port Arthur City Engineer 444 4th Street Port Arthur,TX 77640 Re:Trident Intrastate Pipeline LLC-West Port Arthur Lateral Project To whom it may concern: Trident Intrastate Pipeline LLC("TIP")is proposing to construct the 20-inch West Port Arthur Lateral("WPAL")to provide natural gas transmission service to local power generating facilities for energy reliability. This pipeline is regulated by the Railroad Commission of Texas (TRRC) in accordance with the Department of Transportation, Pipeline and Hazardous Materials Safety Administration(DOT PHMSA). The WPAL is approximately 6.3-miles in length and begins west of the Taylor Bayou Hwy 73 crossing and ends south of Hwy 73 at the power generating facility. Approximately 3.60 miles of WPAL is located within the City of Port Arthur("COPA")Full-Purpose limits.Construction start date is planned for Q1-2026 with a total construction duration of seven(7)months where proposed pipeline and related facilities are planned to be in service prior to Q3-2026. This project will have assigned rights to land and rights-of-way across the project by private landowner easement or permit.Permits will be obtained from USACE,TXDOT,Jefferson County and the City of Port Arthur prior to the start of construction. Within the COPA jurisdictional boundaries,TIP seeks to obtain permits for municipal street crossings and associated temporary construction entrances and one municipal maintained drainage canal and/or culvert crossing. As part of the permit submittal process with COPA,you will find accompanied herewith,the following files for your review. o Completed Major Pipeline Permit Application Forms o Attachment A—Overall map with TIP Centerline, distances within Full-purpose limits and ETJ limits called out o Attachment B—WPAL-specific overview map with TIP centerline,Limits of Disturbance and 200'buffer (offset the LOD within the full purpose only),Full-purpose limits, ETJ limits and COPA road crossing name list table o Attachment C - Landowner list with Kinder Morgan Parcel ID, Jefferson Co CAD tax ID, Landowner Name,Landowner Mailing Address and Landowner Contact(phone or email) o Attachment D-Project Plan Set with Profile—Landowner name and Jefferson Co CAD tax ID referenced o Attachment E-Variance request letter related to the Major Pipeline Permit and the City of Port Arthur Code of Ordinances,Ch. 66,Art.II, Sec.66-51 through 66-69. o Attachment F-Data Set of Full purpose limits only-shp and kmz files Thank you for your consideration and attention to this matter. Best Regards, Brittany Stolte Kinder Morgan Manager-Right-of-way L FEE SCHEDULE FOR PIPELINE PERMIT APPLICATIONS The fees for permits and inspections of pipelines are fixed and established for the respective purposes at the following charges: (a) Major Permit Fee per Section 66-53 $1,500 (b) Administrative Permit Fees per Section 66-54: 1. Level One Permit $ 100 2. Level Two Permit $ 500 (c) Transfer of ownership, lease or assignments $ 100 (d) Annual records maintenance fee $ 100 (per owner or operator) CITY OF PORT ARTHUR JEFFERSON COUNTY, TEXAS MAJOR PIPELINE PERMIT TO: Trident Instrastate Pipeline LLC NO: 1001 Louisiana, Suite 1000 DATE: Houston, TX 77002 The City of Port Arthur, pursuant to Chapter 66, Article II, Sections 66-51 through 66-69, Code of Ordinances hereby grants permission to the above-named permittee for the Construction of a proposed 20" natural gas pipeline named the West Port Arthur Lateral pipeline(s) to be located in accordance with the drawings and/or specifications attached hereto and made a part hereof. It is expressly understood that the City of Port Arthur does not hereby grant or purport to grant any right, claim title, interest, easement, or right-of-way on any property upon which such pipeline(s) and related valves, structures, etc. may be located pursuant hereto, and that the City may require the owner(s), at his own expense, to lower, adjust, relocate, or remove such pipeline(s) on or from any public property upon thirty (30) days written notice to the owner or agent thereof. Permittee shall be required to pay for and be responsible for any adjustments or casings, etc. of its pipeline required because of street improvement, utility or storm sewer crossings within the public rights-of-way covered by this permit. This permit is issued subject to all necessary rights-of-way or easements being acquired by permittee at its expense. Installation of the pipeline(s) within any public street, easement, alley, right-of-way, or grounds shall be performed in accordance with instructions of the City Engineer of the City of Port Arthur and permittee shall notify said City Engineer by letter in his office, forty-eight (48) hours prior to any work pertaining to Trident's West Port Athur Lateral therein. Upon completion of such lateral pipeline permittee shall notify the City Engineer of such completion in order that the City Engineer may make a final inspection thereof. MAJOR PIPELINE PERMIT -2- Special conditions for constructing, replacing or relocating pipeline(s)within the City are as follows: A. All pipelines within or across public rights-of-way shall be constructed with pipe meeting DOT class design factor requirement for wall thickness. 1. No pipeline will be located longitudinally under any existing or proposed pavement; unless permitted by the City. 2. All existing improved streets shall be crossed by the bored method, and boring shall extend the full width of the street right-of-way plus a minimum of ten (10) foot beyond said right-of-way. Provide markers in accordance with Section 66-60. 3. Any pavement repairs or right-of-way restoration necessitated as a result of the construction or operation of any pipeline shall be made in accordance with instructions set out by the City Engineer. Repairs or restorations will be made in such a manner as to equal or exceed the original condition and smoothness that existed prior to construction or operation of pipeline. 4. All drainage improvements or conditions shall be restored to as good or better condition than their original. 5. Any pipeline crossing under any improved street may be uncased provided a minimum depth of five(5)feet below the lowest point of the public right-of-way is achieved and extends for a distance not less than ten (10)foot beyond the right-of- way line of said street. 6. All pipelines shall be protected by adequate and approved cathodic protection measures. 7. Pipelines shall be covered to a minimum depth of five (5)feet below the ultimate flow lines of any existing ditches which it crosses under. 8. The owners of any pipeline under construction shall provide flagmen, barricades, flares, and signs for the protection of the public for the duration of the work as instructed by the City Engineer. 9. Other conditions or restrictions deemed necessary to provide for full use of the public right-of-way, and provide for the safety and convenience of the public shall be applied in cases not herein covered. 10. Pipelines shall be not less than five(5) feet below ground surface, except as otherwise specified above. MAJOR PIPELINE PERMIT -3- 11. Said pipeline shall be designed, constructed, operated, and maintained in accordance with the latest approved minimum standards established by the American National Standards Institute, United States Department of Transportation and other pipeline regulatory agencies. Where there are different standards among such agencies, the most stringent standard shall apply for purposes of this permit. 12. Telephone notification to the local emergency response, 911, to be made by Permittee as required by its carrier emergency response plan at discovery of any leak as defined per Sec.66-51. This notification is to include known information (including name and address of operator, name and telephone number of the reporter, location of spill, discharge and release, type and amount of material released, and assessment of danger to public) and significant facts known by the carrier at time of contact.. 13. Permittee shall file leak reports as required by State and Federal Code Requirements. The provisions of this permit shall be subject to any Federal and State legislation, rules, or regulations enacted or adopted, or which shall be here after enacted or adopted, to the extent that such laws and regulations shall preempt or supersede the authority of the City with respect to this Permit or provision hereof. 14. Hydrostatic test reports to be generated during construction per State and Federal Code requirements. 15. Permittee agrees that if in the event it becomes necessary to lower, or adjust the line(s) permitted herein because of future street improvements, utility or storm sewer crossings within the public rights-of-way covered by this Permit, said line(s) shall be lowered, or adjusted at the sole expense of the Permittee or its assigns. 16. Permittee agrees to install warning tape along the extents of the pipeline within the limits of trenched construction within the city limits. MAJOR PIPELINE PERMIT -4- HOLD HARMLESS PROVISION This permit is subject to and incorporates fully Chapter 66, Section 66-51 through 66-69, Code of Ordinances. By acceptance of this Permit, permittee agrees to pay for all damages to or loss of City of Port Arthur's property which are caused by, result from, or arise out of permittee's construction, operation, maintenance, repair or removal of such pipeline(s) within the City limits of the City of Port Arthur. This permittee further agrees to indemnify and hold the City of Port Arthur harmless against and from any and all suits, claims, and demands for damages to or loss of property of others or for personal injuries to or death of persons whomsoever, including all necessary costs and expenses to the City of Port Arthur relating to such claims, or demands, caused by, resulting from, arising, or growing out of or connected with the granting of this permit or permittee's construction, operation, maintenance, repair or removal of such pipeline(s) within the City limits of the City of Port Arthur. This permit shall not become effective until the permittee has subscribed its acceptance hereof and furnished the City with bond and certification of liability insurance as required by the City pursuant to the aforesaid Chapter. CITY OF PORT ARTHUR BY: TITLE: DATE: ATTEST: APPROVED FOR ADMINISTRATION: City Secretary Director of Public Works APPROVED AS TO FORM: Director of Planning City Attorney MAJOR PIPELINE PERMIT -5- All conditions of this Permit are understood and agreed to by Permittee. ACCEPTED: Permittee: Trident Intrastate ipeline, LLC By: Brittany Stolte Title: Right-of-Way Manager Date: /fir/ ,t ATTEST: MATTHEW JORDAN CHRISTIE Seal *: My Notary ID#12902024b 'm-, ` Expires July 9,2027 BOND # PIPELINE INSTALLATION BOND THE STATE OF TEXAS COUNTY OF JEFFERSON THAT we TRIDENT INTRASTATE PIPELINE, LLC principal, and , and surety, authorized to do business in the State of Texas, acknowledge ourselves bound to the City of Port Arthur, Texas, and/or any person, firm or corporation in the penal sum of TWO HUNDRED THOUSAND ($ 200,000.00 ) Dollars, for the payment of which will and truly be made, we bind ourselves, our heirs, executors, and administrators, jointly and severally be these presents. The conditions of this obligation, however, are such that, whereas, the said TRIDENT INTRASTATE PIPELINE is engaged in the business of constructing, operating, and maintaining a pipeline for the transportation of petroleum products within the City of Port Arthur, Texas, pursuant to Permit No. , granted by the said City, said Permit requiring a bond to be furnished in accordance with Chapter 66, Article II, Section 66-57 (a) and (c), Code of Ordinances of said City of Port Arthur, Texas, which said Permit and Section are made a part hereof for all intents and purposes. NOW, THEREFORE, be it understood that Principal will comply with the terms and conditions of Chapter 66, Article II, Sections, 66-51 through 66-69, Code of Ordinances, the aforesaid Permit issued thereunder, and will promptly pay, within the limits of the penal sum of this Bond, all damages for loss or injury suffered by the City of Port Arthur and/or any person, firm, or corporation that may result from Principal's operations under said Permit as it pertains to a public street, alley, or other public way or easement within the City of Port Arthur during the period until completion of the installation of the line or lines is approved in writing by the City Engineer. This Bond PIPELINE INSTALLATION BOND PAGE 2 shall inure to the benefit of the City and any person who may suffer a loss or injury as stated above. The expiration of the period which this Bond covers shall not affect any claim or cause of action thereon which may have accrued prior thereto, and the Bond shall remain in force and effect as to such prior accrued claims or causes of action. IN TESTIMONY WHEREOF, witness our hands this day of , A.D., BY: BY: APPROVED AS TO FORM: City Attorney APPROVED FOR ADMINISTRATION this day of A.D., . BY: Director of Public Works AFFIDAVIT THE STATE OF TEXAS § COUNTY OF JEFFERSON § BEFORE ME, the undersigned authority, on this day personally ..?appeared Aq 01A--e , known to me to be a creditable person, who after being duly sworn upon oath did depose and say: THAT he/she is k\--()Y\n-tuj \Yl -fKl Representative Title and that he/she is fully authorized to make this Affidavit on its behalf as its representative and that he/she is fully cognizant of the facts herein stated: THAT Trident Intrastate Pipeline LLC proposes to construct, operate, and maintain a new 20" inch pipeline that runs within the City of Port Arthur to which the application submitted is complete and accurate. , ))//A0).. ignatur 1?-}(1-t-k- L tb tve Pr ted Name r\A-Vt v\-e sp ih tCr Title This instrument was acknowledged before me this the a 4 day of J cp/-ef,^- i , 2025, by /3 f�c,, J- /y r '2— 7 ._, 4 ------- My Commission Expires: Notary Public • .2oi Y:?��, MATiHEW JORDAN CHRISTIE / 4a 4-114 PN C A,-;.5-4- ;,. My Notary ID#129020245 Printed Name ^` ` ` Expires July 9,2027 OF ' DEN INTRASTATE PI'ELINE-PO"' AR HUR 'RO T ' -,4 . r-.ti a at • ` f ` SM •,• •'.. Y ♦ .i /,a Oaw r• .r` , J f • • West Port Arthur Lateral 3.60 Miles within City Boundary • • Trident Intrastate Pipeline - 0.58 Miles within City Boundary , tAri# , West Port Arthur Lateral \Y 6.29 Miles within ETJ Boundary `. l •1' f t Trident Intrastate Pipelinet• t - --.-•• 14.96 Miles within ETJ Boundary., •4 t •t • .t • t •• t • • tt a . • •t • r. . 1. 1 SIV • • ivl • • FtYphn ll.fun. t 1 LEGEND •Station • j Trident Intrastate Pipeline N • .._® Port Arthur City Limits .i / KINDE4MORGAN TheWoodlana A Laki - -• Port Arthur ETJ R � i.E • • � .i 0 ost 5 o Houston t i ,oa.E 9,2, o zo mafaa E,o„I