PR 24684: RATIFY AND AUTHORIZE FINAL PAYMENT FOR THE EMERGENCY REPAIR OF 12 INCH SEWER LINE. JIMMY JOHNSON BLVD. BETWEEN HWY 96 AND 9TH AVE.
l 4,,4' _;i VI I f1liur 1, uu INTEROFFICE MEMORANDUM Date: December 1, 2025 To: The Honorable Mayor and City Council Through: Ronald Burton, CPM, City Manager From: Calvin Matthews, P.E., Water Utilities Director RE: PR No. 24684—Ratify and Authorize Final Payment for the Emergency Repair of 12" Sewer Line on Jimmy Johnson Blvd. between Hwy 96 and 9th Ave. Introduction: The intent of this Agenda Item is for the City Council to ratify the additional repairs and authorize the release of final payment to Global Drilling, Inc. of Winnie, Texas for the emergency repair to the 12"sewer located on Jimmy Johnson Blvd between Highway 69/96 and 9th Avenue in the amount of$609,545.21. Background: The 12-inch sanitary sewer line on Jimmy Johnson Boulevard between Highway 69/96 and 9th Avenue has a restriction that is causing the sewer upstream to surcharge, resulting in septic conditions and odors near Motel 6 and the Drainage District No. 7(DD7) Canal. The surcharge extends from the west side of the Sunoco gas station at 9th Avenue back to Highway 69/96 and temporary bypass pumping has been installed to manage the flow. This condition is the result of several sewer lines collapsing approximately 25 feet deep. The original scope of emergency work included bypass pumping, high-pressure cleaning, televising (TV) inspections, directional drilling, CIPP (cured-in-place pipe) repair, and pipe bursting of the collapsed sections. Because City crews do not have the equipment or expertise to perform directional drilling or CIPP installation, the City Manager signed an emergency memo authorizing Global Drilling to complete the work. Immediate repair was required due to public health and safety concerns, as well as the potential for a TCEQ violation. The issue was reported to both the Texas Commission on Environmental Quality (TCEQ) and the Attorney General's Office in connection with the ongoing lawsuit. During the course of the emergency work,it was discovered that additional repairs were required to fully resolve the issue,resulting in costs exceeding the original estimated amount.Key factors driving the cost increases include the repair of the collapsed ductile iron sewer line under the DD7 Canal bridge, which was collapsed and blocked over ten years ago. It requires specialized directional drilling and equipment to replace with HDPE pipe to meet the TCEQ sewer line requirement. Also, significant sinkholes and failed sections along the 24-inch inlet sewer line required additional excavation and replacement, including a 23-foot-deep manhole south of the lift station, complicated by the discovery of an unknown 12-inch ductile iron pipe. A failing brick manhole on the north side of the bridge demanded extensive dewatering and internal grouting due to nearby utilities.These conditions significantly increased labor,equipment needs, and overall project costs. On September 9,2025,Resolution No. 25-385 ratified the emergency repair and also authorized partial payment in the amount $349,336.83 for work completed to date, with additional work ongoing. The work is now completed and Global Drilling, Inc. has submitted final pay invoice for$609,545.21, which brings the total emergency repair to $958,882.04. Budget Impact: The budgetary impact is$609,545.21 and funding in CIP Account 405-40-000-8516-00-00-000, Project No. WS0032.OTH Recommendation: It is recommended that City Council approve PR No. 24684 ratifying the additional repairs and authorizing the final payment of$609,545.21 for the emergency repairs as discussed/outlined above. "Remember,we are here to serve the Citizens of Port Arthur" PR No. 24684 12/1/25 cm Page 1 of 3 RESOLUTION NO. A RESOLUTION RATIFYING THE ADDITIONAL REPAIRS AND AUTHORIZING FINAL PAYMENT FOR THE EMERGENCY REPAIRS OF SEWER LINES AND MANHOLES LOCATED ON JIMMY JOHNSON BOULEVARD BETWEEN HIGHWAYS 69/96 AND 9TH AVENUE IN THE AMOUNT OF $609,545.21 TO GLOBAL DRILLING, INC., OF WINNIE, TEXAS,WITH FUNDING FROM CIP ACCOUNT NO. 405-40-000-8516-00- 00-000 PROJECT NO. WS0032.OTH. WHEREAS,the failure of the 12"sewer line at Jimmy Johnson Blvd.between Hwy 69/96 and 9th Avenue caused a section of the sewer to collapse which further resulted in additional repairs, creating an immediate public health and safety issue; and WHEREAS, on September 9, 2025, Resolution No. 25-385 ratified the ongoing emergency repairs and authorized partial payment of$349,336.83 to Global Drilling,Inc. for work completed to date; and WHEREAS, Global Drilling, Inc. has completed the work which includes sewer line repairs, manhole installations,jet cleaning of lift station, by-pass pumping and other related work required to complete the repairs, and has requested final payment of$609,545.21 (Exhibit "A") bringing the total cost of the emergency repair to $958,882.04; and WHEREAS,pursuant to Section 252.022(a)(1)of the Texas Local Government Code,this purchase is authorized because of a public calamity that requires the immediate appropriation of money to relieve the necessity of the municipality's residents or to preserve the property of the municipality; and WHEREAS, it is further authorized pursuant to Section 252.022(a)(2) of the Texas Local Government Code to preserve or protect the public health or safety of the municipality's residents. NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR,TEXAS: THAT,the facts and opinions in the preamble are true and correct; and THAT, the City Council hereby ratifies the additional repairs and authorizes the final payment to Global Drilling, Inc. Of Winnie, Texas for the emergency repairs of the sewer lines located at Jimmy Johnson Blvd. between Highway 69/96 and 9th Avenue in the amount of $609,545.21 (Exbibit"A"); and THAT, the funding from CIP Account 405-40-000-8516-00-00-000, Project No. WS0032.OTH; and PR No. 24684 12/1/25 cm Page 2 of 3 THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the Meeting of the City Council. READ, ADOPTED, AND APPROVED this day of , 2025 at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote: AYES: Mayor Councilmembers: NOES: Charlotte M. Moses Mayor ATTEST: Sherri Bellard City Secretary PR No. 24684 12/1/25 cm Page 3 of 3 APPROVED AS TO FORM: Roxann Pais Cotroneo City Attorney APPROVED FOR ADMINISTRATION: Ronald B n, PM City ager Suhail Kanwar, P.E. Director of Public Services Ca yin M tthews, P.E. Water Utilities Director APPROVED AS TO THE AVAILABILITY OF FUNDS: Lynn(Lyn) Bos e , MA ICMA-CM Finance Director Clifton E. Wil iams Jr. CPPB Purchasing Manager Exhibit "A" (Final Payment Invoices with the Daily Reports) GLOBAL DRILLING,INC. 44994 Interstate 10 :in,Texas 77665,USA T:+1 800 956 8720;E ntot globaldnllingequipment.com, ! RII.LIN6, INC. W:www.alobaldnIlinaeauioment.com INVOICE Date: Attn: ACCOUNTING November 11,2025 444 4th STREET PORT ARTHUR,TEXAS 77604C Project Name:EMERGENCY CLEANING,TV AND PIPE BURSTING OF 12"SEWER Ref.No.: ON JIMMY JOHNSON BETWEEN HWY 96 AND 9TH AVENUE PA2025-016 As per Interoffice Memorandum dated June 3,2025 ACTUAL COMPLETED WORK ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE - - TOTAL TO— REMARKS NO. % PREVIOUS DATE (FINAL INVOICE) 1 Mobilization,Site Clearing,Excavation LS 1 100.00% 1 2 OPTION-Replacement/Installation of 12"&10"HDPE LF 711 500.00% 711 Pipe,Approximately 711 LF by Directional Drilling 3 letting and High Pressure Cleaning,using Vector Truck LS 1 100.00% 1 (Jimmy Johnson Blvd near Motel 6) 4 By-Pass Pumping(24-Hours Service Monitor) -From May 26,28,29,30 and 31 -From June 1,2025 to July 31,2025(61-Days) -From August 1 to September 30,2025(61-Days) -From October 1 to October 26,2025(26-Days) 5 Pre-TV Inspection IF 914 100.00% 914 6 Rehab,or Change of Existing Manholes(Manhole#15) EA 1 100.00% 1 7 New Manhole(Manhole#13) EA 1 100.00% 1 8 Ilet Cleaning,Hydroexcavation in Manhole#15 LS 1 100.00% 1 9 1ADDITIONALS BEHIND GAS STATION 9.1 1 Removal and reinstallation of Fence LF 200 100.00% 200 9.2 Additional Cost for Trench Shoring Protection LS 1 100.00% 1 9.3 Additional Costs for Generators for Wellpoint LS 1 100.00% 1 9.4 Additional Costs for Wellpoint System LS 1 100.00% 1 9.5 Concrete Works(Behind Seven-11 Store) LS 1 100.00% 1 10 DUE TO THE DELAY BECAUSE OF THE SINKHOLE 10.1 Additional Mobilizations LS 1 100.00% 1 10.2 Additional Costs for Wellpoint System LS 1 100.00% 1 • 10.3Additional Costs for Generators for Wellpoint LS 1 100.00% 1 10.4 Additional Cost for Trench Shoring Protection LS 1 100.00% 1 LIFT STATION 11 8"Gate Valve(Supply and Install) EA 2 100.00% 2 12 '8"PVC Pipe,Tees and Fittings(Supply and Install) LS 1 100.00% 1 13 Slip Lining of 20"Pipe IF 280 100.00% 280 Page 1 of t ACTUAL COMPLETED WORK ITEM 1DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE ------ - - - REMARKS NO. TOTAL TO % PREVIOUS DATE 14 Jet Cleaning in Lift Station DAYS 3 100.00% 3 15 By-Pass Pumping -July 11 to August 7,2025(28-Days) DAY 28 100.00% 28 16 Pre-TV Inspection-Along 9th Ave LF 584 100.00% 584 17 Open Cut for 20"Pipe LF 80 100.00% 80 18 Installation of New Manhole EA 1 100.00% 1 19 20"IPS DR17 HDPE-To be transferred to the City LF 326 100.00% 326 TOTAL COSTS(As of November 11,202S): $ 710,282.99 TOTAL PROJECT AMOUNT W{ ith Plus 35%Mark-Up). T $ 958,882.04 LESS:PAYMENTS RECEIVED 1-PA2025-011(1st Pay App) $ (44,562.00) II2-PA2025-013(2nd Pay App) $ (304,774.83) TOTAL AMOUNT RECEIVED $ (349,336.83) TOTAL AMOUNT DUE: $ 609,545.21 Terms and Conditions: Amount in Words(US Dollars): Six Hundred Nine Thousand Five Hundred Forty-Five&21/100 Only For: GLOBAL DRILLING,INC. ii St JASMIN :•'.sY O Page 2 of 2 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. August 1,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Excavation to expose the existing 24" pipe. • sr_ 4 4;' 0 , , : ..........._ _ ., _____.,..,.. _ , ,,,.: ,..„ , .,.,,,,,, ..,,,,,* , 4 r h i' ` : I. A Pictures Page 1 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. *WM* AIM NOW - i H f � August 2, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Pipe lining of 20" HDPE pipe ii0F‘aller(SEit Pictures Page 2 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. e t a . t i ,..,,,,,, • Pictures Page 3 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. 1011 ae Pictures Page 4 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. • • x Pictures Page 5 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ,t :. . , s . -$ • 'v August 3, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are ill powering up the pumps. 1 August 4,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. 4 Pictures Page 6 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. lir'f ' - a. , 1 � p F 1 L • r }—' tie I a•S. August 5,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Pipe lining of 20" pipe.Vac Truck to clean the pipe. 1 . •�' 95#r ra. --, =y a t Pictures Page 7 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. fi Nr ey 4 - g ,' . 1 1 Pictures Page 8 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. < « « d . y � . < § ,, » . 'i . « f. � . m �. \ ^ : \ . y - \ . �> . �t . { x » © \\£{\ , � . } \ Z f . z .> � » / \ } « . . r - » .-..''''\« : y\ 2 ; `?@. y . ) ^ ) : lriik„ ■ � A a �2^ < v k. : ± ^ : \ ( �` +� \ , { , ? » ® . »Mk,«\ Pictures Page Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. • • _ ;s1 Pictures Page 10 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. .......,. . .., . . : ..:.. , . 4.0„. ,,... ... , ..:,..,,-....",,.,.: 1 .„. . ., , -,,,,„... , F . # ,., .,,-.- ..-.. - li A l' . ' ''.- l'''-, . ,. ,,,, .,,,,.. ) 11110, , 4 ' et- Pictures Page 11 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. } �5 t August 6,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. 1 Pictures Page 12 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. August 7,2025 Pictures Page 13 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Uncover and move the cables(AT&T), power and backfill.Set trenchboxes and sheet plates. Uncover and expose 20"pipe for Manhole#16. i IN' I • . 4-. ia illow. .._ 4 � r . . I ir . g .... tu of ,`„ ? "•F • - ifa- .4d. j - A k t' 4' -� * 4 — Pictures Page 14 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. }� r 2`• V ,. #� , n f r -- - - e , � . V, Pictures Page 15 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. if it ,*1 �� 6 p ,�. _ , ', xa ' 4 .:.,,j s , , . — f#', I , , A'''‘',. 3 .. l# i r Pictures Page 16 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ... ,. .,�__i. •,t (P-4t.,/*E.:: - oi, ,-- It n ,—tili„, ,:-. ,'*-2,:41.—_41,,,shit- ---44 ii' ^" ".?'",• ' . } " .. L. A 'c -- . i V ^' '= iE. _ , . : t • ' i , ` , , - —. -4.!r ' i ' :. - '- . ' ''p , r i_ o f s r li •' •_ t . - NV- -- ' 1. -,,... t t ,. :: ' .. .0-4, - . _. . . , . ___...„, ., . .. ,,, " t -. .. ,a ,. .:.?..4„1...40.4 no:.•••,,', r :, t s. 4f '•M� 1 e. k L - Pictures Page 17 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. w } ti s • 404 4 T r ; �_'t+ v. kr ; i. 4. k #♦ ' i s 's 0 ' . / y 4iiiii f , .. , :.. „.„..,... 0., . .,,_ ..... .. . .. .... . , }a • : , ::.' ., "41116ik '711'' 44 a... V4: ,ii ,_ , 4411/44 At.' N. Pictures Page 18 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. August 8, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Start excavation and remove the pipe at Manhole#16. Put rock base at the bottom.Set-up the manhole base. Install 15ft of 20in pipe,connect to manhole. A 'tic ' { , L. ¢ t . .'° =T ow , i . s It .- a F ;a A .. ..P 1y.-F ter ¢{ ~ - t ‘ si 40 •0 , , -' .E-.vat' Pictures Page 19 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ,, „.. :. ,,..- ... .--:'...---:---i '• -Air-, - -- -- r. ---., .. --4 '.'4' iiiii*it . k- ,,,,--:, . '-i...%,ks'" . ,. . , 41k$ ,. ,. '-1*4•• . „ik- ,. . .„....- , ..t. : . .•_ ::.17, 1 k-, - .,..... . - - - - ., .•,..,.. II . . .., ,. ,, .... -., - 4.-..-..44 . , ..„ ., ,....0 , ..,.- -..7..,..:-...:.'.., .1....•, ..- ...• '' 4 l', . . - -`•4:, ..4; ,,, ,-- . i Page 20 Pictures Emergency Job on 12" Sewer and on Ji9thmAvemy. Johnson between Hwy 96 lit --; 9 `i ''' kik/ te F t „ 3 d 4 -,11 . .1, ...„ ,i \kt , . r ,,*4\ , 41. Pictures Page 21 Hwy 96 between H..' Johnson ,. Jimmy , . 1 7 ii Sewer onath Ave." on -i-- and ' , 1/4 cy Job Emergency A 00441 ' ' .. , s A .4- 7 . . ., 4! ,, '- -' ,•'--` t • . ., -., or '- •"---4,'''''' 4-'''''- , . . ,•••''' ' •,,4-.7' .4,7 -;„''''A..-1 ,...,,,',„ I , \-,.. • =,4:-.1,'--'.'.;...41.,'-, t ' . _ . .,. . .,. ....< i __..... Page 22 Pictures Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. August 9, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Set up manhole#16.Add more rock base. 114 . , _ j Il i N 1pr a y, _ i 3 ((i f' _ems• i .1 iiii ,'. : . , .-!,..ritir'i 1141kSg - -r x } Pictures Page 23 Emergency Job and 9th on 12" Sewer on Jimmy Johnson between Hwy 96 Ave. M . :x' p. - i R f A 4.A: AA+,' Z',AA, ,,,,,,'A, \ii • ' , -,.- ,.. ir- ,,„ pl,..4: 7',,,:-:,- ' i if . ors 1 t i. a..� 'h i.4i' ' : r k4. , a Pictures Page 24 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 e. r _ - r''''''',i''f.:.),...e7, _-1..,/,:,.,,,,,,.. 2 ':* 4. : :. i.,,- -..,1„*.`" '...z.:, i ,,,- 1: -i ''''''' 44. iv 1-'t4s' ''C'''''''' ' . *'- - ;',7,..',,,;1'''1,2'-':-I''''1: a F fit . _ -- "'• .+l • ., Pictures Page 25 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ffis w , 1 August 11, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Backfilling Manhole#16. ,a 4".)35 A 4uy t L. .,Fec Pictures Page 26 Emergency Job on 12" Sewer on Jimmy Johnson betw Hwy 96 and 9th Ave. 'i ° i , B . s ;w' .. v t, to111 ,.. s i , • , t Jul Pictures Page 27 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. , y!p' y , Y i .a --- ' t3 + ' _ , . r v. • Ian-, _ . . t' ;^ . ' W ':Yak • .4. . f i V a • 51: „d - fffi�YYY, _ k Pictures Page 28 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. fl August 12,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering. Generators are powering up the pumps. Entergy fixed/reroute the wire. N. ..... , s. , , , , , .,..,,,,,,,:„•.2..;w. ° , ,_ ,. , . . "sue+ 1 m 41,'''**4 ° ii .44' ,,,`` - ' � ' j''� Ii - ', ,‘",r r,''''‘--s -, '-',7,, kN ,i, ..., ..,..„ ,..„. ., ,, , ..„.. Tf . ., ... i. . . . M ,,,t. •‘,..„ • ,_ ,..,, ,... ..,. ...,. .,.....,..,.. . ..• ... ..... , ,.? f ...,_,. ',f; - 4."-'' • ' '''4,..e..2' • .. Pictures Page 29 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. August 13, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Cleaning up and removed the trenchboxes and sheet plates near lift station. liktie • Q f' J< :asp I. � . 1. .�. v 4 ::: -..:1•,„,.,..%...,s,_ .< , ,, ,,.4:44.4; yfi , , . 9 .-Vie++-_k. ...... - »x ,. g - .. 4. - _ . ,-. 'tom 71 '�\� .g t a ' Pictures Page 30 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. August 14, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering. Generators are powering up the pumps. Finished and sealed Manhole#16. Fix the valve manhole beside lift station. {�it �.. .. ' ....#;..'. „a <4 �1\ mi l r %iIry f-- ..'.'r' Y. ' x3 , bar v • Y, - _ r • - , DIY.• a- v mac- e' Y . t .• •. - , , .-, -- -34,4 - ,,: t@ ' wv? ,tom s t �r ' %-. - •• -*•-t-- - "7"'; * • , - weft ..---,0„, . .e-'. :-.:i'''.,1 T+` _•% .r.. Pam` . ,r . _ L.,. • _ 1101;p:1V:tit '., 4',.' Nk.. .. Pictures Page 31 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. d h i✓ .sy. 0p ' ie-iMt � n .. 4iiiiP } _ 1r t 40060., ,,-s-'ryy?^ ..ate' ..;. 1,,_ m F „ a' f . .ir "v Pictures Page 32 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. August 15,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Backfilling and restoration near lift station • - _: a a ..t P w. , -14 s " Pictures Page 33 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave.411%tom. °♦ 4.-.4 ifi `� -4PC N , , .44 August 16, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering. Generators are powering up the pumps. August 17,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering. Generators are powering up the pumps. August 18,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. Generators are powering up the pumps. Finished restoration of surface area beside lift station. Page 34 Pictures Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. August 19,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. Generators are powering up the pumps. 1'.'11.:*/.:*),: ,. 'i:: 7: .,* �(�' 4•' 1 ,: s. 4 . ) . +S Jf a 1 #mot } +4 = t r :)r.,,,,, t i s, y , 1 1 i 3 k M Pictures Page 35 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. August 20,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. August 21,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. August 22,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. August 23,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. August 24,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. August 25, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Moved additional excavator.Set-up pipe plug atManhole#14. Helped the City to unclog the 2 manholes in front of the church along Jimmy Johnson Blvd. Pictures Page 36 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. August 26,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Set-up 2-24" Pipe Plugs in Manhole#15. Bored under the road from Manhole #14 to#15. • Ufa, 1 T Y .;a Pr � a Pictures Page 37 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. E I A 1h,) r ' `.- 0. '744 I August 27, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. Generators are powering up the pumps. Bored 12" pipe from Manhole#14 to#13, t a;+► Pictures Page 38 3 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. r ::::* .y. :.1 y r 1,4 sit, s5 ,,y r 11,„„,...., , ik ,,,„,„, -..c. \,. I. N.\ x e. 1 Pictures Page 39 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. r , _,-. ---, A „-,111001f. ' 1.4: w a #3u r , ,,,jior , ' . ' / `' ,; arm Pictures Page 40 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. -44 \ August 28,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Set-up trenchboxes at back side of Store for Manhole#13. ii. i J V =tea , 4. `i '.0. ! RED - - _ .. —Y Pictures Page 41 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. August 29,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Delivered materials for manhole#13. i1 L .,, K.:..� a; ♦... fix` # -, a .. e , $ £. y +4 #� lit 1 t ,,,.... p i p + _ -t400 mist wow ,t Pictures Page 42 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. August 30, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Set-Up trench shoring protection for Manhole#13. x 1 , •f fi ,gib? i.'._, Pictures Page 43 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. September 1, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. September 2, 2025 . .., i ,.‘7„., , Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Excavation at back side of the store. . ' M . i v 1 9 . } ,-s ate; Pictures Page 1 i Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. . h i ,no, -tre, - -..,. Ite- _ 4 . .. w a .. _ . A S r , fir . xY ;: 1 " -• ` ' , t B x . " e,5 t r " September 3,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Moved the dirts away from the hole.Cover with steel plates A , , _ . .,..,_ _.,..._ , ;. ,. .... . . :.;„ . ,:.. .. _k, 4 , ,„. . ;a s ,.„„:„ _ , ,2,..,....:`4t.c5 .'t*,..4:2,Z3.t " ...... ,,..01' ii iv. -....1.411109,4.04,1„:44#0....1, ,...,44. -4, _ . _,„,,,,..I•:"4—.4'.* .:,.,. .... ''''":"."`"-7""4"-`' 4.*' , Pictures Page 2 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. . ,141 Pictures Page 3 Emergency Jin ob on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ginr. , ' _*, ' 1-� ' ` q _ za -ya rya : 's a z*°, Y g a `} ' 'y�y'...t r am „ .- ,a. c - September 4, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Set up new dewatering system for Manhole#13 w . i r tI 4 • '}q, X3 'Y � + '.1.414e17,1t"..:-f- t-:'',f1 .-z'w.,4 2. ' . fit S 1'. Pictures Page 4 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. September 5,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. September 6, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. September 7, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. September 8,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are • powering up the pumps. Mobilize additional excavator , i 1 \ . . ;; -- . I .�.� t 'a " _,"� )14toilt. � s _ } :t :!sit.: Pictures Page 5 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. September 9,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. September 10,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Continuation of excavation at back side of the store and setting up trench shoring protection. '°, t -. c'' t $ ; / , \\\ : -,,,, .-4.cilt .4 . •1 ; .. .- Pictures Page 6 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. w of „,::.'s, "grip s , ,,„ ,, $.- 2,.: _ ; . at erg ` 9„ F Pictures Page 7 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. _ _ September 11,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Continuation of excavation at back side of the store and setting up trench shoring protection. ■ ""iw ,: - _A _, . ,,. liotit. _,,,:a c.•., .. '- e .0'4, µ, a - : Pictures Page 8 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ,AL . ,401111%t . t i 1 - 4 - r tl at iZtl. ._ . i- I ) .-4411.1 ...1., :),,,,,i40,. . ,_. - ' :: ,iv — Pictures Page 9 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. I —1 • -' '' -- 4 ' ' -''' s----- ; .... _ 0 x 8,,,. . . a" „,4-- s • A..i-..•.0...,.. _- ,,..-,..c.,.... ai s+.1 t ..w. .n �, 9 A�adFirry -. e� ,=F ..„ . ....„ „...„„ ,,,,....., : .. • „„..,. ... „ • ,.• aY , , All (, .. •'8 r .. ..,, , „ - ,, di idri .._ .. . , ., . . __ . . --..., „___---, ,...„... **::.--.14- F V ...14.. ' rfr tih t. Pictures Page 10 Emergency job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. N- . ,., s September 12,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps.Continuation of excavation at back side of the store and setting up trench shoring protection. 3 e , ir ' '� i•,-` t Pictures Page 11 11 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. September 13,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering. Generators are powering up the pumps. September 14,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. September 15,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps.Started boring 12" pipe at back side of the store.Started setting up Manole #13. :, 0;# , 0 ' I_ilfir: ,fili..; , . '4.".:. ' fi,) -.'' ,.. ' .c: ,', - -i 1,7 r9 ./-` 1°1 - , Pictures Page 12 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. t v tea. + • • I war- 4k �jj a r c „IC 16-441 September 16, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Continuation of boring of 12" pipe at the back side of the store. Conducted Pre- TV Inspection from Manhole#14 to#15. SOPcs{ { Pictures Page 13 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. __ September 17, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Backfilling at the back side of the store. Setting up Manhole#13 • ; . i , , f ._:. 77qq +fry' -' # r _ ,. , . ., ,..__ , -- gitr C'e ,., " -.4.1V T. . ,.,1 _ . , ..„,,, . .., r7 . „^ £ — - s. r t 4 ` * f;'f J , t* .�may:. i 41 . . .6,E, , .. - -...*. .; �_ k` ,.. t$s,. jj\ `� e {{jj ' v Nom.' -?.... , „, , 4, :.‘„...* )• , , , , j ,,,---- , - , . , , _ .6- - ti i . , _., , -- 1,-,..7,s. - , - , ••, . _ hp 4 f.7 ,. 4'71` , _ Pictures Page 14 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. elf miiiimais „:„..,,:r..,:,,,,'.'"!,.iti.,11....-:-... rf J + I 1 t �f ice ) ' =''•: 1 �Y Ofr 4 ',_,:te..... )_ ,,., ... _.. ;4_,... . .: , ,., . . . --2roti .r., , ,lf...,;-)111-_ '.,*.4 ..._.1— ' - .,,.. : '-- _.-- -1:'14 2•' - 111A- ik - .. qs ,q r: s Pictures Page 15 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. � 9 , fit+", .. "' y _ may,.a3 • yy .v+_,...aa:uY September 18,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering. Generators are powering up the pumps.Setting up manhole#13 `fJ, eb 1R J fri $ * 354 , 1 _ a._ s �,. „. 6, Pictures Page 16 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. September 19, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. Generators are powering up the pumps. September 20, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. September 21,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. Generators are powering up the pumps. September 22,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. September 23, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering. Generators are powering up the pumps. Set-up pipe plugs. Fused HDPE pipe rb J . ,; a' a ilil;- % / - r . . i 'i- ',� .-.- .x__.. r_a.:a , _ - -,_ .as �; Pictures Page 17 Jimmy Emergency Job on 12" Sewer on J• Johnson between Hwy 96 and 9th Ave. e , .0 i . lit ,Alt s,g k. • ,..40 .,_-1"W 7 „ b is .k'''' C - t ..._ I%''.`• i ,„ ,„,...;,.. ,....,- - s.- :„,:•*„.- -.# . .4,z " ..,- . ,`, . - • , ?. «, 4.;? •, ' , -''':4-*a -4 1 ..*•-• .....sike..,, "0"1":,- • s -fi--''.. •.; 9. „A , '- .'•'--" ,.•.-. .-v. wit 0 tw• -1° l' • \ * . •:Iktk 4••;• — f,,, Vv yr r• • t‘ 9 . kl• ..; •.*••.:1 , : 4•Z''' Z197,t•19. • ' •v• ... - / 'r... *V g Itgr: It ''lie4 . , *;'il'...''''.3 4: A ' t:a.g,•• • 1,41t 4449• 4.44.% ),c..c/ , ..X..*\'°4•*. '-'.4Z. \ . -1. ,i;.- ..'71* „ ' • ';'01.1...Ir.. . •••Allt . i. - ., ,• ' ' ' i . t NIS A,t''- , 1 11 ...1! 7S, '..... . , .7:00,‘ 11, . , -__„_______, / .. i ___----- ........................,,,,,,, 411101k. 4 , • I n 4 \ ,t * . Page 18 Pictures Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. N : '• \- ,r, -*if'''*' t Ak '• �• 9 ' max Y •: ,". it* yt '51,* • Kr. ':*-,,0**-7.::e* '':::-.'")7 -')4..11' . ' ' ,f. a,`� ** 4`f k �t ~ i rifil , 1 . i ,i,i „,..4, it r,,,. , _ `,, �N r.:fie, 4, `. �� L1C .. v *• Pictures Page 19 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. September 24,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps.Set-up 12" pipe plugs. WApt a Z g„ ir Awe,'414111r ' ri- . 4 IONtiell, #e. _ Pictures Page 20 Emergency Job on 12" Sewer on JimmyA . Johnson between Hwy 96 and 9th ve m Monitoring and Cleaning the Pumps and Hoses.Septe Continuouslyber 25, 2025 pumping and dewatering.an Generators are powering up the pumps. Delivered equipment for boring. Set-up equipment d pipes to get ready for drilling the net day a 1 �3t a . • Pictures Page 21 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. 414. Y � - _ ' '3 Ate" 4 f rrs Pictures Page 22 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. -„ \ __,_ __... \ __.____ _ ___,._...----- ,,. .11_ , R , s , d . I, . i • f 'M Pictures Page 23 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. . . , l 4. i,* Pictures Page 24 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. — . ,* . ... ,_ 1 1* .' .s Pictures Page 25 1 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ow 4100, Pictures Page 26 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ,r u g* , 11161111M,at— r '„mC.i1`'1"""" ` it t Pictures Page 27 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. \ : _ __------___ ‘Ni,,:',7':.'-‘4,-:..i. ':dr - , ,c t� s Jy. r•x r, -'.. 0 •.....—•...,-- - ' .- 1-4 — ,ter. }r Pictures Page 28 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. k � - **digit_ Pictures Page 29 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. vio".111.111 4. _.,u,., r, , t — wpm !• • _ .....wara:. Pictures Page 30 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. Pictures Page 31 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. September 26,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Pump out water in front of the church along Jimmy Johnson Blvd s s. ., 4� [�� "&fir : � ' ''; a .` u �_ ''4 * ...; 4.' '. . j. '' 114ditr :,141' '4.'i'' , ,-, ..., • 1 c ' s a1 ttle. .,.., ,...0.,e ,,r,,.. -:,-,c,4, ---__ �. � � ice_'" � o Y #$+ ' t %F1 tl it,L,e,-- -4.'7it: i x September 27, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. September 28,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Pictures Page 32 t Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. September 29,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Continuation of boring .t' C Y' Aglingille Ott Pictures Page 33 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. • d ' p T9Wy�Y�gJ a - $ aw t s • a Pictures Page 34 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. It , 14:44t411 -# Nt d , 1W .t Pictures Page 35 Emergency Job on 12" Sewer on and 9th Ave. Jimmy Johnson between Hwy 96 ; xr. ''''.,- . g { • • _ '. -•- F' �a ., " tr + Y`..# �# a t ire,Yn Pictures Page 36 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ` r , a ./ ' '. t .., "` ` , . .a 110 Pictures Page 37 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ry yyA A Ir ..to* �.�a•, .s , *14 � r >; l l .: Pictures Page 38 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. i f eSi' vItit, _ ' " YJç . lit‘,. t 4 - `, .; r. ,X:. g} • � r y 1 .s. _.r fi •... ti _' 4. M ', - Pictures Page 39 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ,' ems, 1 r fli J . 1 r .... . 1* 11 IP #, 19* . r iyii ' — - WIN MIL* ..'sc_. - .o 4 a J` ,;, - i . i ...i I, ,..4. r MO • 1 1 II Pictures Page 40 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ' : ,,,,g . . . , ,, . .. .r. . .. . , . . , - . . . , „ ,... .., , ,.......' ...,, ,___,....„ .r.,, ,, ....„„_ . ,. ., , . , , . . . ... , . .._ . ,. `, tz y. o. 3 , ..,,, _ •1 V44,7 t.,,i _ 4.it., 7 _ - - . • • -. -. .;,. ) • b ::,:, ' ',..-,-,---- .,..,,,-,. i j 4 Pictures Page 41 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. — - • Aer 7". •- Pictures Page 42 Emergency Job on 12" Sewer on Jimmy 9thAve. Johnson between Hwy 96 and , " .y ,,: , ., . , ----,! ' -. * ,,,A,. ."-• , a, '''' )r.'.)t --''''''4. i'' - . ,. F' ; . ,-1,-, i ,..''.: - g � f- • �! cam` wy • IMPg g-, 4 - - ---------.„,,,, - -.: , _ ‘ " _.z --: : ... :1010-...,.. .rR I Pictures Page 43 i Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ''-'.- \-- \*.tit%- .4.41 .:.,,,,', , 1 7:; ' L •` *. 31:•'-..e,ZA•!.: a t , r •-tea ;'- 4 sue, l► 110 t,� a t.. ; i nil 0 .t sa .. T:♦,.h 1 4" r y .k 4 ilk "., ` ( , ` Vie. � .af, , �. ,.tr e, .ALA,, 'ti a , h ',• ' e, , 1 111 Pictures Page 44 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. . ..e. _ . \ - -- , - --,* , - ... -...t \ . ikt. -..- , %-- N- V V: . „ . - - . -- -.ist: '04 Itt° t..1 ,.... . i • ---.-- ,'. --- f , , . ..,.. — .... .. . ? .9 .._ I ‘ . . . ,. Pictures Page 45 ) Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. September 30,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Finished boring from Manhole#14 to#15 ? t , - . ... _ 3 f fritt-- — ..., � ter. : Pictures Page 46 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. z rs .11 r � Y r <• £ r Pictures Page 47 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. w ;.s °'-:` :.` r Jam, ` .-Y u' y R w .,' ,+ r .R ,gyp >s ' _ ,• -. ,. R ' ,.--- `— ..ram _ fl �+► , ...termilw. ''' ...4 , , - 4,-„- ,,,, - -,..w.:- ,,,..• • --,--,z-rk, AP,- •,... ,- ,,,..--i,„,,,...;„i„,,,, . .. ..„•:• .........,,,,,,:..:. , ,,, _„ ,: „.. . €1K� .r �`:N+ a 1 � . ry '�^+.aE�+t srt '`-`f -.., . Pictures Page 48 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. 444 2 Nit if v. " x r -e v. Pictures Page 49 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. , „ ,. .,... _ „....4„,,,, .4. ,..,,, .. .. , ..4„....,.. .,,,i . , i liv „ .. .. ..,,...,.._,, , ,,,-.„.,,,t,.....- ,‘, . ...t, - ; ......,. .,._ _ .,: „,.. ,,., ,, ,, ,, -„,,,. , .--ftf- :.iikt ,I.t. .... ..,, „_ .. ... , I, . . .- --, , ,„. ... .." .-/-4: , ; I t { _,..„,7.--,. ..--,---„.. ,, - .,„. i ,. _ , .. ti ' ./ ' a * '— 4 � s i^' ". .mow My._ > - Pictures Page 50 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. • lip or!. T . x• !s^�- Y=° a ' ►' tit Y A.} '' s Pictures Page 51 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ,rr40 4iq >e r q " � ' .. t t ya a e t aC. ,;, s1Fb•. w t Pictures Page 52 Emergency Job on 12" Sewer and on Ji9thmmAvey. Johnson between Hwy 96 .. - .. t -Lt .., , ? o - t ." i► 1V� - v aH . t h;� ♦,- -' j'- ,,Y '.+, ♦...a.uf_ ..+ :s 4 _ a, -i ter - - _ -l Pictures Page 53 Emergency Job on 12" Sewerand on Jimmy Johnson between Hwy 96 9th Ave. Aosik it vr- ' jj ,,j 1, , .. - L. . d`- .: 4; , , . s I. 411. ,{Y • . '..:-.- '' z r-. " ,t, --- :- ,,0*.?-- -. ° 4 r> , T Pictures Page 54 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. r4114 .':112113;3:3',,IF,,:.2,1477,7 ,,"44iiir1:4::4:,,,,,,4.44%. 44::. :3. ag,� �1 Ir. _ rr 4. -- -.... :. ,. .., ; a % ' l'i. _t 14 � ! ; jp- i ..,,,..10* 4 # l c ,j, "IV • ti . ili i' •'. --:7* -'''' ‘ v , . 4K Pictures Page 55 F Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. fr , i p � s m. $ .. .... ,, , . . - „el r....iiiki y. ra, s " Y .'S k ;.. 4. v d Y Pictures Page 56 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. y yy hi '41411 . .; ir ti ' .fir;..'` - Pictures Page 57 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. • �: , 441111( A .. . I.* ‘,r . t � 4. II 10, ;. Pictures Page 58 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. . ../ /. ..‘biC-...4 ''''',--,:',.4-'4.- .11011t. 1 • n v c ik, f Z @ F , V ' - (7: ,'-'- k . 1- „-. =a Pictures Page 59 i Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. .ems .., .. -x "t I . I -.. r 4 -. - „ a "Y`ty • Pictures Page 60 II Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. October 1,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Finished installing the 12"pipe. Continue installing the manhole. , fr 'y,r' ^gam" - ' S iii 1 if,. t I ., ». 4 y.3 Y ,i _.. . i' 1111111111111111.11111) k_ f Y f k ` ' ' — - ihk. .!'44*- -;Z:04)— - . :, .."-- ' ' ,. , i.. ." ---.... rr 4 _ , • Pictures Page 1 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. .. , lilt , -. S' '4' gaP4 ', ,.:0i... ..„, , , - P* - - 'f-V-i•/‘1-4 to - !% ,...4k,\ . .."-4 ' Itk ' .,,. -.' - 77 ''-!* \ "„;.5 , ..4:.e ,.....,.- )- - ...," • - .j-r . 'i'."." ::-. k, . ,(„.., :i ' ''''- ''- • ... , 'it'll& At-?•:' ' .11, ..,,,.- %..r\ • ,.:: 000 too '''' ' lirlifir'° • ,''''..,..;-i,i'', k __ -, ., ''' ' 4k • ,/ " • .- V j 4 , , \ .. - -,,....i. -7- - •••••• ,' ' , . i _,... . , 1 ,*:-''''-. '''.. '-•-• .'-': ' - ' ;*.,........ t ,, ,,.',".:, --:1,1.'-?...!...,',,*-—":„ ..:asH-r„..„ A , ....,..„. .. ...„„,.....„... ,, .., _ ...‹...,. .. . , . .. ,_-.-. , . ,-. - — .- -:''1411;!t• : via -7 - • 4 . , , . % / ''' -' -1.'-. '-'7 '.--- Page 2 Pictures Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. illit \ '' _ rt 4 ti fig - _ ,.„._ „, . , r,. ... - _ k 44 1. x Pictures Page 3 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. p 111111111110•-- Al* 111111 4 ti- Pictures Page 4 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. 41111001Pr ---"- 4 .„------- ,,,,„,,_ ___ „... ----, ................. , . .,,,.. .., . .,_. ,.__ _ , Fiji, , k ,} 7 .i •\11 r t - ,# Vim. Pictures Page 5 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ...men, , it . i -1—\ 4 Ili I ! ‘ - { s or "' ,, Pictures Page 6 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. { ,ate= �. F. i , / 444r, 1 x 4 4111 Ille :1:711.°- ' '''. 4 12.-----d'ai , 4 r A 4 s • _4 s Pictures Page 7 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. lii4 . 1- ' I ill_ a _ f iiii . 4.- t - . . t a _ i + V i. *4 ill .' illir 4 I 101000Iry s lir s ilk Pictures Page 8 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. - : _ ,. :" R.,:' - ANL , . . i 1 L Y 4 ..., 51 7 } t 1 . '*--'''‘ 4 •, '''..,.,' Iv . r c . Y -k. f '• 4s to, it �� r t r T : : r q' �: F ''''44' fr. : ''' -...„,4-(4*-;*er'''''';',-.ik . „ - -,-Ab `ems • 4i • '3 Pictures Page 9 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. v., -.`. . ' r . Ilk At, -. . • �, ....o-, m. a r r�R • ,,n - ''''''-'I. , ; p.- ., ill 4 -"' ':-.-- ... -1,.,„w4;....- ' „- , ;;;;4t.', ,k. -1.---. .- .; i'‘-, ± T `J` � .';� _ �_ 'r+r"a...as Pictures Page 10 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ! - i : ' -: _ , -:,,,:i-,.4.,- ,..•, ,.. _ _- ,,,• ,.,, _-,..„ e ,, .. . ...... . 1 ,...„. _ . ,.. . . ......_,, . . ,..„...„„., , . . . . ... ,. . ..I ,...., . ., „--- ',•:,-7.,.. r . 4,..: . ../.. , C A A , 4 , ., , -At . . , 4, ,., , •,... ,,. -.:4•,,• .. ,,,, , lip,. 1 ' III* , ., .., ,,,,,... ,.••• • ,, , . .. • ‘ \ / t,, , „,..,, - a . ,,. a /I ,-?1,---" --- —I - 40 ---- ' - '''' 14"71.11° - .-„..... _ ...1-,..t..44.....,....L......= ,- _ - „ Page 11 Pictures Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. , .,,,..--,------:7,— ,..-' - . _, . 44, . 1 • .. z�- " _ i Yt.. ' �tlt� i ;ifr _ .'s--' ' ' '7 . *. Pictures Page 12 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. p � t-, . li t -.•; fit`" .,` i t y, z3: e #' Page 13 Pictures Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ..-- 7 c‘: :', `Ira , i tiXp 4 i S „. October 2,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. Generators are powering up the pumps. Removed trench shoring protection. Continue setting up Manhole#13. Vac Truck came to pump out at Manhole#14 lialk------m: . ....- -... -2,1*.:-. - --: :: ,� ..; .r r .. -,.�.,1. s 3. ,yd- ; *„r $ .4 A„'-- `,— two l,-- ram; ..., `�`4 'P. o ' T Pictures Page 14 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ________------------- -_...d.,.... . „... . . ...- ---- , 00 - ' ' '-,.,',7-; - . .. *- ,- - — 4,wi.. .. . , "1110;,-',le' '-N4' '1*- ,,,., -,V ..,, ..1..gr -AtrellOit 't-- 46N-Ar;.....,,,,,1 ' .-7,- ' -..: \ • * - •V. •".-- ort7eir.4v--1:- r- Z A fik * , • ...- yr-1F" armerr. ,„ii AN 1 •0's.liftl ,.4:-. ' '- 4', *. ' 24:44,1'''‘' . , . . . , . ...,. 41. • 0, I. . VA i•: .4.' t....k k \t„. i, ,,,.0 •• %.t* • '-'s..„. 4 • •- Pt..„ ... —*NV' - , - - .. , ,f '`.., ' • pts, :C:9 ''' '•- '4,-*-8, , t • it J -- NO ); •?• V '.1t%'''•:),*P1,*`. . • . ' , *A'4,04;'' '.. , _ `•-. ', ;4, .•9,i 1 ) .0:- v:--"'4,-. `. . . . ,,, III -- ito! ,.'Au"' ' s-• if,.- ';' -- .. ..,...''44'..• ; , - • ' iciLi _ , , --.- 4 ' : ,44.4.7„ ie. . A''.f *•'•.. -- _ 1, ....;„:„,•.-- ,,,*d ,-, • 3 i'., Pictures Page 15 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ,r ,- - A R J � a ; . k jr I i s j ti 0/ 3 .} r * s t e , , # k • , :„ .. .r; r . , < '. -;t,. It .. �t' till* i 111*. . •" , .„ , . . c ik. ,,„ , . , . , , . .,5 y t r . .si"r ' v. S. 'fit Pictures Page 16 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. . y ._ `�..''\ fix;}-`-,, ':., /"'t a • I ;' ;tiz' .`ter . } � ot IF .4,...,1;14_ ,.'' . ,; c,i- _t,....,-, _ . ,.. t _,�._- t, • .40fliffie .ft, ,_, , ,., it; r-1.,1 , . 4 ••44.1‘- (4 ,11 A j r -'*' • i ti. k.:. t .r.. .« .. F at 7 w wr Pictures Page 17 Emergency Job on 12" Sewer on and 9th Ave. Jimmy Johnson between Hwy 96 r 14,7 - >, y F a Pam. b, � [vim. - i V- - F f, "Ut-. _ 4 `7.¢ am ' > 'N r Pictures Page 18 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. • ./-1- -- -'- .' ' \ - '' ' ' ''' - S, } 3, yz r rR • - A it 4$401, rif . ' r '4' *. a `�°`' �`s.' i. d 't, , = .14 '. `sir <°+ October 3,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Clean the hoses and pump in front of the church. Continue setting up Manhole #13. Backfilling. rs r 1111111 Pictures Page 19 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. c ..e 1 y.r 5 � 3y Pictures Page 20 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. • t - .F a � . K . Pictures Page 21 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. v ti 4-4 yg ., ,1 4, 4 It isr' _ G i t if li Pictures Page 22 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. E s€. . , ,. f_ { Kf "�A a- ' i . t }{ ♦ • Oar . I *14 '?�"r ,� S .e+` 44 'AYE A_' `._ • die ,olivir ., ,- -::-..., -- ---.73e- - ..., ..i.%.vow, i I :.� i*a' !- it I: ! i; t. I/ I t Pictures Page 23 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. '. - ..- ♦^mot i< t ^�, fkx ti —— ., 2 Ltir . .. I A- c. - i * ,, -: 4 I"-' - - 1 ' 3 u' .t a'. ''" yuT:, • " a� t.z.,i,.r. . —,-- 44,,..-,;-,:tr, ‘ - - - -- -...._tz. ,. Pictures Page 24 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. 1 r', T s` ''**stZrt'"' V%% ' , Pictures Page 25 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. Pictures Page 26 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. • • 33i Pictures Page 27 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. i A a ; vif o ,:em. ac a .„ a ,;emu, • October 4,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering. Generators are powering up the pumps.Checked and cleaned pumps at front of the church October 5,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. Generators are powering up the pumps. Checked the pumps at front of the church.Also the pump at the corner of Jimmy Johnson Blvd and 9th Ave October 6,2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Checked the pumps at front of the church.Also the pump at the corner of Jimmy Johnson Blvd and 9th Ave. Dismantle and loaded trenchboxes Pictures Page 28 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. . • • -,4401 Pictures Page 29 err Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. y - t . October 7, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Pumps in front of the church and another pump in the corner of 9th St. Fused 10" HDPE Pipes . . ti°11' "-- . ",,,, .,. 4 ..,„ , • :..,.„, .,,,,,,,„,..-440. t o ,...{, 4: bk- AP ..h / , Pictures Page 30 d Emergency Job on 12" Sewer on Jimmy Johnson and 9th Ave. between Hwy 96 ill is is , a +s r mow,,, C . , /P , p c ;xt Pictures Page 31 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. it ,,..,,:i 1 'r. ., 144111141, r. .. t yap itirs=3.116Ptr. 9� y y n .7+..:. ice' F X F' I x� � F .',..itatt. ' , .4:4:4:‘:4111 �(/j r v rslIONN OW 1 , N�Ailk, Pictures Page 32 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. October 8,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Pumps in front of the church and another pump in the corner of 9th St. Finished fusing 10"HDPE pipes. Finished manhole at back side of store. Backfilling rr: s � ? � ` ,111.159 E «. . r 1 •• dry. } b ems.. ,. f ,.� =, Pictures Page 33 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. i fir * • -10 • wf • v - 2a a ,* y Pictures Page 34 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. MIIIII MIBI..it - . 1. t a "' .3,. ''max:: _-f --"'"g , r„ y ter= -ir -• -' -�:+i s it . .Y • r f :®. g It .saw• '•'"y; +}e ^'may.., • >• '�r_"'ft. 4' .�`� t � ' - - •a- _ Pictures Page 35 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. i , ,...,.,7r.t.i ..., ,1 9 '- " � �� Y mar N t. '`t� ', tR ` , .. 'fir ✓} + `l'l•w T.i �� is y.. tIli'' dor- ,__ - ' , _ `mot Pictures Page 36 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. • a � October 9,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Pumps in front of the church and another pump in the corner of 9`h St.Sterted pulling 10" HDPE Pipe. Put rock base.Vac Truck pump out at Manhole#14 r • .' ;c ,s 4 Pictures Page 37 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. 1. : , .er, ,,,,. ii I , . , ,f,„,,,,„„,,,..., . , , 4 - ;, 11 , • 0 -'lfr . I 111* Pictures Page 38 Emergency Job on 12" Sewer on jimmy Johnson between Hwy 96 and 9th Ave. , g . _ ' .: . too. w b y j... \ 41' 0 - {a ` . .:., . • r ;s r, .; ) h6 arm 'C .t! " . ' < Pictures _ Page 39 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. October 10, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering. Generators are powering up the pumps. Pumps in front of the church and another pump in the corner of 9th St.Vac Truck pumped out at Manhole#14. Continue pulling 10" pipe. !F". `t► Vgir - jeamtliott 141114,,, "yam Pictures Page 40 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. a Owl'. Y .. a : ` —„ Pictures Page 41 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. _ • ,441441 Ica me J ice. y m Pictures Page 42 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. , x 4 w � 4 1 '` ,', is ,. Pictures Page 43 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. 4 • 9 Are 1�' `' ��� j f ig,T. -..... 14-,, -v.p.t -' i ii ae'T -, .." - • : , i k\jr Pictures Page 44 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. October 11, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Pumps in front of the church and another pump in the corner of 9th St. October 12, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. Generators are powering up the pumps. Pumps in front of the church and another pump in the corner of 9th St. powering up the pumps. October 13, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Pumps in front of the church and another pump in the corner of 9th St. Continue pulling the10" pipe from Manhole#15 p YYYYYY . "LA R Pictures Page 45 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. _ ___ 1. - -3*':‘:-' ' — , N, 4, i , ..._ r y k i •x I. sr ...-, A %,4 AL,, - ), kl, 4 1 Pictures Page 46 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. • i ylk s ;j a , ,..i ,frt *. , *Y r . 4( A .._„.sr;IININ, $41#14.... ir *04' has : ffi ' r 4 � .- Pictures Page 47 Emergency Job on 12" Sewer on jimmy Johnson between Hwy 96 and 9th Ave. v.. r ` Pictures Page 48 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. • 4 • y " 16 b' 1l • • Ate A-4111,rk mow. •_ .=uM'^ .sp . Pictures Page 49 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. 114 41111111101101.. Pictures Page 50 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. October 14, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Pumps in front of the church and another pump in the corner of 9th St. Continue pulling the pipe. r „,• , - • P`• -17 • 4 Pictures Page 51 Emergency job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. M W x } ` ms� Pictures Page 52 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. p • r t t Pictures Page 53 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. ".Lt . : is+::. . :. imislio ' , T fk 4w. � p µ; ,. ;. • s Pictures Page 54 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. PPPFPw . -,. , ..o., „.... , A „...,, . - :_ , .., .,..,,..; .:., .._ .. ., ,„e-, ,. • .,..... , i „4 11~ •+. I• `/ , 1 Pictures Page 55 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. t • k. •- PPP"- /'i ►a. j Pictures Page 56 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. 4 Alp 4 ,.... ,, , ,.. f . .. • r _ Pictures Page 57 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. - ,..1t.'14-..si,,,,‘ ,i"...r; ,, :,,,,,,,.p:::., :, - ;M Li*til• ' At . :,4•7':.; . I / ' . *--,-. '- . ,r,_— '_,_ ,ii +.. rsk---rJP• lie• 0i ,ram. October 15, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering.Generators are powering up the pumps. Finished pulling the pipe from manhole#14. '',„ :.. . 0.." ! i: 11V it*;?( 4..., , . 4ilr , Jr's R r ," * ,« "lw : * 9 • Pictures Page 58 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. .4 •T • .. , • Y x/ ' 't z° �,� .F 4. '''i e,.';::.4;;;', of 1 :1 . 0 r Pictures Page 59 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. _.... . r fi � "'t' , 4 , ,,. w .• i _- ., , . it .4.- ,,I- ,.a } • i i f." '''11614111116_ . NII. •• -4 ' - ,.• ' lit. 'r .. y ♦ a7YB^ F �r , .,. ,,,,',..147, z. =i,`e 47 ' K' Ili i* Y t. ' Pictures Page 60 1 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. October 16, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering. Generators are powering up the pumps.Switched the directional drilling machine to manhole#15. Fused additional HDPE pipes. Finished pulling the pipe • rin!!!: te-' r .+.._ +d '�',> ^fir ' > = ; % •` yf � ',�''$�`.� • Fx i • Pictures Page 61 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. sh I / .!7 a i r sr Pictures Page 62 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. i , . i ' # , '4'1 ' c:M` g t ' 4 . Pictures Page 63 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. F . Pictures Page 64 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. 11 r . s `1 ` -q it 1,. + i L. l .„ it '-. i4..e Pictures Page 65 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. Liigir . . , le 'ilk. ` . \ ,.---,, •= --: . ,... it,:i ku.., ,,-70:-.--;, 410711tax,--.0...,'-. dr *0 Jt '7, •4 r #F i, 2 S 11ijr,. .7...4011114MILi.....,,i....,, , ‘1,.: t ____ , _.,,,,.:,.., \ ,...: ..:,..". __....as: ii„_ --' - ''''•%. ..- , 1 Pictures Page 66 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. lipe f 1.1\'‘ M _,i r t i. � �. �. ''' ~ /" 1:.,..t1,,..i.e. , i1� - i.., a'C` x--'t7-..1 4`LY R ;may ,: *ra. .»a ^ :I\ I.:$1'''''71::).' $; j t '''''''''''''':'= . . . tr s f' , ...,_, .., i ' , 2_ . > r Pictures Page 67 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. tr �a t +t October 17, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. October 18,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. Generators are powering up the pumps. Pictures Page 68 Emergency Job on 12" Sewer on JimmyAve. Johnson between Hwy 96 and 9th . � � m s+' Gi' y- , a ,44 lee A ) Pictures Page 69 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. October 19, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering. Generators are powering up the pumps.All manholes are flowing good. October 20, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering.Generators are powering up the pumps. Loading of trench shoring protections. 4*0 Pictures Page 70 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. October 21, 2025 Monitoring and Cleaning the Pumps and Hoses.Continuously pumping and dewatering. x • 4 October 22,2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. October 23, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. Pictures Page 71 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. f 6 .b #.g ,*.�yr'�. /fir Ala ilk i z +. :;" 0y ° got{; +it" V. 0 0...,,,,�x r„; ., ri ial t ► .r�. v 4 Pictures Page 72 Emergency Job on 12" Sewer on Jimmy Joh nson4 between Hwy 96 and 9th Ave. �: t } ---------.. : -II - - ' -44,4441".:: t _- . . t • '-'' - '' .- co -- .0 ' - --, 4421i .,,-.:`. : -. — , 1 . A L awe ;it,„, r..,,A _ a a. �••... err!'` '` Y. • l sf,.. • .�a Pictures Page 73 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. Os'. } - '°w° , . •.. � -'.+'a- ."ie. Ai _ �4�►.�;,t of� },r .e Y� .:.o. i d i v.S _ s, v ___..» sillik?veil s4- , • t 04,,,rim > .. .„,....,.#4, 44.,. 1,,, . 'L I Pictures Page 74 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. October 24, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. October 25, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. October 26, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. October 27, 2025 Monitoring and Cleaning the Pumps and Hoses. Continuously pumping and dewatering. mac, fT' 1 . ., z� -_-_-,.-__-.„---- -, , . _ . . , x4 a k -. '.; Pictures Page 75 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. t . . 4 aaiii Pictures Page 76 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. October 28, 2025 Dismantle the pumps and rolled up all the hoses. Cleaning up the jobsite. : <. to i p .., .. i A , w h. ` t , . Pictures Page 77 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. r e _�•� x. ♦ �. 'IN tf- 11 Aar ti I Pictures Page 78 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. 00 y fis - ,+� ! t f +M .. -V__ --•• " -4 - a _._� _. 1 Si..Sa 3f . m +6 t x yr " q.*` AO', Pictures Page 79 Emergency Job on 12" Sewer on Jimmy Johnson between Hwy 96 and 9th Ave. November 13, 2025 Rehab Manhole#13 3:22 $, ..a _ litir'r le* 7:,i r aysrk November 21, 2025 Cleaning,clearing the site near lift station. Cut the 6"pipe, pick-up the trash and haul back to Winnie yard. Pictures Page 1