PR 24687: FIRE STATION 3 CHANGE ORDER NO. 1
City of nrt riltu www.PortArthurTx.gov INTEROFFICE MEMORANDUM Date: December 5, 2025 To: The Honorable Mayor and City Council Through: Mr. Ron Burton, CPM, City Manager From: Robert L. Havens, Interim Fire Chief RE: PR 24687 Station 3 Change Order No. 1 Nature of the Request: The intent of this agenda item is to seek the City Council's approval of Proposed Resolution 23855 authorizing the City Manager to execute change order no. 1 to the contract with G&G Enterprises Construction Corporation, of Beaumont, Texas, for the construction of Fire Station 3 to extend the substantially finished date to March 28,2026,at no change in costs. Background: On August 13,2024,the City Council of the City of Port Arthur approved Resolution 24-336 authorizing a contract with G&G Enterprises Construction Corporation,of Beaumont,Texas,for the construction of Fire Station 3 to be located at 2375 61st Street. The original substantially completion date was set at September 24,2025.However,during construction, the contractor encountered several unforeseen conditions,including land acquisition delays,supply chain delays, inclement weather,water and wastewater tie-in delays,and other utility coordination issues that impacted construction activities. These delays include,but are not limited to: • Inadequate water line pressure,which led to water main repair. • Unforeseen need for additional site prep/excavation work stemming from unknown subsurface debris. • Wastewater tie-in delay. • Water&wastewater lines are converging,requiring the rerouting of the water main. • Delays in securing electricity and data service to the site. • Delays in securing gas service to the site. "Remember,we are here to serve the Citizens of Port Arthur" P.O.Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 City of ort rtlru _ 7ocu, www.PortArthurTx.gov After reassessing construction progress, it was determined that this project can attain the substantially completed point on or by March 28, 2026. Recommendations: The Port Arthur Fire Department recommends approval of P.R. 24687. Budget Considerations: There are no additional costs associated with this project extension. The contractor is subject to liquidated damages in the amount of$500 per day for every day beyond the completion date. "Remember,we are here to serve the Citizens of Port Arthur" P.O. Box 1089 X Port Arthur,Texas 77641-1089 X 409.983.8101 X FAX 409.982.6743 P.R. NO. 24687 04/25/2025 rlh RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 1 TO THE CONTRACT WITH G&G ENTERPRISES CONSTRUCTION CORPORATION, OF BEAUMONT, TEXAS, FOR THE CONSTRUCTION OF FIRE STATION 3 TO EXTEND THE SUBSTANTIALLY FINISHED DATE TO MARCH 28, 2026, AT NO CHANGE IN COSTS. WHEREAS, on August 13, 2024, the City Council of the City of Port Arthur approved Resolution 24-336 authorizing a contract with G&G Enterprises Construction Corporation, of Beaumont, Texas, for the construction of Fire Station 3 located at.2375 61st street; and, WHEREAS, during construction, the contractor encountered several unforeseen conditions, including land acquisition delays, supply chain delays, inclement weather, water and wastewater tie-in delays, and other utility coordination issues that impacted construction activities (Exhibit A); and, WHEREAS, the Fire Department met and conferred with G&G Enterprises Construction Corporation and architects from Brown, Reynolds, and Watford, of College Station, Texas, on the status of this construction project; and, WHEREAS, the requested Change Order No. 1 will increase the contract substantially completed date to March 28, 2026, and extend the contract time by 183 calendar days (Exhibit B); and, WHEREAS, there is no change in funding for this change order. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR, TEXAS: Section 1. That the facts and opinions in the preamble are true and correct. Section 2. That the City Council hereby authorizes the City Manager to execute Change Order No. 1 to the contract with G&G Enterprises Construction Corporation, of Beaumont, Texas, extending the contract duration by 189 calendar days at no change in costs. P.R. NO. 24687 12/5/2025 rlh Section 3. That a copy of the executed Change Order No. 1 shall be filed in the office of the City Secretary and the Development Services Department. Section 4. That this Resolution shall be effective immediately upon its passage. READ, ADOPTED, AND APPROVED on this day of December,A.D., 2025, at a Regular Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor: Councilmembers: Noes: • Charlotte M. Moses, Mayor ATTEST: Sherri Bellard, TRMC, City Secretary APPROV M: Roxann Pais Cotroneo, City Attorney APPROVED F INISTRATION: Ronald "Ron" Burton, , City Manager o ert . Havens, nterim Fire Chief P.R. NO. 24687 12/5/2025 rlh Exhibit A !-tltGV11111G1 IL Tf I lV & 409.883.5465 GandGenterprises.com ENTERPRISES hello@gandgenterprises.com NOTICE OF DELAY Date: November 11, 2025 To: City of Port Arthur Attn: Interim Deputy Chief Antonio Mitchell, MPA 444 4th Street P.O. Box 1089 Port Arthur, Texas 77640 From: J.W. Garrett&Son, Inc., d/b/a G&G Enterprises Construction Corp 3260 Eastex Freeway Beaumont, TX 77703 Project: Fire Station #3 Project Location: 2375 61st Street, Port Arthur, TX 77640 Contract Number: 24-336 Re: Notice of Delay as Required by Contract Documents Dear Interim Deputy Chief Mitchell- In accordance with the Contract Documents and applicable provisions of Texas law, J.W. Garrett&Son, Inc., d/b/a G&G Enterprises Construction Corp. ("G&G") hereby provides formal written notice of cumulative delays affecting the progress of the above-referenced project. This notice consolidates all verified delays encountered to date and requests an extension of the Substantial Completion date from September 26, 2025, to March 27, 2026. G&G is not seeking any additional compensation for compensable delays; this request is solely for an equitable adjustment of time. Summary of Delays: 1. Building Permit- Delay in receipt of building permit. 2. Inclement Weather-Verified rain and weather impacts. c i ! •-1 I I •C & 409.883.5465 GandGenterprises.com ENTERPRISES hello@gandgenterprises.com 3. Buried Obstructions during Building Pad Excavation -Asphalt and concrete obstructions encountered 18" depth. 4. Subgrade Proof-Roll Failures -Additional compaction and retesting required. 5. Dirt Work and Additional Lime Treatment-Additional dirt work&treatment in soft-soil paving areas. 6. Sanitary Sewer Re-Route and Tie-In - Extended duration for plumbing under slab rough-in due to off-sit€ sewer connection location change and encountering buried obstructions during re-route. 7. Additional Entergy Requirements - Entergy required additional disconnects and equipment. 8. City-Related Utility Coordination - Relocation of sanitary connection to the South side of 61st Street (delay ongoing, extent unknown). 9. Gas Piping and Gas Service - Delay awaiting CenterPoint Energy to establish gas service and meter set after City created account (delay ongoing, extent unknown). 10.AT&T Fiber Relocation - Most recent delay caused by unanticipated fiber-optic line requiring relocation prior to completion of storm sewer and driveway paving (delay ongoing, extent unknown). Collectively, the above items represent a cumulative impact extending project completion by approximately 183 calendar days. G&G has diligently continued to prosecute the work and mitigate delays where feasible; however, these conditions, many of which are outside G&G's control, have directly affected the project's schedule. Accordingly, G&G respectfully requests that the City issue a change order extending the Substantial Completion date to March 27, 2026, with Final Completion to follow in accordance with the Contract Documents. G&G will continue to coordinate closely with the City, BRW Architects, and utility providers to advance completion of the remaining work. G&G appreciates the City's continued partnership and support on this essential public safety project. Our team remains fully committed to recovering lost time wherever possible and to improving upon the projected completion date through disciplined coordination, proactive problem-solving, and sustained effort in the field. Respectfully, Digitally signed by COLIN GARRETT ON C=US, E=COLIN@GANDGENTERPRISES.COM COLIN GARRETT =COLI LIN GARRETT' Reason:I attest to the accuracy and integrity of this document Date 2025.11.11 13 05.31-0600' Colin Garrett President& Chief Operating Officer =+s G+ 1 I 1 •C P.R. NO. 24687 12/5/2025 rlh Exhibit B CHANGE ORDER REQUEST (COR) OWNER: PROJECT: COR NO.: COR-001 CITY OF PORT ARTHUR,TEXAS CONSTRUCTION OF FIRE STATION#3 444 4th STREET 2375 61st STREET SUBMITTED ON: 12/7/2025 P.O.BOX 1 089 PORT ARTHUR,TX 77640 PORT ARTHUR,TX 77640 EXPIRES ON: NA OWNER PROJECT NO.: 24-336 ARCHITECT: BASIS OF THIS REQUEST: UNFORESEEN DELAYS BRW ARCHITECTS ARCHITECT PROJECT NO.: 222105.00 175 CENTURY SQUARE DR.,SUITE 350 COLLEGE STATION,TX 77840 GC PROJECT NO.: C46 DO THE ITEMS CONTAINED IN THIS COR IMPACT: CRITICAL PATH: YES GENERAL CONTRACTOR: ALLOWANCE(S): NO J.W.GARRETT&SON,INC.D/B/A CONTINGENCY: NO G&G ENTERPRISES CONSTRUCTION CORP 3260 EASTEX FREEWAY ATTACHMENTS: NO. NO.OF PAGES: BEAUMONT,TX 77703 NOTICE OF DELAY 1 2 The following requested modification(s)is/are being submitted for review and approval.No adjustment to the Work,Contract Time,or Contract Sum is authorized until a Change Order has been executed by all parties listed below. ITEM DESCRIPTION OF MODIFICATION(S) DAYS AMOUNT (CALENDAR) G&G Enterprises Construction Corp.("G&G")requests an equitable extension of the Contract Time to account for unforeseen and cumulative delays that have adversely impacted the progress of the Work on the Project.This Change Order Request is limited solely to an adjustment of time for delays incurred through November 10,2025.This cumulative Change Order Request has been submitted at the express request of the City to consolidate all excusable delays through that date. G&G is not seeking,and expressly disclaims,any adjustment to the Contract Sum or any delay-related compensation associated 1.01 with such delays,whether characterized as compensable or otherwise.G&G irrevocably waives any and all claims for delay- 183 $ related compensation,including any direct,indirect,consequential,or impact costs arising from or related to the delays identified herein. This waiver applies solely to delays incurred through November 10,2025.Any delays occurring after such date shall be evaluated separately in accordance with the Contract Documents.Supporting documentation is provided in Attachment No. 1. 0 $ TOTALS 183 $ - CONTRACT SUM: The original Contract Sum was $ 9,258,000.00 The net change by previously approved Change Order(s)is $ The current Contract Sum is $ 9,258,000.00 The current Contract Sum would remain unchanged or be increased/decreased by the following amount if this COR is approved $ The new Contract Sum,including the modifications in this Change Order Request,would then be $ 9,258,000.00 CONTRACT TIME: The original date of Substantial Completion was 9/26/2025 The net change to the date of Substantial Completion by previously approved Change Order(s)is 0 days The current date of Substantial Completion is 9/26/2025 The current Contract Time would remain unchanged or be increased/decreased by the following number of days if this COR is approved 183 days The new date of Substantial Completion,including the modifications in this Change Order Request,would then be 3/28/2026 "The Contractor certifies that this Change Order Request ARCHITECT REVIEW: OWNER REVIEW: is submitted in good faith,is based on the best information presently available,and accurately reflects the BRW ARCHITECTS CITY OF PORT ARTHUR,TEXAS Contractor's understanding of the requested modification ARCHITECT OWNER to the Contract.The Contractor further understands that RECOMMEND APPROVAL PROCEED WITH CHANGE ORDER AS SUBMITTED no adjustment to the Work,the Contract Time,or the RECOMMEND APPROVAL AS NOTED BELOW PROCEED WITH CHANGE ORDER AS NOTED BELOW Contract Sum is authorized unless and until approved RECOMMEND REJECTION AS STATED BELOW REJECTED FOR REASON(S)STATED BELOW through a fully executed Change Order." COMMENTS• COMMENTS- G&G ENTERPRISES CONSTRUCTION CORP GENERAL CONTRACTOR o,yIty,,,n.,e,COLIN GARRETT C.US E.cOIIN®WNDGEMTERERISES COM. COLIN GARRETT eery o (Signature) (Signature) (Signature) COLIN GARRETT,PRESIDENT&COO MR.MARCUS GIBBON,AIA NAME NAME NAME 12/7/2025 CONTRACT MODIFICATION (CHANGE ORDER) OWNER: PROJECT: CHANGE ORDER NO.: 001 CITY OF PORT ARTHUR,TEXAS CONSTRUCTION OF FIRE STATION#3 444 4th STREET 2375 61st STREET DATE: 12/7/2025 P.O.BOX 1089 PORT ARTHUR,TX 77640 PORT ARTHUR,TX 77640 EXPIRES ON: NA OWNER PROJECT NO.: 24-336 ARCHITECT: BRW ARCHITECTS ARCHITECT PROJECT NO.: 222105.00 ATTACHMENTS: NO. NO.OF PAGES: 175 CENTURY SQUARE DR.,SUITE 350 COR-001 1 3 COLLEGE STATION,TX 77840 GC PROJECT NO.: C46 GENERAL CONTRACTOR: J.W.GARRETT&SON,INC.D/B/A G&G ENTERPRISES CONSTRUCTION CORP("G&G") 3260 EASTEX FREEWAY BEAUMONT,TX 77703 No adjustment to the Work,Contract Time,or Contract Sum is authorized until this Change Order has been executed by all parties listed below.Upon execution of this Change Order, the modification(s)described below shall be incorporated into and made part of the Contract Documents. Any adjustments to the Work,the Contract Time,and/or Contract Sum shall be solely as expressly outlined in the following"Description of Modifications." All other requirements of the Contract Documents remain unchanged. ITEM DESCRIPTION OF MODIFICATION(S) DAYS AMOUNT (CALENDAR) This Change Order authorizes on equitable extension of the Contract Time to account for unforeseen and cumulative delays that have adversely impacted the progress of the Work on the Project.This Change Order is limited solely to an adjustment of time for delays incurred through November 1 0,2025.This cumulative time-only modification has been submitted at the express request of the City to consolidate all excusable delays through that date. G&G is not seeking,and expressly disclaims,any adjustment to the Contract Sum or any delay-related compensation associated 1.01 with such delays,whether characterized as compensable or otherwise.G&G irrevocably waives any and all claims for delay- 183 $ related compensation,including any direct,indirect,consequential,or impact costs arising from or related to the delays identified herein. This waiver applies solely to delays incurred through November 10,2025.Any delays occurring after such date shall be evaluated separately in accordance with the Contract Documents.Supporting documentation is provided in Attachment No. 1. 0 $ TOTALS 183 $ - CONTRACT SUM: The original Contract Sum was $ 9,258,000.00 The net change by previously approved Change Order(s)was $ The Contract Sum prior to this Change Order was $ 9,258,000.00 This Change Order will increase/decrease the Contract Sum by the following amount $ The revised Contract Sum,including this Change Order,shall be $ 9,258,000.00 CONTRACT TIME: The original date of Substantial Completion was 9/26/2025 The net change to the date of Substantial Completion by previously approved Change Order(s)was 0 days The Substantial Completion date prior to this Change Order was 9/26/2025 This Change Order will increase/decrease the Contract Time by the following number of days 183 days The new date of Substantial Completion,including the Change Order,shall be 3/28/2026 "AGREED AND EXECUTED BY THE PARTIES AS OF THE DATES SET FORTH BELOW:" G&G ENTERPRISES CONSTRUCTION CORP("G&G") BRW ARCHITECTS CITY OF PORT ARTHUR,TEXAS GENERAL CONTRACTOR ARCHITECT OWNER SW,.,, in M,"aE„ COLIN GARRETT °°M aE.._ E�oL� �EN.EPPRISESCOM a (Signature) (Signature) (Signature) COLIN GARRETT,PRESIDENT&COO MR.MARCUS GIBBON,AIA MR.RONALD BURTON,CPM,CITY MANAGER AGREED AND EXECUTED BY(NAME) AGREED AND EXECUTED BY(NAME) AGREED AND EXECUTED BY(NAME) 12/7/2025 AGREED AND EXECUTED ON(DATE) AGREED AND EXECUTED ON(DATE) AGREED AND EXECUTED ON(DATE) ® .a►�RD CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD/YYYY) 9/26/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Arthur J. Gallagher Risk Management Services, LLC PHONE FAX No):281 485-6933 2618 E Broadway St (AJ, Lo.Exty 281-670-2958 A Pearland TX 77581 ADDRESS: certrequests@ajg.com INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Valley Forge Insurance Company 20508 INSURED G&GENTE-02 INSURER B:Continental Casualty Company 20443 G&G Enterprises Construction Corp., Inc. (P&C) 3260 Eastex Freeway INSURER C:Columbia Casualty Company 31127 Beaumont, TX 77703 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:742448539 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR POLICY EFF POLICY EXP L TYPE OF INSURANCE INSD SUBR POLICY NUMBER IMM/DD//YYYY) (MM/DD/YYYY) LIMITS A X COMMERCIAL GENERAL LIABILITY Y Y 8033387140 9/25/2025 9/25/2026 EACH OCCURRENCE $1,000,000 DAMAGE TO RENTED CLAIMS-MADE X OCCUR PREMISES(Ea occurrence) $100,000 MED EXP(Any one person) $5,000 PERSONAL&ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 PRO POLICY JECT LOC PRODUCTS-COMP/OPAGG $2,000,000 X OTHER: $ B AUTOMOBILE LIABILITY Y Y 8033387137 9/25/2025 9/25/2026 COMBINED SINGLE LIMIT $1,000,000 (Ea accident) X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS = HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY (Per accident) B X UMBRELLA LIAB X OCCUR Y Y 8033387168 9/25/2025 9/25/2026 EACH OCCURRENCE _ $10,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $10,000,000 DED RETENTION$ $ A WORKERS COMPENSATION Y 8033387154 9/25/2025 9/25/2026 X AND EMPLOYERS'LIABILITY STATUTE OTH- ERH Y/N ANYPROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBEREXCLUDED? Y NIA (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 C Pollution Liability 8035161287 9/25/2025 9/25/2026 Each Claim/Aggregate $5,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) The General Liability,Auto Liability and Umbrella policies include a blanket automatic additional insured endorsement that provides additional insured status to the certificate holder only when there is a written contract between the named insured and the certificate holder that requires such status. The General Liability and Auto Liability policies contain a special endorsement with"Primary and Noncontributory"wording. The General Liability,Auto Liability,Umbrella and Workers Compensation policies include a blanket automatic waiver of subrogation endorsement that provides this feature only when there is a written contract between the named insured and the certificate holder.The General Liability policy includes an endorsement providing that 30 day notice of cancellation(or coverage change)will be furnished to the certificate holder.Notice is sent to the certificate holders with mailing addresses on file with the agent or the company.This endorsement does not provide for notice of cancellation to the certificate holder if the named insured requests cancellation. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Port Arthur P O Box 1089 AUTHORIZED REPRESNTATIVE'''' Port Arthur TX 77641 1 V r I i ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD r ® DATE(MM/DD/YYYY) ACCORD CERTIFICATE OF LIABILITY INSURANCE 9/26/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Arthur J. Gallagher Risk Management Services, LLC PHONE 281-670-2958 FAX No):281-485-6933 2618 E Broadway St (A/C.No.Ext.); IL Pearland TX 77581 ADDRESS: certrequests@ajg.com INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Valley Forge Insurance Company 20508 INSURED G&GENTE-02 INSURER B:Continental Casualty Company 20443 G&G Enterprises Construction Corp., Inc. (P&C) 3260 Eastex Freeway INSURER C:Columbia Casualty Company 31127 Beaumont, TX 77703 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:1076246876 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER (MM/DDY EFF/YYYY) IMM/LDD//YYYYY) LIMITS LTR INSD WVD A X COMMERCIAL GENERAL LIABILITY Y Y 8033387140 9/25/2025 9/25/2026 EACH OCCURRENCE $1,000,000 DAMAGE TO RENTED CLAIMS-MADE X OCCUR PREMISES(Ea occurrence) $100,000 MED EXP(Any one person) $5,000 PERSONAL&ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 X POLICY PRO- JECT LOC PRODUCTS-COMP/OPAGG $2,000,000 OTHER: $ B AUTOMOBILE LIABILITY Y Y 8033387137 9/25/2025 9/25/2026 COMBINED SINGLE LIMIT $1,000,000 (Ea accident) X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY (Per accident) B X UMBRELLA LIAB X OCCUR Y Y 8033387168 9/25/2025 9/25/2026 EACH OCCURRENCE $10,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $10,000,000 DED RETENTION$ $ A WORKERS COMPENSATION Y 8033387154 9/25/2025 9/25/2026 X AND EMPLOYERS'LIABILITY STATUTE ER Y N ANYPROPRIETOR/PARTNER/EXECUTIVE YN/A E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 C Pollution Liability 8035161287 9/25/2025 9/25/2026 Each Claim/Aggregate $5,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) The General Liability,Auto Liability and Umbrella policies include a blanket automatic additional insured endorsement that provides additional insured status to the certificate holder only when there is a written contract between the named insured and the certificate holder that requires such status. The General Liability and Auto Liability policies contain a special endorsement with"Primary and Noncontributory"wording. The General Liability,Auto Liability,Umbrella and Workers Compensation policies include a blanket automatic waiver of subrogation endorsement that provides this feature only when there is a written contract between the named insured and the certificate holder.The General Liability policy includes an endorsement providing that 30 day notice of cancellation(or coverage change)will be furnished to the certificate holder.Notice is sent to the certificate holders with mailing addresses on file with the agent or the company.This endorsement does not provide for notice of cancellation to the certificate holder if the named insured requests cancellation. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Port Arthur PO Box 1089 AUTHORIZED REPRES NTATIVE Port Arthur TX 77641 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD