HomeMy WebLinkAboutPR 15636: CENTRAL TANK COATING - HURR. IKE DAMAGE REPAIRS TO SEVEN ELEVATED WATER TANKSMEMORANDUM.
CITY OF PORT ARTHUR
UTILITY OPERATIONS DEPARTMENT
TO: Stephen Fitzgibbons, City Manager
FROM: Kelly Eldridge, Duector of Utility Operations K ~s!,~(
//"^^
DATE: November 19, 2009
SUBJECT: Proposed Resolution No. 15636
COMMENTS
RECOMMENDATION
I recommend that the City Council approve Proposed Resolution No. 15636 authorizing the execution of a
construction contract with Central Tank Coating, Inc., ofElgin, IA, for $65,900.00 for Hurricane Ike Damage
Repairs to Seven Elevated Water Tanks.
BACKGROUND
Several elevated storage tanks (EST's) were damaged during Hurricane Ilse. Eazlier this yeaz, the City Council
authorized Don S. Reichle & Associates to design and prepare construction plans and specifications to make
needed repairs to seven (7) EST's. On November 18, 2009, we opened the following six bids:
Bidder Total Bid
Diamond Enterprises $87,100.
Gloster, MS
Plasco Texas, Inc. $77,400.
Houston, TX
L.C. United Painting $91,500.
Sterling Heights MI
Utility Service Co. Inc. $79,200.
Houston, TX
Central Tank Coating, Inc. $65,900.
Elgin, IA
H&R Enterprises, LLC $72,048.76
Sapulpa, OK
The low bid from Central Tank Coating, Inc. meets the advertised specifications and is recommended for
award.
BUDGET/FISCAL EFFECT
The engineer's estimate for this project was $63,800, and FEMA has already submitted Project Worksheets
totaling $53,645 for these repairs. Note that FEMA only allowed 50% for some painting, but we will submit
the total upon completion. Finance has set up project numbers to correspond with each FEMA PW.
STAFF/EMPLOYEE EFFECT
Our consulting engineer and City staff will monitor this 50 calendar day contract.
SUMMARY
I recommend. that the City Council approve Proposed Resolution No. 15636 authorizing the execution of a
construction contract with Central Tank Coating, Inc, of Elgin, L4, for $65,900.00 for Hurricane Ike Damage
P.R. No. 15636
i1-19-09
RESOLUTION NO.
A RESOLUTION AWARDING A CONTRACT AND AUTHORIZING THE
EXECUTION OF SAID CONTRACT IN THE AMOUNT OF $65,900.00 FOR
HURRICANE IKE DAMAGE REPAIRS TO SEVEN ELEVATED WATER
TANKS BETWEEN THE CITY OF PORT ARTHUR AND CENTRAL TANK
COATING, INC., OF ELGIN, IOWA. ACCOUNT N0. 121-2300-901.85-OQ,
PROJECT NOS. IKEWTI, IKEWT2, IKEWT3, IKEWT4, IKEWTS, IKEWT6,
IKEWT7.
WHEREAS, several elevated water storage tanks were damaged during Hurricane Ike; and,
WHEREAS, the City Council of the City of Port Arthur deems it necessary to repair these
water storage tanks in order to comply with regulatory mandates; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR:
THAT, the City Council of the City of Port Arthur hereby awazds the contract for Hurricane
Ike Damage Repairs to Seven Elevated Water Tanks, to the lowest bidder to-wit; Central Tank
Coating, Inc., of Elgin, Iowa; and,
THAT the Mayor and City Manager of the City of Port Arthur are hereby authorized to
execute on behalf of the City of Port Arthur a contract between the City of Port Arthur and Central
Tank Coating, Inc. in the amount of $65,900.00 to be completed within 50 days, a copy attached
hereto as Exhibit "A"; and,
THAT a copy of engineer's recommendation for awazding the contract to the .lowest
responsible bidder is attached hereto as Exhibit "B"; and,
THAT the contractor shall not proceed on any phase or segment of this work until a Notice
to Proceed is issued; and,
THAT the said contract is an exact duplicate of a City Standard Form contract except for the
changes (if any) shown in the Certificate of Standard Form Contract, a copy of which is attached
hereto as Exhibit "C", and said changes are hereby approved; and,
P.R. No. 15636
11-18-09
Page 2 of 3
THAT a copy of the caption of this Resolution be spread upon the Minutes of the City
Council; and,
THAT the contractor shall sign the contract documents as well as this resolution agreeing to
the terms hereof.
READ, ADOPTED AND APPROVED THIS day of
2009
at a Regulaz Meeting of the City Council of the City of Port Arthur, Texas, by the following vote:
AYES: Mayor
Councilmembers:
NOES:
ATTEST:
Terri Hanks
City Secretary
Deloris Prince
Mayor
APPROVED AS TO FORM:
Valecia Tizeno
Acting City Attorney
P.R. No. 15636
11-18-09
Page 3 of 3
APPROVED FOR ADMINISTRATION:
~~_
Stephen itzgibbons
City Manager
~~ ~
Ross Blackketter
Director of Public Works
~t-~'C~ ge~~
Director of Utility Operations
APPROVED AS TO AVAILABILITY OF FUNDS:
~~~~~A~~ ~~~~--
Deborah Echols
Director of Finance
Account No.: 121-2300-901.85-00
Project No.: IKEWTl
IKEWT2
IKEWT3
IKEWT4
IKEWTS
IKEWT6
IKEWT7
(Dallas & 4~' St.)
(Procter St.-Ext.)
(Lake Arthur)
(RR & Thomas)
(Pleasure Island)
(Pioneer Park)
(Hwy 365)
AGREED TO:
Central Tank Coating, Inc.
Date
EXHIBIT' "P~"
Associates
November 23, 2009
Mr. Kelly Eldridge, Director Of Utilities
City of Port Arthur
P. 0. Box 1089
Port Arthur, TX 77641-1089
5010 Jerry Ware Drive
Southeast Texas Regional Airport
Beaumont, TX 77705
OFFICE (409) 722-2242
FAX (409) 722-8596
EMAIL rreichleQtankdoo.com
Re: Seven Elevated Water Tanks
Storm Damage Repair Project
Recommendation For Contract Award
Our 4382-II
Dear Mr. Eldridge,
Bid Proposals for the project "Storm Damage Repairs To Seven Elevated Water Tanks"
were received and opened on November 18, 2009 at 3:00 PM. Six (6) proposals were
received and all bid data is shown on the attached Bid Tabulation.
The low bidder is Central Tank Coatings, Inc. at their total bid of $65,900.00. Their
quoted calendar day completion time is fifty (50) calendar days.
We requested and received the attached Central Tank reference list. Several of the
references .have been contacted and reports indicate this contractor has the
qualifications and experience to handle this City of Port Arthur project.
We recommend that the City award the contract to Central Tank Coatings, Inc. at
their total bid of $65,900.00 and fifty (50) calendar day completion time.
At your direction, we will provide the Notice of Award, assemble the required contract
documents and forward to the contractor for their' action and execution.
Please contact our office if you have any questions.
Sincerely yours,
Randy S. Reichle, President
DSR & Associates, Inc.
cc: Mr. Charles Shajari, City of Port Arthur
Enclosures
EXHIBIT "B"
BID TABULATION
MISC. STORM DAMAGE REPAIRS TO SEVEN ELEVATED WATER STORAGE TANKS
CITY OF PORT ARTHUR, TX
BID DATE: NOVEMBER 18, 2009
3:00 P.M.
BID BREAKDOWN CENTRAL TANK H & R ENTERPRISES BLASTCO TEXAS, UTILITY SERVICE DIAMOND ENTERPRISE, L. C. UNITED
COATINGS, INC. LLC INC. CO., INC. INC. PAINTING CO., INC.
1. DALLAS/FOURTH ST. EST-IKEWTI $38,400.00 $24,874.12 $62,400.00 ~ ~ $38,000.00 $57,200.00 $39,000.00
2. PROCTER ST. EXT. EST-IKEWT2 $5,000.00 $7,862.44 $2,250.00 $7,000.00 ~ $3,500.00 $8,500.00
3. LAKE ARTHUR STANDPIPE-IKEWT3 $3,000.00 $7,862.44 $2,000.00 $6,000.00 $3,500.00 $8,500.00
4. RAILROAD/THOMAS EST- IKEWi4 $7,000.00 $7,862.44 $3,250.00 $9,600.00 $6,500.00 $10,500.00
5. PLEASURE ISLAND EST - IKEWiS $6,000.00 $7,862.44 $2,500.00 $6,500.00 $6,500.00 ~ $9,000.00
6. PIONEER PARK EST - IKEWT6 $3,000.00 $7,862.44 $2,250.00 $6,000.00 $5,500.00 ~ $9,000.00
7. HWY. 365 EST- IKEWT7 $3,500.00 $7,862.44 $2,750.00 $5,600.00 $4,400.00 $7,000.00
TOTAL BASE BID- $65,900.00 $72,048.76 $77,400.00 • $79,200.00 $87,100.00 $91,500.00
r;,.. ~ .., . __ _,..
CALENDAR DAY COMPLETION TIME = 50 ~ 90 30 60 60 30
ADDENDUM N0.1 ACKNOWLEDGED YES YES YES YES ~ YES YES
~~ ~. !=
BID 80ND YES YES YES YES YES YES
' COMMENTS `810 BREAKDOWN AMOUNTS
AOD UP TD $18,700.00
TOTAL RASE BID
DSR and ASSOCIATES, INC.
CONSULTING ENGINEERS
PACE 1 OF 1
EXHIBIT. C
(City of Port Arthur)
(Law Department)
(Required Form)
(7/8/88)
(10/5/89)
(3/15/90)
(9-8-94)
(p.2 Revised 9/18/90)
CERTIFICATE OF STANDARD FORM CONTRACT FOR LAW
DEPARTMENT REVIEW AND CITY COUNCIL AGENDA
I certify that the contract (hereinafter called "said contract") affixed to the attached Proposed City
Council Resolution No 15636 is an exact duplicate of an applicable standard form contract (the title of which
is shownbelow) previously approved by the Law department and adopted as a standard form by City Council
Resolution, except forthe blanks that have been filled in with all necessary information and except for the
changes described below.
The title of the applicable standard form contract is:
[ ] Federally Funded Construction Contract, Revised 1 /5/88, 7/89, 8/89; 4/28/94
[Xj Non-Federally Funded Construction Contract, Revised t /5/88, 7/89, 8/89; 4/28/94
[ ] Federal -Professional Services -Engineering Contract, Revised 1/5/88, 5/89 (§10) 7/89/(§8);
10/89; 2/91 (§8)
[ ] Non-Federal -Professional Services -Engineering Contract, Revised 1 /5/88, 5/89(§10), 7/89(§8),
10/89; 2/91(§8)
[ ] CDBG -Professional Services -Engineering Contract, Revised 1 /5/88, 5/89 (§10), 7/89(§8), 10/89;
2/91 (§8)
(] Federal -Professional Services -
Non-Engineering (Consultant) Contract,. Revised 1 /5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8)
[ ] Non-Federal -Professional Services -
Non-Engineering (Consultant) Contract, Revised 1 /5/88, 5/89.(§10), 7/89 (§8); 1D/89; 2/91 (§8)
[ ] CDBG -Professional services -
Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8)
[ ]Other Standard Form Contract, described as follows:
The changes are as follows: (Put an "X" in the appropriate [ ])
[j None.
[ ] The following described provisions at the indicated page, section, etc. of the standard form have
been deleted from said contract:
Page 1 of 3
(p.2 Revised 9/18/90)
(Certificate of Standard Form Contract, page 2)
DELETIONS
Page Number
Where
Deleted Provision
Is
Found On Standard Form
None.
Section or Paragraph No.
and Caption
Which
Contains Provision
Deleted From Form
Subsection or
Subparagraph No.
and Caption
Which Contains Provision
Deleted From Form
Description of
Provision Deleted
[ ] The following described provisions at the indicated page, section, etc. of the standard form
have been altered, modified, replaced or otherv~ise changed:
ALTERATIONS, MODlF1CATIONS, REPLACEMENTS, ETC.
Sub § or Sub ¶ No.
Page No. § or ¶ No. It 8 Caption Description
Where Caption of of of
Provision Found Standard Form Standard Form .Provision
On which which in
Standard Form Contains Provision Contains Provision Standard Form
Page § & caption
sub § & caption, etc.
of said contract
which contains
altered, etc. provision;
Description of
Alteration etc.
Page 2 of 3
p.3 Revised 9/18/90)
(Certificate of Standard Form Contract, page 3)
[ J The following provisions have been added to Said Contract:
Page, Section and Caption
Subsection and Caption, etc. of Said Contract Which
Contains the Added Provision and DescriQtion Thereof
I further certify that said attached proposed City Council Resolution contains the following
provision:
'That said contract is an exact duplicate of a City Standard Form Contract except for the changes
described in the Certificate of Standard Form Contract, a copy of which is attached hereto as Exhibit
"C" and is hereby incorporated by reference, and said changes are hereby approved."
I understand that this certificate will be retied on by the Law Department in reviewing and
approving (or rejecting) as to form and by the City Council in reviewing and adapting (or rejecting) said
Resolution and Contract.
Signed this -~-day of Nov~,(i~r-- , 2009.
Departmei t Head
Page 3 of 3