Loading...
HomeMy WebLinkAboutPR 15636: CENTRAL TANK COATING - HURR. IKE DAMAGE REPAIRS TO SEVEN ELEVATED WATER TANKSMEMORANDUM. CITY OF PORT ARTHUR UTILITY OPERATIONS DEPARTMENT TO: Stephen Fitzgibbons, City Manager FROM: Kelly Eldridge, Duector of Utility Operations K ~s!,~( //"^^ DATE: November 19, 2009 SUBJECT: Proposed Resolution No. 15636 COMMENTS RECOMMENDATION I recommend that the City Council approve Proposed Resolution No. 15636 authorizing the execution of a construction contract with Central Tank Coating, Inc., ofElgin, IA, for $65,900.00 for Hurricane Ike Damage Repairs to Seven Elevated Water Tanks. BACKGROUND Several elevated storage tanks (EST's) were damaged during Hurricane Ilse. Eazlier this yeaz, the City Council authorized Don S. Reichle & Associates to design and prepare construction plans and specifications to make needed repairs to seven (7) EST's. On November 18, 2009, we opened the following six bids: Bidder Total Bid Diamond Enterprises $87,100. Gloster, MS Plasco Texas, Inc. $77,400. Houston, TX L.C. United Painting $91,500. Sterling Heights MI Utility Service Co. Inc. $79,200. Houston, TX Central Tank Coating, Inc. $65,900. Elgin, IA H&R Enterprises, LLC $72,048.76 Sapulpa, OK The low bid from Central Tank Coating, Inc. meets the advertised specifications and is recommended for award. BUDGET/FISCAL EFFECT The engineer's estimate for this project was $63,800, and FEMA has already submitted Project Worksheets totaling $53,645 for these repairs. Note that FEMA only allowed 50% for some painting, but we will submit the total upon completion. Finance has set up project numbers to correspond with each FEMA PW. STAFF/EMPLOYEE EFFECT Our consulting engineer and City staff will monitor this 50 calendar day contract. SUMMARY I recommend. that the City Council approve Proposed Resolution No. 15636 authorizing the execution of a construction contract with Central Tank Coating, Inc, of Elgin, L4, for $65,900.00 for Hurricane Ike Damage P.R. No. 15636 i1-19-09 RESOLUTION NO. A RESOLUTION AWARDING A CONTRACT AND AUTHORIZING THE EXECUTION OF SAID CONTRACT IN THE AMOUNT OF $65,900.00 FOR HURRICANE IKE DAMAGE REPAIRS TO SEVEN ELEVATED WATER TANKS BETWEEN THE CITY OF PORT ARTHUR AND CENTRAL TANK COATING, INC., OF ELGIN, IOWA. ACCOUNT N0. 121-2300-901.85-OQ, PROJECT NOS. IKEWTI, IKEWT2, IKEWT3, IKEWT4, IKEWTS, IKEWT6, IKEWT7. WHEREAS, several elevated water storage tanks were damaged during Hurricane Ike; and, WHEREAS, the City Council of the City of Port Arthur deems it necessary to repair these water storage tanks in order to comply with regulatory mandates; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PORT ARTHUR: THAT, the City Council of the City of Port Arthur hereby awazds the contract for Hurricane Ike Damage Repairs to Seven Elevated Water Tanks, to the lowest bidder to-wit; Central Tank Coating, Inc., of Elgin, Iowa; and, THAT the Mayor and City Manager of the City of Port Arthur are hereby authorized to execute on behalf of the City of Port Arthur a contract between the City of Port Arthur and Central Tank Coating, Inc. in the amount of $65,900.00 to be completed within 50 days, a copy attached hereto as Exhibit "A"; and, THAT a copy of engineer's recommendation for awazding the contract to the .lowest responsible bidder is attached hereto as Exhibit "B"; and, THAT the contractor shall not proceed on any phase or segment of this work until a Notice to Proceed is issued; and, THAT the said contract is an exact duplicate of a City Standard Form contract except for the changes (if any) shown in the Certificate of Standard Form Contract, a copy of which is attached hereto as Exhibit "C", and said changes are hereby approved; and, P.R. No. 15636 11-18-09 Page 2 of 3 THAT a copy of the caption of this Resolution be spread upon the Minutes of the City Council; and, THAT the contractor shall sign the contract documents as well as this resolution agreeing to the terms hereof. READ, ADOPTED AND APPROVED THIS day of 2009 at a Regulaz Meeting of the City Council of the City of Port Arthur, Texas, by the following vote: AYES: Mayor Councilmembers: NOES: ATTEST: Terri Hanks City Secretary Deloris Prince Mayor APPROVED AS TO FORM: Valecia Tizeno Acting City Attorney P.R. No. 15636 11-18-09 Page 3 of 3 APPROVED FOR ADMINISTRATION: ~~_ Stephen itzgibbons City Manager ~~ ~ Ross Blackketter Director of Public Works ~t-~'C~ ge~~ Director of Utility Operations APPROVED AS TO AVAILABILITY OF FUNDS: ~~~~~A~~ ~~~~-- Deborah Echols Director of Finance Account No.: 121-2300-901.85-00 Project No.: IKEWTl IKEWT2 IKEWT3 IKEWT4 IKEWTS IKEWT6 IKEWT7 (Dallas & 4~' St.) (Procter St.-Ext.) (Lake Arthur) (RR & Thomas) (Pleasure Island) (Pioneer Park) (Hwy 365) AGREED TO: Central Tank Coating, Inc. Date EXHIBIT' "P~" Associates November 23, 2009 Mr. Kelly Eldridge, Director Of Utilities City of Port Arthur P. 0. Box 1089 Port Arthur, TX 77641-1089 5010 Jerry Ware Drive Southeast Texas Regional Airport Beaumont, TX 77705 OFFICE (409) 722-2242 FAX (409) 722-8596 EMAIL rreichleQtankdoo.com Re: Seven Elevated Water Tanks Storm Damage Repair Project Recommendation For Contract Award Our 4382-II Dear Mr. Eldridge, Bid Proposals for the project "Storm Damage Repairs To Seven Elevated Water Tanks" were received and opened on November 18, 2009 at 3:00 PM. Six (6) proposals were received and all bid data is shown on the attached Bid Tabulation. The low bidder is Central Tank Coatings, Inc. at their total bid of $65,900.00. Their quoted calendar day completion time is fifty (50) calendar days. We requested and received the attached Central Tank reference list. Several of the references .have been contacted and reports indicate this contractor has the qualifications and experience to handle this City of Port Arthur project. We recommend that the City award the contract to Central Tank Coatings, Inc. at their total bid of $65,900.00 and fifty (50) calendar day completion time. At your direction, we will provide the Notice of Award, assemble the required contract documents and forward to the contractor for their' action and execution. Please contact our office if you have any questions. Sincerely yours, Randy S. Reichle, President DSR & Associates, Inc. cc: Mr. Charles Shajari, City of Port Arthur Enclosures EXHIBIT "B" BID TABULATION MISC. STORM DAMAGE REPAIRS TO SEVEN ELEVATED WATER STORAGE TANKS CITY OF PORT ARTHUR, TX BID DATE: NOVEMBER 18, 2009 3:00 P.M. BID BREAKDOWN CENTRAL TANK H & R ENTERPRISES BLASTCO TEXAS, UTILITY SERVICE DIAMOND ENTERPRISE, L. C. UNITED COATINGS, INC. LLC INC. CO., INC. INC. PAINTING CO., INC. 1. DALLAS/FOURTH ST. EST-IKEWTI $38,400.00 $24,874.12 $62,400.00 ~ ~ $38,000.00 $57,200.00 $39,000.00 2. PROCTER ST. EXT. EST-IKEWT2 $5,000.00 $7,862.44 $2,250.00 $7,000.00 ~ $3,500.00 $8,500.00 3. LAKE ARTHUR STANDPIPE-IKEWT3 $3,000.00 $7,862.44 $2,000.00 $6,000.00 $3,500.00 $8,500.00 4. RAILROAD/THOMAS EST- IKEWi4 $7,000.00 $7,862.44 $3,250.00 $9,600.00 $6,500.00 $10,500.00 5. PLEASURE ISLAND EST - IKEWiS $6,000.00 $7,862.44 $2,500.00 $6,500.00 $6,500.00 ~ $9,000.00 6. PIONEER PARK EST - IKEWT6 $3,000.00 $7,862.44 $2,250.00 $6,000.00 $5,500.00 ~ $9,000.00 7. HWY. 365 EST- IKEWT7 $3,500.00 $7,862.44 $2,750.00 $5,600.00 $4,400.00 $7,000.00 TOTAL BASE BID- $65,900.00 $72,048.76 $77,400.00 • $79,200.00 $87,100.00 $91,500.00 r;,.. ~ .., . __ _,.. CALENDAR DAY COMPLETION TIME = 50 ~ 90 30 60 60 30 ADDENDUM N0.1 ACKNOWLEDGED YES YES YES YES ~ YES YES ~~ ~. != BID 80ND YES YES YES YES YES YES ' COMMENTS `810 BREAKDOWN AMOUNTS AOD UP TD $18,700.00 TOTAL RASE BID DSR and ASSOCIATES, INC. CONSULTING ENGINEERS PACE 1 OF 1 EXHIBIT. C (City of Port Arthur) (Law Department) (Required Form) (7/8/88) (10/5/89) (3/15/90) (9-8-94) (p.2 Revised 9/18/90) CERTIFICATE OF STANDARD FORM CONTRACT FOR LAW DEPARTMENT REVIEW AND CITY COUNCIL AGENDA I certify that the contract (hereinafter called "said contract") affixed to the attached Proposed City Council Resolution No 15636 is an exact duplicate of an applicable standard form contract (the title of which is shownbelow) previously approved by the Law department and adopted as a standard form by City Council Resolution, except forthe blanks that have been filled in with all necessary information and except for the changes described below. The title of the applicable standard form contract is: [ ] Federally Funded Construction Contract, Revised 1 /5/88, 7/89, 8/89; 4/28/94 [Xj Non-Federally Funded Construction Contract, Revised t /5/88, 7/89, 8/89; 4/28/94 [ ] Federal -Professional Services -Engineering Contract, Revised 1/5/88, 5/89 (§10) 7/89/(§8); 10/89; 2/91 (§8) [ ] Non-Federal -Professional Services -Engineering Contract, Revised 1 /5/88, 5/89(§10), 7/89(§8), 10/89; 2/91(§8) [ ] CDBG -Professional Services -Engineering Contract, Revised 1 /5/88, 5/89 (§10), 7/89(§8), 10/89; 2/91 (§8) (] Federal -Professional Services - Non-Engineering (Consultant) Contract,. Revised 1 /5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ] Non-Federal -Professional Services - Non-Engineering (Consultant) Contract, Revised 1 /5/88, 5/89.(§10), 7/89 (§8); 1D/89; 2/91 (§8) [ ] CDBG -Professional services - Non-Engineering (Consultant) Contract, Revised 1/5/88, 5/89 (§10), 7/89 (§8); 10/89; 2/91 (§8) [ ]Other Standard Form Contract, described as follows: The changes are as follows: (Put an "X" in the appropriate [ ]) [j None. [ ] The following described provisions at the indicated page, section, etc. of the standard form have been deleted from said contract: Page 1 of 3 (p.2 Revised 9/18/90) (Certificate of Standard Form Contract, page 2) DELETIONS Page Number Where Deleted Provision Is Found On Standard Form None. Section or Paragraph No. and Caption Which Contains Provision Deleted From Form Subsection or Subparagraph No. and Caption Which Contains Provision Deleted From Form Description of Provision Deleted [ ] The following described provisions at the indicated page, section, etc. of the standard form have been altered, modified, replaced or otherv~ise changed: ALTERATIONS, MODlF1CATIONS, REPLACEMENTS, ETC. Sub § or Sub ¶ No. Page No. § or ¶ No. It 8 Caption Description Where Caption of of of Provision Found Standard Form Standard Form .Provision On which which in Standard Form Contains Provision Contains Provision Standard Form Page § & caption sub § & caption, etc. of said contract which contains altered, etc. provision; Description of Alteration etc. Page 2 of 3 p.3 Revised 9/18/90) (Certificate of Standard Form Contract, page 3) [ J The following provisions have been added to Said Contract: Page, Section and Caption Subsection and Caption, etc. of Said Contract Which Contains the Added Provision and DescriQtion Thereof I further certify that said attached proposed City Council Resolution contains the following provision: 'That said contract is an exact duplicate of a City Standard Form Contract except for the changes described in the Certificate of Standard Form Contract, a copy of which is attached hereto as Exhibit "C" and is hereby incorporated by reference, and said changes are hereby approved." I understand that this certificate will be retied on by the Law Department in reviewing and approving (or rejecting) as to form and by the City Council in reviewing and adapting (or rejecting) said Resolution and Contract. Signed this -~-day of Nov~,(i~r-- , 2009. Departmei t Head Page 3 of 3