Loading...
HomeMy WebLinkAboutI. C&C DEMO, INC. - PHASE I DEMOLITION OF THE OLD MAIN LINE LIFT STATIONCity of Port Arthur, Texas Ma or and Cit Council Communication PAGE DATE - REFERENCE SUBJECT - Award of Bid for the Phase I Demolition of the Old Main Main LS Phase I Line Lift Station for the Utility Operations Department. 1 of 2. 11/24/09 Demo RECOMMENDATION We recommend the City Council award the bid for the Phase I Demolition of the Old Main Line Lift Station to C&C Demo Inc., of Orange, Texas, in the amount of $12,500. BACKGROUND . Our old Main Line LS is in need of rehabilitation. It was originally constructed in 1960. Conventional rehabilitation would be cost prohibitive; as none of the existing valves function, and the LS does not meet current TCEO Design Criteria, especially in the area of confined space safety. Our solution is to convert this wet well/dry-well LS into'a wet well only LS, complimented by a single submersible - - - (expandable to two),-and multiple self-priming pumps to yield adequate capacity.:This eliminates the current LS's design shortcomings and allows our personnel to work in a much safer environment. For months, we have been looking into re-commissioning the old Main Line Lift Station in order to get our system-back upao peak capacity. Toward this end, we have developed a plan o split this work into small, disfihct phases to reduce costs and to get more local participation. Phase j of the plan is to demolish the existing interior equipment/piping in the LS. Phase II will be the structural modifications necessary to bring the LS bacKup to service,conditiohs, by coating the interior, sealing off some doors, vents and vrindows, and replacing some doors. Phase Ill. will install/reinstall new/existing pumps and .piping, placing-the LS bacK into active. service. Phase II &-III may be combined if we cannot get. adequate feedback-from contractors.. : We recently received three quotes/bids for the Phase I portion of this work, as follows: Bidder Bid Amount Port Iron, Ltd. $18,860. Port Arthur, TX CSC Demo Inc. $12,500.. Orange, TX . K-T Construction >$36,000. Beaumont, TX BUDGETIFISCAL EFFECT Funds for this purchase.are available in account no. 426-1625-532.83-00, Project No. 426018. PREPARED BY: KE/aw ~SITION BY COUNCIL:--- - PROCESSED BY an SECRETARY APPROVED BY: - - [)APPROVE - ` DOTHER (DESCRIBE) - - DATE City Manager City of Port Arthur, Texas Mavor and -City Council Communication DATE REFERENCE SUBJECT - - - - PAGE Main LS Phase I Award of Bid for the Phase I Demolition of the Old Main 11/24/09 Demo Line Lift Station for the Utility Operations Department. 2 of 2 STAFFING/EMPLOYEE EFFECT City staff will operate and maintain this equipment as part of normaloperations. SUMMARY The bid from C8C Demo Inc., of Orange, Texas, meets the requirements of the specifications and is therefore recommended for approval in the total amount of $12,500. Recommended: - - _ V Kelly El ridge Shawna Tubbs Deborah Echols- _ Director of Utility Operations- Purchasing Manager Director of Finance 426 TWDB Sewer Bond-Fund 1625 -532 % Water Utilities 83 Sewer Systems 426018 City,Project No. cc: Asst. birector Utility Operations Director of Public Works - PREPARED BY: -. - DISPOSITION BY COUNCIL: -- - ~ - ~ - PROCESSED - _ BY KE/aw cITY - ~ .. ~ - ~ - ~- SECRETARY APPROVED BY:. - - -[)APPROVE ~ DOTHER (DESCRIBE) -. ~ - - - - - - - - ~ - DATE City Manager-