HomeMy WebLinkAboutPR 24730: RATIFY 2 EMERGENCY REPAIRS OF 36" WATER MAIN ON SAVANNAH AVE. City of ��1
v
urt rtftttr _
7ctus
INTEROFFICE MEMORANDUM
Date: January 12, 2026
To: The Honorable Mayor and City Council
Through: Ronald Burton, CPM, City Manager
From: Calvin Matthews, P.E.,Water Utilities Director
RE: PR No. 24730—Ratify Two (2) Emergency Repairs of the 36"Water Main on
Savannah Ave.
Introduction:
The intent of this Agenda Item is for the City Council to ratify the City Manager's decision to
authorize two (2) emergency repairs to the 36"water main on Savannah Ave, Jimmy Johnson,
by Jet Aeration of Texas, LLC of Vidor,Texas,in the combined total amount of$173,889.79.
Background:
The 36-inch water main, which runs from the Water Treatment Plant along the east side of
Savannah Avenue, was leaking in the Motiva parking area. The line is approximately 16 feet
deep in this area, and City crews do not have the equipment or expertise to work at this depth.
This main line has no bypass and is the major water source to all residences and industries south
of Hwy 73, so immediate repair was critical. On September 26, 2025, an emergency memo was
issued for the repair of the water main on Savannah. As per Resolution No. 25-168, the City
entered into a contract with Jet Aeration of Texas, LLC,for the emergency repair of water leaks.
Consequently, the contractor was contacted for the repair and has since repaired the leak. The
repair was completed on September 29,2025,for$94,894.00. However,the 36-inch water main
began to leak again around the same area, and another emergency repair memo was issued on
January 2,2025. Jet Aeration of Texas was contacted to evaluate the leak to verify the repair on
the first leak. It was found that this was another break that needed additional repair. The repair
was completed on January 6, 2026, for $78,994.79. The combined total amount for the two
repairs was $173,889.79.
Budget Impact:
The total budgetary impact is $173,889.79, with funding allocated to Account No. 410-40-215-
5315-00-00-000,Water System Maintenance.
Recommendation:
It is recommended that the City Council approve PR No. 24730 ratifying the two emergency
repairs of the 36"water main on Savannah Ave. as discussed/outlined above.
"Remember,we are here to serve the Citizens of Port Arthur"
PR No. 24730
1/12/26 cm
Page 1 of 3
RESOLUTION NO.
A RESOLUTION RATIFYING THE CITY MANAGER'S DECISION TO
AUTHORIZE TWO (2) EMERGENCY REPAIRS TO THE 36-INCH
WATER MAIN LINE LOCATED ON SAVANNAH AVE BY JET
AERATION OF TEXAS, LLC OF VIDOR, TEXAS, IN THE TOTAL
COMBINED AMOUNT OF $173,889.79, WITH FUNDING FROM
ACCOUNT NO. 410-40-215-5315-00-00-000, WATER SYSTEM
MAINTENANCE.
WHEREAS, there was a water leak on the 36" water main line on Savanah Ave, creating
a public health and safety issue since the line is the major water source to all residences and
industries south of Hwy 73, so immediate repair was critical; and,
WHEREAS, as per Resolution No. 25-168, the City entered into a contract with Jet
Aeration of Texas, LLC for the emergency repair of water leaks; and,
WHEREAS,due to the need for specialized equipment and expertise beyond the capability
of City crews for water line repairs at such depths, the City Manager signed an emergency repair
memo (Exhibit "A") on September 26, 2025, authorizing Jet Aeration of Texas, LLC of Vidor,
Texas to perform the work, and has since completed the work on September 29, 2025 for
$94,894.00; and,
WHEREAS, the 36-inch water main began to leak again around the same area, therefore,
another emergency repair memo was issued on January 2, 2026 (Exhibit "A") and Jet Aeration of
Texas, LLC was contacted to evaluate the leak to verify the repair on the first leak but it was found
that it was another break that needed additional repair and has since completed this repair on
January 6, 2025 for$78,995.79; and,
WHEREAS,Jet Aeration of Texas has completed both repairs and submitted invoices for
the two (2) emergency repairs (Exhibit "B") in the combined total amount of$173,889.79; and
WHEREAS,pursuant to Section 252.022(a)(1) of the Texas Local Government Code,this
purchase is authorized because of a public calamity that requires the immediate appropriation of
money to relieve the necessity of the municipality's residents or to preserve the property of the
municipality; and
WHEREAS, it is further authorized pursuant to Section 252.022(a)(2) of the Texas Local
Government Code to preserve or protect the public health or safety of the municipality's residents.
NOW THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF PORT ARTHUR, TEXAS:
THAT,the facts and opinions in the preamble are true and correct; and
PR No. 24730
1/12/26 cm
Page 2 of 3
THAT, the City Council hereby ratifies the City Manager's decision to authorize the two
(2)emergency repairs of the 36-inch water line located on Savannah Avenue, authorizing the City
Manager to approve the payments to Jet Aeration of Texas, LLC in the total combined amount of
$173,889.79 (Exhibit"B"); and
THAT, the funding from Account No. 410-40-215-5315-00-00-000, Water System
Maintenance; and
THAT, a copy of the caption of this Resolution shall be spread upon the Minutes of the
Meeting of the City Council.
READ, ADOPTED, AND APPROVED this day of , 2026
at a Regular Meeting of the City Council of the City of Port Arthur, Texas by the following vote:
AYES: Mayor
Councilmembers:
•
NOES:
Charlotte M. Moses
Mayor
ATTEST:
Sherri Bellard
City Secretary
PR No. 24730
1/12/26 cm
Page 3 of 3
APPROVED AS TO FORM:
Roxann Pais Cotroneo
City Attorney
APPROVED FOR ADMINISTRATION:
Ron d B on, CP 071 4(ty
City Manager
Suhail Kanwar, P.E.
Director of Public Servi es
.7 /
Calvin Matthews, P.E.
Water Utilities Director
APPROVED AS TO THE AVAILABILITY
OF FUNDS:
Ly (Lyn) Boswell, MA ICM -CM
Finance Director
L , d
Clifton E. Williams Jr. CPPB
Purchasing Manager
Exhibit "A"
(Emergency Memos)
City of 0
/81)
nrt rthu r
TPm,
INTEROFFICE MEMORANDUM
WATER UTILITY DEPARTMENT
Date: September 26, 2025
To: Mr. Ron Burton. CPM, City Manager
) 4
Ar
From: Calvin Matthews, P.E., Director of Utilities 1 '�A�"
RE: Emergency Repair of 36-inch Water Main on Savannah Ave.
The 36-inch water main that runs from the Water Treatment Plant along the east side of Savannah
Ave. is leaking in the Motiva parking area. The line is approximately 16 feet deep in this area, and
City crews do not have the equipment or expertise to work at this depth. This main line has no
bypass and is the major water source to all residences and industries south of Hwy 73, so immediate
repair was critical. Jet aeration has been contacted to mobilize for
The estimated expenditure for the repair of the 36-inch pipe by Jet Aeration, of Vidor, TX is
estimated to be $200,000.00 .
I, Ron Burton, City Manager, approve the emergency repair necessary for the 36-inch waterline
by Jet Aeration.
all#
e!r, C-.
1r` )eptzl, eZ, C) zq
Ronald Burton, ' '1 Date
City Manag• •
"Remember, we are here to serve the citizens of Port Arthur."
Cin of -= 8 p
itinrt rthuG�^
Teuc,
INTEROFFICE MEMORANDUM
WATER UTILITY DEPARTMENT
Date: January 5, 2026 To: Mr. Ron Burton, CPM, City Manager et/
From: Calvin Matthews, P.E., Director of Utilities
RE: Emergency Repair of 36-inch Water Main on Savannah Ave.
The 36-inch water main that runs from the Water Treatment Plant along the east side of Savannah
Ave. is leaking in the Motiva parking area. The line is approximately 16 feet deep in this area, and
City crews do not have the equipment or expertise to work at this depth. This main line has no
bypass and is the major water source to all residences and industries south of Hwy 73,so immediate
repair was critical. Jet aeration has been contacted to mobilize for this work.
The estimated expenditure for the repair of the 36-inch pipe by Jet Aeration, of Vidor, TX is
estimated to be $200,000.00 .
I, Ron Burton, City Manager, approve the emergency repair necessary for the 36-inch waterline
by Jet Aeration.
Ronald Burt, , PM Date
City Man.:er
"Remember, we are here to serve the citizens of Port Arthur."
a
Exhibit "B"
(Invoices from Jet Aeration of Texas, LLC)
INVOICEaw
1111111110011
JET AERATION OF TEXAS,LLC lisa.l@team-jet.com 11111
tilerars
PO Box 458 +1 (409)769-1500 ,Q lawa"
ai
Vidor,TX 77670-0458 r r 4t.
rIta_s_.
AERATION OF TEXAS
Bill to
City of Port Arthur
P.O.Box 1089
Port Arthur,TX 77641
Invoice details
Invoice no.: 17108
Terms:Net 30
Invoice date:10/10/2025
Due date:11/09/2025
# Product or service Description Qty Rate Amount
1. Commercial Utilities Equipment 1 $63.820.25 $63,820.25
2. Commercial Utilities Labor 1 $31,073.75 $31,073.75
3. 9-26 Thru 9-29
Emergency Repair of 36"Water Main on
Savannah Ave
Total $94,894.00
INVOICE
JET AERATION OF TEXAS,LLC lisa.1@team-jet.com
INN IM
PO Box 458 +1 (409)769-1500 ism
Vidor,TX 77670-0458 r r S
AERATION OF TEXAS
Bill to
City of Port Arthur
P.O.Box 1089
Port Arthur,TX 77641
Invoice details
Invoice no.:17619
Terms:Net 30
Invoice date:01/09/2026 •
Due date:02/08/2026
# Product or service Description Qty Rate Amount
1. Commercial Utilities Equipment 1 $48,416.21 $48,416.21
2. Commercial Utilities Labor 1 $30,579.58 $30,579.58
3. 1-5-26 Thru 1-6-26
Emergency Repair of 36"Water Main on
Savannah Ave
Total $78,995.79